Loading...
HomeMy WebLinkAboutRA-552_3534_F_BID_20230214_Wlsonville Grocery cement MW's SR&R Environmental Proposal Response February 14, 2023 Terracon Well abandonment project NC General Contractors License #80686 Proposal prepared for Terracon Consultants regarding the concrete closure of 5 monitoring well covers, located at Wilsonville General Store in Chatham County, NC. PREFACE The following discussion is regarding the information provided by Adam Lee, and presents the position of SR&R Environmental (SR&R) as it relates to technical qualifications and capabilities. This discussion is being prefaced with the following frank and concise statement: SR&R Environmental has grown to be a major provider of environmental services in our region and is especially recognized in our local eastern North Carolina market area. Our partial list of satisfied clients in the local public and private sector include: ❖ Marine Corp Base Camp Lejeune ❖ Military Ocean Terminal Sunny Point ❖ Marine Corp Air Station Cherry Point ❖ Fort Bragg ❖ Marine Corp Air Station New River ❖ United States Coast Guard (multiple docking locations along the east coast), plus annual BOA for emergency response efforts ❖ North Carolina Department of Transportation (regional Hazardous Materials and Waste Services contractor) ❖ General Electric Hitachi ❖ Cape Fear Public Utility Authority ❖ Capital Power USA ❖ Archer Daniels Midland ❖ Kinder Morgan ❖ Duke Energy With our work among high-profile and sophisticated clients, we are unique in our ability to secure broad professional insurance coverage which typically far exceeds the limits set by our market. Finally, we pride ourselves in providing services professionally at competitive pricing, but will not sacrifice or cut corners on safety procedures. All personnel receive Hazardous Waste Operations and SR&R Environmental Proposal Response February 14, 2023 Terracon Well abandonment project NC General Contractors License #80686 Emergency Response (HAZWOPER) training, and many personnel also hold a long list of other training credentials including, but not limited to, First Aid, CPR, Confined Space, Confined Space Rescue, Excavation Safety, Hydroblast fundamentals, and Commercial Driver Licensing. As a Company, we also are credentialed by both the ISNetWorld and PICS safety compliance and monitoring programs, and have received the Five-Star Safety Award from the Greenpoint Group. APPROACH TO PROJECT A. Program Management SR&R will approach this project with the same diligence and professionalism with which it approaches any project for its many satisfied clientele. Specifically, we would plan the services to Terracon’s project in the following manner: ✔ Conduct an in-house project kick-off meeting with senior management personnel [program development, operations manager, executive officer, administrative manager, and senior field supervisor(s)] to ensure all the details of the client requirements are fully understood and implemented from Day One in the execution of the task. o Review of technical requirements o Equipment and staff assignments o Health & Safety o Administrative requirements ✔ From this point going forward, the Operations Manager will have primary responsibility for implementing the project requirements, including, but not necessarily limited to: o Equipment scheduling o Field Staff scheduling o Directing invoice procedures SR&R Environmental Proposal Response February 14, 2023 Terracon Well abandonment project NC General Contractors License #80686 B. Understanding of the Program Requirements In short summary, the objective of this program is to perform concrete closure over the top of 5 monitoring wells located at the Wilsonville General Store in Chatham County, NC. C. Equipment and Staff Utilization SR&R employs trained and certified personnel with normal and customary training related to the environmental concerns of our business. This includes, but not necessarily limited to, tank cleaning and removal, loading and unloading techniques, industrial cleaning practices, spill prevention procedures, spill containment procedures, emergency response policies, record keeping, and above all, client service. Our proposal directly addresses the needs and concerns of the task assignment as presented by communication from Adam Lee, and understand our scope of services to be as follows: ❖ Mobilize equipment and professional technical staff to the project site. ❖ Equipment will include a service truck, and misc tools. ❖ Technical staff will include a senior field supervisor. ❖ We will remove the lid on all 5 monitoring wells, then use fast drying water plug cement we will cement the entire void atop the monitoring wells so that the finished cement will be flush with the surrounding surface. ❖ All equipment and technical staff will demobilize from the site. ❖ All of the site activities shall have free and unencumbered access to the work area(s) from dawn to dusk and there are no delays for transport vehicles arriving or departing the site. In most instances the crews will schedule to work up to a 10-hour day onsite, Monday through Friday, not including lunch break. SR&R Environmental Proposal Response February 14, 2023 Terracon Well abandonment project NC General Contractors License #80686 D. Project Administration Many organizations may believe that project administration basically just revolves around an invoice, but at SR&R we recognize that complete project administration involves ensuring that all program deliverables are accurate and complete. To that end, our in-house project kick-off meeting will concentrate of the structure and format of all deliverables, including but not necessarily limited to, generation of disposal documents, and, of course, accurate invoices. SR&R Environmental Proposal Response February 14, 2023 Terracon Well abandonment project NC General Contractors License #80686 COMMERCIAL PROPOSAL ● Based on the scope outlined above, we have compiled the following fees to complete this assignment and are proposed in accordance with SR&R standard terms and conditions of service, including payment terms of Net 30 Days following completion of project. Remove covers from (5) monitoring wells and cover each void with water plug cement: Total cost $475.00 ACCEPTED BY: Name:__________________________________________________________________ Signature:__________________________________________________________________ Date: _________________, ___________ 2023 SR&R Environmental Proposal Response February 14, 2023 Terracon Well abandonment project NC General Contractors License #80686 POINTS OF CONTACT: Proposal Q&A and Contract Negotiations Patrick Beccaria Cell 910-515-9671 Email patrick@srrenviro.com Contract Execution and Operations Management Richard Wareham Cell 910-617-1490 Email richard@srrenviro.com Administration and Documentation Tammy Gurganus Office 800-310-6757 Email tammy@srrenviro.com