HomeMy WebLinkAboutWS-10123_45265_F_SLTA_20191029TA#: 01
NCDEQ – Division of Waste Management – UST Section –Trust Fund Branch
TASK AUTHORIZATION
October 29, 2019
To: Withers And Ravenel Incident Name: Former Hanmmond Exxon
Contract #: N17005 Incident Number: TF-45265
Project Manager: Matt James Region: Winston-Salem
Phone Number: County: Randolph
Fax Number: City: Asheboro
Authorized By: Herb Berger
Regional Ofc. Contact:
Phone Number: 919-707-8170 Phone Number: (336) 771-4608
Fax Number: Fax Number: (336) 771-4632
TOTAL TASK NOT TO EXCEED $7,680.00
TASKS TO BE PERFORMED:
Completion of a Receptor Survey.
Collection of two groundwater samples for Risk Based Analysis:
GP-7 (VOCs, SVOCs, MADEP VPH/EPH, and Lead);
GP-13 (SVOCS and EPH).
DEADLINE FOR TASK COMPLETION: January 10. 2020
CONTRACT #:
INCIDENT #:
CITY:
COUNTY:
PHONE NO:
Listed below
DATE:
1)
2)
3)
4)
5)
6)
7)
Units Lab/SubCode # Units Rate Cost
1.010 Site ---1 $500.00 $500.00
1.020 Site ---1 $1,080.00 $1,080.00
3.060 Cost ---0 $1,500.00 $0.00
3.101 Foot ---50 $10.00 $500.00
3.111 Foot ---0 $20.00 $0.00
3.113 Foot ---50 $50.00 $2,500.00
3.398 Event ---1 $250.00 $250.00
4.031 Well ---1 $140.00 $140.00
4.031 Well 1 $80.00 $80.00
6.090 report ---1 $1,250.00 $1,250.00
12.050 Trip ---0 $220.00 $0.00
4.090 Sample 272 1 $62.00 $62.00
4.090 Sample 301 2 $196.00 $392.00
4.090 Sample 330 1 $13.00 $13.00
4.090 Sample 341 1 $52.00 $52.00
4.090 Sample 342 2 $94.00 $188.00
4.090 Sample 409 1 $79.00 $79.00
4.090 Sample 410 2 $176.00 $352.00
4.090 Sample 421 1 $54.00 $54.00
4.090 Sample 422 2 $94.00 $188.00
$7,680.00
45 Days Following Approval
Advancement of 1 soil boring at the location of Pyramid soil boring GP-7 (former UST area). Collection of a Risk Based Parameters for
VOCs, SVOCs, and MADEP VPH/EPH.
Advancement of 1 soil boring at the location of Pyramid soil boring GP-13 (hydraulic lift). Collection of a Risk Based Parameters for SVOCs
and EPH.
One permanent type II groundwater monitoring well will be installed location of GP-7 and one permanent type II groundwater monitoring
well will be installed at the location of GP-13. Both are estimated to be completed to a depth of 25 ft below ground surface.
Hydrocarbon Sampling (soil)
TRAVEL TIME & LODGING
EPA METHOD 5035/8260 (Including MTBE & IPE)
EPA METHOD 8270 (Base Neutral and Acid Extractables)
Massachussetts Dept. of Environmental Protection VPH: Aliphatics/Aromatics
Massachussetts Dept. of Environmental Protection EPH: Aliphatics/Aromatics
2-inch Well (Includes 1 - 10 ft boring from dispenser area and 1 - 15 ft boring from UST area)
Cost for Sampling Well (Subsequent Wells)
PRE-DRILLING TASKS
MISC. DRILLING COSTS
MULTI-PHASE DRILLING
REPORTS
Massachussetts Dept. of Environmental Protection VPH: Alkanes/Aromatics
Massachussetts Dept. of Environmental Protection EPH: Alkanes/Aromatics
EPA 625 (Base Neutral and Acid Extractables with 10 Largest Non-Target Peaks)
Total Lead with STANDARD METHODS 3030C Sample Preparation
STANDARD METHODS 6200B (Including MTBE, IPE, & EDB*)
STATE TRUST FUNDPROPOSAL
Consultant Mobe
ANALYTICAL TESTING
Monitoring Rpt. (Initial)
Drill Rig Mobilization
Cost for Sampling Well (First Well on Site)
SAMPLING & ANALYTICAL COSTS
Cost for Utility Clearance (Utility Clearance and GPR Survey)
Drilling Supervision
Soil Boring (Includes 3 - 10 ft borings from dispenser area and 1 - 15 ft borings from former UST area)
Randolph
N17005WithersRavenel
Former Hammond Exxon
$7,680.00
ESTIMATED DEADLINE FOR TASK COMPLETION:
TOTAL COST ESTIMATE
TASK INVOICE(S) NOT TO EXCEED:
CONTRACTOR:
959 & 961 South Fayetteville St
SITE NAME:
ADDRESS:
REGIONAL OFFICE:
919-238-0335
Asheboro
45265
Winston-Salem
Matthew James WR PROJECT MANAGER:
Herb Berger
Project Review / Setup.
TASKS TO BE PERFORMED:
Completion of a Receptor Survey.
Collection of two groundwater samples for Risk Based Analysis:
GP-7 (VOCs, SVOCs, MADEP VPH/EPH, and Lead);
GP-13 (SVOCS and EPH).
TA-01
SLP INCIDENT MANAGER:
02171214.61
Task
October 28, 2019
DESCRIPTION OF TASK(S) TO BE PERFORMED:
CONTRACTOR'S PROJECT #
Field activities and analytical result will be summarized in a Initial Monitoring Report.
Project Review
Site recon. & receptor survey
TASK AUTHORIZATION NUMBER:
Former UST Area Soil BoringsDispensers Soil Borings Hydraulic Lift Soil BoringDry ASTGP-1GP-2GP-3GP-4GP-5GP-6GP-6AGP-7GP-8GP-9GP-10GP-11GP-12GP-13_____________FIGURE 5________________________________Geoprobe Boring Location MapFormer EXXON Service Station961 S. Fayetteville St., Asehboro, NC