Loading...
HomeMy WebLinkAbout7304_UpperPiedmontMSWLF_2023 Financial Assurance_FID1799021_20230605HODGES, HARBIN, NEWBERRY & TRIBBLE, INC. Consulting Engineers June 5, 2023 Ms. Sarah M. Moutos Environmental Program Consultant Division of Waste Mgmt - Solid Waste Section North Carolina Dept of Environmental Quality 217 W. Jones Street Raleigh, NC 27603 Re: Upper Piedmont Regional MSW Landfill Person County, North Carolina Facility Permit No. 73-04 Closure / Post -Closure Cost HHNT Project No. 6703-304-05 / 6703-304-14 Dear Ms. Moutos: We have enclosed the updated Closure/Post-Closure Cost Estimate for Financial Assurance on the subject project. Please note, these costs have been updated to 2023 dollars. These costs are summarized below: Closure Costs............................................................................................... $10,441,958.82 Post -Closure Costs......................................................................................... $6,630,430.00 Potential Assessment and Corrective Action ................................................. $2,608,361.26 Total Financial Assurance............................................................................ $19,680,750.08 The annual financial assurance mechanism will be submitted under separate cover after these costs have been approved. Should you have any questions, please call. Sincerely, HODGES, HARBIN, NEWBERRY & TRIBBLE, INC. f< � C� K Matthew Cheek, P.E. Professional Engineer KMC/sc Enclosure �SS/0. . .; 2249 c � e: -�y TfhEl cc: Sherri Stanley (w/ enclosure) Matt Einsmann, PE (w/ enclosure) Allen Gaither, PE (w/ enclosure) Scott Harless (w/ enclosure) 3920 Arkwright Road, Suite 101 • Macon, Georgia 31210 (478) 743-7175 • Fax (478) 743-1703 • www.hhnt.com SAVANNAH • ATLANTA • Macon • STATESBORO • GREENVILLE, SC UPPER PIEDMONT REGIONAL LANDFILL FACILITY PERMIT NO.73-04 PERSON COUNTY, NC CLOSURE COST ESTIMATE 2023 UPDATE GENERAL Largest Area: Cells No. 1 - 4, 5A, 6A, 5B, & 6B = 3,018,708 s.f. = 69.3 acres CLOSURE CARE COST ESTIMATE 1 Contractor Mobilization 1 L.S. @ 2 Subgrade Preparation 3,018,708 s.f. @ 3 6" Topsoil 3,018,708 s.f. x 0.5 ft. — 27 ft3/cy = 55,902 c.y. @ 4 18" Cover Soil 3,018,708 s.f. x 1.5 ft. — 27 ft3/cy = 167,706 c.y. @ 5 18" Infiltration Layer (1 x 10-5 cm/sec) 45,729 s.f. x 1.5 ft. — 27 ft3/cy = 6 Drainage Layer (Geocomposite) Material Labor 7 FML Material & Installation 8 Permanent Vegetation 9 Silt Fence 10 Excelsior Matting 11 Final Disposal of Waste & Cleanup 12 Downdrain Construction 13 Stormwater Diversion Berms 14 Stormwater Channels & Lining 15 Sediment Basin Cleanout 16 Landfill Gas Extraction System Expansion 17 Waste Limit Survey for Deed Recordation 18 Engineering and Closure Certification 19 CQA Monitoring & Reporting (including Field & Lab testing) 20 Certification Surveying $53,500.00 = $53,500.00 $0.23 = $694,302.84 $6.25 = $349,387.50 $7.15 = $1,199,097.90 2,541 c.y. @ $12.75 = $32,391.38 3,018,708 s.f. @ $0.52 = $1,569,728.16 3,018,708 s.f. @ $0.16 = $482,993.28 3,018,708 s.f. @ $0.62 = $1,871,598.96 69.3 ac @ $3,150.00 = $218,295.00 2,625 11 @ $4.25 = $11,156.25 335,412 s.y. @ $2.10 = $704,365.20 630 tons @ $53.00 = $33,390.00 3,541 l.f. @ $83.00 = $293,903.00 31,617 11 @ $23.75 = $750,903.75 13,530 s.y. @ $96.00 = $1,298,880.00 3,150 c.y. @ $7.50 = $23,625.00 1 L.S. @ $110,000.00 = $110,000.00 1 L.S. @ $6,950.00 = $6,950.00 69.3 ac @ $2,850.00 = $197,505.00 69.3 ac @ $6,900.00 = $478,170.00 69.3 ac @ $892.00 = $61,815.60 TOTAL CLOSURE COST (2023) $10,441,958.82 UPPER PIEDMONT REGIONAL LANDFILL FACILITY PERMIT NO. 73-04 PERSON COUNTY, NC POST CLOSURE CARE COST ESTIMATE 2023 UPDATE Constructed Area Covered by this Est. = 69.3 1 Water Monitoring & Statistics (Includes Appendix I sampling, analysis & reporting for 2 events per year.) Groundwater 12 wells @ 2 event/yr @ $1,550.00 = $37,200.00 Surface Water 2 locations @ 2 event/yr @ $219.00 = $876.00 Leachate 1 sample @ 2 event/yr @ $1,025.00 $2,050.00 2 Methane Gas Monitoring 5 wells @ 4 events/yr @ $26.75 = $535.00 3 Sediment & Erosion Control, (including Inspections, Repairs to Cap, Slope & Vegetation) 1 L.S. @ $17,500.00 $17,500.00 4 Sediment Basin Cleanout 1,100 C.Y. @ $7.90 = $8,690.00 5 Leachate Collection Treatment & Analysis (Average over 30 years) 1 L.S. @ $39,320.00 = $39,320.00 6 Leachate System Maintenance (including camera & jetting every 5 yrs) 1 L.S. @ $12,500.00 = $12,500.00 7 Alarm System Monitoring 1 L.S. @ $1,150.00 = $1,150.00 8 Engineering Inspections & Reporting 4 yr @ $1,600.00 = $6,400.00 9 Air Emissions Testing & Reporting 1 yr @ $3,200.00 = $3,200.00 10 Operation & Maintenance of the Methane Gas Collection System 1 yr @ $62,000.00 = $62,000.00 11 Mowing 2 yr @ $5,500.00 = $11,000.00 12 Site Maintenance & Repair (including fencing, gates, security, paths to final cover system & 1 L.S. @ $1,450.00 = $1,450.00 monitoring network) ANNUAL POST CLOSURE CARE COST (2023) $203,871.00 X 30 YEARS $6,116,130.00 13 Leachate System Decommissioning (one-time cost) 2 Ea. @ $80,200.00 = $160,400.00 14 LFG System Decommissioning (one-time cost) (including conversion to passive vents) 1 L.S. @ $353,900.00 = $353,900.00 ANNUAL POST CLOSURE CARE COST (2023) $514,300.00 TOTAL 30 YEAR COST (2023) $6,630,430.00