HomeMy WebLinkAboutWA-27119_38285_CA_O_20120301 7-ELEVEN PROGRAM Project Manager’s Site-Specific HASP Checklist ***This Checklist will be completed with Site-Specific details for each 7-Eleven Project*** Before Mobilization Review the HASP for applicability to the project and make appropriate changes. If any significant changes are made to the original HASP, forward a completed copy to the Regional Health and Safety Manager for review and filing. Assemble the Project Team and prepare a Job Safety Analysis (JSA) for the project task. Provide a copy of the site-specific HASP to the AECOM field staff. Provide copies of the standard HASP to subcontractors working for AECOM on the project site with the understanding that site-specific details will be discussed during the initial site H&S meetings. Confirm that all PPE specified in the HASP are available to all AECOM employees, including biological hazard PPE identified in the JSA. Confirm that monitoring equipment specified in the HASP is available to the field staff. The following SHE Program requirements have been established for each employee assigned to work in the exclusion or contamination reduction zones. Completed OSHA 40-Hour HAZWOPER Training Current OSHA 8-Hour HAZWOPER Refresher (within last 12 months) Current Medical Surveillance Examination (within last 12 months) Current Respirator Fit-test (within last 12 months) Current First Aid Training (within last 2 years) Current CPR Training (within last 12 months) Ensure that all workers & subs sign HASP, JSAs, Pre-Entry and any other applicable forms. After Demobilization Collect all HASPs, JHAs, Pre-Entry and other applicable forms and place into project files. Confirm that field personnel have a copy of all applicable HASP information and forms, and that these documents are also stored in any AECOM remediation structures. Site-Specific Emergency Information And Hazardous Assessment Section 7-Eleven Store #19847 1610 South Croatan Highway Kill Devil Hills, NC SITE DESCRIPTION 7-Eleven Store No. 19847 is currently an active gasoline station / convenience store. The No. 2 tank is currently out of operation. The following tasks will be conducted: installation of soil borings; filling the No. 2 underground storage tank (UST) with foam; and the installation and sampling of site monitoring wells. BRIEF SITE HISTORY The No. 2 tank is no longer in service. AECOM is overseeing the filling of the No. 2 tank, and is conducting soil borings and monitoring well installation. At this time, no release or spill is known. TYPE OF WORK TO BE PERFORMED The No. 2 tank will be abandoned in place. Per NC DENR closure requirements, a monitoring well will be installed in a down-gradient direction. Gasoline sales have ceased prior to this project and the area encompassing the existing canopy and tanks will be fenced off and remain inaccessible to the public throughout construction. The protection of AECOM employees, subcontractors, and the public is a major concern during tank closure project design and implementation. Several health and safety concerns require evaluation and include excavation/trenching hazards, confined space hazards; toxic, flammable and/or oxygen deficient atmospheres; hot work and cold cutting operations; tank removal; physical hazards; and others. Although AECOM employees do not actually perform underground storage tank abandonment operations, they may oversee, or be present during, operations performed by contractors or subcontractors which involve the removal or closure of underground storage tanks. It is therefore important that AECOM employees be aware of the hazards associated with, and the safe work procedures for, performing underground storage tank removal operations. During the removal of the USTs, AECOM will be on-site to manage the environmental impacts. Specifically, AECOM will: If present, oversee the operation and maintenance of water containment/treatment system equipment (i.e. tanks, carbon vessels, filters) for dewatering operations; Collect compliance samples for discharges from water treatment system (if present); Screen excavated soils from the tank pit and beneath piping using direct-reading air monitoring instrumentation and/or test field kits to ensure that potentially impacted soils are properly managed; Collect post-excavation soil samples from tank pit and beneath piping for subsequent laboratory analyses; and Collect grab groundwater samples, if present and required by regulatory agency, from the tank pit, for subsequent laboratory analyses. AECOM will not: Enter a confined space (i.e. UST, excavation) and shall not issue, sign off or approve a confined space permits that is issued by subcontractors or any other entity; Enter the underground storage tank excavation for any reason due to the potential cave-in and atmospheric hazards. Soil samples from the excavation should be collected with a remote sampling device or from the bucket of the backhoe. The following U.S. Safety, Health & Environment (SH&E) Safety Operating Procedures (SOP) should be reviewed where appropriate: SHE SOP 715 - Underground Storage Tank Removal SHE SOP 714 - Excavation and Trenching SHE SOP 713 - Confined Spaces Additional SOPs may be applicable dependent upon the scope of work. The complete SH&E SOP Library can be accessed through the AECOM Intranet Safety, Health & Environment page. SITE-SPECIFIC Personal Protective Equipment Site-Specific PPE Item (in addition to standard equipment listed in Section 7.1 of the HASP) UST Removal Soil Borings / Well Installation Sampling Hard Hat Steel-toed Safety Shoes Safety Glasses with Sideshields ANSI-approved Class II Traffic Vest Poly-coated Tyvek Coveralls If splash hazard exists If splash hazard exists If splash hazard exists Outer Nitrile Gloves When handling potentially impacted soils When handling potentially impacted soils Hearing Protection If conditions outlined in Section 7.0 are met If conditions outlined in Section 7.0 are met If conditions outlined in Section 7.0 are met OCCUPATIONAL CARE CLINIC Once the injury has been reported, seek treatment at the identified occupational care clinic for non- critical injuries; i.e. injuries of the First Aid variety. http://www.talispoint.com/travelers/ext/?lob=wc Outer Banks Urgent Care 4923 S. Croatan Highway Nags Head, NC 27959 Driving distance is approximately 4.6 miles; driving time is approximately 5 minutes. Map image and driving directions were obtained through Google® Earth and Maps. When using any driving directions or map, it's a good idea to do a reality check and make sure the road still exists, watch out for construction, and follow all traffic safety precautions. This is only to be used as an aid in planning. 1. Head southeast on US-158 E toward Ocean Acres Drive go 4.6 mi 2. Destination will be on the left. EMERGENCY REFERENCES For critical injuries, dial 911 and/or seek treatment at the identified local Emergency Room Ambulance: 911 Fire: 911 Police: 911 Medical Services: NOTE: If person is transported by ambulance the choice of hospital maybe determined by the emergency responders The Outer Banks Hospital 4800 S. Croatan Highway Nags Head, NC 27959 Driving distance is approximately 7miles; driving time is approximately 12 minutes. Map image and driving directions were obtained through Google® Earth and Maps. Map and directions on next page When using any driving directions or map, it's a good idea to do a reality check and make sure the road still exists, watch out for construction, and follow all traffic safety precautions. This is only to be used as an aid in planning. 1. Head southeast on US-158 E toward Ocean Acres Drive go 4.6 mi 2. Destination will be on the left. Underground Utilities – 811: www.call811.com Emergency Chemical Information – InfoTrac (800) 535-5053 Poison Control Center - (800) 222-1222 http://www.aapcc.org/ Emergency Muster Point The escape route from the site and an emergency muster point will be determined and provided to all workers during the project mobilization, and will be noted in the space below. [NOTE: be specific as possible when describing the escape route, using street names, landmarks, etc. to ensure ease in finding the facility.] Key Personnel: Regional SH&E Manager: Russell Reynolds Tele #: 864-234-3042 Program SH&E Manager: Michael Grasso Tele #: 607-282-0175 Project Manager: John Canzeri Tele #: 240-565-6516 Supervisor of Field Employee(s): Michelle Friedman Tele #: 919-457-7046 Senior Program Manager: Julie Spencer Tele #: 978-589-3137 Report All Incidents Immediately to the SH&E Reporting Hotline 800-348-5046 and Report All Incidents to both the Regional and Program SH&E Manager as soon as possible AECOM Medical Records and medical Consultant In the event of a non-critical injury, and once preliminary reporting been completed, if the injury employee desires/needs to speak with a medical professional to consult on the nature of their injury and treatment options, employees should contact the RSH& E Manager who will contact WorkCare. Once, contacted WorkCare will make direct contact with the employee. WorkCare North Alameda, CA 94502 Telephone: 510-748-6900 Fax: 510-748-6915 Site-Specific Hazard Assessment Task-Specific Hazard Assessment – Physical & Chemical Hazard General Site Hazard Tank Removal and Soil Excavation Soil Boring / Well Installation Sampling Animals Cold Confined Spaces Dust Electrical 240 Volts AC Excavations Exposure to Chemical Hazards Falling Falling Objects Flying Objects Heat Heavy Equipment Hot Surfaces Insects Lifting Noise Overhead Materials Overhead Utilities Pinch Points Poisonous Plants Sharp Objects Splashing Liquids Traffic Tripping Underground Utilities Vacuum Systems Vehicle Operations Weather Air Monitoring Instruments In some situations such as emergency response the use of air monitoring equipment is necessary. The air monitor of choice is the MultiRAE Plus, a direct reading instrument equipped with a PID and Oxygen, LEL and two toxic gas sensors. Confined Space AECOM employees are prohibited from entering a confined space (i.e. UST, excavation) and shall not issue, sign off or approve a confined space permits that is issued by subcontractors or any other entity. Contact your Regional SH&E Manager with questions regarding confined space entry. Respiratory Protection Assumption that level C respiratory protection is not required, however if conditions change Level C respirator protection in the form of half face or full face air purifying respirator with a combination organic vapors cartridge with P 100 filters or an organic vapors/ acid gases cartridge with P100 filters may be required. If dust is the presenting hazard a P100 filter element can be used.. Unique Conditions/Hazards Note any unique or site-specific hazardous conditions Employee immediately calls Supervisor Office Telephone – 919-239-7151 Mobile Telephone – 919-931-3402 RSH&E Manager Office Telephone -864-234-3042 Client Account/Project Manager Office Telephone – 240-565-6516 Mobile Telephone – 410-562-0290 Department/Office Manager Office Telephone – 919-872-6600 Mobile Telephone SH&E Reporting Hotline 800-348-5046 Program SH&E Manager- Michael Grasso Office Telephone - 607-277-5716 Mobile Telephone – 607-282-0175 Potential Chemical Hazards No subsurface activities have been performed to date at this site. Based on the sites use as a retail gasoline station the following are potential chemical hazards Chemical Name PEL1 TLV2 VP3 VD4 SG5 SOL6 FP7 LEL8 UEL9 Benzene 1 0.5 75 2.8 0.88 <1 12 1.2 7.8 Toluene 200 50 21 4 0.87 <1 40 1.1 7.1 Ethyl Benzene 100 100 7 4 0.87 <1 55 0.8 6.7 Xylene 100 100 9 4 0.86 <1 81 1.1 7.0 Gasoline 300 300 38 4 0.76 <1 -49 1.4 7.6 Diesel Fuel 400 11 <5 >1 0.84 <1 125 0.6 7.5 Kerosene 400 29 <5 3 0.81 <1 100 0.7 5 Ethyl alcohol 1000 1000 44 1.5 0.79 miscible 55 3.3 19 Methyl tert-butyl ether (MTBE) NA 40 7.8 3.1 0.74 5 -14 1.6 8.4 Tetraethyl lead A 0.075 0.1 0.2 8.6 1.6 <1 200 1.8 ? 1 Permissible Exposure Limit in ppm 2 Threshold Limit Value in ppm 3 Vapor Pressure in mm Hg 4 Vapor Density (air = 1) 5 Specific Gravity (water = 1) 6 Solubility in Water in % 7 Flash Point in ºF 8 Lower Explosive Limit in % by volume 9 Upper Explosive Limit in % by volume A PEL and TLV in mg/m3 NA = Not Applicable ? = Not known C = Ceiling limit not to be exceeded Personal Protective Equipment The minimum level of personal protective equipment required for field work is Level D. Level D consists of, hard hat (where there is a potential for injury to the head from falling objects), safety glasses, traffic safety vest, protective footwear, and, as appropriate gloves for collection of environmental samples and hearing protection. Field personnel should anticipate that Level C protective garments may be required in some situations (splash, contact with contaminated media) and should have Level C protective garments available for use. Recommended Level C garments consist of chemical resistant disposable: coveralls (Tychem® QC or Tychem® SL); outer gloves( Nitrile 22ml); inner gloves ( disposable nitrile); and over boots (latex or neoprene). If dust is the presenting hazard a standard disposable Tyvek® or equivalent coverall can be worn. Prepared for: Prepared by: 7-Eleven, Inc. AECOM Dallas ,Texas Westford, MA Original:November2011 Reissue: Environment Health and Safety Plan for 7-Eleven Program Prepared for: Prepared by: 7-Eleven, Inc. AECOM Dallas ,Texas Westford, MA Original:November2011 Reissue: Environment Health and Safety Plan for 7-Eleven Program Prepared By Michelle Friedman Date Reviewed By Michael Grasso, CIH Date Reviewed By Project Manager Date AECOM Environment November 2011 i Contents 1.0 Introduction .................................................................................................................... 1-1 1.1 AECOM Environment Safety Policy .................................................................................... 1-1 1.1.1 Maximum Duration of the Work Day for Field Activities ...................................... 1-1 1.1.2 Short Service Employee ....................................................................................... 1-1 1.2 Health and Safety Plan (HASP) .......................................................................................... 1-1 1.2.1 HASP Purpose ...................................................................................................... 1-1 1.2.2 HASP Applicability ................................................................................................ 1-2 1.3 Organization/Responsibility ................................................................................................. 1-2 1.3.1 AECOM Project Manager ..................................................................................... 1-2 1.3.2 AECOM Program Safety, Health & Environment Manager................................. 1-3 1.3.3 AECOM Site Safety Officer .................................................................................. 1-3 1.3.4 AECOM Field Personnel ...................................................................................... 1-4 1.3.5 Contractors ............................................................................................................ 1-5 1.4 Health and Safety Expectations .......................................................................................... 1-5 1.5 Management of Change/Modification of the HASP ............................................................ 1-6 1.5.1 Management of Change ....................................................................................... 1-6 1.5.2 HASP Modification ................................................................................................ 1-6 1.5.3 Job Safety Analysis (JSA) .................................................................................... 1-6 1.5.4 Employees Working Alone ................................................................................... 1-6 2.0 INTRODUCTION ............................................................................................................. 2-1 2.1 AECOM Environment Safety Policy .................................................................................... 2-1 2.1.1 Maximum Duration of the Work Day for Field Activities ...................................... 2-1 2.1.2 Short Service Employee ....................................................................................... 2-1 2.2 Health and Safety Plan (HASP) .......................................................................................... 2-1 2.2.1 HASP Purpose ...................................................................................................... 2-1 2.2.2 HASP Applicability ................................................................................................ 2-2 2.3 Organization/Responsibility ................................................................................................. 2-2 2.3.1 AECOM Project Manager ..................................................................................... 2-2 2.3.2 AECOM Program Safety, Health & Environment Manager................................. 2-3 2.3.3 AECOM Site Safety Officer .................................................................................. 2-3 2.3.4 AECOM Field Personnel ...................................................................................... 2-4 2.3.5 Contractors ............................................................................................................ 2-5 2.4 Health and Safety Expectations .......................................................................................... 2-5 2.5 Management of Change/Modification of the HASP ............................................................ 2-6 2.5.1 Management of Change ....................................................................................... 2-6 2.5.2 HASP Modification ................................................................................................ 2-6 AECOM Environment November 2011 ii 2.5.3 Job Safety Analysis (JSA) .................................................................................... 2-6 2.5.4 Employees Working Alone ................................................................................... 2-6 3.0 Scope of Work and Assumptions ................................................................................ 3-1 3.1 Project Goals ........................................................................................................................ 3-1 3.2 Field Tasks ........................................................................................................................... 3-1 3.3 Assumptions ......................................................................................................................... 3-1 4.0 Chemical Hazard Assessment and Control ................................................................ 4-1 4.1 Chemical Contaminants of Concern ................................................................................... 4-1 4.1.1 BTEX ..................................................................................................................... 4-1 4.1.2 Petroleum Hydrocarbons ...................................................................................... 4-1 4.1.3 Volatile Organic Compounds (VOCs & SVOCs) ................................................. 4-1 4.1.4 Tetraethyl Lead ..................................................................................................... 4-2 4.1.5 Methyl tert-butyl ether ........................................................................................... 4-2 4.1.6 Ethyl Alcohol ......................................................................................................... 4-2 4.1.7 Dust ....................................................................................................................... 4-2 4.2 Hazard Substances Brought On Site by AECOM .............................................................. 4-3 4.3 Chemical Exposure and Control ......................................................................................... 4-3 4.3.1 Chemical Exposure Potential ............................................................................... 4-3 4.3.2 Chemical Hazard Control ..................................................................................... 4-3 4.4 Hazardous Waste Management .......................................................................................... 4-3 5.0 Physical Hazards and Controls .................................................................................... 5-1 5.1 Back Safety .......................................................................................................................... 5-1 5.2 Control of Hazardous Energy (Lockout) .............................................................................. 5-1 5.2.1 Basic Lockout Requirements ................................................................................ 5-1 5.3 Concrete and Asphalt Coring & Cutting .............................................................................. 5-2 5.4 Corrosive Liquids ................................................................................................................. 5-2 5.5 Cuts and Lacerations ........................................................................................................... 5-2 5.6 Drilling Hazards .................................................................................................................... 5-2 5.6.1 Rotating Parts ....................................................................................................... 5-3 5.6.2 Direct Push Hazards ............................................................................................. 5-4 5.6.3 Sonic Drilling ......................................................................................................... 5-4 5.7 Driving Safety ....................................................................................................................... 5-5 5.7.1 Planning / Preparation .......................................................................................... 5-6 5.7.2 DOT ....................................................................................................................... 5-6 5.7.3 Secure Packing ..................................................................................................... 5-6 AECOM Environment November 2011 iii 5.7.4 Emergency Procedures ........................................................................................ 5-6 5.8 Electrical Hazards ................................................................................................................ 5-6 5.9 Excavation and Trenching ................................................................................................... 5-7 5.10 Flammable Vapors/Liquids .................................................................................................. 5-8 5.11 Flying Objects Hazards........................................................................................................ 5-9 5.12 Hand Augering ..................................................................................................................... 5-9 5.13 Hand Safety ......................................................................................................................... 5-9 5.13.1 Glove Selection ..................................................................................................... 5-9 5.13.2 Working with Glassware ..................................................................................... 5-10 5.13.3 Hand Tools .......................................................................................................... 5-10 5.13.4 Specific Tool Use ................................................................................................ 5-11 5.14 Heavy Equipment............................................................................................................... 5-12 5.15 Heavy Equipment – Drill Rigs ............................................................................................ 5-12 5.15.1 Heavy Equipment-Earthmovers ......................................................................... 5-13 5.16 Insects, Spiders, Wasps and Bees ................................................................................... 5-13 5.16.1 Ticks .................................................................................................................... 5-13 5.16.2 Mosquitoes .......................................................................................................... 5-14 5.16.3 Spiders ................................................................................................................ 5-14 5.16.4 Wasps and Bees ................................................................................................. 5-15 5.17 Noise Exposure .................................................................................................................. 5-15 5.18 Overhead Materials ........................................................................................................... 5-16 5.19 Pinch Points ....................................................................................................................... 5-16 5.20 Poisonous Plants ............................................................................................................... 5-17 5.21 Slips, trips and fall hazards ................................................................................................ 5-18 5.22 Splashing Liquids ............................................................................................................... 5-18 5.23 Traffic Safety ...................................................................................................................... 5-19 5.23.1 Basic Procedures ................................................................................................ 5-19 5.23.2 Work On/Adjacent to Public Roadways ............................................................. 5-20 5.23.3 Flagging/Redirecting Traffic ................................................................................ 5-20 5.24 Utility Hazards .................................................................................................................... 5-20 5.24.1 Underground Utilities .......................................................................................... 5-20 5.24.2 Overhead Utilities ................................................................................................ 5-22 5.25 Weather .............................................................................................................................. 5-23 5.25.1 Inclement Weather .............................................................................................. 5-23 5.25.2 Heat Stress ......................................................................................................... 5-23 5.25.3 Cold Stress .......................................................................................................... 5-25 5.25.4 Work/Rest Cycles for Cold Weather .................................................................. 5-26 AECOM Environment November 2011 iv 5.26 Well Development and Groundwater Monitoring .............................................................. 5-26 5.27 Confined Spaces ................................................................................................................ 5-27 6.0 Air Monitoring ................................................................................................................ 6-1 6.1 Monitors ................................................................................................................................ 6-1 6.1.1 Photoionization Detector ...................................................................................... 6-1 6.1.2 Oxygen Meter........................................................................................................ 6-1 6.1.3 Explosive Gas Meter ............................................................................................. 6-1 6.1.4 Colorimetric Detector Tubes/Draeger Chip System ............................................ 6-1 6.1.5 Carbon Monoxide Meter ....................................................................................... 6-2 6.1.6 Dust/Particulate Meter .......................................................................................... 6-2 6.2 Personal Air Sampling ......................................................................................................... 6-2 6.3 Calibration and Recordkeeping ........................................................................................... 6-3 7.0 Personal Protective Equipment ................................................................................... 7-1 7.1 Personal Protective Equipment ........................................................................................... 7-1 7.2 Respiratory Protection ......................................................................................................... 7-2 7.3 Other Safety Equipment ...................................................................................................... 7-2 8.0 Site Control .................................................................................................................... 8-1 8.1 Designation of Zones ........................................................................................................... 8-1 8.1.1 Exclusion Zone ..................................................................................................... 8-1 8.1.2 Contamination Reduction Zone ............................................................................ 8-1 8.1.3 Support Zone ........................................................................................................ 8-1 8.1.4 Site Access Control............................................................................................... 8-1 8.1.5 Parking and Staging Areas ................................................................................... 8-1 8.1.6 Pedestrian Walkways ........................................................................................... 8-2 8.2 General Site Safety Practices ............................................................................................. 8-2 9.0 Decontamination ........................................................................................................... 9-1 9.1 Personal Decontamination .................................................................................................. 9-1 9.2 PPE Decontamination.......................................................................................................... 9-1 9.3 Equipment Decontamination ............................................................................................... 9-1 10.0 Medical Monitoring and Training Requirements ...................................................... 10-1 10.1 Medical Monitoring ............................................................................................................. 10-1 10.2 Health and Safety Training ................................................................................................ 10-1 AECOM Environment November 2011 v 10.2.1 HAZWOPER ....................................................................................................... 10-1 10.2.2 Pre-Entry Briefing/Tailgate Meetings ................................................................. 10-1 11.0 Emergency Response ................................................................................................. 11-1 11.1 Spill Response ................................................................................................................... 11-1 11.2 Employee Training ............................................................................................................. 11-2 11.3 Alarm System/Emergency Signals .................................................................................... 11-2 11.4 Escape Routes and Procedures ....................................................................................... 11-3 11.5 Employee Accounting Method .......................................................................................... 11-3 11.6 Injuries and Illnesses ......................................................................................................... 11-3 11.6.1 First Aid ............................................................................................................... 11-3 11.6.2 Professional Treatment....................................................................................... 11-3 11.7 Designation of responsible parties .................................................................................... 11-3 11.8 Emergency Response Drills .............................................................................................. 11-4 11.9 Incident Reporting and Investigation ................................................................................. 11-4 List of Appendices Attachment A Health and Safety Plan Review Form Attachment B Job Safety Analysis Form Attachment C Drill Rig Inspection Form Attachment D Pre-Entry Briefing Attendance Form Attachment E Supervisor’s Report of Incident Attachment F Material Safety Data Sheets Attachment G Traffic Safety Protocol for Non-Intrusive Tasks at Retail Petroleum Facilities Attachment H Subsurface Boring Clearance Procedures at Retail Petroleum Facilities AECOM Environment May 20121 1-1 1.0 Introduction 1.1 AECOM Environment Safety Policy AECOM Environment (AECOM) is committed to providing our employees with a safe and healthy work environment. It is not only our obligation to each other, but also a sound business practice to do so. Work related injuries and illnesses cause needless pain and suffering, cost money, and adversely affect our reputation with our clients. Every attempt shall be made to eliminate the possibility of injuries and illnesses. No aspect of the company's activities, including expediency and cost, shall take precedence over the health and safety of our employees. 1.1.1 Maximum Duration of the Work Day for Field Activities An employee may not work a shift that exceeds 16 hours in duration. For the purpose of this policy, the work shift includes time spent at lunch and on break. If an employee works more than one shift during the course of a calendar day, the total number of hours worked in that day cannot exceed 16 hours. Exception: If work is to be done continuously in ambient air temperatures of less than 20º F, the Site Safety Officer and Field Manager will use a guideline of limiting work shifts to 10 hours in duration, including 8 hours working outdoors and 2 hours of time spent at lunch, breaks, and travel. Refer to Section 5.15, Cold Stress, fur further work day guidelines. 1.1.2 Short Service Employee A Short Service Employee (SSE) is an employee with fewer than six months experience working supervised on field projects or an employee who has not completed required training or received required certifications. Short Service Employees will not be assigned to work involving any machinery or equipment on this project unless they are supervised on site by a qualified person. 1.2 Health and Safety Plan (HASP) 1.2.1 HASP Purpose The purpose of this HASP is to identify hazards associated with this project and specify engineering and administrative controls and personal protective equipment necessary to mitigate the risks associated with these hazards. This HASP addresses the hazards recognized prior to writing or updating the documents. As new hazards are encountered, a Job Hazard Assessment (JHA) or Job Safety Analysis (JSA) must be conducted and the results input into the HASP. This HASP also assigns responsibilities for the implementation of safety programs on this project and defines monitoring and emergency response planning specific to the project. AECOM Environment May 20121 1-2 1.2.2 HASP Applicability This site-specific Health and Safety Plan (HASP) has been developed by AECOM. It establishes the health and safety procedures required to minimize potential risk to AECOM and contractor personnel involved with the field activities associated with the execution of the 7-Eleven program contract. The provisions of this plan apply to AECOM personnel who will potentially be exposed to safety and/or health hazards related to activities described in Section 3.0 of this document. Client, Subcontractor employees, and third party personnel performing work that potentially exposes them to the chemical and physical hazards at the site are recommended to work under their own HASP and are also expected to review and acknowledge this HASP as a recognition of the SH&E standards that AECOM expects outside personnel to uphold. This HASP has been written to comply with the requirements of the Occupational Safety and Health Administration (Hazardous Waste Operations and Emergency Response Standard (29 CFR 1910.120). All activities covered by this HASP must be conducted in complete compliance with this HASP and with all applicable federal, state, and local health and safety regulations. Personnel covered by this HASP who cannot or will not comply will be excluded from site activities. This plan will be distributed to each employee involved with the proposed activities at the site, including subcontractor employees. Each employee must sign a copy of the attached health and safety plan sign-off sheet (see Attachment A). This HASP only pertains to the tasks that are listed in Section 3.0. A task specific HASP or addendum to this HASP will be developed at a later date for any other subsequent investigative/remedial activities at the site. 1.3 Organization/Responsibility The implementation of health and safety at this project location will be the shared responsibility of the AECOM Project Manager (PM), the AECOM Regional Safety, Health & Environment Manager (RSM), the AECOM Project Site Safety Officer (SSO) and other AECOM personnel and AECOM’s contractors implementing the proposed scope of work. 1.3.1 AECOM Project Manager The AECOM PM (enter name) is the individual who has the primary responsibility for ensuring the overall health and safety of this project. As such, the PM is responsible for ensuring that the requirements of this HASP are implemented. Some of the PM's specific responsibilities include: Assuring that all personnel to whom this HASP applies, including AECOM subcontractors, have received a copy of it; Providing the RSM with updated information regarding conditions at the site and the scope of site work; Providing adequate authority and resources to the on-site SSO to allow for the successful implementation of all necessary safety procedures; Supporting the decisions made by the SSO and RSM; AECOM Environment May 20121 1-3 Maintaining regular communications with the SSO and, if necessary, the RSM; Coordinating the activities of all AECOM subcontractors and ensuring that they are aware of the pertinent health and safety requirements for this project, In the event that an incident occurs, leading the incident investigation to identify root causes, corrective actions and lessons learned; and Conducting random project audits. 1.3.2 AECOM Program Safety, Health & Environment Manager The AECOM program Safety Health and Environmental Manager (Michael Grasso) is the individual responsible for the preparation, interpretation and modification of this HASP. Modifications to this HASP which might result in less stringent precautions cannot be undertaken by the PM or the SSO without the approval of the Program Safety, Health & Environmental Manager (PSM) or the Regional Safety Manager (RSM). Specific duties of the RSM include: Writing, approving and amending the HASP for this project; Advising the PM and SSO on matters relating to health and safety on this site; Recommending appropriate personal protective equipment (PPE) and respiratory equipment to protect personnel from potential site hazards; Assisting with Incident investigations; and, Maintaining regular contact with the PM and SSO to evaluate site conditions and new information which might require modifications to the HASP; and Conducting random project audits. 1.3.3 AECOM Site Safety Officer All AECOM field technicians are responsible for implementing the safety requirements specified in this HASP. However, one field technician will serve as the SSO. The SSO will be appointed by the PM. The SSO will be on-site during all activities covered by this HASP. The SSO is responsible for enforcing the requirements of this HASP once work begins. The SSO has the authority to immediately correct all situations where noncompliance with this HASP is noted and to immediately stop work in cases where an immediate danger is perceived. Some of the SSO's specific responsibilities include: Assuring that all personnel to whom this HASP applies, including all subcontractors, have reviewed this HASP, and submitted a completed copy of the HASP review and acceptance form (Attachment A); Assuring that all personnel to whom this HASP applies have attended a pre-entry briefing and any subsequent safety meetings that are conducted during the implementation of the program; Maintaining a high level of health and safety consciousness among employees implementing the proposed investigative activities; Securing Work Permits. The SSO must determine what, if any, work permits must be secured from the facility prior to the commencement of activities. If required, the SSO must determine AECOM Environment May 20121 1-4 how long the work permit is good for and verify that all the provisions of the work permit can be met by AECOM and its subcontractors. Procuring the air monitoring instrumentation required and performing air monitoring for investigative activities; Procuring and distributing the PPE and safety equipment needed for this project for AECOM employees; Verifying that all PPE and health and safety equipment used by AECOM is in good working order; Verifying that AECOM contractors are prepared with the PPE, respiratory protection and safety equipment required for this program; Preparing an initial Job Safety Analysis (JSA) during the initial mobilization and revising the Job Safety Analysis if conditions or tasks change and communicating with all workers the results of the Job Safety Analysis. See attachment B for a JSA form. The JSA will be reviewed daily by all workers and updated as needed. Notifying the PM of all noncompliance situations and stopping work in the event that an immediate danger situation is perceived; Monitoring and controlling the safety performance of all personnel within the established restricted areas to ensure that required safety and health procedures are being followed; Conducting accident/incident investigations and preparing accident/incident investigation reports; Conducting the pre-entry briefing prior to beginning work and subsequent safety meetings as necessary; and Initiating emergency response procedures in accordance with Section 11.0 of this HASP. 1.3.4 AECOM Field Personnel All AECOM field personnel covered by this HASP are responsible for following the health and safety procedures specified in this HASP and complying with the requirements of AECOM Health and Safety Procedures. Some of the specific responsibilities of the field personnel are as follows: Performing work in a safe and responsible manner; Assess each task prior to beginning work on that task for hazards and necessary precautions; Assess the work area for changing conditions and new hazards and address the hazards; STOP WORK if they see a potential or actual hazard that may threaten the safety of people or the environment; Reading this HASP in its entirety prior to the start of on-site work; Submitting a completed HASP Review and acceptance form (Attachment A) to the AECOM SSO prior to the start of work; Attending the required pre-entry briefing prior to beginning on-site work and any subsequent safety meetings that are conducted during the implementation of the program; AECOM Environment May 20121 1-5 Bringing forth any questions or concerns regarding the content of the HASP to the PM or the SSO prior to the start of work; Reporting all Incidents, injuries and illnesses, regardless of their severity, to the AECOM SSO; and, Complying with the requirements of this HASP and the requests of the SSO. 1.3.5 Contractors Additionally, contractors hired by AECOM are responsible for: Reading the HASP in its entirety prior to the start of on-site work; Comply with the health and safety policies/procedures of their employer; Attending the required pre-entry briefing prior to beginning on-site work and any subsequent safety meetings that are conducted during the implementation of the program; Ensuring that their equipment is in good working order via daily inspections; Operating their equipment in a safe manner; Appointing an on-site safety coordinator to interface with the AECOM SSO; Providing AECOM with copies of material safety data sheets (MSDS) for all hazardous materials brought on-site; and, Providing all the required PPE, respiratory equipment and safety supplies to their employees. 1.4 Health and Safety Expectations Commitment to safety, health, and environmental excellence requires that all work proceed only after it is safe and environmentally sound to do so. The responsibility for ensuring that this takes place rests with every worker present at this property. Effectively meeting these responsibilities depends upon open communication between individuals and their supervisors prior to work beginning, and – in certain cases – after safety, health and/or environmental issues are identified. Completing a Job Safety Analysis (JSA) to aid in planning safe work performance will be an integral part of meeting safety, health and environment (SHE) expectations. The safety and health of onsite personnel will take precedence over cost and schedule considerations for all project work. All AECOM personnel have the authority to STOP WORK if they see a potential or actual hazard that may threaten the safety of people or the environment. Upon stopping work, the SSO must be immediately notified and provided with information regarding the nature of the safety, health or environmental concern. The SSO should meet with the worker with the intent of resolving the worker’s concerns. Once the concerns are resolved to the satisfaction of the worker, work can proceed. If the concerns are not resolved to the satisfaction of the worker and/or the SSO, work does not proceed. The AECOM RSM will be contacted to obtain assistance in resolving the concerns. Using his/her expertise, safety, health, and environmental rules, regulations, and procedures, the AECOM RSM will attempt to resolve the matter with all parties involved. Work will not resume until this criterion is met. AECOM Environment May 20121 1-6 1.5 Management of Change/Modification of the HASP 1.5.1 Management of Change This document discusses the physical hazards associated with the proposed activities. However, unanticipated site-specific conditions or situations might occur during the implementation of this project. Also, AECOM and/or the contractors may elect to perform certain tasks in a manner that is different from what was originally intended due to a change in field conditions. As such, this HASP must be considered a working document that is subject to change to meet the needs of this dynamic project. 1.5.2 HASP Modification Should significant information become available regarding potential on-site hazards, it will be necessary to modify this HASP. All proposed modifications to this HASP must be reviewed and approved by the AECOM RSM before such modifications are implemented. Any significant modifications must be incorporated into the written document as addenda and the HASP must be reissued. The AECOM PM will ensure that all personnel covered by this HASP receive copies of all issued addenda. Sign-off forms will accompany each addendum and must be signed by all personnel covered by the addendum. Sign-off forms will be submitted to the AECOM PM. The HASP addenda should be distributed during the daily safety meeting so that they can be reviewed and discussed. Attendance forms will be collected during the meeting. 1.5.3 Job Safety Analysis (JSA) AECOM and/or AECOM’s contractors will prepare a Job Safety Analysis (JSA) for each task to be performed prior to commencing work. The use of new techniques will be reviewed and if new hazards are associated with the proposed changes, they will be documented and evaluated on the JSA form. An effective control measure must also be identified for each new hazard. JSA forms will be reviewed by the SSO prior to being implemented. Once approved, the completed forms will be reviewed with all field staff during the daily safety meeting. A blank JSA form is presented as Attachment B. 1.5.4 Employees Working Alone Employees working alone at project sites will review the JSA for their tasks as they are conducting their daily overview and reconnaissance of the site. After completing the JSA review/revision and site reconnaissance, the employee should call the Project Manager and report any new hazards or site conditions observed. AECOM Environment May 20121 2-1 2.0 INTRODUCTION 2.1 AECOM Environment Safety Policy AECOM Environment (AECOM) is committed to providing our employees with a safe and healthy work environment. It is not only our obligation to each other, but also a sound business practice to do so. Work related injuries and illnesses cause needless pain and suffering, cost money, and adversely affect our reputation with our clients. Every attempt shall be made to eliminate the possibility of injuries and illnesses. No aspect of the company's activities, including expediency and cost, shall take precedence over the health and safety of our employees. 2.1.1 Maximum Duration of the Work Day for Field Activities An employee may not work a shift that exceeds 16 hours in duration. For the purpose of this policy, the work shift includes time spent at lunch and on break. If an employee works more than one shift during the course of a calendar day, the total number of hours worked in that day cannot exceed 16 hours. Exception: If work is to be done continuously in ambient air temperatures of less than 20º F, the Site Safety Officer and Field Manager will use a guideline of limiting work shifts to 10 hours in duration, including 8 hours working outdoors and 2 hours of time spent at lunch, breaks, and travel. Refer to Section 5.15, Cold Stress, fur further work day guidelines. 2.1.2 Short Service Employee A Short Service Employee (SSE) is an employee with fewer than six months experience working supervised on field projects or an employee who has not completed required training or received required certifications. Short Service Employees will not be assigned to work on a project where vehicles, equipment or other physical environmental hazards are present unless they are supervised on site by a qualified person. 2.2 Health and Safety Plan (HASP) 2.2.1 HASP Purpose The purpose of this HASP is to identify hazards associated with this project and specify engineering and administrative controls and personal protective equipment necessary to mitigate the risks associated with these hazards. This HASP addresses the hazards recognized prior to writing or updating the documents. As new hazards are encountered, a Job Hazard Assessment (JHA) or Job Safety Analysis (JSA) must be conducted and the results input into the HASP. This HASP also assigns responsibilities for the implementation of safety programs on this project and defines monitoring and emergency response planning specific to the project. AECOM Environment May 20121 2-2 2.2.2 HASP Applicability This site-specific Health and Safety Plan (HASP) has been developed by AECOM. It establishes the health and safety procedures required to minimize potential risk to AECOM and contractor personnel involved with the field activities associated with the execution of the 7-Eleven program contract. The provisions of this plan apply to AECOM personnel who will potentially be exposed to safety and/or health hazards related to activities described in Section 3.0 of this document. Client, Subcontractor employees, and third party personnel performing work that potentially exposes them to the chemical and physical hazards at the site are recommended to work under their own HASP and are also expected to review and acknowledge this HASP as a recognition of the SH&E standards that AECOM expects outside personnel to uphold. This HASP has been written to comply with the requirements of the Occupational Safety and Health Administration (Hazardous Waste Operations and Emergency Response Standard (29 CFR 1910.120). All activities covered by this HASP must be conducted in complete compliance with this HASP and with all applicable federal, state, and local health and safety regulations. Personnel covered by this HASP who cannot or will not comply will be excluded from site activities. This plan will be distributed to each employee involved with the proposed activities at the site, including subcontractor employees. Each employee must sign a copy of the attached health and safety plan sign-off sheet (see Attachment A). This HASP only pertains to the tasks that are listed in Section 3.0. A task specific HASP or addendum to this HASP will be developed at a later date for any other subsequent investigative/remedial activities at the site. 2.3 Organization/Responsibility The implementation of health and safety at this project location will be the shared responsibility of the AECOM Project Manager (PM), the AECOM Regional Safety, Health & Environment Manager (RSM), the AECOM Project Site Safety Officer (SSO) and other AECOM personnel and AECOM’s contractors implementing the proposed scope of work. 2.3.1 AECOM Project Manager The AECOM PM is the individual who has the primary responsibility for ensuring the overall health and safety of this project. As such, the PM is responsible for ensuring that the requirements of this HASP are implemented. Some of the PM's specific responsibilities include: Assuring that all personnel to whom this HASP applies, including AECOM subcontractors, have received a copy of it; Providing the RSM with updated information regarding conditions at the site and the scope of site work; Providing adequate authority and resources to the on-site SSO to allow for the successful implementation of all necessary safety procedures; Supporting the decisions made by the SSO and RSM; AECOM Environment May 20121 2-3 Maintaining regular communications with the SSO and, if necessary, the RSM; Coordinating the activities of all AECOM subcontractors and ensuring that they are aware of the pertinent health and safety requirements for this project, In the event that an incident occurs, leading the incident investigation to identify root causes, corrective actions and lessons learned; and Conducting random project audits. 2.3.2 AECOM Program Safety, Health & Environment Manager The AECOM program Safety Health and Environmental Manager (Michael Grasso) is the individual responsible for the preparation, interpretation and modification of this HASP. Modifications to this HASP which might result in less stringent precautions cannot be undertaken by the PM or the SSO without the approval of the Program Safety, Health & Environmental Manager (PSM) or the Regional Safety Manager (RSM). Specific duties of the RSM include: Writing, approving and amending the HASP for this project; Advising the PM and SSO on matters relating to health and safety on this site; Recommending appropriate personal protective equipment (PPE) and respiratory equipment to protect personnel from potential site hazards; Assisting with Incident investigations; and, Maintaining regular contact with the PM and SSO to evaluate site conditions and new information which might require modifications to the HASP; and Conducting random project audits. 2.3.3 AECOM Site Safety Officer All AECOM field technicians are responsible for implementing the safety requirements specified in this HASP. However, one field technician will serve as the SSO. The SSO will be appointed by the PM. The SSO will be on-site during all activities covered by this HASP. The SSO is responsible for enforcing the requirements of this HASP once work begins. The SSO has the authority to immediately correct all situations where noncompliance with this HASP is noted and to immediately stop work in cases where an immediate danger is perceived. Some of the SSO's specific responsibilities include: Assuring that all personnel to whom this HASP applies, including all subcontractors, have reviewed this HASP, and submitted a completed copy of the HASP review and acceptance form (Attachment A); Assuring that all personnel to whom this HASP applies have attended a pre-entry briefing and any subsequent safety meetings that are conducted during the implementation of the program; Maintaining a high level of health and safety consciousness among employees implementing the proposed investigative activities; Securing Work Permits. The SSO must determine what, if any, work permits must be secured from the facility prior to the commencement of activities. If required, the SSO must determine AECOM Environment May 20121 2-4 how long the work permit is good for and verify that all the provisions of the work permit can be met by AECOM and its subcontractors. Procuring the air monitoring instrumentation required and performing air monitoring for investigative activities; Procuring and distributing the PPE and safety equipment needed for this project for AECOM employees; Verifying that all PPE and health and safety equipment used by AECOM is in good working order; Verifying that AECOM contractors are prepared with the PPE, respiratory protection and safety equipment required for this program; Preparing an initial Job Safety Analysis (JSA) during the initial mobilization and revising the Job Safety Analysis if conditions or tasks change and communicating with all workers the results of the Job Safety Analysis. See attachment B for a JSA form. The JSA will be reviewed daily by all workers and updated as needed. Notifying the PM of all noncompliance situations and stopping work in the event that an immediate danger situation is perceived; Monitoring and controlling the safety performance of all personnel within the established restricted areas to ensure that required safety and health procedures are being followed; Conducting accident/incident investigations and preparing accident/incident investigation reports; Conducting the pre-entry briefing prior to beginning work and subsequent safety meetings as necessary; and Initiating emergency response procedures in accordance with Section 11.0 of this HASP. 2.3.4 AECOM Field Personnel All AECOM field personnel covered by this HASP are responsible for following the health and safety procedures specified in this HASP and complying with the requirements of AECOM Health and Safety Procedures. Some of the specific responsibilities of the field personnel are as follows: Performing work in a safe and responsible manner; Assess each task prior to beginning work on that task for hazards and necessary precautions; Assess the work area for changing conditions and new hazards and address the hazards; STOP WORK if they see a potential or actual hazard that may threaten the safety of people or the environment; Reading this HASP in its entirety prior to the start of on-site work; Submitting a completed HASP Review and acceptance form (Attachment A) to the AECOM SSO prior to the start of work; Attending the required pre-entry briefing prior to beginning on-site work and any subsequent safety meetings that are conducted during the implementation of the program; AECOM Environment May 20121 2-5 Bringing forth any questions or concerns regarding the content of the HASP to the PM or the SSO prior to the start of work; Reporting all Incidents, injuries and illnesses, regardless of their severity, to the AECOM SSO; and, Complying with the requirements of this HASP and the requests of the SSO. 2.3.5 Contractors Additionally, contractors hired by AECOM are responsible for: Reading the HASP in its entirety prior to the start of on-site work; Comply with the health and safety policies/procedures of their employer; Attending the required pre-entry briefing prior to beginning on-site work and any subsequent safety meetings that are conducted during the implementation of the program; Ensuring that their equipment is in good working order via daily inspections; Operating their equipment in a safe manner; Appointing an on-site safety coordinator to interface with the AECOM SSO; Providing AECOM with copies of material safety data sheets (MSDS) for all hazardous materials brought on-site; and, Providing all the required PPE, respiratory equipment and safety supplies to their employees. 2.4 Health and Safety Expectations Commitment to safety, health, and environmental excellence requires that all work proceed only after it is safe and environmentally sound to do so. The responsibility for ensuring that this takes place rests with every worker present at this property. Effectively meeting these responsibilities depends upon open communication between individuals and their supervisors prior to work beginning, and – in certain cases – after safety, health and/or environmental issues are identified. Completing a Job Safety Analysis (JSA) to aid in planning safe work performance will be an integral part of meeting safety, health and environment (SHE) expectations. The safety and health of onsite personnel will take precedence over cost and schedule considerations for all project work. All AECOM personnel have the authority to STOP WORK if they see a potential or actual hazard that may threaten the safety of people or the environment. Upon stopping work, the SSO must be immediately notified and provided with information regarding the nature of the safety, health or environmental concern. The SSO should meet with the worker with the intent of resolving the worker’s concerns. Once the concerns are resolved to the satisfaction of the worker, work can proceed. If the concerns are not resolved to the satisfaction of the worker and/or the SSO, work does not proceed. The AECOM RSM will be contacted to obtain assistance in resolving the concerns. Using his/her expertise, safety, health, and environmental rules, regulations, and procedures, the AECOM RSM will attempt to resolve the matter with all parties involved. Work will not resume until this criterion is met. AECOM Environment May 20121 2-6 2.5 Management of Change/Modification of the HASP 2.5.1 Management of Change This document discusses the physical hazards associated with the proposed activities. However, unanticipated site-specific conditions or situations might occur during the implementation of this project. Also, AECOM and/or the contractors may elect to perform certain tasks in a manner that is different from what was originally intended due to a change in field conditions. As such, this HASP must be considered a working document that is subject to change to meet the needs of this dynamic project. 2.5.2 HASP Modification Should significant information become available regarding potential on-site hazards, it will be necessary to modify this HASP. All proposed modifications to this HASP must be reviewed and approved by the AECOM RSM before such modifications are implemented. Any significant modifications must be incorporated into the written document as addenda and the HASP must be reissued. The AECOM PM will ensure that all personnel covered by this HASP receive copies of all issued addenda. Sign-off forms will accompany each addendum and must be signed by all personnel covered by the addendum. Sign-off forms will be submitted to the AECOM PM. The HASP addenda should be distributed during the daily safety meeting so that they can be reviewed and discussed. Attendance forms will be collected during the meeting. 2.5.3 Job Safety Analysis (JSA) AECOM and/or AECOM’s contractors will prepare a Job Safety Analysis (JSA) for each task to be performed prior to commencing work. The use of new techniques will be reviewed and if new hazards are associated with the proposed changes, they will be documented and evaluated on the JSA form. An effective control measure must also be identified for each new hazard. JSA forms will be reviewed by the SSO prior to being implemented. Once approved, the completed forms will be reviewed with all field staff during the daily safety meeting. A blank JSA form is presented as Attachment B. 2.5.4 Employees Working Alone Employees working alone at project sites will review the JSA for their tasks as they are conducting their daily overview and reconnaissance of the site. After completing the JSA review/revision and site reconnaissance, the employee should call the Project Manager and report any new hazards or site conditions observed. AECOM Environment May 20121 3-1 3.0 Scope of Work and Assumptions The scope of work associated with the 7-Eleven contract, will vary by task order issued by 7-Eleven. Task orders may include but not limited to the following: Phase I property/environmental audits; Phase II investigations; Over sight of the removal of underground storage tanks, piping; Remediation of contaminated soils or groundwater ; Operations and maintenance of groundwater or soil treatment systems; Installation and sampling of groundwater monitoring wells; and Immediate response to situations involving the discovery of a leaking underground storage tank, piping or accidental release of petroleum products. 3.1 Project Goals The goal of this project is to assist the client in compliance with environmental regulations by completing the following tasks: assess the impact that site activities may have on the environment, develop corrective action plans, implement the action plan, evaluate the implemented corrective action to determine its effectiveness, generate the required environmental compliance documents and continue to assess until the impacted areas no longer pose a potential threat to the environment. 3.2 Field Tasks The specific field tasks that may be implemented include: Collection of air, soil, water, and sediment samples for subsequent laboratory analyses; Routine monitoring and sampling of groundwater wells; Subsurface drilling for the collection of soil, water samples and the installation of groundwater monitoring wells; Subsurface drilling for the installation of product recovery wells; Using a vacuum truck extract free product from groundwater wells; Over sight of remedial activities such as underground tank removal, and soil excavation; Installation of groundwater or soil vapor extraction systems; Operation and maintenance of groundwater or soil vapor extraction system 3.3 Assumptions All work can be performed using Level D Personal Protective Equipment; AECOM Environment May 20121 3-2 Site management will assist in locating subsurface utilities, vessels, and structures located on the property and outside the scope of the utility locator service; AECOM field personnel will not enter excavation or trenches; and No confined spaces will be entered on this project. Others as noted in the Site-Specific Emergency Information and Hazard Assessment Section AECOM Environment May 20121 4-1 4.0 Chemical Hazard Assessment and Control 4.1 Chemical Contaminants of Concern 4.1.1 BTEX Petroleum is a highly complex mixture of aliphatic and aromatic hydrocarbons. Benzene, toluene, ethylbenzene, and xylenes are natural but minor components of fuel oils, kerosene and diesel fuels. Gasoline contains higher quantities of these aromatic hydrocarbons. Exposure to the vapors of BTEX above their respective permissible exposure limits (PELs) as an 8-hr time weighted average (TWA) may produce irritation of the mucous membranes of the upper respiratory tract, nose and mouth. Overexposure may also result in the depression of the central nervous system. Symptoms of such exposure include drowsiness, headache, fatigue and euphoria. Chronic and prolonged overexposure to the vapors of benzene may cause damage to the blood- forming organs and is known to cause leukemia in humans. Gasoline is typically 1 – 2% benzene. The PEL for benzene is 1 ppm. The ACGIH has set a TLV for Benzene at 0.5 ppm; however, for this project the SSO will use the OSHA PEL’s and will utilize an action level of one half the PEL for various responses. Benzene is considered to be a carcinogen by the ACGIH. The PELs for ethylbenzene and xylene are 100 ppm. The PEL for toluene is 200 ppm. The American Conference of Governmental Industrial Hygienists (ACGIH) have recommended a threshold limit value of 50 ppm for toluene. 4.1.2 Petroleum Hydrocarbons Petroleum hydrocarbons are generally considered to be of moderate to low toxicity. Federal or recommended airborne exposure limits have not been established for the vapors of petroleum hydrocarbons. However, inhalation of low concentrations of the vapor may cause mucous membrane irritation. Inhalation of high concentrations of the vapor (which would only be likely to occur in confined spaces where the liquid had been significantly heated) may cause extensive pulmonary edema. Chronic direct skin contact with the liquid may produce skin irritation as a result of defatting. 4.1.3 Volatile Organic Compounds (VOCs & SVOCs) Volatile Organic Compounds refer to a group of volatile compounds or mixtures that are relatively VOCs are typically organic solvents used for extracting, dissolving, or suspending materials such as fats, waxes, and resins that are not soluble in water. The removal of the solvent from a solution permits the recovery of the solute intact with its original properties. Solvents are used in paints, adhesives, glues coatings, and degreasing/ cleaning agents. Semivolatile Organic Compounds (SVOCs) are less volatile chemicals that tend to persist in the environment. AECOM Environment May 20121 4-2 Inhalation and skin absorption are the primary routes of exposure. Organic compounds are metabolized or they accumulate in the lipid-rich tissues such as the liver, fat cells, or the nervous system. Solvent inhalation by workers can cause effects ranging from an alcohol-like intoxication to narcosis and death from respiratory failure. Symptoms of solvent inhalation include drowsiness, headache, dizziness, dyspepsia, and nausea. 4.1.4 Tetraethyl Lead Tetraethyl lead (also called alkyl lead), was used as anti-knock agents in gasoline. Tetraethyl lead is colorless liquid (unless dyed red, orange, or blue) with a pleasant, sweet odor. Tetraethyl lead exposure can occur through inhalation, eye or skin contact, and absorption through the skin. Exposure to tetraethyl lead through inhalation and skin absorption can induces sneezing, irritation of the upper respiratory tract and mild to severe systemic responses: insomnia, lassitude (weakness, exhaustion), nausea, anxiety, tremors, bradycardia, hypotension, and hypothermia. The most severe responses include complete disorientation with hallucinations, and facial contortions. Such episodes may progress to maniacal and violent convulsive seizures which may terminate in coma and death. Tetraethyl lead targets the central nervous system, heart kidneys and eyes. In contact with the skin tetraethyl lead induces itching, burning and transient redness. 4.1.5 Methyl tert-butyl ether Methyl tert-butyl ether (MTBE) is a flammable liquid with a distinctive, disagreeable odor. It is made from blending chemicals such as isobutylene and methanol, and has been used since the 1980s as an additive for unleaded gasoline to achieve more efficient burning. Direct contact with the liquid may cause minor skin and eye irritation. Prolonged or repeated inhalation of MTBE vapor may cause irritation of the respiratory tract as well as depression of the central nervous system. OSHA has not established a PEL for MTBE. However, the ACGIH has established a TLV of 50 ppm, as an 8-hr TWA. 4.1.6 Ethyl Alcohol Gasoline stations are using 10% ethanol as a replacement for MTBE. Pure ethanol is irritating to the eyes, skin and respiratory tract. Exposure may also result in headache, nervousness, dizziness, fatigue, distorted perceptions, loss of motor coordination and hallucinations. Chronic and repeated overexposures may cause skin de-fatting and dermatitis as well as somnolence and lack of concentration. The OSHA PEL for ethanol is 1,000 ppm, as an 8-hr TWA. 4.1.7 Dust Dust generated during coring or cutting of concrete, boring, or excavations can be hazardous to the respiratory system and irritating to the eyes. Dust can also carry the contaminants of concern potentially exposing workers by skin contact and inhalation. The ACGIH has established an eight-hour exposure limit for dust at 3 mg/m3. The concentrations of the chemicals of concern in the soil are low enough that inhalation of dust would not by itself be an exposure hazard. However contamination of skin and clothing can provide additional exposures. Therefore the generation and contact with dust should be minimized. AECOM Environment May 20121 4-3 Water or other methods should be used to control dust during dusty operations; however care must be used to prevent electrical shock if electric tools are used in the same area. If dusts become irritating and engineering controls such as the application of water cannot be used, respirators should be donned as discussed in Section 7. 4.2 Hazard Substances Brought On Site by AECOM A material safety data sheet (MSDS) must be available for each hazardous substance that AECOM or its contractors bring on the property. This includes solutions/chemicals that will be used to decontaminate sampling equipment and gases needed to calibrate air monitoring equipment. In addition, all containers of hazardous materials must be labeled in accordance with OSHA's Hazard Communication Standard. Either the original manufacturer’s label or an NFPA 704M label specific for the material (as shown at the right) is considered to be an acceptable label. 4.3 Chemical Exposure and Control 4.3.1 Chemical Exposure Potential Employees can be exposed by inhalation to the chemicals of concern during the installation of the soil borings, sampling activities or during O&M activities. Another route of potential exposure to the contaminants of concern is via direct dermal contact with soils and groundwater during sampling. Although highly unlikely, exposure to all of the contaminants of concern can occur via ingestion (hand- to-mouth transfer). The decontamination procedures described in Section 9.0 address personal hygiene issues that will limit the potential for contaminant ingestion. 4.3.2 Chemical Hazard Control The chemical hazards associated with the investigative and sampling activities can be controlled in several ways, including: AECOM will perform air monitoring (Section 6) in the worker's breathing zone to determine exposure to the chemicals of concern during the installation of soil borings and the sampling program. If exposures exceed the action levels, respiratory protection as discussed in Section 7, will be donned. To avoid direct dermal contact with contaminated media, protective clothing, as described in Section 7 will be required when collecting samples and decontaminating sampling equipment. To avoid inhalation of vapors or dust during: sampling activities, drilling vacuum extraction of wells, and excavation field personal should maintain a position up wind from the source of contaminants of concern. 4.4 Hazardous Waste Management Waste generated as a result of O&M or investigation activities will be containerized local to the point of generation, sampled for characterization purposes and secured prior to off-site transportation and disposal. Upon receipt of analytical results, the AECOM project team will work with the Client to properly characterize, profile and dispose of the waste(s). AECOM Environment May 20121 5-1 5.0 Physical Hazards and Controls 5.1 Back Safety Using the proper techniques to lift and move heavy pieces of equipment is important to reduce the potential for back injury. The following precautions should be implemented when lifting or moving heavy objects: Bend at the knees, not the waist. Let your legs do the lifting; Do not twist while lifting; Bring the load as close to you as possible before lifting; Be sure the path you are taking while carrying a heavy object is free of obstructions and slip, trip and fall hazards; Use mechanical devices to move objects that are too heavy to be moved manually; and, If mechanical devices are not available, ask another person to assist you. 5.2 Control of Hazardous Energy (Lockout) Lockout procedures of control of hazardous energy shall be implemented and enforced. Lockout procedures are required to render inoperative electrical systems, pumps, construction equipment, motors, pipelines, valves and all other such energy systems that may accidentally be energized while employees are working on them on or before they are ready and released for service. Control of hazardous energy shall comply with Subpart J of 29 CFR 1910. 5.2.1 Basic Lockout Requirements Notify affected personnel and facility staff; Shut down equipment by normal stopping procedure; De-activate the energy isolating device(s) so that the machine or equipment is isolated from the energy source(s); Apply locks with tag identifying the person performing the lockout. Each authorized person working on equipment applies his/her own lock; Release any stored energy; Ensure that the equipment is disconnected from the energy source(s) by first checking that no personnel are exposed, then verify the isolation of the equipment by operating the push button or other normal operating control(s) or by testing to make certain the equipment will not operate; Remove guards or covers as necessary and perform work; When work is complete, reinstall guards and inspect equipment to ensure it is operational; Notify affected personnel; AECOM Environment May 20121 5-2 Remove locks. Each authorized individual removes his/her own; and Return the equipment to service and notify affected personnel. 5.3 Concrete and Asphalt Coring & Cutting Cutting and coring concrete and asphalt can involve numerous hazards. The noise generated as a result of the tools used, and adequate hearing protection is necessary when conditions outlined in the Noise section below are encountered. Tools used which can include drills and saws, must be appropriately guarded to prevent hands, PPE, and other objects from being caught-up in the moving parts and drawing employees in. Dust may also be generated while cutting concrete and either respiratory protection or dust suppression will need to be utilized to prevent exposure. Additional consideration must be given chemical hazard concerns that may exist in the materials underlying the concrete. 5.4 Corrosive Liquids Site activities may require the use of corrosive liquids for preserving samples once collected, identifying substances in the field, or as part of system operations and maintenance. When corrosive liquids are identified in the work area, PPE upgrades will need to include an appropriate glove to mitigate the hazard, protective eye wear to guard against splashing liquids, and the potential need for poly-coated Tyvek to be worn. Additionally, the job task will be analyzed to determine if splashing and spilling can be minimized through the use of special equipment or procedures. Examples include using a funnel, identifying an alternative substance for use, and more. 5.5 Cuts and Lacerations Geoprobe soil samples are collected in acetate liners that must be cut open in order to collect the sample. Additionally, tubing will need to be cut to facilitate groundwater sampling. Additional tasks for the job may also pose laceration hazards. Tube-cutters are available and should be used to eliminate this hazard. However, if it is necessary to use knives or blades, follow the safety precautions listed below: Keep your free hand out of the way; Secure the acetate liner so it won't roll or move while you are cutting; Use only sharp blades; dull blades require more force which results in less knife control; Pull the knife at an angle to your body; pulling motions are easier to manage; Don't put your knife in your pocket; Use a hooked knife (i.e. linoleum knife) or a utility knife with a self-retracting blade; and Wear leather or Kevlar® gloves when using knives or blades. 5.6 Drilling Hazards Use of a drill rig to advance soil borings and install monitoring wells will require all personnel in the vicinity of the operating rig to wear steel-toed boots, hard hats, hearing protection and safety eyewear. Personnel shall not remain in the vicinity of operating equipment unless it is required for their work responsibilities. AECOM Environment May 20121 5-3 Additionally, the following safety requirements must be adhered to: All drill rigs and other machinery with exposed moving parts must be equipped with an operational emergency stop device. Drillers and geologists must be aware of the location of this device. This device must be tested prior to job initiation and periodically thereafter. The driller and helper shall not simultaneously handle augers unless there is a standby person to activate the emergency stop. The driller must never leave the controls while the tools are rotating unless all personnel are kept clear of rotating equipment. A long-handled shovel or equivalent must be used to clear drill cuttings away from the hole and from rotating tools. Hands and/or feet are not to be used for this purpose. A remote sampling device must be used to sample drill cuttings if the tools are rotating or if the tools are readily capable of rotating. Samplers must not reach into or near the rotating equipment. If personnel must work near any tools, which could rotate, the driller must shut down the rig prior to initiating such work. Drillers, Driller’s helpers and geologists must secure all loose clothing, long hair, or jewelry when in the vicinity of drilling operations. Only equipment, that has been approved by the manufacturer, may be used in conjunction with drilling equipment Pins that protrude excessively from augers shall not be allowed No person shall climb the drill mast while tools are rotating. No person shall climb beyond 6 feet above ground on the drill mast without the use of ANSI- approved fall protection (approved belts, lanyards and a fall protection slide rail) or portable ladder that meets the requirements of OSHA standards. When using the rig’s hoist to lift or move objects other than the equipment associated with the direct push operation, an assessment of the force required to perform the lift and the rig’s design specifications must be made to determine whether the lift can be made safely. In all cases personnel must not be in line with the cable when it is under tension. If drilling operations are to be performed within an enclosed space proper procedures must be followed to prevent the accumulation of carbon monoxide within the work area. Open doors and windows and provide ventilation to the outside. Employ the use of a mechanical ventilation system, i.e. blower or fan, appropriately sized for the room to circulate fresh air. Connect equipment exhaust points to hoses that can be direct ventilated to an outside area. 5.6.1 Rotating Parts Exposure to rotating parts can occur when working near the drilling rig or the internal combustion engine. All rotating parts should be covered with guards to prevent access by workers. When performing maintenance activities that require the rotating parts to be exposed, workers should not allow loose clothing, hands, or tools to approach the rotating parts. Guards must be replaced as soon as possible after completing the maintenance task. AECOM Environment May 20121 5-4 Operation of drilling equipment also creates hazards associated with pinch points and rotating equipment. Employees will evaluate work procedures to avoid placing their body and extremities in the path of rotating equipment and tools to avoid being struck by moving equipment, tools and machinery. Similarly, these hazards also create pinch point hazards where the body and extremities, especially the hands, can be caught in moving equipment and crushed. Employees will evaluate equipment and tool use procedures to identify pinch points and develop procedures to avoid placing body parts in a position where they can be caught in moving equipment, tools and machinery. 5.6.2 Direct Push Hazards Use of the Direct Push System to advance soil borings and collect soil samples will require all personnel in the vicinity of the operating unit to wear steel-toed boots, hardhats, hearing protection and safety eyewear. Personnel shall not remain in the vicinity of operating equipment unless it is required for their work responsibilities. Additionally, the following safety requirements must be adhered to: A remote vehicle ignition is located on the control panel of the Geoprobe unit. This allows the operator to start and stop the vehicle engine from the rear. This device must be tested prior to job initiation and periodically thereafter. All employees should be aware of how to access and operate the rear ignition. The driller must never leave the controls while the probe is being driven. Drillers, helpers and geologists must secure all loose clothing when in the vicinity of drilling operations. The Geoprobe vehicle shall not be moved any distance with the probe in the extended position. Check for clearance at roof or the vehicle before folding the Geoprobe out of the carrier vehicle. Be sure the parking brake is set, or vehicle wheels have been chocked, before probing. Never allow the derrick foot to be lifted more than 6" off of the ground surface. Deactivate hydraulics when adding or removing probe rods, anvils or any tool in the hammer. Verify that all threaded parts are completely threaded together before probing. 5.6.3 Sonic Drilling Use of a Sonic Drill Rig to advance soil borings, collect soil samples and/or install monitoring wells will require all personnel in the vicinity of the operating unit to wear steel-toed boots, hardhats, hearing protection and safety eyewear. Personnel shall not remain in the vicinity of operating equipment unless it is required for their work responsibilities. Additionally, the following safety requirements must be adhered to: A remote vehicle ignition may be located on the control panel of the Drill Rig. This allows the operator to start and stop the vehicle engine from the rear. This device must be tested prior to job initiation and periodically thereafter. All employees should be aware of how to access and operate the rear ignition. The driller must never leave the controls while the probe is being driven. AECOM Environment May 20121 5-5 Drillers, helpers and geologists must secure all loose clothing when in the vicinity of drilling operations. The Drill Rig shall not be moved any distance with the mast in the extended position. Check for clearance at roof or the vehicle before folding the Rig out of the carrier vehicle. Be sure the parking brake is set, vehicle wheels have been chocked and/or outrigger stabilizers have been positioned before drilling. Never allow the derrick foot to be lifted more than 6" off of the ground surface. Deactivate hydraulics when adding or removing rods, anvils or any tool in the hammer. Verify that all threaded parts are completely threaded together before drilling. 5.7 Driving Safety Drivers must be licensed to drive the class of vehicle they are operating and trained in defensive driving. Only AECOM personnel may drive AECOM vehicles or vehicles rented for AECOM business; client, subcontractor, or other work-related personnel may ride. Drivers and passengers must comply with all traffic laws and posted signs, and will not operate a vehicle if under the influence of impairing medication, alcohol, or any other substance. Make sure that the following basic safe driving practices are followed at all times while working on this project: Always wear a seat belt while operating a motor vehicle or while traveling as a passenger. Obey speed limits and local traffic laws at all times. Obtain proper directions to the site in advance and take the route that is most likely to be free of known traffic hazards (e.g., congestion, construction, etc.) and that avoids travel through potentially dangerous neighborhoods. Abstain from distractions while driving (e.g., the use of cell phones, eating/drinking, reading maps, etc). While on company business, drivers are prohibited from using hand-held mobile phones and “texting” while operating a motor vehicle. If drivers require use of such devices, they shall drive to a safe location where they can park to perform these activities. The only exception to this prohibition is with the use of a “hands-free” cell phone where local laws allow for such use and where weather and traffic conditions permit. In general, it is AECOM’s policy to discourage use of all two-way communication devices while operating motor vehicles. Do NOT allow other distractions to interfere with your safe operation of the vehicle. Do not operate a motor vehicle if you are tired and/or have not had sufficient rest. AECOM’s H&S policy 1.2 limits the maximum length of the workday to 16 hours for fieldwork. This limit includes the time spent driving to/from a site. All unattended personnel transport vehicles will not be allowed to idle, and must be turned off when not in use. AECOM Environment May 20121 5-6 5.7.1 Planning / Preparation Prior to departure, check traffic reports, weather conditions, road construction, and road closures. If necessary, develop an alternate route and new, approved JMP (Journey Management Plan). Prior to entering the vehicle, inspect the vehicle. Leave early to allow for contingencies. 5.7.2 DOT If you are to operate a vehicle exceeding 10,000 pounds (or vehicle and trailer with a combined weight over 10,000 pounds), or you are to transport greater than 1,000 pounds of hazardous materials, you MUST comply with DOT regulations. These are NOT addressed in this HASP; contact the H&S Department if this applies. 5.7.3 Secure Packing Do not move your vehicle unless all equipment and supplies are secured. Items and material which may roll, slide, or move about in your vehicle while traveling are a major hazard. Secure the load! 5.7.4 Emergency Procedures Always move out of traffic if possible; even if those in front of you have stopped. Stopping on an active highway can precipitate being hit from the rear. If you must stop on an active roadway, leave at least one car length in front of you, and watch the rear mirror, so you can ease up if someone behind can’t stop. Keep your flashers on in this situation. If you are the only driver coming to a stop on an active roadway, leave the flashers on and when safe to do so, exit the car and get to a safe location. If you must stop due to vehicle failure, etc. try to coast out of traffic. Put on your flashers, and tie a white handkerchief, etc. on the driver’s side door or mirror. If you remain in the vehicle, lock the doors. Use your cell phone to summon help. 5.8 Electrical Hazards Only qualified electricians with full knowledge of the electrical code requirements will be allowed to perform electrical work. Electrical tools and equipment must be grounded, of the double insulated type or battery operated. The use ground-fault circuit interrupters (GFCIs) are required. Additionally, inspection and testing shall be conducted to locate defective electrical equipment, tools, and cords, which may expose personnel to electrical hazards. Temporary electrical cords are rated for extra hard usage or hard usage and are the three-wire type with a grounding pin and a grounding receptacle. Look for the following letters on the cord: S, SJ, ST, or SO. No Romex, ribbon or two-wire extension cords Temporary electrical cords must be protected or elevated a minimum of 8 feet. They must be kept clear of walkways and other location where they may be exposed to damage or create a trip hazard. Do not hang extension cords with bare wire, nails, staples or objects that will cut/damage cords. Inspect all electrical cords for signs of wear and exposed wiring, strain, and ripped, torn, cut or burned insulation. Defective cords shall be removed from service. AECOM Environment May 20121 5-7 Prior to digging or boring check the work area for overhead and underground electrical utilities. If the overhead power line is 50 kV or less, then stay at least 10 feet away. For everything else, keep at least 35 feet away. Contact the power company if power lines needed to be, moved, de-energized and grounded, or have insulated sleeves installed. When work is to be performed on electrical equipment, lockout procedures are required to ensure that the equipment is de-energized and isolated. 5.9 Excavation and Trenching AECOM field personnel shall not enter any trench or excavation that they feel is not safe or meets the minimum requirements found in this section. As an alternative to entering an excavation for sample collection, an excavator can scoop up a load of soil from the desired location and the soil sample can be taken from the bucket. Excavating and trenching operations shall be performed in such a manner as to protect personnel from the dangers associated with trenching and excavating such as cave-ins, and to prevent damage to underground utilities. A competent person will conduct daily inspection of each trench or excavation, the adjacent hazards and protective systems for evidence of possible cave-in/failure of protective systems, hazardous atmosphere, and other hazardous condition and determine the necessary precautions to take. In addition, the competent person shall perform soil classification in accordance with Subpart P of 29 CFR 1926. The inspections shall be documented. Prior to digging, all underground utilities in the work area must be positively identified has indicated in Section 5.24. Markings made during the utility investigation must be maintained throughout the course of work. If underground utilities not previously identified are encountered, work shall be immediately ceased and the Project Manager will be notified before proceeding. A means of safe access and egress (ladders, steps, ramps) to all excavations must be available when trench excavations are 4 feet or deeper and located so as to require no more than 25 feet of lateral travel. Ladders must extend at least 3 feet above the edge of the trench and be securely staked in place. Walkways or bridges with standard railings and toeplates must be provided when personnel or equipment are required to cross over excavations. The walls and faces of all excavations in which personnel are exposed to danger from moving ground must be guarded by a shoring system, sloping of the ground, or some other equivalent means. No person shall be permitted under loads handled by excavator, loader, backhoe etc. The spoils pile must be placed at one side of the excavation. At a minimum, the toe of the spoil pile shall be at least 2 feet away from the edge of the excavation. The spoils pile shall be moved farther back in proportion to the depth of the excavation. The spoils pile height shall not exceed the depth of the excavation and shall be sloped to prevent the soil and rocks from sliding into the excavation. All wells, holes, test pits, shafts, etc., shall be barricaded or covered. Covers shall be secured in place and marked. AECOM Environment May 20121 5-8 Do not enter an unprotected trench! Trenches 5 feet deep or greater require a protective system unless the excavation is made entirely in stable rock. Trenches 20 feet deep or greater require that the protective system be de-signed by a registered professional engineer or be based on tabulated data prepared and/ or approved by a registered professional engineer Protective system(s) to prevent cave-in shall be used when personnel enter excavations. Where protective systems are used such as trench boxes, hydraulic shoring, etc., they shall be used in accordance with the manufacturer's specifications and limitations. The manufacturer's tabulated data for such systems will be maintained on the project site. Excavations or trenches which water is free flowing into or has accumulated shall not be entered until water removal is initiated and maintain to prevent cave-in or engulfment. 5.10 Flammable Vapors/Liquids Petroleum hydrocarbons vapors are all heavier than air and settle close to the ground and into low laying areas. Gasoline vapors have a very low flash point and are more flammable then diesel fuel or kerosene vapors. Nevertheless, vapors of all petroleum hydrocarbons should be consider flammable. During subsurface drilling or tank removal pockets of petroleum hydrocarbons may be encountered. Vapors of petroleum hydrocarbons between their lower explosive limit (LEL) and upper explosive level (UEL) may migrate into the borehole or excavation and flashover when spark is introduced. The vapor in the borehole or excavation can be monitored using the PID. The chart below can be used to determine if the atmosphere is at or above the action limit of 10 % of the LEL. Chemical Name LEL (ppm) 10% of the LEL (ppm) Benzene 12000 1200 Toluene 11000 1100 Ethyl Benzene 8000 800 Xylene 11000 1100 Gasoline 14000 1400 Diesel Fuel 6000 600 Kerosene 7000 700 Concentrations of gases and vapors at or above the LEL are also considered immediately dangerous to life and health (IDLH) atmospheres and should not be entered. If the borehole or excavation flashes over and a fire remains burning or equipment is on fire, field personal should not attempt to extinguish the fire but should call 911 to report the fire. Field personal must evacuate the area and get others out of harm’s way. The performance of hot work or the use of electrical equipment which has not been approved for use in hazardous locations is prohibited in areas where the concentration of flammable gases and vapors is in excess of 10% of the lower explosive limit (LEL). AECOM Environment May 20121 5-9 Equipment used in hazardous locations must meet the National Electrical Code (NEC) classification for hazardous locations. Class 1, Division 1 locations are ones in which flammable concentrations of gases or vapors exist (1)continuously, intermittently or periodically under normal operating conditions or (2) frequently because of maintenance or repair operations or because of leakage. Class 1, Division 2 locations are ones (1) in which flammable liquids or gases are handled but are normally confined within closed containers or systems, (2) in which flammable concentrations of gases or vapors are prevented by positive mechanical ventilation, or (3) are adjacent to, but not physically isolated from, Class I, Division I locations. When free product is being transferred from a recovery well or tank to a vacuum truck or container, electrical bonding of the containers must be established to prevent a static spark. In addition the container must be grounded. 5.11 Flying Objects Hazards Activities involving the use of power tools, drilling rigs, and hand tools, among other activities, can create flying object hazards where objects can become projectiles. When flying objects represent projectiles employees need to use equipment that is appropriately guarded to minimize the creation of projectile hazards, and also use the appropriate PPE including hard hats, safety goggles, face shields to prevent projectiles from causing injuries to employees. 5.12 Hand Augering In addition to the precautions listed in the Back Safety discussion below, additional care should be taken to prevent injuries when using hand augers. When practical, work as a team of two to advance borings with a hand auger. Wear cotton or leather gloves when rotating the auger. Avoid putting pressure on the palms of your hands; use a good grip to spread the pressure over the entire hand. Take frequent stretch breaks to stretch and relax your back, arms and hands. 5.13 Hand Safety 5.13.1 Glove Selection To protect onsite workers from hand injuries, the following gloves will be used for when performing a specific duty: Brightly colored gloves will be used to help emphasize and easily locate the hands. It is recommended that the color of gloves be changed monthly to draw attention to the hands. Pinch points are found between a moving object and a stationary object, or between two continuously moving objects. Yellow hand stickers will be placed on equipment to remind workers of pinch points. AECOM Environment May 20121 5-10 5.13.2 Working with Glassware Glass bottles, laboratory equipment, and VOA vials can break and cause lacerations and puncture wounds. The follow preventive measures should be taken to reduce the potential for broken glassware. Package all glassware such that there is no glass to glass contact during transportation or storage; Assume that any time glass strikes another object it is damaged; Inspect all glassware for cracks, scratches, and other damage before using; Lids and caps should be “finger tight” unless there is a torque specification and you use a torque wrench; Never fill a glass container (other than VOA vials with a septum) liquid full, always leave an air space to buffer thermal expansion of the liquid; and Avoid rapid temperature changes when filling glass containers. Glass often has flaws that cannot be detected by visual inspection and the force needed to open and tighten lids can cause these flaws to fracture the glass. Any time force is applied to glass, workers should wear leather gloves or preferably Kevlar® gloves to protect against breakage and injury. Kevlar® glove liners are available for use under Nitrile or cotton gloves. 5.13.3 Hand Tools Rules for the safe use of hand tools: Select the right size tool for the job. Don’t use “cheaters” and avoid pulling old tools from the waste stream. There’s a reason why they were thrown away! All hand tools must be in safe condition. Handles must be sound, straight and tight-fitting. Always inspect tools before use and replace or repair worn or damaged tools. Always keep the cutting edges sharp and never test a cutting edge with your finger. When working on an elevated surface (ladder, truck, scaffold), ensure your tools are secure. Falling tools can cause serious injury. Always carry your tools correctly and never put sharp or pointed tools in your pocket. When carrying hand tools, always point the cutting edge to the ground. Always keep your tools in a dry place to prevent rust. Cutting tools must be kept sharp and properly shaped. Secure work pieces prior to cutting or drilling. Keep the unused hand and other people away from the tool. AECOM Environment May 20121 5-11 5.13.4 Specific Tool Use 5.13.4.1 Screwdrivers Most screwdrivers are not designed to be used on electrical equipment. Use an insulated screwdriver for electrical work. Do not hold an object in the palm of one hand and press a screwdriver into it; place the object on a bench or table. Never hammer with a screwdriver. Never use a screwdriver with a broken handle, bent or burred blade, etc. 5.13.4.2 Pliers Do not use pliers as a substitute for hammers, wrenches, pry bars, etc. Use insulated pliers when doing electrical work. Inspect the pliers frequently to make certain that they are free of breaks or cracks. Use the right type of pliers for the specific task – adjustable, locking (Vise Grip®), standard, bolt size fit, pipe wrench. 5.13.4.3 Hammers Use the correct hammer for the specific type of striking work (task) to be done. Always wear safety glasses when using a hammer to strike an object. Always use the claw portion of a hammer to remove nails and not as a pick or awl. Have an unobstructed view and swing when using a hammer. Watch for overhead interference on back and forward swing. Use a good grip and use something other then your hand to hold a nail when starting hammering. Check for defects on the handle and head before using. If the hammer head shows signs of mushrooming, replace it immediately. Handles may be wood, tubular/solid steel or fiberglass. Replace any hammer with a loose handle before the head flies off and causes injury to you or someone else. Tighten loose handles with the proper wedges; never use nails or staples for wedges. If a steel or fiberglass handle is loose replace it, since it is more difficult to repair than a wooden one. Some fiberglass handles can be tightened with the aid of a repair kit with epoxy materials. 5.13.4.4 Wrenches Select the correct size of wrench for the job. Never use a pipe wrench as a wrench handle extension. Too much leverage can ruin a tool and cause injury. To avoid sudden slips, stand in a balanced position and always pull on the wrench instead of pushing against the fixed jaw, particularly when a pinch point is created. Wear gloves when using a wrench in a confined space. Whenever possible use a box end wrench instead of an open end wrench to avoid slipping. 5.13.4.5 Chisels Always wear safety goggles or a face shield when using a chisel. Drive chisels outward and away from your body. Do not use chisels to pry. Keep edges sharp for most effective work and protect AECOM Environment May 20121 5-12 when not in use. Driven tools (chisels, punches, etc.) must be dressed to remove any mushrooming. Use the proper hammer when using a chisel. 5.13.4.6 Knives Always perform a thorough Job Safety Analysis (JSA) to define the proper cutting tool for the task. Always place the item to be cut on a solid surface, attempt to hold the cut item without your hand and cut in a direction away from the body and hand. Always keep hands and body clear of the knife stroke. Always keep the cutting tool blades sharp. Make sure there is plenty of open space around you when using any cutting tool. Use the following safer tools in place of fixed open blade knives (FOBK) whenever possible: Self-retracting utility knives Guarded utility knives Shears, snips, and/or scissors Concealed blade cutters Pipe cutters Specialty cutters (e.g. Geoprobe Acetate Liner Cutter) Ratcheting tools 5.14 Heavy Equipment The use of heavy equipment for earth moving work poses potential hazards to employees. Such equipment can cause trauma injuries to the operator or nearby workers. It may also roll over, or fall on sloped ground or unstable soil. AECOM personnel are to remain clear of operating heavy equipment to the extent feasible. Operators of earth moving equipment must be experienced or trained in the use of the equipment. They must inspect the equipment each day before use to assure that it is in safe operational condition. The equipment must be set up in a stable configuration, with the outriggers fully extended and supported on stable soil to prevent rollover. The rear swing-radius must be barricaded to prevent injuries to persons passing behind the equipment. When employees must work near the equipment, eye contact and clear communication must be maintained. 5.15 Heavy Equipment – Drill Rigs Drill rigs are considered to be heavy equipment, and therefore precautions must be incorporated into job activities when working in close proximity to drill rigs. In addition the wearing the PPE that has been determined to be necessary for the project, employees will need to ensure that Drill Rig Operators conduct inspections of the drill rig on a daily basis. A drill rig inspection is included in Attachment C as a reference. Focal points of the inspection should include checking hydraulic lines, AECOM Environment May 20121 5-13 tools and drilling equipment, emergency stop switches, and other parts of the equipment to insure that they are maintained in a safe operating condition. Employees will also consider the staging their work area so that they are not within the shadow of the drill rig’s mast. Working within this area creates a potential to be contacted by the drill rig if it were to tip over on its side. Likewise, when establishing a drilling location, the rig shall be positioned so that it won’t clip overhead power lines should it tip over. 5.15.1 Heavy Equipment-Earthmovers Employees working around heavy equipment such as backhoes, excavators, loads and dump trucks take precaution to prevent being struck by equipment. Hard hat and a high visibility traffic safety vest must be worn when working around equipment. Field team members must be alert for the sudden movement of equipment and never walk behind or long side moving equipment. If you cannot see the operator, the operator cannot see you. If you have to cross in front of equipment maintain eye contact with the operator and wait until they signal you to cross or approach the machine. Do not stand next to or near equipment being loaded or unloaded. Hitching or riding on equipment in other than the operator’s seat is prohibited. Employees should not use personal head stereo sets, talk on cell phones or text message when working near heavy equipment. 5.16 Insects, Spiders, Wasps and Bees Employees are encouraged to review AECOM SHE SOP 610 – Biological Hazards Injury & Illness Prevention, for detailed discussion on working around insects within the workplace and procedures that can be used to minimize and prevent exposure. 5.16.1 Ticks Ticks are bloodsuckers, attaching themselves to warm-blooded vertebrates to feed. Deer ticks are the most common carriers of Lyme disease, a bacterial infection that is transmitted to humans through the bite of the tick. Personnel should carefully inspect themselves each day for the presence of ticks or any rashes. This is important since prompt removal of the tick can prevent disease transmission. Female deer ticks are about one-quarter inch in length and are black and brick red in color. Males are smaller and all black. Removal of the tick is important in that the tick should not be crushed and care must be taken so that the head is also removed. If the head is not completely removed or if the tick is allowed to remain for days feeding on human blood, a condition known as tick paralysis can develop, this is due to a neurotoxin that the tick apparently injects while engorging. This neurotoxin acts upon the spinal cord causing loss of coordination, weakness and paralysis. One characteristic symptom of Lyme disease is a bulls-eye rash that develops around the bite site. The rash appears in about 60-80% of all Lyme disease cases. Contact your OHSC immediately if you develop such a rash. Tick season typically lasts from April through October; peak season is May through July; seasons can very depending on climate. Wear light-colored clothing (easier to spot ticks) with long sleeves and make sure that shirts are tucked into pants and pants are tucked into socks or boots. Ticks have a tendency to crawl upwards. These procedures will make it more difficult for a tick to reach your skin. AECOM Environment May 20121 5-14 Studies have determined that repellants containing DEET as a main ingredient are most effective against mosquitoes and ticks. DEET can be directly applied to the exposed skin of adults and/or clothing. Products containing DEET can’t be used with Fire Resistant Clothing (FRC) as it diminishes the garments’ capacity to resist ignition in a fire. Permethrin is another repellent; however, it can only be directly applied to clothing. 5.16.2 Mosquitoes Mosquitoes, carriers of the West Nile Virus, Yellow Fever and other diseases, are indigenous to the area. As mentioned above, DEET is an effective mosquito repellent and is recommended. Although concentrated DEET formulations protect longer than those that are more dilute, little improvement is offered by concentrations of the active ingredient higher than 50 percent. Adverse effects, though documented, are infrequent and are generally associated with gross overuse of the product. Users should avoid the temptation to apply the most concentrated product available. The transient protection offered by more dilute preparations can be extended by reapplication. When using DEET care should be taken to reapply the repellant when its effectiveness wears off. 5.16.3 Spiders Spiders and wasps may be found in derelict buildings, sheltered areas, and even on open ground. Exercise care when collecting samples and avoid reaching into areas where visibility is limited. If bitten by a spider, notify a co-worker or someone who can help if you should you have an allergic reaction or develop other symptoms related to spider venom. Stay calm and treat the area with ice or cold water. Seek medical attention if you have any reactions to the bite such as developing a rash, excessive swelling or pain at the site of the bite or sting or any swelling or numbness beyond the site of the bite. Black Widow Spider Abdomen usually shows hourglass marking. The female is 3-4 centimeters in diameter. Have been found in well casings and flush-mount covers. Not aggressive, but more likely to bite if guarding eggs. Light, local swelling and reddening of the bite are early signs of a bite, followed by intense muscular pain, rigidity of the abdomen and legs, difficulty breathing, and nausea. If bitten, see physician as soon as possible. AECOM Environment May 20121 5-15 Brown Spiders (Recluse) Central and South U.S., although in some other areas, as well. ¼-to-½-inch-long body, and size of silver dollar. Hide in baseboards, ceiling cracks, and undisturbed piles of material. Bite either may go unnoticed or may be followed by a severe localized reaction, including scabbing, necrosis of affected tissue, and very slow healing. If bitten, see physician as soon as possible. Studies have determined that repellants containing DEET as a main ingredient are most effective against mosquitoes and ticks. DEET can be directly applied to the exposed skin of adults and/or clothing. Products containing DEET can’t be used with Fire Resistant Clothing (FRC) as it diminishes the garments’ capacity to resist ignition in a fire. Permethrin is another repellent; however, it can only be directly applied to clothing. 5.16.4 Wasps and Bees Wasps (hornets and yellow-jackets) and bees (honeybees and bumblebees) are common insects that may pose a potential hazard to the field team if work is performed during spring, summer or fall. Bees normally build their nests in the soil. However, they use other natural holes such as abandoned rodent nests or tree hollows. Wasps make a football-shaped, paper-like nest either below or above the ground. Yellow-jackets tend to build their nests in the ground but hornets tend to build their nests in trees and shrubbery. Bees are generally more mild-mannered than wasps and are less likely to sting. Bees can only sting once while wasps sting multiple times because their stinger is barbless. Wasps sting when they feel threatened. By remaining calm and not annoying wasps by swatting, you lessen the chance of being stung. Wasps and bees inject a venomous fluid under the skin when they sting. The venom causes a painful swelling that may last for several days. If the stinger is still present, carefully remove it with tweezers or y scraping a credit card or other blunt object against the sting site in the opposite direction in which the stinger is embedded. Some people may develop an allergic reaction, i.e. anaphylaxis, to a wasp or bee sting. If such a reaction develops, seek medical attention at once. Persons who are allergic to bee and wasp stings should carry an epinephrine pen, e.g. epi-pen, with them that is prescribed by a doctor and used to help abate swelling that occurs due to their allergy. Even if an employee utilizes their epi-pen, they still need to seek medical attention for follow-up care and observation. 5.17 Noise Exposure The use of drilling equipment can expose the field team to noise levels that exceed the OSHA PEL of 90 dB for an 8-hour day. Exposure to noise can result in the following: Temporary hearing losses where normal hearing returns after a rest period; AECOM Environment May 20121 5-16 Interference with speech communication and the perception of auditory signals; Interference with the performance of complicated tasks; and, Permanent hearing loss due to repeated exposure resulting in nerve destruction in the hearing organ. Since personal noise monitoring will not be conducted during the proposed activities, employees must follow this general rule of thumb: If the noise levels are such that you must shout at someone two (2) feet away from you, you need to be wearing hearing protection. Employees can wear either disposable earplugs or earmuffs but all hearing protection must have a minimum noise reduction rating (NRR) of 27 dB. 5.18 Overhead Materials Overhead materials can include objects, tools, utilities, equipment and machinery that are, or have the potential to be, elevated above the work area. Overhead materials pose a significant safety risk because of the force that can be generated when they fall and strike an employee. Special attention should be paid when setting up a work area to evaluate the potential for overhead materials to cause traumatic blunt force trauma. Consideration must be given to potential for these overhead objects to be contacted during the course of work by AECOM employees and Subcontractors, and what the result of contacting these overhead materials will be. If possible, the work area should be adjusted or moved so that no overhead materials present a hazard. Likewise, if the object overhead can be relocated to remove the hazard, that is the preferred course of mitigation. When the hazard can’t be eliminated, then protective measures to shield the employees from being struck by falling objects should be taken. As a last resort, and as part of the minimum PPE for site work, employees working in areas where falling objects pose a hazard will wear a hard hat. 5.19 Pinch Points The use of hand tools, mechanical equipment, heavy machinery and more can create pinch points within the working area. Pinch points can be recognized when moving objects are present in the work space in close proximity to employees, and it is reasonable to assume that a part of the employee’s body can be caught between the moving objects. Pinch points will be considered when performing a Job Safety Analysis for the task being performed and recommendations will be made to reduce the potential for body parts to become caught in moving parts, including but not limited to: The use of PPE, e.g. gloves, boots, etc, to protect exposed body parts; Guarding machinery and equipment to prevent body parts from being caught in the moving objects; Using tools as an extension of the body to avoid placing body parts in the path of harm. When tools are used as an extension of the body consideration will be given to how the tool may become a hazard if it is caught within moving parts. AECOM Environment May 20121 5-17 5.20 Poisonous Plants Employees are encouraged to review AECOM SHE SOP 610 – Biological Hazards Injury & Illness Prevention, for detailed discussion on working around poisonous plants within the workplace and procedures that can be used to minimize and prevent exposure. All undeveloped property potentially has poison ivy, oak, or sumac growing in areas where vegetation is not controlled. These plants can also be found in cultivated and landscaped areas. Perform a hazard analysis appropriate for the working conditions and consider the existence of poisonous plants. Use appropriate PPE to prevent exposure, including but no limited to, full length clothing, Tyvek coveralls, and dermal barrier creams. Poison Ivy Grows in West, Midwest, Texas, East. Several forms – vine, trailing shrub, or shrub. Three leaflets (can vary 3-9). Leaves green in summer, red in fall. Yellow or green flowers. White berries. Poison Oak Grown in the East (NJ to Texas), Pacific Coast. 6-foot tall shrubs or long vines. Oak-like leaves, clusters of three. Yellow berries. Poison Sumac Grows in boggy areas, especially in the Southwest and Northern states. Shrub up to 15 feet tall. Seven to 13 smooth-edged leaflets. Glossy pale yellow or cream-colored berries. If you must enter areas containing such plants, wear protective clothing, such as Tyvek® coveralls, Nitrile or latex gloves, and boot covers. The use of a barrier cream such as Ivy Block can prevent the AECOM Environment May 20121 5-18 active agent in poisonous plants from affecting skin and Tecnu cleansing wipes can remove the plant oil from exposed skin. Avoid using mowers and weed trimmers in areas where poison ivy and oak are likely. Additional care should be taken during early winter after the leaves have fallen from the poisonous plants; the poison still exists in the vines and stubble remaining above the ground. Wash any contaminated skin immediately with cold water and mild soap. 5.21 Slips, trips and fall hazards On any work area, it is expected that the ground might be uneven. The ground surface might be unreliable due to settling. Surface debris might be present and wet or swampy areas can exist. Employees shall be vigilant in providing clear footing, clearly identifying obstructions, holes, or other tripping hazards and maintaining an awareness of uneven terrain and slippery surfaces. Fall hazards such as slips, trips and falls from elevations will be eliminated or guards will be erected around the hazard. Employees should walk around, not over or on top of debris or trash piles. When carrying equipment, identify a path that is clear of any obstructions. It might be necessary to remove obstacles to create a smooth, unobstructed access point to the work areas on site. Makeshift substitute ladders such as toolboxes, buckets, and coolers shall not be used. The use of cellular telephones (making or receiving calls) or texting should be avoided when walking. During the winter months, snow shovels and salt crystals or calcium chloride should be kept on site to keep work areas free of accumulated snow and ice. Furthermore, use sand or other aggregate material to help keep work surfaces from being slippery, especially where salt/calcium chloride cannot be used. In addition, make sure work boots have soles that provide good traction. When walking on ice is necessary crampons or Yaktrax® should be used. Maintaining a work environment that is free from accumulated debris is the key to preventing slip, trip and fall hazards at construction sites. Essential elements of good housekeeping include Orderly placement of materials, tools and equipment; Placing trash receptacles at appropriate locations for the disposal of miscellaneous rubbish; Prompt removal and secure storage of items that are not needed to perform the immediate task at hand; and Awareness on the part of all employees to walk around, not over or on, equipment that might have been stored in the work area. 5.22 Splashing Liquids Groundwater sampling activities can produce splashing hazards in the work area. Employees will use techniques that minimize the production of splashing hazards while handling liquids, including groundwater, sample container preservatives, decontamination solutions and any other liquids in the work area. Employees will also evaluate the working tasks to consider the use of goggles while working with liquids. AECOM Environment May 20121 5-19 5.23 Traffic Safety 5.23.1 Basic Procedures Heavy traffic in the parking areas and dispensing islands will be a concern to employees. The most danger is associated with tasks, such as groundwater sampling, where large machinery is not needed and employees are working low-to-the ground in a crouched position. To make certain that motorists are aware of our presence, all employees who are potentially exposed to traffic hazards should wear orange or yellow ANSI Class II or III safety vests. In accordance with AECOM Traffic Safety Protocol for Non-Intrusive Task At Retail Petroleum Facilities Work as found in Attachment G, the area should be delineated with traffic cones, or other suitable warning barriers, to prevent motorists from inadvertently driving through. As for vests, cones or other barrier materials should be reflectorized if work will be performed during dusk or evening hours. At a minimum, the on-site field technician will be required to complete the following to address traffic safety hazards when working at a retail facility: Prior to the start of work, field staff will communicate with the store manager or employee to let them know that you are on-site and the duration of your site work. Secure approval for any disturbances or impact to facility operations that might be required to complete the field task safely (shut-down of dispenser island, relocation of customer parking, etc.). If you do not receive cooperation from the facility stop work and notify the Project Manager. Conduct a site survey and determine the order in which the wells should be sampled based on your scope of work. Are there any obstacles on or near the wells? If so, can the obstacles be removed safely (i.e. vehicle, dumpster, water, ice/snow, etc.). When performing routine field tasks within paved parking areas, field staff will be required to use a vehicle as a safety barrier. Activate hazard lights, back the vehicle as close to the work area as possible. The front of the vehicle should be facing the heaviest flow of traffic. The objective is to work out the back of the vehicle, with the vehicle between you and the flow of traffic, thereby reducing exposure to traffic hazards. At a minimum, your work area behind the vehicle should be 5 feet x 5 feet, this should increase to 10 feet x 10 feet when working in the rain or snow. Safety gates with high visibility flagging will be used to mark your work zone . Large cones with high visibility flagging can only be used as an alternative to barriers as a last resort if barriers are not available. When on the ground or bent-over working on a road box, your back should be facing the vehicle. This approach allows you to be aware of your surroundings and offers protection for you blind spot (behind you). If your well or field task is in front of or immediately adjacent to a parking spot, block off the entire parking location prior to starting your sampling/gauging activities (refer to Figure 1). If you are sampling near a car, and are unsure about the competency of the driver or feel unsafe, remove yourself from the area until the driver leaves, or the area is safe. NOTE: If at any point, field staff do not feel that conditions are controlled enough to facilitate the safe completion of a field task STOP WORK AND REEVAULATE. AECOM Environment May 20121 5-20 5.23.2 Work On/Adjacent to Public Roadways For projects that involve potential exposure to traffic on or adjacent to public roadways, consult the "Work Zone Traffic Control" handbook, under "Traffic Control" on AECOM's H&S Website, at the following web address: http://intranet.AECOM.com/healthweb The handbook was developed by the State of Maine DOT and provides examples of traffic control applications for typical road work situations (e.g., closure of one lane of a two lane road, stationary work on the shoulder of a road, mobile work along the shoulder of a road, etc.). Although it was written to reflect the basic requirements of Part VI of the Federal Highway Administration's (FHWA) Manual of Uniform Traffic Control Devices (MUTCD), this handbook is not a regulatory document. Since specific requirements will vary from state to state, and within a state, by county, city or town. 5.23.3 Flagging/Redirecting Traffic Specific requirements exist when traffic must be redirected around a work area that is on or adjacent to a public roadway. In certain locations only police officers may redirect traffic. As a minimum, OSHA requires that flaggers be formally trained in accordance with the requirements specified in ANSI D6.1-1971. As a result, AECOM personnel should not redirect traffic on public roadways. http://www.atssa.com/cs/flagger Texas Flagging Requirements: Certification required every three years; Hardhat required. DOT must wear white. Contractors wear any color; Reflectorized safety vests required. and All training courses handled by ATSSA and Texas Engineering Extension Services. When traffic must be redirected, and the local police do not perform that role, a traffic control firm should be hired (these are frequently listed in the yellow pages under "safety"). 5.24 Utility Hazards 5.24.1 Underground Utilities Federal and state law requires that a utility clearance be performed at least two (2) working days prior to initiation of any subsurface work. The nation’s one call locating system can be accessed by calling 811. To request a mark-out of natural gas, electric, telephone, cable television, water and sewer lines in the proposed drilling locations. In many locations, a separate location request must be submitted to the municipality providing potable water, sanitary and storm sewerage. Work will not begin until the required utility clearances have been performed. Utility clearance organizations typically do not mark-out underground utility lines that are located on private property. As such, the drilling contractor must exercise due diligence and try to identify the location of any private utilities on the property being investigated. AECOM Environment May 20121 5-21 In accordance with AECOM Subsurface Boring Clearance Procedures At Retail Petroleum Facilities as found in Attachment G. At a minimum, prior to performing any subsurface assessment work, the Project Manager will be required to do the following list of activities: Request as-builts or other maps and information from the client concerning underground utilities, USTs, piping, etc. related to the site. If as-builts are not available or if there is no individuals on-site with knowledge of utility locations the project manager will evaluate the additional step of contacting a private utility clearing company. Confirm that the field staff understands the types of known and potential underground and above ground structures and their associated equipment. Confirm that the field staff has conducted a site walkover to visually identify known or potential structures or equipment (e.g. concrete pads, re-paved portions of the parking lot, etc.). Confirm that the field staff has conducted a visual inspection of the site and has identified all observable utilizes boxes, poles, manholes, etc. and has established obvious lines of underground connections between two or more of these structures. Confirm that the field staff understands the limits of the “UST equipment exclusion zone”, which encompasses all components of the UST system (tanks, product lines, dispensers, electric conduits, vent lines, etc.) and that no drilling or excavation should be performed within this zone without the specific pre-approval by the client manager and/or senior technical manager. See example site sketch attached. Confirm the size and types of USTs present (fiberglass, steel, etc.) in order to determine the minimal step-out drilling or excavation distance. Consider the elimination of any high risk task that may be included as part of the scope of work (i.e. not installing a boring in a high-traffic area or keeping a boring outside of the UST equipment exclusion zone). Make arrangements in the budget and scope of work to pre-clear each boring using hand tools or an air-vacuum excavator/air knife. When performing subsurface assessment work at retail facilities, field staff will be required to do the following list of activities: Conduct a site walkover to visually identify known or potential structures or equipment (e.g. concrete pads, re-paved portions of the parking lot, etc.). Using a copy of the DigSafe form for reference, the location of each utility will be identified. If not already completed during the Dig Safe process, once utility locations have been identified, each proposed boring location will be marked-out with white paint and if possible inspected and approved by the retail facility manager. NOTE: No drilling activities will be completed in the UST equipment exclusion zone without pre-approval. Field staff will make sure they are knowledgeable of all emergency response procedures for the facility including the location of the emergency shut-offs for the UST system and evacuation procedures prior to the start of any pre-clearing activities. AECOM Environment May 20121 5-22 Each boring will be pre-cleared using hand tools or an air-vacuum excavator/air knife. The diameter of the pre-cleared boring will be, at a minimum, 3-inches greater than the drill bit on the lead auger to be used. The boring will be cleared to a depth of 5 feet or deeper per regional guidelines below surface grade. If approval has been granted to drill within the UST equipment exclusion zone, the diameter of the pre-cleared boring will be 6-inches greater than the drill bit on the lead auger to be used. NOTE: That the pre-cleared boring will need to be re-cleared if augers are switched out during the drilling event to a larger diameter auger. During the pre-digging (digging) process for soil borings and monitoring wells, no further digging or excavation will occur if any of the following conditions exist: Peastone Fill sand Any other well-sorted, non-local material Debris Plastic, PVC, fiberglass or other UST or pipe-related material Resistance or obstructions The pre-drilled boring will be visually inspected by the field staff and the driller with a flashlight. The boring needs to be inspected to insure that a utility line is not present on the immediate perimeter or base of the cleared boring. Once the pre-drilled boring has been cleared and the augers have been placed into the hole: Drilling should advance at a relatively slow rate to a depth of 10 feet below surface grade. In sand, silt or clay soils the cutting key should be removed. A quick inspection is performed of the initial soil returns to verify that no plastic, PVC, fiberglass or other piping material is present. NOTE: In the event there is any evidence of contact with an underground utility or structure, drilling will immediately cease and the situation will be evaluated prior to the removal of equipment or augers. 5.24.2 Overhead Utilities All overhead lines will be considered “energized” unless properly de-energized, grounded and tested by the utility company before working within the clearance distance as defined below. The AECOM SSO must observe de-energizing process and reconfirm that the lines are de-energized on a daily basis. Any vehicle or mechanical equipment that is capable of having parts of its structure elevated near energized overhead lines shall be operated so that a minimum clearance of 10 feet is maintained at all times. This 10 foot distance shall be increased a minimum of 0.4 inches for each 1 kV over 50 kV. If the voltage of the overhead line is unknown, maintain a clearance distance of 35 feet from ground projection of the nearest power line to the vehicle. Any work within the clearance distance must be approved by the Regional Health and Safety Manager and the utility company. Precautions must be taken when handling lengths of pipe or tubing that can approach overhead power and utility lines. When working with pipe or tubing, maintain a distance equal to the length of pipe plus the clearance distance defined above. AECOM Environment May 20121 5-23 Personnel should also be aware of the limited clearance associated with the canopy that typically covers the dispensing island. 5.25 Weather 5.25.1 Inclement Weather The Site Safety Officer will check the weather forecast for the project area each morning prior to mobilization. Predicted weather conditions will be included in the Job Safety Analysis. Weather changes should initiate a review and update of the JSA as necessary. Severe weather can occur with little warning. The employee must be aware of the potentials for lightning, flash flooding and high wind events. Be Prepared, Know what is Coming your Way Listen to the radio for severe weather alerts. Check the Storm Prediction Center's web page for alerts and warnings. http://www.spc.noaa.gov/products/wwa/ Pay attention to the weather in your area, up wind of your location, and in the watershed up- stream from your location. When in the field, be aware of the route you must take to get to shelter. When working in low areas be aware of the potential for flash flooding and the route to higher ground. 5.25.2 Heat Stress Types of Heat Stress Heat related problems include heat rash, fainting, heat cramps, heat exhaustion and heat stroke. Heat rash can occur when sweat isn't allowed to evaporate; leaving the skin wet most of the time and making it subject to irritation. Fainting may occur when blood pools to lower parts of the body and as a result, does not return to the heart to be pumped to the brain. Heat related fainting often occurs during activities that require standing erect and immobile in the heat for long periods of time. Heat cramps are painful spasms of the muscles due to excessive salt loss associated with profuse sweating. Heat exhaustion is a result of the loss of large amounts of fluid and excessive loss of salt from profuse sweating. The skin will be clammy and moist and the affected individual may exhibit giddiness, nausea and headache. Heat stroke occurs when the body's temperature regulatory system has failed. The skin is hot, dry, red and spotted. The affected person may be mentally confused and delirious. Convul¬sions could occur. EARLY RECOGNITION AND TREATMENT OF HEAT STROKE ARE THE ONLY MEANS OF PREVENTING BRAIN DAMAGE OR DEATH. A person exhibiting signs of heat stroke should be removed from the work area to a shaded area. The person should be soaked with water to promote evaporation. Fan the person's body to increase cooling. AECOM Environment May 20121 5-24 Increased body temperature and physical discomfort also promote irritability and a decreased attention to the performance of hazardous tasks. Early Symptoms of Heat-Related Health Problems: decline in task performance excessive fatigue in-coordination reduced vigilance decline in alertness muscle cramps unsteady walk dizziness Susceptibility to Heat Stress Increases due to: lack of physical fitness obesity lack of acclimatization drug or alcohol use increased age sunburn dehydration infection People unaccustomed to heat are particularly susceptible to heat fatigue. First timers in PPE need to gradually adjust to the heat. The Effect of Personal Protective Equipment Sweating normally cools the body as moisture is removed from the skin by evaporation. However, the wearing of certain personal protective equipment (PPE), particularly chemical protective coveralls (e.g., Tyvek), reduces the body's ability to evaporate sweat and thereby regulate heat buildup. The body's efforts to maintain an acceptable temperature can therefore become significantly impaired by the wearing of PPE. Measures to Avoid Heat Stress: The following guidelines should be adhered to when working in hot environments: Establish work-rest cycles (short and frequent are more beneficial than long and seldom). Identify a shaded, cool rest area. Rotate personnel, alternative job functions. Water intake should exceed sweat produced. Most workers exposed to hot conditions drink less fluids than needed because of an insufficient thirst. DO NOT DEPEND ON THIRST TO SIGNAL WHEN AND HOW MUCH TO DRINK. Consume enough liquid to force urination every two hours. In humid climates ice water or ice should be consumed to help maintain normal body temperature since evaporation does not provide an efficient mechanism for heat removal. Eat light meals before and during work shifts. Avoid highly salted foods. Drink sports drinks such as Gatorade® diluted 1:1 with water. AECOM Environment May 20121 5-25 Save most strenuous tasks for non-peak heat hours such as the early morning or at night. Avoid alcohol during prolonged periods of heat. Alcohol will cause additional dehydration. Avoid double shifts and/or overtime. The implementation and enforcement of the above mentioned measures will be the joint responsibility of the Project Manager and health and the Site Safety Officer. Potable water and fruit juices should be made available each day for the field team. Heat Stress Monitoring Techniques Site personnel should regularly monitor their heart rate as an indicator of heat strain by the following method: Radial pulse rates should be checked by using fore-and middle fingers and applying light pressure top the pulse in the wrist for one minute at the beginning of each rest cycle. If the pulse rate exceeds 110 beats-per- minute (bpm), the next work cycle will be shortened by one-third and the rest period will be kept the same. If, after the next rest period, the pulse rate still exceeds 110 bpm, the work cycle will be shortened again by one-third. 5.25.3 Cold Stress Type of Cold Stress Cold injury is classified as either localized, as in frostbite, frostnip or chilblain; or generalized, as in hypothermia. The main factors contributing to cold injury are exposure to humidity and high winds, contact with wetness and inadequate clothing. The likelihood of developing frostbite occurs when the face or extremities are exposed to a cold wind in addition to cold temperatures. The freezing point of the skin is about 30o F. When fluids around the cells of the body tissue freeze, skin turns white. This freezing is due to exposure to extremely low temperatures. As wind velocity increases, heat loss is greater and frostbite will occur more rapidly. Symptoms of Cold Stress The first symptom of frostbite is usually an uncomfortable sensation of coldness, followed by numbness. There might be a tingling, stinging or aching feeling in the affected area. The most vulnerable parts of the body are the nose, cheeks, ears, fingers and toes. Symptoms of hypothermia, a condition of abnormally low body temperature, include uncontrollable shivering and sensations of cold. The heartbeat slows and can become irregular, the pulse weakens and the blood pressure changes. Pain in the extremities and severe shivering can be the first warning of dangerous exposure to cold. Maximum severe shivering develops when the body temperature has fallen to 95o F. Productive physical and mental work is limited when severe shivering occurs. Shivering is a serious sign of danger. Immediately remove any person who is shivering from the cold. Methods to Prevent Cold Stress AECOM Environment May 20121 5-26 When the ambient temperature, or a wind chill equivalent, falls to below 40o F (American Conference of Governmental Industrial Hygienists recommendation), site personnel who must remain outdoors should wear insulated coveralls, insulated boot liners, hard hat helmet liners and insulated hand protection. Wool mittens are more efficient insulators than gloves. Keeping the head covered is very important, since 40% of body heat can be lost when the head is exposed. If it is not necessary to wear a hard hat, a wool knit cap provides the best head protection. A facemask may also be worn. Persons should dress in several layers rather than one single heavy outer garment. The outer piece of clothing should ideally be wind and waterproof. Clothing made of thin cotton fabric or synthetic fabrics such as polypropylene is ideal since it helps to evaporate sweat. Polypropylene is best at wicking away moisture while still retaining its insulating properties. Loosely fitting clothing also aids in sweat evaporation. Denim is not a good protective fabric. It is loosely woven which allows moisture to penetrate. Socks with a high wool content are best. If two pairs of socks are worn, the inner sock should be smaller and made of cotton, polypropylene or similar types of synthetic material that wick away moisture. If clothing becomes wet, it should be taken off immediately and a dry set of clothing put on. If wind conditions become severe, it might become necessary to shield the work area temporarily. The SSO and the PM will determine if this type of action is necessary. Heated break trailers or a designated area that is heated should be available if work is performed continuously in the cold at temperatures, or equivalent wind chill temperatures, of 20o F. Dehydration occurs in the cold environment and can increase the susceptibility of the worker to cold injury due to significant change in blood flow to the extremities. Drink plenty of fluids, but limit the intake of caffeine 5.25.4 Work/Rest Cycles for Cold Weather If wind chill temperatures fall below minus 25º F, breaks from the cold will occur at a rate of one every hour. If wind chill temperatures fall below minus 45º F, all work will cease and persons will be required to go indoors. Also see Section 1.1.1 regarding shift duration. However, these guidelines can be modified at any time based on actual site conditions and professional judgment rendered by either the Field Manger and/or SSO. For example, the Field Manger and/or SSO will evaluate field crew fitness; the condition of their cold-weather gear, including boots; and will observe employees alertness, including fatigue and rate of cold tolerance/acclimation. If weather conditions warrant, portable tents might become necessary to shield the work area from wind, rain, snow, etc. The SSO and the Field Manager will determine if this type of action is necessary. However, under no conditions will the tents be heated and as a precautionary measure, a Photoionization Detector (PID) with a 10.6 eV lamp will be used to monitor the breathing zone of personnel inside the tent. See Section 6 for action levels based on PID readings. A JSA should be prepared and discussed with all workers detailing the precautions for working in these cold weather conditions. 5.26 Well Development and Groundwater Monitoring During purging and development of borings into monitoring wells, the PPE indicated in Section 7 below will be worn to avoid chemical contact / exposure, as well as physical trauma. Bailing wells AECOM Environment May 20121 5-27 requires proper gloves, eye protection, and possibly protective coveralls to prevent splashing. Back and lifting precautions outlined in this document shall be used to avoid ergonomic injuries. 5.27 Confined Spaces No confined space entries are planned or allowed on this project. When working in industrial settings, it is common to need to enter a confined space to make observations, collect samples, or perform other duties. AECOM employees or sub contractors must not enter any confined space containing a hazard... A confined space is defined as any space that meets the following criteria: Is not designed for human occupancy (excludes vehicles, elevator cabins etc,)(includes elevator shafts and wells, tanks, vaults, etc.) Is large enough to physically enter with the whole body, and Has a restricted exit path (you must climb over pipes, through manways, etc.) If the confined space contains any hazard, entry may only be made if permitted in writing by the space owner or the Regional Health and Safety Manger, the entry is monitored by an observer, and with the prior written approval of the AECOM Regional Health and Safety Manager. Typical hazards include but are not limited to: Flammable materials Toxic materials Corrosive materials Exposed electrical circuits Falls greater than six feet Moving machinery Oxygen deficient atmosphere If there is any doubt about whether a space meets the above criteria, call the AECOM Health and Safety Staff. AECOM Environment May 20121 6-1 6.0 Air Monitoring 6.1 Monitors NOTE: All subcontractors are responsible for providing, calibrating and maintaining all equipment, meters and monitoring devices that will be required for them to successfully completing their work. 6.1.1 Photoionization Detector As a precautionary measure, a Photoionization Detector (PID) with a 10.6 eV lamp will be used to monitor the breathing zone of personnel during the proposed activities. If the PID indicates sustained (5 minute) breathing zone vapor concentrations in excess of 5 ppm as isobutylene, respiratory protection, as described in Section 7.2 of this document, will be donned. A MultiRAE Plus, is a PID equipped with, Oxygen, LEL and two toxic gas sensors (CO, Hydrogen Sulfide), which would replace the requirement for an oxygen, explosive gas and carbon monoxide meters. 6.1.2 Oxygen Meter An oxygen meter will be used to monitor all atmospheres requiring an explosive gas meter. The oxygen level will be determined prior to the explosive gas level to assure that there is sufficient oxygen to support both human life and to allow the explosive gas meter to operate properly. 6.1.3 Explosive Gas Meter An explosive gas meter will be used to confirm that work area atmospheres contain less than 10% LEL before any cutting, welding, or other hot work is initiated and to monitor those areas during the activities. An explosive gas meter will be used to determine and monitor the air quality in any confined space entered. If the PID reading indicates a sustained (1 minute) concentration at any location in excess of 500 ppm as isobutylene or the instrument reads an off scale high concentration, a combustible gas meter will be obtained and used to verify that no concentrations exceed ten percent (10%) of the Lower Explosive Limit (LEL). If concentrations exceed 10% of LEL, all spark and heat producing equipment will be shut down until the concentration can be reduced below 10% of LEL. 6.1.4 Colorimetric Detector Tubes/Draeger Chip System If a properly calibrated PID reads 5 ppm as isobutylene sustained for 5 minutes colorimetric detector tubes, e.g. Draeger or Sensydine, or a Draeger Chip system equipped with the appropriate constituent monitoring chip, shall be used to confirm the presence and concentration of site-specific chemicals of concern, e.g. benenze. If a site-specific chemical of concern is detected at concentration of half its’ PEL then respiratory protection shall be used as described in Section 7.2 of this document. AECOM Environment May 20121 6-2 6.1.5 Carbon Monoxide Meter If hydrocarbon fuels such as gasoline, diesel, natural gas, or propane are used inside a building, a CO meter must be used to monitor the build up of exhaust gas in the building. The unit will be set to alarm at 25 ppm. If the alarm sounds, work will cease and all employees will leave the building. If carbon monoxide concentrations cannot be reduced, mechanical ventilation may be required. Even if the building is well-ventilated and the exhaust gas is ducted to the outside, a CO meter is still required. 6.1.6 Dust/Particulate Meter A particulate meter will be used to monitor dust levels within the work zone. If particulate levels exceed 1.0 mg/m3 in air, respiratory protection, as described in Section 7.2 of this document, will be donned. Additionally, actions will be taken to suppress particulates in the work area. Task Instrument Action Limit and Action All tasks involving potential exposure to contaminated soils and/or groundwater Photoionization Detector 5 ppm as isobutylene; Don respiratory protection as discussed in Section 7 All tasks involving potential flammable vapor concentrations above 10% of LEL Oxygen Meter Oxygen <19.5%; Will not support human breathing, will not support LEL meter operation, STOP WORK and evacuate work area. Oxygen >23.5%; Oxygen enriched environment which increases the likelihood of an explosive atmosphere, STOP WORK and evacuate the work area. All tasks involving potential flammable vapor concentrations Explosive gas meter 10% of LEL; Shutdown all ignition sources until vapor level is controlled, STOP WORK and evacuate. All tasks involving exposure to site chemicals of concern Colorimetric detector tubes or Draeger Chip System ½ OSHA PEL Don respiratory protection described in section 7.2 All indoor tasks where hydrocarbon fuels are used for heating or powering equipment. Carbon Monoxide Meter 10 ppm carbon monoxide; Begin ventilating area 25 ppm carbon monoxide; STOP WORK and evacuate. All tasks with the potential to generate dust. Particulate meter >1.0 mg/m3; Apply dust suppression controls and don respiratory protection >1.5 mg/m3; STOP WORK until levels are reduced below1.0 mg/m3 6.2 Personal Air Sampling The need for personal air sampling is not anticipated by AECOM during the activities covered by this HASP. The AECOM Project Manager, or the AECOM Regional Health and Safety Manager can prescribe personal air sampling based on observations or concerns recognized during the project. AECOM Environment May 20121 6-3 6.3 Calibration and Recordkeeping Equipment used by AECOM will be calibrated in accordance with AECOM's standard operating procedures. A log of the calibrations and readings will be kept in the field notebook. Daily calibration information will also be recorded in the field notebook. AECOM Environment May 20121 7-1 7.0 Personal Protective Equipment Personal protective equipment (PPE) will be worn during these activities to prevent on-site personnel from being injured by the safety hazards posed by the site and/or the activities being performed. In addition, chemical protective clothing will be worn to prevent direct dermal contact with the site’s chemical contaminants. The following table describes the PPE and chemical protective clothing to be worn for general site activities and for certain specific tasks. Site-specific PPE in addition to those referenced below are listed in the Site-Specific Emergency Information and Hazard Assessment section. 7.1 Personal Protective Equipment PPE Item General Soil boring/ Well installation Remedial Activities Sampling Hard Hat 1 & 2   2 Traffic Vests 2 2  2 Steel Toed Safety Shoes 1    Safety Glasses with Side shields 1    Goggles or Face shield 3 3 3 3 Hearing Protection 4   4 Tyvek Coveralls 5 5 5 5 Nitrile Gloves 5 5 5 5 Heavy Duty Work or Kevlar Gloves 6 6 6 6 Ivy Block® or Ivy Screen® barrier cream 7 7 7 7 Snake Protection 8 8 8 8 Polycoated Tyvek coveralls with hood, double Nitrile gloves, rubber boots, and taped transitions. 9 9 9 9  Required PPE 1 All employees must comply with client specific safety requirements. 2 Traffic vests and hardhats are required when working within twenty feet of any public road or any private road with active traffic. Hard hats are also required when working around heavy equipment, when falling objects may cause impact injuries, or when working around energized electrical lines. 3 Goggles or a Face Shield are necessary when splashing liquid hazards are present in the work area. If tool use presents a hazard of creating high velocity object hazards, a Face Shield is recommended to protect against face and eye trauma. 4 Hearing protection should be worn around soil boring equipment if normal conversation cannot be understood. 5 Tyvek coveralls and Nitrile gloves are only required of those that are likely to come in direct contact with potentially contaminated soils and/or groundwater. Tyvek coveralls and Nitrile gloves will be worn to protect workers from poison ivy and poison oak when contact cannot be avoided. 6 Heavy duty work gloves should be worn when handling tools and equipment that present pinch point and laceration hazards. Kevlar gloves should be used when cut and laceration hazards are present. AECOM Environment May 20121 7-2 7 Ivy Block® or Ivy Screen® barrier cream should be worn on exposed skin where there is a potential for exposure to poison ivy or oak. 8 Snake protection (e.g., boots and snake chaps) should be worn when walking through vegetated areas. 9 When working in areas with high potential for excessive contact with hazardous chemicals, precautions will be taken to reduce the potential for direct dermal contact that may incorporate the use of polycoated Tyvek, double gloves, and additional protective measures based upon the permeability of the PPE chosen and the potential for chemicals of concern to degrade the selected PPE. 7.2 Respiratory Protection As a precautionary measure, a Photoionization Detector (PID) with a 10.6 ev lamp will be used to monitor the breathing zone of personnel during the proposed activities. If the PID indicates sustained (5 minute) breathing zone vapor concentrations in excess of 5 ppm as isobutylene, respiratory protection, as described below will be donned. Task Action Limit Respiratory Protection Level All tasks involving potential exposure to contaminated soils and/or groundwater TLV/CF ppm as Isobutylene for 5 minute 10 X ppm as Isobutylene 50 X ppm as isobutylene Half or full face mask respirator with combination organic vapor/HEPA cartridges Full face respirator with organic vapor/HEPA cartridges STOP WORK C C All tasks with the potential to produce Dust 1.0 mg/m3 particulates in air 1.5 mg/m3 particulates in air Half or full face mask respirator with combination organic vapor/HEPA cartridges STOP WORK and apply dust suppression techniques until levels have returned to ambient conditions C C Respiratory protection (half or full face mask respirator with combination organic vapor/P-100 cartridges) should also be donned if odors become objectionable at any time or if respiratory tract irritation is noticed. All employees who are expected to don respiratory protection must have successfully passed a qualitative or quantitative fit-test within the past year for the brand, model and size respirator they plan to don. If worn, respirators will be cleaned after each use with respirator wipe pads and will be stored in plastic bags after cleaning. Respirators will be thoroughly cleaned using disinfectant material within one week following any respirator use. Refer to the cleaning instructions provided with the respirator or specified by Appendix B-2 to the OSHA regulations at 29 CFR 1910.134. 7.3 Other Safety Equipment The following is a list of additional safety items that may need to be available at the project site depending on the facility activity level, proximity to emergency assistance and other factors: AECOM Environment May 20121 7-3 Portable, hand-held eyewash bottles, First aid kit, Type A-B-C Fire extinguisher, Fire blanket, Emergency telephone and, if available, two-way radio on facility frequency, Emergency air horn, Drinking water, ice and cups, Caution tape or traffic cones, High visibility traffic vests (if working near vehicle traffic), Flashlight/lantern, and Spill containment kit. AECOM Environment May 20121 8-1 8.0 Site Control To prevent both exposure of unprotected personnel and migration of contamination due to tracking by personnel or equipment, hazardous work areas will be clearly identified and decontamination procedures will be required for personnel and equipment leaving those areas. 8.1 Designation of Zones AECOM designates work areas or zones as suggested in the "Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities," NIOSH/OSHA/USCG/EPA, November 1985. They recommend that the areas surrounding each of the work areas to be divided into three zones: Exclusion or "Hot" Zone Contamination Reduction Zone Support Zone 8.1.1 Exclusion Zone An exclusion zone will be established around the work area. The perimeter of the exclusion zone will be marked with caution tape, traffic cones or other identifier so that employees, visitors, and client or host employer personnel are aware of the work being conducted. All AECOM and contractor personnel entering these work areas must wear the prescribed level of protective equipment. 8.1.2 Contamination Reduction Zone A decontamination zone will be established adjacent to each work area. Personnel will remove contaminated gloves and other disposable items in this area and place them in a plastic bag until they can be properly disposed of. 8.1.3 Support Zone At this site the support zone will include the area outside of the exclusion zone. 8.1.4 Site Access Control The public will be restricted from the project site and monitoring well locations (during monitoring) by fences, barricade tape, traffic cones, and/or signs. 8.1.5 Parking and Staging Areas Parking will be restricted to areas that have been cleared of tall grass and combustible material. Vehicles parked on the public streets will be marked with cones both in front of and behind the vehicle. AECOM Environment May 20121 8-2 8.1.6 Pedestrian Walkways Pathways within the work areas will be kept clear of obstructions. Public pathways will be clearly marked to provide access to the business onsite and protect the public from the hazards of the project. 8.2 General Site Safety Practices The following measures are designed to augment the specific health and safety guidelines provided in this plan. The "buddy system" will be used by field personnel. Subcontractors working on-site with AECOM employees can help fulfill the role of a buddy while site activities are occurring. The store clerk can also fulfill the role of a buddy while site activities are occurring. If an employee will be alone in a work area, they will develop a procedure to contact their Supervisor or PM on a regular schedule to confirm that the employee is safe Eating, drinking, chewing gum or tobacco, smoking or any practice that increases the probability of hand-to-mouth transfer and ingestion of materials is prohibited in the immediate work area and the decontamination zone. Water and Ice may be consumed in all areas to prevent heat stress but precautions must be taken to prevent contamination of the water and ice. Smoking is prohibited in all work areas. Hands and face must be thoroughly washed upon leaving the work area and before eating, drinking or any other activities. Beards or other facial hair that interfere with respirator fit are prohibited. The use of alcohol or illicit drugs is prohibited during the conduct of field operations. All equipment must be decontaminated or properly discarded before leaving the site in accordance with the project work plan. Parking and pedestrian areas will be established and communicated to all workers. AECOM Environment May 20121 9-1 9.0 Decontamination 9.1 Personal Decontamination Proper decontamination is required of all personnel before leaving the site. Decontamination will occur within the contamination reduction zone. Regardless of the type of decontamination system required, a container of potable water and liquid soap should be made available so employees can wash their hands and face before leaving the site for lunch or for the day. 9.2 PPE Decontamination Disposable PPE, such as Tyvek coveralls, gloves, etc. will be removed in the decon zone and placed in garbage bags. Final disposal of contaminated PPE will be in accordance with the work plan. If worn, respirators assigned to an individual will be cleaned after each use with respirator wipe pads and will be stored upright in plastic bags. Respirators will be thoroughly cleaned using disinfectant material within one week following any respirator use. Respirators that have the potential to be shared by employees within the workplace will be completely dismantled and thoroughly cleaned after each use. Refer to the cleaning instructions provided with the respirator or specified by Appendix B-2 to the OSHA regulations at 29 CFR 1910.134. 9.3 Equipment Decontamination Equipment will be decontaminated prior to being moved to other locations. Decontamination procedures will be specified by the Project Manager. AECOM Environment May 20121 10-1 10.0 Medical Monitoring and Training Requirements Each worker subject to this HASP shall have copies of documentation that the requirements for training, medical surveillance, and respirator use are current. Copies of these documents shall be made available to AECOM or AECOM’s client upon request. 10.1 Medical Monitoring All personnel performing activities covered by this HASP must be active participants in a medical monitoring program that complies with 29 CFR 1910.120(f). Each individual must have completed an annual surveillance examination and/or an initial baseline examination within the last year prior to performing any work on the site covered by this HASP. 10.2 Health and Safety Training 10.2.1 HAZWOPER All personnel performing activities covered by this HASP must have completed the appropriate training requirements specified in 29 CFR 1910.120 (e). Each individual must have completed an annual 8-hour refresher training course and/or initial 40-hour training course within the last year prior to performing any work on the sites covered by this HASP. 10.2.2 Pre-Entry Briefing/Tailgate Meetings Prior to the commencement of daily project activities, a pre-entry briefing or tailgate meeting will be conducted by the SSO to review the specific requirements of this HASP, review and revise the JSA, discuss Incidents, Near Misses and lessons learned from the previous day’s activities, and discuss site conditions that have changed since the previous day or trip to the site. Attendance at the daily tailgate meeting is mandatory for all personnel covered by this HASP at the site and must be documented on the attendance form provided in Attachment D. HASP sign-off sheets should also be collected at the time of the tailgate meetings. All documentation should be maintained in the project file. The pre-entry briefing must be completed for each new employee before they begin work at the site. Short safety refresher meetings will be conducted, as needed, throughout the duration of the project. AECOM Environment May 20121 11-1 11.0 Emergency Response OSHA defines emergency response as any "response effort by employees from outside the immediate release area or by other designated responders (i.e., mutual-aid groups, local fire departments, etc.) to an occurrence which results, or is likely to result in an uncontrolled release of a hazardous substance." According to AECOM policy, AECOM personnel shall not participate in any emergency response where there are potential safety or health hazards (i.e., fire, explosion, or chemical exposure). AECOM response actions will be limited to evacuation and medical/first aid as described within this section below. As such this section is written to comply with the requirements of 29 CFR 1910.38 (a). The basic elements of an emergency evacuation plan include: employee training, alarm systems, escape routes, escape procedures, critical operations or equipment, rescue and medical duty assignments, designation of responsible parties, emergency reporting procedures and methods to account for all employees after evacuation. 11.1 Spill Response Employees are only authorized to respond to incidental spills and releases of hazardous substances. The following criteria must be met for a spill to be considered incidental with the employee having the ability to respond to the spill: Quantity of spilled material is minimal enough where additional, third party assistance is not needed to manage the spill Material is not immediately threatening to impact an open water way The conditions of the spill do not present a hazardous condition that is immediately dangerous to life and health (IDLH) The employee responding has: received training on proper spill response techniques relative to the spilled material full knowledge of what has been spilled and the proper clean up techniques to be used the means to protect themselves against exposure to harmful conditions caused by the spill including the necessary PPE AECOM Environment May 20121 11-2 the means to containerize and dispose of the spilled material properly Employees may be equipped with the following materials, assembled into a spill response kit, to manage incidental workplace spills: Absorbent pads or media, i.e. speedy-dry, kitty litter Broom and dust pan to clean up spent granular spill control media or impacted earth Shovel to clean up impacted earth or create a dam or dike to prevent the spill area from increasing Disposal drums and over-pack drums Appropriate waste identification labels Appropriate PPE If a spill is not considered incidental, then additional assistance will be sought to aid in clean-up. The responding employee shall contact the Project Manager and provide initial notification of the release. The Project Manager will then notify the client representative and determine a suitable course of action. . Consideration will need to be given to whether or not the spill is deemed to be a reportable quantity (RQ) by the EPA, if the National Spill Response Center needs to be contacted due to surface water impact, and if local, state or federal agencies need to be contacted to provide information related to public health threats and environmental impact. All spills must be reported to the AECOM PM and RSM, with the PM providing notification to the client representative, no matter how small the spill is. After initial response actions have been completed an incident investigation will be performed to determine the root causes of the incident and corrective actions, and lessons learned shall be shared to prevent future reoccurrence. Once the response is complete, the responding employee will also conduct an inventory of supplies used during the response effort and re-stock any used response equipment that could not be decontaminated and reused. 11.2 Employee Training Employees must be instructed in the site-specific aspects of emergency evacuation. On-site refresher or update training is required anytime escape routes or procedures are modified or personnel assignments are changed. 11.3 Alarm System/Emergency Signals An emergency communication system must be in effect at all sites. The simplest and most and effective emergency communication system in many situations will be direct verbal communications. Each site must be assessed at the time of initial site activity and periodically as the work progresses. Verbal communications must be supplemented anytime voices cannot be clearly perceived above ambient noise levels (i.e., noise from heavy equipment; drilling rigs, backhoes, etc.) and anytime a clear line-of-sight cannot be easily maintained amongst all AECOM personnel because of distance, terrain or other obstructions. Verbal communications will be adequate to warn employees of hazards associated with the immediate work area. The property is occupied but AECOM may not have access to facility phones. AECOM Environment May 20121 11-3 Therefore, AECOM will bring a portable phone to the site to ensure that communications with local emergency responders is maintained, when necessary. 11.4 Escape Routes and Procedures The escape route from the site and an emergency muster point will be determined and provided to all workers during the project mobilization. Prior to mobilizing to a new project area, the Site Safety Officer or his designee will confirm that the escape routes are clear and lead to a safe area. 11.5 Employee Accounting Method The SSO is responsible for identifying all AECOM personnel on-site at all times. AECOM and its subcontract employees will notify the SSO when they enter and leave the site. The SSO will account for all AECOM and its subcontract employees following an evacuation. 11.6 Injuries and Illnesses The phone numbers of the police and fire departments, ambulance service, local hospital, and AECOM representatives are provided in the emergency reference sheet on page 1. This sheet will be posted in the site vehicle. 11.6.1 First Aid Minor injuries will be treated on site using materials from the first aid kit or other local sources. All cuts and abrasions will be cleaned with potable water and a clean dressing applied. The injured employee will be evaluated at the end of the work day and the following day when the employee arrives at the project site to determine whether the wound has started the healing process. The wound will be protected from contamination during the project activities. 11.6.2 Professional Treatment In the event an injury or illness requires more than first aid treatment, the SSO will accompany the injured person to the medical facility and will remain with the person until release or admittance is determined. The escort will relay all appropriate medical information to the on-site project manager and the RSM. If the injured employee can be moved from the accident area, he or she will be brought to the CRZ where their PPE will be removed. If the person is suffering from a back or neck injury the person will not be moved and the requirements for decontamination do not apply. The SSO must familiarize the responding emergency personnel about the nature of the site and the injury. If the responder feels that the PPE can be cut away from the injured person's body, this will be done on-site. If this not feasible, decontamination will be performed after the injured person has been stabilized. 11.7 Designation of responsible parties The SSO is responsible for initiating emergency response. In the event the SSO cannot fulfill this duty, the alternate SSO will take charge. AECOM Environment May 20121 11-4 11.8 Emergency Response Drills For projects with durations of greater than four days on site, the SSO will initiate an evacuation drill during the first five days and shall repeat the drills at least quarterly. Deficiencies noted during the drills will be documented as a Near Loss, a Root Cause Analysis conducted and corrective actions initiated. A table-top run through of the evacuations procedures from the manufacturing site will be conducted the first day on the site and reviewed with all workers arriving on site after that date. Emergency Response drills and subsequent personnel briefings on evacuation procedures will be documented in the safety briefing agenda or briefing notes. 11.9 Incident Reporting and Investigation Any incident (other than minor first aid treatment) resulting in injury, illness or property damage requires an Incident investigation and report. The investigation should be conducted as soon as emergency conditions are under control. The purpose of the investigation is not to attribute blame but to determine the pertinent facts so that repeat or similar occurrences can be avoided. An AECOM Incident investigation form is presented in Attachment E of this HASP. The injured AECOM employee's supervisor, the AECOM Project Manager, and the RSM should be notified immediately of the injury. If a subcontractor employee is injured, they are required to notify the AECOM SSO. Once the incident is under control, the subcontractor will submit a copy of their company's Incident investigation report to the AECOM SSO. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment A Health and Safety Plan Review Form AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Health and Safety Plan Acceptance Form I have reviewed a copy of the Health and Safety Plan prepared for the above-referenced site and activities. I have read and understood its contents and I agree that I will abide by its requirements. Name Signature Date Representing AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment B Job Safety Analysis Form AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Job Safety Analysis JSA Type: Investigation O&M Office Construction New Revised Date: Work Activity: Personal Protective Equipment (PPE): Development Team Position/Title Reviewed By Position/Title Date  Job Steps1  Potential Hazards2  Critical Actions3 Stop Work Criteria AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment C Drill Rig Inspection Form AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Drill Rig Inspection Log Project Name: ___________________ Project Number: _____________________ Date: ____________ Subcontractor Inspected: __________________________ AECOM Site Manager:____________________________ General Safety Safety Officer Designated for Job:  Yes  No Name: Safety Meeting Performed (Daily)  Yes  No Personal Protective Equipment (PPE) Hard Hats  Yes  No Safety Glasses  Yes  No Steel Toed Boots  Yes  No Hearing Protection  Yes  No Work Gloves  Yes  No Orange Work Vests  Yes  No Traffic Cones and Signs  Yes  No Other  Yes  No Disposal of PPE in Proper Waste Containers (if applicable)  Yes  No Comments: Daily Inspections of Drill Rig: Structural Damage, Loose Bolts  Yes  No Proper Tension in Chain Drives  Yes  No Loose or Missing Guards, Fluid Leaks  Yes  No Damaged Hoses and/or Damaged Pressure  Yes  No Gages and Pressure Relief Valves  Yes  No Comments: Check and test all safety devices such as: Emergency shutdown switches, at least daily  Yes  No All gages and warning lights and ensure control levers are  Yes  No AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 functioning properly First Aid and fire extinguishers on drill rig  Yes  No Back up alarm functioning properly  Yes  No Comments: Drill Crew Training Requirements: 40-hour OSHA Training  Yes  No 8-hour Annual Refresher Training  Yes  No Drill Rig Training/Safe Operating Practices  Yes  No First Aid/CPR  Yes  No Emergency Procedures  Yes  No Emergency Phone Numbers Posted  Yes  No Site Orientation  Yes  No Health and Safety Plan Review  Yes  No Comments: Housekeeping: Suitable storage for tools, materials, and supplies  Yes  No Pipes, drill rods, casing, and augers stacked on racks to prevent rolling and sliding  Yes  No Platforms and other work areas free of debris materials and obstructions  Yes  No Comments: Hand Tools: Tools in good condition  Yes  No Broken tools discarded and replaced  Yes  No Right tool used for the right job  Yes  No Comments: AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Drilling Operations: Mast or derrick down when moving rig  Yes  No Overhead obstructions identified before mast is raised  Yes  No Drill rig stabilized using leveling jacks or solid cribbing  Yes  No Secure and lock derrick  Yes  No Comments: Overhead and Buried Utilities: Buried utilities identified and marked  Yes  No Safe distance of drill rig from overhead power lines  Yes  No Comments: Wire Line Hoists Wire Rope and Hardware: Inspection for broken wires where reduction in rope diameter, wire diameter, fatigue, corrosion, damage from gear jamming, crushing, bird caging, kinking  Yes  No Inspect and lubricate parts daily  Yes  No Comments: AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Auger Operations - What to look for: A system of responsibility between the operator and the tool handler when connecting and disconnecting auger sections and inserting and removing auger fork. During connecting and disconnecting auger sections and inserting auger for the tool, handler should position himself away from the auger column while it is rotating. When securing the auger to the power coupling, pin should be inserted and tapped into place using a hammer or other similar device. Tool hoist should be used to lower second section of auger into place. Both operators should be clear of auger as it is being lifted into place. Long-handled shovel should be used to move dirt away from auger. Overall Summary: ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment D Pre-Entry Briefing Attendance Form AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Health and Safety Pre-Entry Briefing Attendance Form Printed Name Signature Representing Conducted by: Date Performed: List of Daily Activities/Tasks 1. 2. 3. 4. Topics Discussed: 1. Review of the content of the HASP (Required 1st day; applicable sections ongoing) 2. 3. 4. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment E Supervisor’s Report of Incident AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Supervisor’s Report of Incident 1. Seek immediate medical attention if necessary. 2. Employee must report all incidents to their supervisor immediately. 3. Supervisor calls the Incident, Injury and Near Miss Reporting Line at (800) 348-5046. Section 1 - Organization Information Section 2 - Type of Incident (SRI Sections to be Completed) Section 3 – Contact/Incident Information Region: West Midwest Southwest/Mountain Southeast Mid-Atlantic Northeast District: Section/Dept Number: Business Line: Infrastructure-Water Infrastructure-Transportation Infrastructure-Energy & Power PDD-Facilities PDD-Design Environmental Office Name: Client Name: Project Number: Project Name: Injury/ illness (Sections 3, 4, and 7) Vehicle Incident (Sections 3, 4, 5, and 7) Property Damage (Sections 3, 4, 6 and 7) (Sections 3, 4, and 7) Regulatory Inspection or Notification: (Sections 3, 4,7) Other (describe) Employee/Claimant Name: Employee Job Title: Full-Time Employee Subcontractor/Subconsultant Temp Agency Employee Part-Time Employee Third Party Employee Work Phone: Cell Phone: Home Phone: Employee Number: Date/Time of Incident: Date/Time Reported to Supervisor: Street Address of Incident or approximately: City: State/Zip: Body Part Injured: Type of Treatment: Medical/hospital or doctor First Aid Only Medical Facility Contact Info: (Name, Address, Phone) AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Section 4 - Descriptions of Incident (employee, supervisor and witness statements) Employee Description of Incident: (use additional paper if necessary) Employee Signature: Date and Time: Supervisor Description of Incident: (Supervisor signs in Section 7) (use additional paper if necessary) Witness Name : Witness Address: Witness Phone No.: Witness Description of the Incident: (use additional paper if necessary) Witness Signature: Date and time: AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Section 5 - Vehicle Incident Information (fill out for motor vehicle incidents only) If Vehicle Owner is different from driver then complete owner’s contact information Owner Name: Address, City, State, Zip: Work Phone: Cell Phone: Authorities contacted? Yes No If so, who responded? Citations Issued? Yes No Type of Citation: Person Cited: Section 6 - General Liability (Fill out for property damage only) Description of damaged property: Where can the property be seen? Property Owner Name: Address, City, State, Zip: Work Phone: Cell Phone: 5a - AECOM Driver Name: Drivers License #: State Issued: Expiration Date: Vehicle Year: Make: Model: Color: License Plate: State: VIN Number: AECOM Vehicle was: AECOM Owned Leased Rented Personal Vehicle Who was involved? AECOM Vehicle(Section 5a) Another Vehicle(Section 5b) Pedestrian Property Use of Vehicle at Time of Incident: Office Visit Site Visit Client Meetings Field Work Personal Other__________ Vehicle Type: Commercial Motor Vehicle Non Commercial Motor Vehicle 5b - Name of Other Driver: Address: City: State/Zip: Work Phone: Cell Phone: Date of Birth: Drivers License #: State Issued: Expiration Date: Vehicle Year: Make: Model: Color: License Plate: State: VIN Number, Insurance Company Name, Insurance Policy Number: AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Section 7- Signatures Supervisor Print Name: Signature: Date: Telephone: Office/Location Manager Print Name: Signature: Date: Telephone: Regional SH&E Manager Print Name: Signature: Date: Telephone: Comments: Attention: This form must be completed and forward to the Regional SH&E Manager within one (1) business day following the occurrence of the incident. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment F Material Safety Data Sheets AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Alconox SPI Supplies Division Structure Probe, Inc. P.O. Box 656 West Chester, PA 19381-0656 USA Phone: 1-(610)-436-5400 Fax: 1-(610)-436-5755 E-mail: spi3spi@2spi.com WWW: http://www.2spi.com Manufacturer's CAGE: 1P573 Material Safety Data Sheet SPI #01200-AB and #01200A-AB Alconox® Powdered Detergent Section 1: Identification Date Effective........... November 14, 2005 (most recent revision) Chemical Name/Synonyms... On Label: Alconox® Chemical Family.......... Anionic powdered detergent Emergencies Contacting CHEMTREC: 24 Hour Emergency Use Only #'s... Worldwide phone: 1-(703)-527-3887 Worldwide FAX: 1-(703)-741-6090 Toll-free phone: 1-(800)-424-9300 USA only Product or Trade Name.... SPI #01200-AB and #01200A-AB Alconox® Powdered Detergent CAS #.................... Not applicable Chemical Formula......... Not applicable AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Section 2 Composition Component Name CAS # OSHA OSHA ACGIH ACGIH No hazardous ingredients in Alconox Powdered Detergent as defined by the OSHA Standard and Hazardous Substance List 29 CFR 1910 Subpart Z. Hazardous Material Information System USA Health 0 National Fire Protection Association USA Fire Hazard 0 Reactivity 0 Personal Protection NFPA (National Fire Protection Association) Rating (Scale 0-4): HEALTH=0 FLAMMABILITY=0 REACTIVITY=0 OTHER=0 Not known Section 3: Hazard Identification Routes of entry Inhalation? Yes Skin? No Ingestion? Yes Health Hazards (Acute and chronic): Inhalation of powder may prove locally irritating to mucous membranes. Ingestion may cause discomfort and/or diarrhea. Eye contact may prove irritating. Carcinogenicity: NTP? No IARC Monographs? No OSHA Regulated? No Section 4: First Aid Measures Signs and Symptoms of Exposure: Exposure may irritate mucous membranes. May cause sneezing. Medical conditions generally aggravated by exposure: Not established. Unnecessary exposure to this product or any industrial chemical should be avoided. Respiratory conditions may be aggravated by powder if air borne. Emergency and First Aid Procedures: AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Eyes: Immediately flush eyes with copious amounts of water for minimum 15 minutes. Call physician. Skin: Flush with plenty of water. Ingestion: Drink large quantities of water or milk. Do not induce vomiting. If vomiting occurs re-administer fluids. See a physician for discomfort. Section 5: Fire Fighting Measures NFPA Rating: Not known Extinguishing Media Suitable/Not suitable: SMALL FIRE: Use DRY chemical powder, water, foam, carbon dioxide LARGE FIRE: Use extinguishing media suitable for the surrounding materials. Special firefighting procedures: Self-contained positive pressure breathing apparatus and protective clothing should be worn when fighting fires involving chemicals. Unusual Fire/Explosion Hazards: None Hazardous thermal decomposition products: None known. Protection of fire fighters: No special measures are required. Flammable Limits: LEL: No data UEL: No data Section 6: Accidental Release Measures Personal precautions: No special precautions Environmental Precautions and Clean Up Methods: Material foams profusely. Recover as much as possible and flush remainder to sewer. Material is biodegradable. Section 7: Handling and Storage Material should be stored in a dry area to prevent caking. Section 8: Exposure Controls and Personal Protection Engineering controls: Normal ventilation is normally required when handling or using this product. Avoid conditions that could produce dusting. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Personal Protective Equipment Respiratory system: Dust mask recommended but not required. Skin and body: Laboratory coat recommended but not required. Hands: Impervious gloves recommended Eyes: Goggles are recommended, especially when handling solutions irrespective of what they might be. Other: Wash hands before eating, drinking, or smoking. Section 9: Physical and Chemical Properties Physical State and Appearance: White powder interspersed with cream colored flakes. Odor: None Boiling Point: Not applicable Melting Point: Not applicable Density (water = 1): Not applicable Solubility: Appreciable, to 10% at ambient conditions. Octanol/water partition coefficient: Not available pH: Not known Flash Point: None Flammability: Non-flammable Autoignition temperature: Not applicable Section 10: Stability and Reactivity Chemical Stability: The product is stable Hazardous polymerization: Will not occur Conditions to Avoid: None Hazardous Products of Deposition: May release CO2 on burning. Reactions with Air and Water: Does not react with air, water or other common materials. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Section 11: Toxicological Information Summary: Not considered to be toxic to humans or animals. Skin Effects: Can be locally irritating Eye Irritation: Can be irritating to the eyes Inhalation: Dust can be irritating to mucous membranes Sensitization: Not known Chronic toxicity: There is no known effect from the chronic exposure to this product. Section 12: Ecological Information Exotoxicity: Not know but it is expected to be low because the material is biodegradable. Environmental Fate: It is biodegradable. Bioaccumulation: Not expected to occur (because the material is biodegradable). Section 13: Disposal Considerations This material is NOT classified as a hazardous material by RCRA. Use only licensed transporters and permitted disposal facilities and conform to all laws. Recycle to process, if possible. Germany water class: VCI WGK: No products were found. Methods of disposal; waste of residues; contaminated packaging: Waste must be disposed of in accordance with federal, state and local environmental control regulations. Section 14: Transport Information Proper Shipping Name: Non-Regulated, No dangerous cargo DOT Hazard Class: Non-Regulated, No dangerous cargo UN/NA ID: Non-Regulated, No dangerous cargo Packing Group: Not Applicable Labels: Not Regulated AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Marine Pollutant: No NAER Guidebook: Not Regulated DOT Status: Not Regulated Land-Road/Railway: ADR/RID Class: No dangerous cargo Sea: IMDG Class: No dangerous cargo Air: IATA-DGR Class: No dangerous cargo Section 15: Regulatory Information TSCA: All components of this product are listed on the TSCA 8(b) inventory. If identified components of this product are listed under the TSCA 12(b) Export Notification Rule, they will be listed below. TSCA 12(b) Component Listed under TSCA Section SARA Title 3: Section 313 Information/Emissions Reporting (40 CFR 372): Component Reporting Threshold SARA-Section 311/312: No components present in this product are subject to the reporting requirements of this statute. CERCLA Hazardous Substances and their Reportable Quantities: Component Reportable Quantity EU Regulations: Risk Phrases: This product is not classified according to the EU regulations. Safety Phrases: Not applicable Contains: Not applicable California Prop. 65: Proposition 65 requires manufacturers or distributors of consumer products into the State of California to provide a warning statement if the product contains ingredients for which the State has found to cause cancer, birth defects or other reproductive harm. If this product contains an ingredient listed by the State of California to cause cancer or reproductive toxicity, it will be listed below: AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 None found Section 16: Other Information Disclaimer of Liability: Caution! Do not use SPI Supplies products or materials in applications involving implantation within the body; direct or indirect contact with the blood pathway; contact with bone, tissue, tissue fluid, or blood; or prolonged contact with mucous membranes. Products offered by SPI Supplies are not designed or manufactured for use in implantation in the human body or in contact with internal body fluids or tissues. SPI Supplies will not provide to customers making devices for such applications any notice, certification, or information necessary for such medical device use required by US FDA (Food and Drug Administration) regulation or any other statute. SPI Supplies and Structure Probe, Inc. make no representation, promise, express warranty or implied warranty concerning the suitability of these materials for use in implantation in the human body or in contact with internal body tissues of fluids. ************************************************************************ The information and recommendations set forth above are taken from sources believed to be accurate as of the date hereof, however SPI Supplies and Structure Probe, Inc. make no warranty with respect to the accuracy of the information or the suitability of the recommendations, and assume no liability to any user thereof. The information contained in this sheet does not constitute a hazard assessment and should not be used in place of the user's own assessment of work place risks as required by other health and safety legislation. Be aware of the Structure Probe, Inc. Copyright Policy. Structure Probe, Inc. grants a nonexclusive license to make unlimited copies of this safety sheet for internal use only. Quite obviously, this information would pertain only to this material when purchased from SPI Supplies as product from other sources, with other ingredients and impurity levels could have substantially different properties. Thursday February 22, 2007 © Copyright 2000 - 2007. By Structure Probe, Inc. Contacting SPI Supplies and Structure Probe, Inc. All rights reserved. All trademarks and trade names are the property of their respective owners. Privacy Policy Worldwide Distributors, Representatives, and Agents AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Isobutylene Calibration Gas MATERIAL SAFETY DATA SHEET Prepared to U.S. OSHA, CMA, ANSI and Canadian WHMIS Standards PART I What is the material and what do I need to know in an emergency? 1. PRODUCT IDENTIFICATION CHEMICAL NAME; CLASS: NON-FLAMMABLE GAS MIXTURE Document Number: 002103 PRODUCT USE: For general analytical/synthetic chemical uses. SUPPLIER/MANUFACTURER'S NAME: AIRGAS INC. ADDRESS: 259 North Radnor-Chester Road Suite 100 Radnor, PA 19087-5283 BUSINESS PHONE: 1-610-687-5253 EMERGENCY PHONE: 1-800-949-7937 International: 1-423-479-0293 DATE OF PREPARATION: April 22, 2001 2. COMPOSITION and INFORMATION ON INGREDIENTS CHEMICAL NAME CAS # mole % EXPOSURE LIMITS IN AIR ACGIH OSHA NIOSH IDLH ppm OTHER ppm TLV ppm STEL ppm PEL ppm STEL ppm Isobutylene 115-11-7 1 ppm - 1.7% There are no specific exposure limits for Isobutylene. Isobutylene is a simple asphyxiant (SA). Oxygen levels should be maintained above 19.5%. Air 25635- 88-5 Balance There are no specific exposure limits applicable to Air. Air is a mixture of gases. The primary components of air, and the approximate concentration of each component, are listed below Nitrogen 7727-37- 9 79% There are no specific exposure limits for Nitrogen. Nitrogen is a simple asphyxiant (SA). Oxygen levels should be maintained above 19.5%. Oxygen 7782-44- 7 21% There are no specific exposure limits for Oxygen NE = Not Established. See Section 16 for Definitions of Terms Used. NOTE (1): ALL WHMIS required information is included in appropriate sections based on the ANSI Z400.1-1998 format. This product has been classified in accordance with the hazard criteria of the CPR and the MSDS contains all the information required by the CPR. 3. HAZARD IDENTIFICATION EMERGENCY OVERVIEW: This product is a colorless, odorless, non-flammable gas. The main AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 health hazards associated with releases of this gas are related to the high pressure within the cylinder. Air, the main component of this product, is generally considered non-flammable, however, Air will support combustion. The flammable component of this gas mixture is below the LEL. A cylinder rupture hazard exists when this product, which is under pressure, is subjected to heat or flames. Emergency responders must wear personal protective equipment appropriate for the situation to which they are responding. SYMPTOMS OF OVER-EXPOSURE BY ROUTE OF EXPOSURE: The most significant route of over-exposure for air is by inhalation at elevated or reduced pressure. INHALATION: This product is non-toxic. Air, the main component of this product, is necessary for life. OTHER POTENTIAL HEALTH EFFECTS: Contact with rapidly expanding gases (which are released under high pressure) may cause frostbite. Symptoms of frostbite include change in skin color to white or grayish-yellow. The pain after contact with liquid can quickly subside. HEALTH EFFECTS OR RISKS FROM EXPOSURE: An Explanation in Lay Terms. Over-exposure to this product may cause the following health effects: ACUTE: The most significant hazards associated with compressed air is the pressure hazard. Contact with rapidly expanding gases (which are released under high pressure) may cause frostbite. Symptoms of frostbite include change in skin color to white or grayish-yellow. The pain after contact with liquid can quickly subside. CHRONIC: There are currently no known adverse health effects associated with chronic exposure to this gas. TARGET ORGANS: ACUTE: Respiratory system under ambient low pressure conditions. Central nervous system under ambient high pressure conditions. CHRONIC: None expected. PART II What should I do if a hazardous situation occurs? 4. FIRST-AID MEASURES RESCUERS SHOULD NOT ATTEMPT TO RETRIEVE VICTIMS OF EXPOSURE TO THIS PRODUCT WITHOUT ADEQUATE PERSONAL PROTECTIVE EQUIPMENT. At a minimum, Self- Contained Breathing Apparatus equipment should be worn. Victim(s) must be taken for medical attention. Rescuers should be taken for medical attention, if necessary. Take copy of label and MSDS to physician or other health professional with victim(s). Remove victim(s) to fresh air, as quickly as possible. In case of eye contact which leads to irritation, immediately flush eyes with copious amounts of water for at least 15 minutes. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Only trained personnel should administer supplemental oxygen. In case of frostbite, place the frostbitten part in warm water. DO NOT USE HOT WATER. If warm water is not available, or is impractical to use, wrap the affected parts gently in blankets. Alternatively, if the fingers or hands are frostbitten, place the affected area in the armpit. Encourage victim to gently exercise the affected part while being warmed. Seek immediate medical attention. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 MEDICAL CONDITIONS AGGRAVATED BY EXPOSURE: Acute or chronic respiratory conditions, as well as disorders involving the “Target Organs”, as listed in Section 3 (Hazard Information), may be aggravated by overexposure to the components of this product. RECOMMENDATIONS TO PHYSICIANS: Administer oxygen as soon as possible, following exposure. 5. FIRE-FIGHTING MEASURES FLASH POINT: Not applicable. AUTOIGNITION TEMPERATURE: Not applicable. FLAMMABLE LIMITS (in air by volume, %): Lower (LEL): Not applicable. Upper (UEL): Not applicable. 5. FIRE-FIGHTING MEASURES (Continued) FIRE EXTINGUISHING MATERIALS: Non-flammable gas. Use extinguishing media appropriate for surrounding fire. UNUSUAL FIRE AND EXPLOSION HAZARDS: When involved in a fire, this material may decompose and produce toxic gases including carbon monoxide and carbon dioxide. Additionally, when involved in fire, the cylinders may rupture. Explosion Sensitivity to Mechanical Impact: Not Sensitive. Explosion Sensitivity to Static Discharge: Not Sensitive. SPECIAL FIRE-FIGHTING PROCEDURES: Structural firefighters must wear Self-Contained Breathing Apparatus and full protective equipment. Move fire-exposed cylinders from area, if it can be done without risk to fire-fighters. Withdraw immediately in case of rising sounds from venting pressure relief devices or any discoloration of tanks or cylinders due to a fire. 6. ACCIDENTAL RELEASE MEASURES SPILL AND LEAK RESPONSE: Uncontrolled releases should be responded to by trained personnel using pre-planned procedures. Proper protective equipment should be used. In case of a release, clear the affected area, protect people, and respond with trained personnel. Minimum Personal Protective Equipment should be Level D: safety glasses, and mechanically-resistant gloves. Level B, which includes the use of Self- Contained Breathing Apparatus, should be worn when oxygen levels are below 19.5% or are unknown. Locate and seal the source of the leaking gas. If this does not stop the release (or if it is not possible to reach the valve), allow the gas to release in place or remove it to a safe area and allow the gas to be released there. PART III How can I prevent hazardous situations from occurring? 7. HANDLING and STORAGE WORK PRACTICES AND HYGIENE PRACTICES: Do not eat or drink while handling chemicals. STORAGE AND HANDLING PRACTICES: Cylinders should be stored in dry, well-ventilated areas away from sources of heat. Compressed gases can present significant safety hazards. Store containers away from heavily trafficked areas and emergency exits. SPECIAL PRECAUTIONS FOR HANDLING GAS CYLINDERS: Protect cylinders against physical damage. Store in cool, dry, well-ventilated, fireproof area, away from flammable or combustible materials and corrosive atmospheres. Store away from heat and ignition sources and out of direct sunlight. Do not store near elevators, corridors or loading docks. Do not allow area where cylinders AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 are stored to exceed 52 C (125 F). Isolate from incompatible materials including flammable materials (see Section 10, Stability and Reactivity), which can burn violently. Use only storage containers and equipment (pipes, valves, fittings to relieve pressure, etc.) designed for the storage of Air. Do not store containers where they can come into contact with moisture. Cylinders should be stored upright and be firmly secured to prevent falling or being knocked over. Cylinders can be stored in the open, but in such cases, should be protected against extremes of weather and from the dampness of the ground to prevent rusting. Never tamper with pressure relief devices in valves and cylinders. The following rules are applicable to situations in which cylinders are being used: Before Use: Move cylinders with a suitable hand-truck. Do not drag, slide or roll cylinders. Do not drop cylinders or permit them to strike each other. Secure cylinders firmly. Leave the valve protection cap in-place until cylinder is ready for use. During Use: Use designated CGA fittings and other support equipment. Do not use adapters. Do not heat cylinder by any means to increase the discharge rate of the product from the cylinder. Use check valve or trap in discharge line to prevent hazardous backflow into the cylinder. Do not use oils or grease on gas-handling fittings or equipment. After Use: Close main cylinder valve. Replace valve protection cap. Mark empty cylinders “EMPTY”. NOTE: Use only DOT or ASME code containers. Earth-ground and bond all lines and equipment associated with this product. Close valve after each use and when empty. Cylinders must not be recharged except by or with the consent of owner. For additional information refer to the Compressed Gas Association Pamphlet P-1, Safe Handling of Compressed Gases in Containers. Additionally, refer to CGA Bulletin SB-2 “Oxygen Deficient Atmospheres”. 7. HANDLING and STORAGE (Continued) PROTECTIVE PRACTICES DURING MAINTENANCE OF CONTAMINATED EQUIPMENT: Follow practices indicated in Section 6 (Accidental Release Measures). Make certain application equipment is locked and tagged out safely. Purge gas handling equipment with inert gas (i.e. nitrogen) before attempting repairs. Always use product in areas where adequate ventilation is provided. 8. EXPOSURE CONTROLS - PERSONAL PROTECTION VENTILATION AND ENGINEERING CONTROLS: Use with adequate ventilation. RESPIRATORY PROTECTION: Maintain Oxygen levels above 19.5% in the workplace. If respiratory protection is needed, use only protection authorized in the U.S. Federal OSHA Standard (29 CFR 1910.134), applicable U.S. State regulations, or the Canadian CSA Standard Z94.4-93 and applicable standards of Canadian Provinces. Oxygen levels below 19.5% are considered IDLH by OSHA. In such atmospheres, use of a full facepiece pressure/demand SCBA or a full facepiece, supplied air respirator with auxiliary self-contained air supply is required under OSHA’s Respiratory Protection Standard (1910.134-1998). EYE PROTECTION: Splash goggles, face-shields or safety glasses. If necessary, refer to U.S. OSHA 29 CFR 1910.133, or Canadian Standards. HAND PROTECTION: Wear mechanically-resistant gloves when handling cylinders of this product. If necessary, refer to U.S. OSHA 29 CFR 1910.138 or appropriate Standards of Canada. BODY PROTECTION: Use body protection appropriate for task. If a hazard of injury to the feet exists due to falling objects, rolling objects, where objects may pierce the soles of the feet or where employee’s feet may be exposed to electrical hazards, use foot protection, as described in U.S. OSHA 29 CFR. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 9. PHYSICAL and CHEMICAL PROPERTIES The following information is for Air, the main component of this product , unless otherwise stated: RELATIVE VAPOR DENSITY: 1 EVAPORATION RATE (nBuAc = 1): Not applicable. SPECIFIC GRAVITY: Not applicable. FREEZING POINT: -216.2°C (-357.2°F) SOLUBILITY IN WATER: 1.49% (v/v) BOILING POINT @ 1 atmos: -194.3°C(-317.8°F) VAPOR PRESSURE, mmHg @ 20°C:. pH: Not applicable. EXPANSION RATIO: Not applicable. VAPOR PRESSURE: Not applicable. SPECIFIC VOLUME: 13.3 ft3/lb; (0.833 m3/kg) ODOR THRESHOLD: Not applicable. COEFFICIENT WATER/OIL DISTRIBUTION: Not applicable. The following information is pertinent to this gas mixture: APPEARANCE, ODOR AND COLOR: This product is a colorless, odorless gas. HOW TO DETECT THIS SUBSTANCE (warning properties): There are no distinctive properties to this product. In terms of leak detection, fittings and joints can be painted with a soap solution to detect leaks, which will be indicated by a bubble formation. 10. STABILITY and REACTIVITY STABILITY: Normally stable. DECOMPOSITION PRODUCTS: None known. MATERIALS WITH WHICH SUBSTANCE IS INCOMPATIBLE. Air (the main component of this product) is not compatible with fuels, in that air will support combustion. The Isobutylene component of this mixture is incompatible with Strong oxidizers (e.g., chlorine, bromine pentafluoride, oxygen, oxygen difluoride, and nitrogen trifluoride). HAZARDOUS POLYMERIZATION: Will not occur. CONDITIONS TO AVOID: Contact with incompatible materials and exposure to heat, sparks and other sources of ignition. Cylinders exposed to high temperatures or direct flame can rupture or burst. PART III How can I prevent hazardous situations from occurring? 11. TOXICOLOGICAL INFORMATION TOXICITY DATA: The following toxicology data are for the components of this gas mixture present at a level greater than 1 mole %: ISOBUTYLENE: LC50 (Inhalation-Rat) 620 gm/m3/4 hours LC50 (Inhalation-Mouse) 415 gm/m3/2 hours SUSPECTED CANCER AGENT: No component of this gas mixture is found on the following lists: FEDERAL OSHA Z LIST, NTP, CAL/OSHA, IARC, and therefore is not considered to be, nor suspected to be, cancer causing agents by these agencies. IRRITANCY OF PRODUCT: Contact with rapidly expanding gases can cause frostbite and damage to exposed skin and eyes. SENSITIZATION OF PRODUCT: No component of this product is a skin or respiratory sensitizer. REPRODUCTIVE TOXICITY INFORMATION: Listed below is information concerning the effects of this product and its components on the human reproductive system. Mutagenicity: This product is not reported to cause mutagenic effects in humans. Embryotoxicity: This product is not reported to cause embryotoxic effects in humans. Teratogenicity: This product is not reported to cause teratogenic effects in humans. Reproductive Toxicity: This product is not reported to cause adverse reproductive effects in humans. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 A mutagen is a chemical which causes permanent changes to genetic material (DNA) such that the changes will propagate through generation lines. An embryotoxin is a chemical which causes damage to a developing embryo (i.e. within the first eight weeks of pregnancy in humans), but the damage does not propagate across generational lines. A teratogen is a chemical which causes damage to a developing fetus, but the damage does not propagate across generational lines. A reproductive toxin is any substance which interferes in any way with the reproductive process. BIOLOGICAL EXPOSURE INDICES: Biological Exposure Indices (BEIs) have been determined for the components of this product are as follows: 12. ECOLOGICAL INFORMATION ENVIRONMENTAL STABILITY: This gas will be dissipated rapidly in well-ventilated areas. EFFECT OF MATERIAL ON PLANTS or ANIMALS: No adverse effect is anticipated to occur to plant-life, except for frost produced in the presence of rapidly expanding gases. EFFECT OF CHEMICAL ON AQUATIC LIFE: No evidence of an adverse effect of this product on aquatic life is currently available. 13. DISPOSAL CONSIDERATIONS PREPARING WASTES FOR DISPOSAL: Product removed from cylinder must be disposed of in accordance with appropriate U.S. Federal, State and local regulations or with regulations of Canada and its Provinces. Return cylinders with residual product to Airgas, Inc. Do not dispose of locally. 14. TRANSPORTATION INFORMATION THIS GAS MIXTURE IS HAZARDOUS AS DEFINED BY 49 CFR 172.101 BY THE U.S. DEPARTMENT OF TRANSPORTATION. PROPER SHIPPING NAME: Compressed gases, n.o.s. (Air, Isobutylene) HAZARD CLASS NUMBER and DESCRIPTION: 2.2 (Compressed Gas) UN IDENTIFICATION NUMBER: UN 1956 PACKING GROUP: Not Applicable DOT LABEL(S) REQUIRED: Compressed Gas NORTH AMERICAN EMERGENCY RESPONSE GUIDEBOOK NUMBER (2000): 126 TRANSPORT CANADA, TRANSPORTATION OF DANGEROUS GOODS REGULATIONS: This gas mixture is considered as dangerous goods, per regulations of Transport Canada. Use the above information for the preparation of Canadian Shipments. 15. REGULATORY INFORMATION ADDITIONAL U.S. REGULATIONS: U.S. SARA REPORTING REQUIREMENTS: The components of this gas mixture are not subject to the reporting requirements of Sections 302, 304 and 313 of Title III of the Superfund Amendments and Reauthorization Act. U.S. SARA THRESHOLD PLANNING QUANTITY: There are no specific Threshold Planning Quantities for this material. The default Federal MSDS submission and inventory requirement filing threshold of 10,000 lb (4,540 kg) may apply, per 40 CFR 370.20. U.S. CERCLA REPORTABLE QUANTITY (RQ): Not applicable. U.S. TSCA INVENTORY STATUS: The components of this product are listed on the TSCA Inventory. OTHER U.S. FEDERAL REGULATIONS: Not applicable. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 U.S. STATE REGULATORY INFORMATION: The components of this gas mixture are covered under specific State regulations, as denoted below: Alaska - Designated Toxic and Hazardous Substances: None. California - Permissible Exposure Limits for Chemical Contaminants: None. Florida - Substance List: Isobutylene. Illinois - Toxic Substance List: None. Kansas - Section 302/313 List: None. Minnesota - List of Hazardous Substances: Isobutylene. Massachusetts - Substance List: None. Missouri - Employer Information/Toxic Substance List: None. New Jersey - Right to Know Hazardous Substance List: Isobutylene. North Dakota - List of Hazardous Chemicals, Reportable Quantities: None. Pennsylvania - Hazardous Substance List: Isobutylene. Rhode Island - Hazardous Substance List: None. Texas - Hazardous Substance List: None. West Virginia - Hazardous Substance List: None. Wisconsin - Toxic and Hazardous Substances: None. CALIFORNIA SAFE DRINKING WATER AND TOXIC ENFORCEMENT ACT (PROPOSITION 65): No component of this product is on the California Proposition 65 Lists. LABELING: CAUTION: HIGH PRESSURE GAS. MAY ACCELERATE COMBUSTION. Keep oil and grease away. Use equipment rated for cylinder pressure. Close valve after each use and when empty. Use in accordance with the Material Safety Data Sheet. FIRST-AID: IF INHALED, remove to fresh air. If not breathing, give artificial respiration. If breathing is difficult, give oxygen. Call a physician. IN CASE OF FROSTBITE, obtain immediate medial attention. DO NOT REMOVE THIS PRODUCT LABEL. ADDITIONAL CANADIAN REGULATIONS: CANADIAN DSL INVENTORY: The components of this product are listed on the DSL Inventory. OTHER CANADIAN REGULATIONS: Not applicable. CANADIAN ENVIRONMENTAL PROTECTION ACT (CEPA) PRIORITIES SUBSTANCES LISTS: The components of this product are not on the CEPA Priorities Substances Lists. CANADIAN WHMIS SYMBOLS: Class A: Compressed Gases 16. OTHER INFORMATION PREPARED BY: CHEMICAL SAFETY ASSOCIATES, Inc. 9163 Chesapeake Drive, San Diego, CA 92123-1002 858/565-0302 The information contained herein is based on data considered accurate. However, no warranty is expressed or implied regarding the accuracy of these data or the results to be obtained from the use thereof. AirGas, Inc. assumes no responsibility for injury to the vendee or third persons proximately caused by the material if reasonable safety procedures are not adhered to as stipulated in the data sheet. Additionally, AirGas, Inc. assumes no responsibility for injury to vendee or third persons AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 proximately caused by abnormal use of the material even if reasonable safety procedures are followed. Furthermore, vendee assumes the risk in his use of the material. DEFINITIONS OF TERMS A large number of abbreviations and acronyms appear on a MSDS. Some of these which are commonly used include the following: CAS #: This is the Chemical Abstract Service Number which uniquely identifies each constituent. EXPOSURE LIMITS IN AIR: ACGIH - American Conference of Governmental Industrial Hygienists, a professional association which establishes exposure limits. TLV - Threshold Limit Value - an airborne concentration of a substance which represents conditions under which it is generally believed that nearly all workers may be repeatedly exposed without adverse effect. The duration must be considered, including the 8- hour Time Weighted Average (TWA), the 15-minute Short Term Exposure Limit, and the instantaneous Ceiling Level (C). Skin absorption effects must also be considered. OSHA - U.S. Occupational Safety and Health Administration. PEL - Permissible Exposure Limit - This exposure value means exactly the same as a TLV, except that it is enforceable by OSHA. The OSHA Permissible Exposure Limits are based in the 1989 PELs and the June, 1993 Air Contaminants Rule (Federal Register: 58: 35338-35351 and 58: 40191). Both the current PELs and the vacated PELs are indicated. The phrase, “Vacated 1989 PEL,” is placed next to the PEL which was vacated by Court Order. IDLH - Immediately Dangerous to Life and Health - This level represents a concentration from which one can escape within 30- minutes without suffering escape-preventing or permanent injury. The DFG - MAK is the Republic of Germany’s Maximum Exposure Level, similar to the U.S. PEL. NIOSH is the National Institute of Occupational Safety and Health, which is the research arm of the U.S. Occupational Safety and Health Administration (OSHA). NIOSH issues exposure guidelines called Recommended Exposure Levels (RELs). When no exposure guidelines are established, an entry of NE is made for reference. HAZARD RATINGS: HAZARDOUS MATERIALS IDENTIFICATION SYSTEM: Health Hazard: 0 (minimal acute or chronic exposure hazard); 1 (slight acute or chronic exposure hazard); 2 (moderate acute or significant chronic exposure hazard); 3 (severe acute exposure hazard; onetime overexposure can result in permanent injury and may be fatal); 4 (extreme acute exposure hazard; onetime overexposure can be fatal). Flammability Hazard: 0 (minimal hazard); 1 (materials that require substantial pre-heating before burning); 2 (combustible liquid or solids; liquids with a flash point of 38- -3 4 [0 (normally stable); 1 (material that can become unstable at elevated temperatures or which can react slightly with water); 2 (materials that are unstable but do not detonate or which can react violently with water); 3 (materials that can detonate when initiated or which can react explosively with water); 4 (materials that can detonate at normal temperatures or pressures). PERSONAL PROTECTIVE EQUIPMENT CODES: B: Gloves and goggles; C: Gloves, AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 goggles, rubber apron (appropriate body protection); D: Gloves, goggles, faceshield; rubber apron (appropriate body protection);. X: Special attention should be given to PPE Selection. NATIONAL FIRE PROTECTION ASSOCIATION: Health Hazard: 0 (material that on exposure under fire conditions would offer no hazard beyond that of ordinary combustible materials); 1 (materials that on exposure under fire conditions could cause irritation or minor residual injury); 2 (materials that on intense or continued exposure under fire conditions could cause temporary incapacitation or possible residual injury); 3 (materials that can on short exposure could cause serious temporary or residual injury); 4 (materials that under very short exposure could cause death or major residual injury). Flammability Hazard and Reactivity Hazard: Refer to definitions for “Hazardous Materials Identification System”. FLAMMABILITY LIMITS IN AIR: Much of the information related to fire and explosion is derived from the National Fire Protection Association (NFPA). Flash Point – Minimum temperature at which a liquid gives off sufficient vapors to form an ignitable mixture with air. Autoignition Temperature: The minimum temperature required to initiate combustion in air with no other source of ignition. LEL - the lowest percent of vapor in air, by volume, that will explode or ignite in the presence of an ignition source. UEL – the highest percent of vapor in air, by volume, that will explode or ignite in the presence of an ignition source. TOXICOLOGICAL INFORMATION: Possible health hazards as derived from human data, animal studies, or from the results of studies with similar compounds are presented. Definitions of some terms used in this section are: LD50 - Lethal Dose (solids & liquids) which kills 50% of the exposed animals; LC50 – Lethal Concentration (gases) which kills 50% of the exposed animals; ppm concentration expressed in parts of material per million parts of air or water; mg/m3 concentration expressed in weight of substance per volume of air; mg/kg quantity of material, by weight, administered to a test subject, based on their body weight in kg. Data from several sources are used to evaluate the cancer-causing potential of the material. The sources are: IARC - the International Agency for Research on Cancer; NTP - the National Toxicology Program, RTECS - the Registry of Toxic Effects of Chemical Substances, OSHA and CAL/OSHA. IARC and NTP rate chemicals on a scale of decreasing potential to cause human cancer with rankings from 1 to 4. Subrankings (2A, 2B, etc.) are also used. Other measures of toxicity include TDLo, the lowest dose to cause a symptom and TCLo the lowest concentration to cause a symptom; TDo, LDLo, and LDo, or TC, TCo, LCLo, and LCo, the lowest dose (or concentration) to cause lethal or toxic effects. BEI - Biological Exposure Indices, represent the levels of determinants which are most likely to be observed in specimens collected from a healthy worker who has been exposed to chemicals to the same extent as a worker with inhalation exposure to the TLV. Ecological Information: EC is the effect concentration in water. REGULATORY INFORMATION: This section explains the impact of various laws and regulations on the material. EPA is the U.S. Environmental Protection Agency. WHMIS is the Canadian Workplace Hazardous Materials Information System. DOT and TC are the U.S. Department of Transportation and the Transport Canada, respectively. Superfund Amendments and Reauthorization Act (SARA); the Canadian Domestic/Non-Domestic Substances List (DSL/NDSL); the U.S. Toxic Substance Control Act (TSCA); Marine Pollutant status according to the DOT; the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA or Superfund); and various state regulations. AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment G Traffic Safety Protocol for Non-Intrusive Tasks at Retail Petroleum Facilities AECOM Environment \\usral1vfp001\JOBS\Projects\S\7-Eleven\Kill Devil Hills\20-day report\Appendices\App A - 19847 HASP (on CD).doc November 2011 Attachment H Subsurface Boring Clearance Procedures at Retail Petroleum Facilities