Loading...
HomeMy WebLinkAboutWI-96036_0_CA_RPTS_20230329Clean Harbors EOC 101 Phillip Dr, Norwell, MA 02061 855-645-8265 (855-OIL-TANK) INCIDENT REPORT PROJECT DETAILS INCIDENT DATE SALES ORDER CREATED BY NUMBER 1/8/2023 2300131932 Christopher Kaminski (781) 792-5862 LOCATION ADDRESS STORE CONTACT NUMBER Walmart Neighborhood Market #7137 4250 Western Boulevard Jacksonville, NC 28546 Dwyne Batin (910) 581-0018 INCIDENT #: WI-96036 INCIDENT: Management reported that a truck ruptured their fuel tank and is in need of assistance with clean-up. Fuel was potentially leaked into the storm drain. The fire department was notified. Transferring management to Clean Harbors for further assistance SITE INFORMATON SURFACE TYPE Soil Asphalt Cement Tile Metal AREA IMPACTED Lot Drain/Waterway Roadway Loading Dock Floor WEATHER Condition: Clear PRODUCT Diesel AMOUNT 15 gallons SUBCONTRACTOR INFORMATION SUBCONTRACTOR REQUIRED? YES NO COMPANY NAME First Call PROJECT TIMELINE (LOCAL TIME) Sunday 1/8/2023 10:19 pm: Management reported that a truck ruptured their fuel tank and is in need of assistance with clean-up. Fuel was potentially leaked into the storm drain. The fire department was notified. Transferring management to Clean Harbors for further assistance. FD is on site and has put down absorbent. Spill is approx. 15 gallons. 11:00 pm: Crew at branch. Pre-tripped vehicles. Loaded up supplies and equipment needed for response. 11:40 pm: Departed branch, headed to job location. Monday 1/9/2023 1:45 am: Arrived on site and met with management. Located the work site. Took photos of work site. Held crew safety meeting. Unloaded equipment and supplies. Donned PPE. 1:55 am: Started cleanup. Crew began by vacuuming firefighting foam and collecting absorbents placed prior to arrival and deploying additional granular absorbents on the area of the shipping/receiving area as this was the only area not previously addressed prior to arrival. All absorbents were broomed in and collected and placed into 1-55G steel drum. Crew tested the opening of one small drain with pads and boom, all of which came out clean. No additional work was recommended regarding the drain. 4:20 am: Finished cleanup and took photos of the site. Labeled and manifested waste. Loaded equipment and supplies. 4:25 am: Met with management to review work performed and sign paperwork. 4:45 am: Crew departed job site and headed back to the branch. 7:31 am: Crew arrived at branch. Offloaded equipment. Post-tripped vehicles. Restocked supplies. Completed paperwork. 8:00 am: Response complete. Tuesday 1/17/2023 7:00 am – 5:00pm: Driver brings waste for disposal Waste Generated: One (1) 55-gallon steel drum was transported off site for disposal by Clean Harbors. PHOTOS SHIPPING DOCUMENT(S) BOL SUPPORTING DOCUMENT(S) Work Completion Form END OF REPORT