Loading...
HomeMy WebLinkAboutWS-10123_45265_F_SLTA_20191029TA#: 01 NCDEQ – Division of Waste Management – UST Section –Trust Fund Branch TASK AUTHORIZATION October 29, 2019 To: Withers And Ravenel Incident Name: Former Hanmmond Exxon Contract #: N17005 Incident Number: TF-45265 Project Manager: Matt James Region: Winston-Salem Phone Number: County: Randolph Fax Number: City: Asheboro Authorized By: Herb Berger Regional Ofc. Contact: Phone Number: 919-707-8170 Phone Number: (336) 771-4608 Fax Number: Fax Number: (336) 771-4632 TOTAL TASK NOT TO EXCEED $7,680.00 TASKS TO BE PERFORMED: Completion of a Receptor Survey. Collection of two groundwater samples for Risk Based Analysis: GP-7 (VOCs, SVOCs, MADEP VPH/EPH, and Lead); GP-13 (SVOCS and EPH). DEADLINE FOR TASK COMPLETION: January 10. 2020 CONTRACT #: INCIDENT #: CITY: COUNTY: PHONE NO: Listed below DATE: 1) 2) 3) 4) 5) 6) 7) Units Lab/SubCode # Units Rate Cost 1.010 Site ---1 $500.00 $500.00 1.020 Site ---1 $1,080.00 $1,080.00 3.060 Cost ---0 $1,500.00 $0.00 3.101 Foot ---50 $10.00 $500.00 3.111 Foot ---0 $20.00 $0.00 3.113 Foot ---50 $50.00 $2,500.00 3.398 Event ---1 $250.00 $250.00 4.031 Well ---1 $140.00 $140.00 4.031 Well 1 $80.00 $80.00 6.090 report ---1 $1,250.00 $1,250.00 12.050 Trip ---0 $220.00 $0.00 4.090 Sample 272 1 $62.00 $62.00 4.090 Sample 301 2 $196.00 $392.00 4.090 Sample 330 1 $13.00 $13.00 4.090 Sample 341 1 $52.00 $52.00 4.090 Sample 342 2 $94.00 $188.00 4.090 Sample 409 1 $79.00 $79.00 4.090 Sample 410 2 $176.00 $352.00 4.090 Sample 421 1 $54.00 $54.00 4.090 Sample 422 2 $94.00 $188.00 $7,680.00 45 Days Following Approval Advancement of 1 soil boring at the location of Pyramid soil boring GP-7 (former UST area). Collection of a Risk Based Parameters for VOCs, SVOCs, and MADEP VPH/EPH. Advancement of 1 soil boring at the location of Pyramid soil boring GP-13 (hydraulic lift). Collection of a Risk Based Parameters for SVOCs and EPH. One permanent type II groundwater monitoring well will be installed location of GP-7 and one permanent type II groundwater monitoring well will be installed at the location of GP-13. Both are estimated to be completed to a depth of 25 ft below ground surface. Hydrocarbon Sampling (soil) TRAVEL TIME & LODGING EPA METHOD 5035/8260 (Including MTBE & IPE) EPA METHOD 8270 (Base Neutral and Acid Extractables) Massachussetts Dept. of Environmental Protection VPH: Aliphatics/Aromatics Massachussetts Dept. of Environmental Protection EPH: Aliphatics/Aromatics 2-inch Well (Includes 1 - 10 ft boring from dispenser area and 1 - 15 ft boring from UST area) Cost for Sampling Well (Subsequent Wells) PRE-DRILLING TASKS MISC. DRILLING COSTS MULTI-PHASE DRILLING REPORTS Massachussetts Dept. of Environmental Protection VPH: Alkanes/Aromatics Massachussetts Dept. of Environmental Protection EPH: Alkanes/Aromatics EPA 625 (Base Neutral and Acid Extractables with 10 Largest Non-Target Peaks) Total Lead with STANDARD METHODS 3030C Sample Preparation STANDARD METHODS 6200B (Including MTBE, IPE, & EDB*) STATE TRUST FUNDPROPOSAL Consultant Mobe ANALYTICAL TESTING Monitoring Rpt. (Initial) Drill Rig Mobilization Cost for Sampling Well (First Well on Site) SAMPLING & ANALYTICAL COSTS Cost for Utility Clearance (Utility Clearance and GPR Survey) Drilling Supervision Soil Boring (Includes 3 - 10 ft borings from dispenser area and 1 - 15 ft borings from former UST area) Randolph N17005WithersRavenel Former Hammond Exxon $7,680.00 ESTIMATED DEADLINE FOR TASK COMPLETION: TOTAL COST ESTIMATE TASK INVOICE(S) NOT TO EXCEED: CONTRACTOR: 959 & 961 South Fayetteville St SITE NAME: ADDRESS: REGIONAL OFFICE: 919-238-0335 Asheboro 45265 Winston-Salem Matthew James WR PROJECT MANAGER: Herb Berger Project Review / Setup. TASKS TO BE PERFORMED: Completion of a Receptor Survey. Collection of two groundwater samples for Risk Based Analysis: GP-7 (VOCs, SVOCs, MADEP VPH/EPH, and Lead); GP-13 (SVOCS and EPH). TA-01 SLP INCIDENT MANAGER: 02171214.61 Task October 28, 2019 DESCRIPTION OF TASK(S) TO BE PERFORMED: CONTRACTOR'S PROJECT # Field activities and analytical result will be summarized in a Initial Monitoring Report. Project Review Site recon. & receptor survey TASK AUTHORIZATION NUMBER: Former UST Area Soil BoringsDispensers Soil Borings Hydraulic Lift Soil BoringDry ASTGP-1GP-2GP-3GP-4GP-5GP-6GP-6AGP-7GP-8GP-9GP-10GP-11GP-12GP-13_____________FIGURE 5________________________________Geoprobe Boring Location MapFormer EXXON Service Station961 S. Fayetteville St., Asehboro, NC