HomeMy WebLinkAboutFA-61_3646_CA_LTRRPT_20221209December 9, 2022
Mr. Mark Petermann
North Carolina Department of Environmental Quality
Division of Waste Management
1646 Mail Service Center
Raleigh, North Carolina 27699-1646
Email:mark.petermann@ncdenr.gov
Re: Water Connection Report
Plain View Grocery
5515 Plain View Highway
Dunn, Sampson County, North Carolina
UST Number: FA-61
Incident Number: 3646
Terracon Project No. 70149610B
Dear Mr. Petermann:
Terracon Consultants, Inc. is pleased to submit this Water Connection Report for the above-
referenced property. This report has been prepared in general accordance with North Carolina
Department of Environmental Quality, Underground Storage Tank (UST) Section Assessment
Guidelines and Corrective Action Guidelines for Petroleum and Hazardous Substance UST
Releases / Petroleum Non-UST Releases,dated January 19, 2021, and Task Authorization No. 03
approved on October 1, 2021; change order No. 1 authorized on November, 4 2021; change order
No. 2 authorized on December 22, 2021; and change order No. 3 authorized on
September 23, 2022.
The Plain View Grocery site is located at 5515 Plain View Highway in Dunn, Sampson County,
North Carolina and is comprised of 0.74 acres (site) (Figure 1). The site currently contains two
1,000-gallon gasoline USTs, two associated dispensers, and an approximate 500-gallon
aboveground storage tank (AST) located adjacent to the northeast corner of the Plain View Grocery
structure. Adjacent properties consisted of grassy vacant land, residential properties, and The
Country Manor mobile home park. The USTs and AST are not currently in use.
Following detections of petroleum compounds in the water supply well on the adjacent Plain View
Elementary School property, four 1,000-gallon gasoline USTs were removed from the site in
February 1990. Soil and groundwater samples collected on-site between April 1990 and June 2013
contained concentrations of petroleum compounds above their respective soil to groundwater
maximum soil contaminant concentrations (MSCCs) and numerous petroleum constituents were
detected in groundwater samples above the respective 15A NCAC 2L Groundwater Quality
Plain View Grocery
Dunn, North Carolina
Terracon Project No. 70149610B
Incident No. 3646
December 9, 2022
Standards (2L standards). Subsequent groundwater sampling was conducted by Terracon starting
in 2014 and continuing through 2022.
In November 2020 Terracon began the process to connect the adjacent mobile home park to the
Sampson County municipal water system. Dewberry Engineers, Inc. (Dewberry) was contracted to
design the water system. In March 2021 authorization to construct a Public Water System was
received and a subcontractor (Burnette Utilities) was selected to construct the water line.
Construction was set to begin in October 2021, however, due to supply chain issues and the
inability for Burnette Utilities to acquire materials, the construction was delayed to the following
year.
In September 2022, construction of the water system began, and Burnette Utilities installed a water
main tap under the supervision of Dewberry. Following the completion of the water main installation
the connection from the tap to thirteen mobile home units, and disconnection from the onsite water
supply wells, was completed on November 28, 2022, by Gary Willis Plumbing. Photos of the water
main tap and the connection to the units are provided in Appendix A.
If you have any questions regarding this report or the water connection, please contact us at (919)
873-2211.
Sincerely,
Terracon Consultants, Inc.
Adam A. Lee, P.G.Justin L. Fabriziani, RSM
Senior Staff Geologist Environmental Department Manager
Attachments: Figure 1 – Site Plan
Appendix A – Photographs
FIGURES
ED
ED
ED
@A@A
@A
@A @A
@A
@A
@A@A
@A
@A
@A
@A
@A
@A
@A
@A @A
@A
@A
@A@A
ED
ED
ED
@A
ED
@A
Hawley RoadPlainvie
w High
w
ay
FormerPlainviewGrocery
Mo
bile
H
o
me
S hedSuspected 10,000-gallonHeating Oil UST
MW-5
MW-6
MW-1
MW-2R
MW-3 MW-4R
MW-1R
MW-2
MW-9
MW-8
MW-13
MW-14
MW-3R
MW-15
MW-16
MW-11
MW-12MW-17
PW-8MW-7
PW-4
PW-6
PW-2
PW-3
Active UST Basin
Approx. Location of Former USTs
Dispenser Island
NC Center for Geographic Information & Analysis
N:\GIS\2014\70149610B - Plain View\EDIT_70149610_3646_Fig2_SitePlan_Dec2022.mxd0 50 10025Feet
Site Plan FigureProject No.
Reviewed By:
Date:
Drawn By:
70149610B
AIM
JDF
December 2022 2401 Brentwood Rd.Raleigh, NC 27604
PH. (919) 873-2211 terracon.com
PLAIN VIEW GROCERY5515 PLAINVIEW HIGHWAY (ROUTE 421)DUNN, NC
_^1
Monitoring Wells
@A Active
@A Destroyed/Abandoned/Missing
Site Boundary
Water Supply Wells
ED Active
ED Inactive
ED Active/Irrigation
Data Sources:Well Locations - Crawford Env. ServicesImagery - ESRI WMS³
APPENDIX A
PHOTOGRAPHS
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 1 –Mobile home park viewed from intersection of Plain View Hwy and Hawley Rd.
Photo 2 –Entrance into MHP. Country Manor Lane.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 3 –Unit 1 and Unit 2.
Photo 4 -Units 1 and 2 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 5 –Unit 1 and 2 Connection from municipal water main to meter.
Photo 6 –Unit 3 and 4 Connection from municipal water main to meter.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 7 -Units 3 and 4.
Photo 8 -Units 3 and 4 connection from water main to meter.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 9 –Unit 5.
Photo 10 –Unit 5 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 11 –Unit 6.
Photo 12 –Unit 6 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 13 –Unit 7.
Photo 14 –Unit 7 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 15 –Unit 8.
Photo 16 –Unit 8 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 17 –Units 9 and 10
Photo 18 –Units 9 and 10 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 19 –Units 11 and 12.
Photo 20 –Units 11 and 12 meter detail.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 21 –View from North side of property looking South towards entrance. Water main
install.
Photo 22 –Monitoring well installed in line with new water main.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 20, 2022 ■
Terracon Project No. 70149610B
Photo 23 –Well house located on Southwest corner of property.
Photo 24 –Well house connection.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 1 –Country Manor Lane. Municipal connection to meters 1 and 2.
Photo 2 –Municipal connection under roadway after repair.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 3 –Meters 1 and 2.
Photo 4 –Municipal connection to meters 3 and 4 looking North.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 5 –2nd connection under roadway.
Photo 6 –Detail of 2nd connection after repair.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 7 –Meters 3 and 4.
Photo 8 –3rd connection under roadway.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 9 –3rd connection looking North.
Photo 10 –3rd connection to meters.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 11 –3rd connection detail.
Photo 12 –4th connection under roadway.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 13 –4th connection looking West.
Photo 14 –4th connection looking East.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 15 –4th connection detail.
Photo 16 –North side of property.Water connection is under dirt and grass.
Plainview MHP ■Plainview, NC
Date Pictures Taken:September 23, 2022 ■
Terracon Project No. 70149610B
Photo 17 –Water connection passes under dirt road portion of horseshoe shape in Country
Manor Ln.