Loading...
HomeMy WebLinkAboutRA-29812_48917_CA_SCH_20230316  March 16, 2023 Mark Powers NCDEQ RRO UST Section Supervisor 3800 Barrett Drive Raleigh, NC 27609 Reference: Spill Bucket Site Check Report Refuel 176 6700 Hilburn Road, Raleigh, NC 27409 NCDEQ Facility ID #0-0-0000039389 Dear Mr. Powers: Contained herein is a report summarizing Site Check activities for the above referenced facility. These activities were conducted pursuant to a NOV issued by Charlie Stangle of the NCDEQ Permits and Inspections branch. On March 14, 2023, Henry Nemargut Engineering Services mobilized personnel and drilling equipment to the site to assess the condition of in-situ soils beneath the premium gasoline and diesel spill buckets. Due to the presence of pea gravel in the UST basin to a depth of approximately 13’-14’, samples were obtained from auger borings initiated from the edge of the UST basin. The angled borings were advanced to allow collection of a soil sample beneath the pea gravel backfill at a depth of approximately 1’ beneath the pea gravel bed (approximately 15’ below ground surface). The sample obtained from the premium gasoline spill bucket area was labeled PSB, and the sample beneath the diesel spill bucket was labeled DSB. Both soil samples were containerized for submittal to RedLab, LLC for UVF analyses as allowed by the NCDEQ for gasoline/diesel site check investigations. The soil samples were obtained as specified in the collection, preservation, and handling section of the specific method. Each container was labeled with sample location, analyses to be performed, time, date, and the sampler's name. They were then placed in a cooler and chilled with ice to approximately 4oC in preparation for transportation to the analytical laboratory utilizing EPA approved chain of custody procedures. Laboratory analytical results for soil samples PSB and DSB indicated TPH-GRO/DRO levels below current NCDEQ action levels for these compound groups. A copy of the laboratory analytical report and the chain of custody record for the soil samples collected from this site are contained in Appendix A. Based on the results from the laboratory soil analyses, Henry Nemargut Engineering Services recommends no further action in response to the site check conducted at the premium gasoline and diesel spill buckets at this site. Mr. Powers, please contact me at (336) 316-0452 if you have questions regarding this report. Sincerely, Henry Nemargut, P.E. Henry Nemargut Engineering Services FIGURE Refuel 176 #00-0-0000039389 Legend 6700 Hilburn Dr 100 ft N➤➤N APPENDIX A LABORATORY ANALYTICAL RESULTS Hydrocarbon Analysis ResultsClient:HN ENGINEERINGSamples takenTuesday, March 14, 2023Address:2211 CHESTNUT STSamples extractedWednesday, March 15, 2023WILMINGTON NCSamples analysedWednesday, March 15, 2023Contact:HENRY NEMARGUTOperatorMAX MOYERProject:REFUEL 1762F03640Matrix Sample IDDilution usedBTEX (C6 - C9)GRO (C5 - C10)DRO (C10 - C35)TPH (C5 - C35)Total Aromatics (C10-C35)16 EPA PAHsBaP HC Fingerprint Match% light % mid% heavys PSB 25.5 <0.64 <0.64 49.3 49.3 24.1 2.6 0.046 0 89 11Road Tar 92.8%,(FCM)s DSB 22.0 <0.55 9.9 0.86 10.76 0.62 <0.18 <0.022 94.9 3.9 1.2V.Deg.PHC 55.1%,(FCM)Initial Calibrator QC checkOKFinal FCM QC CheckOK 100 %Results generated by a QED HC-1 analyser. Concentration values in mg/kg for soil samples and mg/L for water samples. Soil values are not corrected for moisture or stone contentFingerprints provide a tentative hydrocarbon identification. The abbreviations are:- FCM = Results calculated using Fundamental Calibration Mode : % = confidence for sample fingerprint match to library(SBS) or (LBS) = Site Specific or Library Background Subtraction applied to result : (PFM) = Poor Fingerprint Match : (T) = Turbid : (P) = Particulate presentRatios