Loading...
HomeMy WebLinkAbout3620_DukeAllen_PZ02_AbandonmentReq_FID1795493_20230516Moutos, Sarah From: Murphy, Courtney <Courtney.Murphy@duke-energy.com> Sent: Tuesday, May 16, 2023 1:13 PM To: Moutos, Sarah Cc: Russ, Jordan A; Osborn, Claire J Subject: [External] Allen SSLF-PZ-02 Abandonment Request_3620-INDUS Attachments: 2022_03_24_SSLF NCDEQ DWM Figure.pdf; SSLF-PZ-02 Draft Boring Log.pdf Importance: High Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sarah — One of the water level monitoring piezometers within the footprint of the SSLF (3620-INDUS) needs to be abandoned due to subgrade excavation progression in its vicinity. The piezometer is labeled SSLF-PZ-02 as shown in attached figure. A typical well abandonment via grouting per 2C Well Construction Standards is planned for this week pending your approval. I attached a draft boring/well logs if interested in that information for this location (final boring logs for each of the previously installed SSLF-PZ's will be included in the upcoming groundwater modeling tech memo companion document to the PTC Mod Request). We will likely replace this piezometer in the near future since it was the closest water level monitoring point to the future SSLF sump, but I will send you a separate request for approval to install such once we have those details determined. Let me know if you have any questions or need additional information. Respectfully, Courtney Uk Murphy, PG Lead Environmental Specialist EHS Waste & Groundwater Programs Courtnev.MurohvCcDduke-energv.com Office: 704.382.7171 Mobile: 704.718.7570 B-14D/BR �: �• AB-2/D ph GWA-14S/DA I GWA-22S/D L GWA-21 S/DA/BR ■ 5 - IAB-13S/D a' '} AB-4S/D/BR�.�-; c GWA-23S/D �• i CIF WELL ,GWA-9S/D/BR/D/BR GWA-24SA/D/BR AB-21 S/S L/S S/D/ .Ae • AB-5 1 0000, r�•— rr F b AB-29 S/S L/S S/D AB-9S/D AB-30S/D f/ , AB-28S/D AB-27S/D/BR % � CCRCCR-14S/D/D I AB-24S/SL/D/BR • ♦ AB-26S/D GWA-3S/D/BRA AB-25S/SL/SS/BR/BRU , • / 2■ AB-23S/BRU _ � f CCR-16S/D/BR r' ® CCR-17S/D AB-22 S/D/BR/B RL AB-10S/D AB-6A/R b+ CCR-18S/D CCR-21 S/D• . pH ADJ BLDG � PH WELL '; v -22S/DA . t GWA-2S/D "fir ti ■ (' DUKE ENERGY® CAROLINAS — 46 w* ,�;'i • f `�• synTerra ry '4 % F . d y Fr r LEGEND C PLANNED PIEZOMETER EXISTING MONITORING WELL SOUTH STARTER LANDFILL BOUNDARY ACTIVE ASH BASIN WASTE BOUNDARY RETIRED ASH BASIN WASTE BOUNDARY RETIRED ASH BASIN ASH LANDFILL WASTE BOUNDARY DORS FILLS BOUNDARIES - DUKE ENERGY CAROLINAS PROPERTY LINE STREAM (AMEC NRTR 2015) WETLAND (AMEC NRTR 2015) 4T r NOTES: 1. PROPOSED PIEZOMETER LOCATIONS ARE DEEMED APPROXIMATE AND FINAL LOCATIONS WILL BE DETERMINED DURING FIELD IMPLEMENTATION. 2. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL &AMP; INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR ALLEN STEAM STATION DATED MAY 29, 2015. 3. ALL BOUNDARIES ARE APPROXIMATE. 4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON DECEMBER 13, 2018. AERIAL WAS COLLECTED ON MARCH 30, 2018. 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). GRAPHIC SCALE 250 G500 FIGURE 1 (IN FEET) SOUTH STARTER LANDFILL (3620-INDUS) DRAWN BY: B. MCGANN DATE: 09/28/2020 PLANNED PIEZOMETERS REVISED BY: B. MCGANN DATE: 03/24/2022 ALLEN STEAM STATION CHECKED BY: L. DRAGO DATE: 03/24/2022 APPROVED BY: L. DRAGO DATE: 03/24/2022 GASTON COUNTY, NORTH CAROLINA PROJECT MANAGER: C. SUTTELL PROJECT: Allen Steam Station WELL / BORING NO: SSLF-PZ-02 PROJECT NO: 1026.17 STARTED: 5/18/22 COMPLETED: 5/18/22 DRILLING COMPANY: Geologic Exploration NORTHING: 523991.93 EASTING: 1400031.62 DRILLING METHOD: Hollow Stem Augers G.S. ELEV: 616.87 ft M.P. ELEV: 619.74 ft BOREHOLE DIAMETER: 8 IN DEPTH TO WATER: 10 ft TOC TOTAL DEPTH: 28.0 ft BGS NOTES: bgs: below ground surface LOGGED BY: G. Khang CHECKED BY: M. Crai 2 w U = U) LLI _ OUo 2 d a <O ? DESCRIPTION Q Lu 2 WELL o U) of ii CONSTRUCTION CLAY; red, dry, fine e°-AquaGuard Grout (0-5 ft bgs) CLAY w/ minor silt and sand; dry to slightly moist, weak 5 plasticity, slightly cohesive Brown and red at 5 ft bgs, brown w/ depth and clumpy cuttings -2-in PVC Riser -Bentonite Holeplug Seal Slightly micaceous (5-10 ft bgs) 10 Driller noted water during drilling at —10 ft bgs Light brown and slightly orange cuttings; decreased 40 cohesiveness and plasticity 15 `= f -Sand Filter Pack (10-28 ft 20 Light orange brown to light orange bgs) Minor rock pieces and gravel in cutting -Well Screen (13-28 ft bgs Increased moisture 25 Borin inated at 2 gs 30 35 40 45 CLIENT: Duke Energy Carolinas SynTerra 148 River Street, Suite 220 PROJECT LOCATION: Gaston County, North Carolina Terra Greenville, South Carolina 29601 s)mPhone:864-421-9999 PAGE 1 OF 1