Loading...
HomeMy WebLinkAboutWS-5532_19272_G_C_20220708_EmailFrom:Link, Marianne To:Lepard, Mindy Cc:Treiber, Marie Subject:[External] 46865 / SDWY 6958 (Burlington, NC): DPE Treatment System down for Repairs Date:Friday, July 8, 2022 10:51:14 AM Attachments:image001.png CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Dear Ms. Lepard, I am reaching to introduce myself and to give you an update on the remediation system being operated by Speedway at the Burlington site located at 653 E. Webb St. Beginning July 1, 2022, the management of this site was transitioned from Mid-Atlantic Associates (MAA) to AECOM. Jim Young of MAA gave us a tour of the remediation system and provided useful information for a smooth transition. At our first visit on Tuesday, July 5th, our technician found the system inoperative due to a malfunctioning high level float. We have shut the system off until we can receive a replacement part. The current estimate from our supplier is a 1-2 week lead time. Please let me know if you have any questions or require any additional information at this time. I will let you know when we have the system operating again. You can reach me anytime by email or on my cell phone (919)740-3503. Thank you and have a good weekend, Marianne Link PG Remediation Project Manager, US West Environment M +1 919-740-3503 marianne.link@aecom.com Click here to connect with me on LinkedIn AECOM 5438 Wade Park Boulevard Suite 200 Raleigh, NC 27607, United States T +1 919-461-1100 aecom.com​ Delivering a better world LinkedIn | Twitter | Facebook | Instagram