HomeMy WebLinkAboutNCD980602163_19900731_Warren County PCB Landfill_SERB C_Jul 1990 Monthly Inspection Report-OCR,s
;,.
' ~.,~:STATt~~ lf/r••'""-, ~.
~
,,irf&i~-~ \ r--. "' (, l v J
.......... ,1 .... •'
ol.)lt Qt.1AM"11'-";)_'
¼'-1':J..R:,a~•"·'
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Solid Waste Management
P.O. Box 27687 · Raleigh, North Carolina 27611-7687
James G. Martin, Governor
William W. Cobey, Jr., Secretary
MEMORANDUM
TO:
FROM:
RE:
July 31, 1990
Mr. James Rhodes, Deputy Secretary
Department of Administration
Bobby Lutfy, Hydrogeologist 8µ
Solid Waste Section
The PCB Landfill Monthly Inspection
William L. Meyer
Director
The Monthly Inspection of the PCB Landfill for July did not show
any significant problems at the landfill. It appeared that the
Department of Transportation had spread more gravel along the
entrance road. Also, repairs had been made to the main gate of the
landfill. The landfill facility appears to be in generally good
condition at this time.
Mr. Tommy Cline of the Department of Administration accompanied
me on this month's inspection of the landfill. We discussed the need
to fence in the leachate lagoon and the need for an operating budget
to provide funds for ongoing operation, maintenance, and sampling at
the PCB Landfill.
If you have any questions concerning the landfill please contact
our office at (919) 733-0692.
cc: Bill Meyer
J. Gordon Layton
PCB LANDFILL MONTHLY REPORT
DATE 7 -3 I -q 0 __ --:.,. __ .;.._ __________ _ NAME _ _.;__B_o_15_1!,.,_y_L_u_T_F_y ___ _
l. Entrance Road
2. Monitoring Wells
Casings, locks
· Fences, gates, locks
3. Landfill fence, gate, locks
4. Air Vent
. 5. Land£ ill Cover
6.
7.
Erosion, vegetation
Subsidence
Leachate Detection System
Water in sump
Leachate Collection System
Access Pipe
Pump
Piping
8. Treatment Works
Influent Piping
Sand Filter
Carbon Filter
Effluent Piping
9. Surface Impoundment
·-.ir
Erosion~ vegetation ,.
10. Irrigation Syst~
Influent Piping
Pump
Sprinkler Units
NO
PROBLEM
. .
v
t/
✓
v
✓
V
v
v---
✓
POTENTIAL
PROBLEM OBSERVATIONS
< PCB LANDFILL MONTHLY REPORT (CONT.
DATE __ .7_-_-..... 3 ___ /_~_9_o ____ NAME __ /3_0_B_g ...... t _L_t.A__;..;T_F-+-'/---
.~_.Pumping Data
Pumping -Times f.l O T TsSTEJ>
Pumping Volume----------------~
Irrigatibn Data
:.-.• .: ;-. f
Irri$ating ·Times
·:r'~\:J
·~
i