HomeMy WebLinkAboutNCD980602163_19841029_Warren County PCB Landfill_SERB C_Monthly Inspection of PCB Landfill, Oct 1984-OCR' '
DIVISION OF HEAL TH SERVICES
P.O . Box 2091
Raleigh, N.C. 27602-2091
October 29, 1984
MEMORANDUM
TO: 0. W. Strickland
FROM: Tom Karnoski
Ronald H. Levine, M.D., M.P.H.
ST ATE HEALTH DIRECTOR
SUBJECT: Monthly Inspection of PCB Landfill -October
Attached is a copy of the PCB Landfill Monthly Inspection Report
for October. As indicated, the irrigation system is inoperable due
to broken risers and influent lines. Analyses of the treatment
works influent indicate < .1 ppb PCB prior to treatment.
TK:ct
Attachments
Jomes B Hunt, Jr/ Sarah T Morrow MD MPH STATE OF NORTH CAROLINA DEPARTMENT OF HUMAN RESOURCES . ' . ' GOVERNOR SECRET ARY
l."
--t :.
PCB LANDFILL MONTHLY REPORT
DATE ___ ..,../)c.,..~~io::.,.:h;;..;;~=·.r_ ...... lL,.,;O;_...,,,~<...,.l-41.....,;g::,_t.j...L-__ _
1. Entrance Road
2. Monitoring Wells
Casings, locks
Fences, gates, locks
3. Landfill fence, gate, locks
4. Air Vent
5. Landfill Cover
Erosion, vegetation
Subsidence
6. Leachate Detection System
} Water in sump
7. Leachate Collection System
Access Pipe
Pump
Piping
8. Treatment Works
l
Influent Piping
Sand Filter
Carbon Filter
Effluent Piping
9. Surface Impoundment
Erosion, vegetation
10. Irrigation System
Influent Piping
Pump
Sprinkler Units
NAME Ji llifJ.11 fo-vfr/
NO POTENTIAL
PROBLEM PROBLEM OBSERVATIONS
v'
v
./
~
I ) ,v \--
V
J
PCB LANDFILL MONTHLY REPORT (CONT.
DATE
Pumping Data
Pumping Times s:1-oe-f e~ rJ:X (0 2,() £!) tf:1
5fopped c...t tl fio ev-
Pumping Volume qo );i.t.:~-S ~ /.17 JaM~~ (_;__ 1
Irrigation Data
Irrigating Times
Irrigating Volume
\ >'> u{;.JJ,~~~
) '.A.-€ f 14 e, j 5 ~ (-<-Gt} [ (-e-df ~
e._~€ (v...,~ s~r~ c..ofted{t~J
/lo,;-9µ.
IL ;J. S-~I-<