Loading...
HomeMy WebLinkAbout1117_Buncombe_GARAA_LQ_ApprovalESCP_FID_20220531ROY COOPER Governor ELIZABETH S. BISER secretary BRIAN WRENN Director Duke Energy Progress, LLC ATTN: Mr. Eric Szkolnyj 526 S. Church St. Charlotte, NC 28202 NORTH CAROLINA Environmental Quality May 31, 2022 LETTER OF APPROVAL RE: Project Name: ASHEVILLE AIRPORT AREA 1 PERMANENT CAP Acres Approved: 30.9 Project ID: BUNCO-2022-009 County: Buncombe City: Fletcher Address: 61 Terminal Dr. River Basin: French Broad Stream Classification: Unnamed Tributaries to French Broad River - Class B Submitted By: Geosyntec Consultants of NC, P.C. - Ms. Katherine Fox, P.E. Date Received by LQS: March 17, 2022 Date Revision Received by LQS: May 19, 2022 Plan Type: Industrial Dear Mr. Szkolnyj, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources D_ Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 W a+n' /'� 828.296,4500 Letter of Approval Duke Energy Progress, LLC ATTN: Mr. Eric Szkolnyj May 31, 2022 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, 6W Fred Walker, P.E. Express Engineer Land Quality Section Letter of Approval Duke Energy Progress, LLC ATTN: Mr. Eric Szkolnyj May 31, 2022 Page 3 of 3 Enclosures: Certificate of Coverage NPDES NCG01 Fact Sheet ec: Mr. Don Safrit, P.E. — Duke Energy (don.safritna,duke-energy.com) Ms. Katie Fox, P.E. — Geosyntec (kfox@yeosyntec.com) Ms. Shawna Riddle — NCDEQ LQS (shawna.riddle(cr�,ncdenr.gov) Mr. Landon Davidson, P.G. —NCDEQ-DWR (landon.davidsonancdenr.gov) Mr. Andrew Moore, P.G. — NCDEQ-DWR (andrew.w.moore(2ncdenr.gov) cc: Regional Office file