Loading...
HomeMy WebLinkAboutNCD980602163_19911011_Warren County PCB Landfill_SERB C_Landfill Water Recovery - Treatment Cost Estimate-OCRt '1 ·•1 \1,t '..•~, f''. t; ·1 ,,.1-:!1'•,f\11; ·,.,.,11• .. ··•"', n,: V\/i1•~t1111 ·~•.1lr.r111 l)!f; /\:.111:~vmri, I'll r; , l(ttrJxvilk, HJ Dl\1'E: /() -I I-t.?,/ FJ\X 10: ::fret(.. B fA..T<..'r'...e_ (knr.-1111illr.1 !:lO !.:hr,11;tt1110ovn1 TN N'>r.lndlk:1 TN fROM: ~~ €._ F:7c"D NUMBER OF PAGES (including this cover sheet): .,, ., . IF ANY PORTION OF THIS FAX MESSAGE IS UNCLEAR, PLEASE PHONE US AT ' (919)832-2535. t;,n rnnln{'lrC, Crlv• I Unit 103 / n11lnlch, North ci,1-~1in°iill,.!7C03 / (g19l 93:z~·2s:3~ • SPATCO Environmerrtal Services SPATcor October 11, 1991 Mr, Jack Butler Superfund Section SPATCO Liquid Process Technology SPATCO Petro Marlarting Systems North Carolina Division of Solid Waste Management Post Office Box 27687 Raleigh, North Carolina 27611-7687 Referenc~: Landfill Water Recovery/Treatment Cost Estimate Dear Mr. Butler: Jack Stonebraker and I were pleased your section called on us to help develop the cost estimate for this project. I have called on the resources of our other branches to find the best suited equipment for this type application. Not knowing the contaminate and its concentration causes us to over compensate for a safety factor. The greatest variable we have compensated for is the carbon units. Once we have analytical data to work with, appropriate information can be developed regard ing sizing of units, carbon life span, regeneration, and O&M cost. Sampling of the carbon after the units are operational will be requi red to determine if the carbon can be regenerated. For the most part, my estimates are ballpark. I have included a relative firm price for the well, well pump, controls, and above ground tanks. The cost figure for the containment dike, coatings, fence, and ca rbon units, and installation of the system components are for budget only. SPATCO Environmental recommends that you consider installing a new vertical well for the recovery system in lieu of using the horizontal pipe presently installed in the landfill. Most pump intakes would damage the casing from laying next to it and vibrating. The type pump you would need to use in the horizontal piping, centrifugal, would not last long due to being restricted to a low flow of approximately . 7 gallons per minute or less. l30 Pcnm~rc Drive l!nlt l12 Raklgh, NC 27G03·2434 919,832.2535 PAX 919.832,5914 Corporatt: F.nvironmcnt:il Ch:irlouc, NC '7Q,L'i97 ~M(I h .11u•il11n ,-c;:v,1i:a ri.r~, SPATCC,,. Well: Pump: Controls: Activated Carbon Vessels: Treated Water Stgrage: -SYSTEM DESCRIPTION/COST 3 5 feet Depth 1 5 feet Screen 4 inch Inside Diameter 12 inch Augered Hole 4 inch Annuar Gravel Pack 24' X 24" Well head assembly for flush mount installation. Cost: $4,100.00 ( 1) Grundfos 2 inch submersible pump varlable pumping capacity of 100 ml to 9 gallons per minute Cost: $1,000.00 Custom Automated Systems controller for well pump and storage tank overfill sa·fety switch Cost: $3,400.00 (2) 2,000 pound or 3,000 pound vessels connected to provide standby unit when primary unit is spent. Estimated Cost: (2) 2,000 pound System (2) 3,000 pound System $25,000.00 $30,000.00 (2) 10,000 gallon carbon steel above ground storage tanks with bottom drain fittings Carbon Steel Tanks with Saddles and Prime Paint Only: $12,370.00 5PATco,.- Containment Area: Wiring, Piping, and Pump Installation: 30 ft. x 30 ft. concrete slab with rebar on 12 inch center, four (4) ft. high concrete block wall with rebar and cored with 2000 PSI concrete. Six (6) foot high 9 gauge chain link fence with three (3) strand barb wire top and three (3) foot personnel gate. Six (6) cast in place concrete above ground tank piers for tank saddles. Including fine grade, forming, base stone installed. Estimated Cost $12,000.00 Estimated Cost $7,000.00 Engineering, Drafting, Project Management Estimated Cost $6,000 -8,000.00 ESTIMATED TOTAL PROJECT COST {WITHOUT OPTIONS): $82,000.00 Containm~nt Area: Treated Water Stora9.e and Activated Carbon Vessels and Exposed Piping: Weatherize System: OPTIONS: High performance concrete coating system, installed Estimated Cost: $8,000.00 High performance coating system, 3 coat system with polyurethane top coat Estimated Cost: $12,000.00 Heat trace exposed piping and insulated Estimated Cost: $1,500.00 -3,000.00 .. SPATcor TOTAL OPTIONS: $21,500.00 -23,000.00 Please note that I have not included any cost for additional equipment that may be required if total dissolved solids, iron, or manganese are present. My best guess on this cost is a range from $5,000.00 to $50,000.00 depending on the extent of pre- treatment required to prevent fouling of the carbon system. Costs associated with regeneration of the carbon are estimated at $1.35/pound for virgin carbon and from $.68 -. 75/pound for reactivated carbon. This doesn't include transportation from the re-activation plant in Beaver Falls, Pennsylvania. Some of the information I have regarding specific components are not conducive to being faxed, so I will forward those to you by mail or deliver myself. Please look over the package and give me a call on Friday if you have any questions or alterations you might want to work.