Loading...
HomeMy WebLinkAbout9700_WilkesAbattoir_addinfo_20230421Sizing Calculations: Advanced Composting Technologies Sizing for 20M sed Seth Church 51.50 4MI2023ces Storage Calculations: Est. Brig Lentil Associated Cost: Design Dare 1215l Finish Storea Area: 180 Annual Sawdust Costs: Bin Soe(W x L x H) 10x 15 x6 Square footage of open bin 1200 Sawdust per open bin -CY 11.50 With Mixer8, Air Open bin wall height fl 60 Miff carbonown bin fitter CY 556 #of houses 64 Volume ofoften bin pnirb 7200 Total ceirbon / bin cycle-CY 171 r house MOOD Average days to fill an open bin 179 Annual pounds of mortality ###M!## Total per cycle 640,000.0 Volume general pertl cu fit . 40212 Loadcapacity open ban 12632 Days per 347.0 Finished storage=target Days 18.0 Number of l st stage cydeslyr 19380 per War1.00 Finished story =cuff target days]238.2 Carbon usage totag CY 3300]8 Total a 640 000 Percent re used 230% Average trailer size CY 80 % morlaq 10.00 % Revised volume storyre-used! W 5,5705 Average trailer cost $$ $ 850.00 Mortality per cycle 640000 Revised volume strinige with refuse E 74273 Estmated sawdust coseYtr 35156 Mortality per War 640000 Est length of finish storage area 85 Avg weight 65-]5%marred) 3825 Calewidth of finish storage area 14.56 Annual Electrical Costs: 20hp Wh Market weight 51.00 Carbon StorageArea Lbs of mortality per day 6]0] 6]0] Pounds mortality r cycle 24480000 Carbon usa e/o en binyP/o en bin 460.5 ovieDrinder/daybillbr/day, 124 182 Pounds mMally, per year 2,4480000 Daily usage of dust(T) 25719 Hours of mnfimeltlay 4918 2459 Payment pounds per day 9,406.3 # of days carbon on site (30 day min.) 30.0 Gentler kwbours her month 1 828 2 1839 0 Design Its mort Albay 705476 Carbon storage needed! W ]7157 #of Armted Bins 13 13 Avg . days to fill open bin 1 79 Carbon storage needed - repose fl' 104162 kwNMoreer/tla 4hNtl 31 31 Ended! Its per open bin 12632 Est length of carbon storal area 47 Blower kwhours per month 1,2108 1,2108 1st stye cycle time 14 Dalcwidth of carbon storage area 36.94 Cast per kwhour $ 0.126 $ 0126 Days in 1st stage 1579 Semix! Stage Storage Area: Monthly Electrical Cost $ 38291 $ 321 Maximum open bin cyclestibil Y 48 D in 2nd stye 10 Annual Electrical Cost $ 4,595 $ 3,855 Lbs./o en Ell 283981 Avg days to fill open bin 179 Safety factor -hi hest 90 days 25%1 Number of 2nd stye en bins (storage) 559 Mailing Address: Calculated open bins required 10.78 Volume ofopen bins cu. fL ]20.0 BasicOpen Eloon Building ifications(Summary): 2nd stage storri required! 40212 Physical Address: #of Ist stye en bins required 13 2nd state storae'dw/repose 5026.5 Est length of 2nd stye storage area 70 Email # of 1st stye open bins proposed 13 Calewidth of 2nd stye storatie area 11.97 2nd stye stora a uiretl not bins 5.59 Total Storage Dimensions 2nd stage storrae reelw/3walls W 502651 Combine! width of storage areas 5150 Width stafic bins at grader 5585 Revised volume sWmW required W 228700 Inter retor Build width 2nd stage storage Width of open bins 10 Designed buildable width of storage Designed length of storrage-average 54.0 66.0 Length of open bins 15 Total volume of storage provitletl (W) 2],684.0 Width of storage 54 Lengffi of overall building 180 60' \ Working Pad tDryMater,al Carcass on & � Wet Material Seth Church 257 Brewer Road, Hays, NC 28635 W= Standard 11" knee wall w/wood above I= Painted lines designating aerated floor n= Concrete Wall 44" tall x 8" thick �- Open wall under roof �= Recessed grade 186.5 cubic yard Dump Aerated Floor Bin Travel Alley 24' W x 70' L Mixer ---� -- ;---,----r — 7 & I 186.5 cubic yard Conveyor I Aerated Floor I _ J �I Tractor Shed I (PTO I i Mixer) i 5' = Concrete area, Grade at 0' ■ = Concrete area, Grade at -3' ■ = Concrete area = Angle of Respose Area I I 205 cubic yard Storage I 155' Travel Alley 15' W x 80' L / l