HomeMy WebLinkAbout9700_WilkesAbattoir_addinfo_20230421Sizing Calculations:
Advanced Composting Technologies Sizing for 20M
sed
Seth Church
51.50
4MI2023ces
Storage Calculations:
Est. Brig Lentil
Associated Cost:
Design Dare
1215l
Finish Storea Area:
180
Annual Sawdust Costs:
Bin Soe(W x L x H)
10x 15 x6
Square footage of open bin
1200
Sawdust per open bin -CY
11.50
With Mixer8, Air
Open bin wall height fl
60
Miff carbonown bin fitter CY
556
#of houses
64
Volume ofoften bin pnirb
7200
Total ceirbon / bin cycle-CY
171
r house
MOOD
Average days to fill an open bin
179
Annual pounds of mortality
###M!##
Total per cycle
640,000.0
Volume general pertl cu fit .
40212
Loadcapacity open ban
12632
Days per
347.0
Finished storage=target Days
18.0
Number of l st stage cydeslyr
19380
per War1.00
Finished story =cuff target days]238.2
Carbon usage totag CY
3300]8
Total a
640 000
Percent re used
230%
Average trailer size CY
80
% morlaq
10.00 %
Revised volume storyre-used! W
5,5705
Average trailer cost $$
$ 850.00
Mortality per cycle
640000
Revised volume strinige with refuse E
74273
Estmated sawdust coseYtr
35156
Mortality per War
640000
Est length of finish storage area
85
Avg weight 65-]5%marred)
3825
Calewidth of finish storage area
14.56
Annual Electrical Costs:
20hp
Wh
Market weight
51.00
Carbon StorageArea
Lbs of mortality per day
6]0]
6]0]
Pounds mortality r cycle
24480000
Carbon usa e/o en binyP/o en bin
460.5
ovieDrinder/daybillbr/day,
124
182
Pounds mMally, per year
2,4480000
Daily usage of dust(T)
25719
Hours of mnfimeltlay
4918
2459
Payment pounds per day
9,406.3
# of days carbon on site (30 day min.)
30.0
Gentler kwbours her month
1 828 2
1839 0
Design Its mort Albay
705476
Carbon storage needed! W
]7157
#of Armted Bins
13
13
Avg . days to fill open bin
1 79
Carbon storage needed - repose fl'
104162
kwNMoreer/tla 4hNtl
31
31
Ended! Its per open bin
12632
Est length of carbon storal area
47
Blower kwhours per month
1,2108
1,2108
1st stye cycle time
14
Dalcwidth of carbon storage area
36.94
Cast per kwhour
$ 0.126
$ 0126
Days in 1st stage
1579
Semix! Stage Storage Area:
Monthly Electrical Cost
$ 38291
$ 321
Maximum open bin cyclestibil
Y 48
D in 2nd stye
10
Annual Electrical Cost
$ 4,595
$ 3,855
Lbs./o en Ell
283981
Avg days to fill open bin
179
Safety factor -hi hest 90 days
25%1
Number of 2nd stye en bins (storage)
559
Mailing Address:
Calculated open bins required
10.78
Volume ofopen bins cu. fL
]20.0
BasicOpen Eloon Building ifications(Summary):
2nd stage storri required!
40212
Physical Address:
#of Ist stye en bins required
13
2nd state storae'dw/repose
5026.5
Est length of 2nd stye storage area
70
Email
# of 1st stye open bins proposed
13
Calewidth of 2nd stye storatie area
11.97
2nd stye stora a uiretl not bins
5.59
Total Storage Dimensions
2nd stage storrae reelw/3walls W
502651
Combine! width of storage areas
5150
Width stafic bins at grader
5585
Revised volume sWmW required W
228700
Inter retor
Build width 2nd stage storage
Width of open bins
10
Designed buildable width of storage
Designed length of storrage-average
54.0
66.0
Length of open bins
15
Total volume of storage provitletl (W)
2],684.0
Width of storage
54
Lengffi of overall building
180
60'
\ Working
Pad
tDryMater,al
Carcass
on
& �
Wet
Material
Seth Church
257 Brewer Road, Hays, NC 28635
W= Standard 11" knee wall w/wood above
I= Painted lines designating aerated floor
n= Concrete Wall 44" tall x 8" thick
�- Open wall under roof
�= Recessed grade
186.5 cubic yard
Dump Aerated Floor
Bin
Travel Alley 24' W x 70' L
Mixer ---� -- ;---,----r — 7
& I 186.5 cubic yard
Conveyor I Aerated Floor
I
_ J
�I
Tractor
Shed
I (PTO I
i Mixer) i
5'
= Concrete area, Grade at 0'
■ = Concrete area, Grade at -3'
■ = Concrete area
= Angle of Respose Area
I
I 205 cubic yard
Storage
I
155'
Travel Alley 15' W x 80' L
/ l