HomeMy WebLinkAboutNCD980602163_19840918_Warren County PCB Landfill_SERB C_PCB Landfill Monthly Report, Sep 1984-OCR.. 1 •
DIVISION OF HEALTH SERVICES
P.O. Box 2091
Raleigh, N.C . 27602-2091
September 18, 1984
MEMORANDUM
TO: 0. W. Strickland
FROM: Tom Karnoski :J-_:i_
Ronald H. Levine, M.D., M.P.H.
ST A TE HEAL TH DIRECTOR
SUBJECT: Monthly Inspection of PCB Landfill -September
Attached is a copy of the PCB Landfill Monthly Inspection Report for
September. As indicated, the irrigation system is inoperable due to
broken risers and influent lines. Analyses of the treatment·works
effluent indicate 4'-.l ppb PCB after treatment.
TK:dl
Attachment
,....__ _______________________________ _
Jomes B Hunt Jr/ Sarah T Morrow, MD , MPH
Sf ATE OF NORTH CAROLINA GOv'FRNOR , DEPARTMENT OF HUMAN RESOURCES SECRETA ~Y
,.
PCB LANDFILL MONTHLY REPORT
DATE ___ q..._.,/.....,{/,..._3'1 ______ _
1. Entrance Road
2. Monitoring Wells
Casings, locks
Fences, gates, locks
3. Landfill fence, gate, locks
4. Air Vent
5~ Landfill Cover
Erosion, vegetation
Subsidence
6. Leachate Detection System
Water in sump
7. Leachate Collection System
Access Pipe
Pump
Piping
8. Treatment Works
Influent Piping
Sand Filter
Carbon Filter
Effluent Piping
9. Surface Impoundment
Erosion, vegetation
10. Irrigation System
Influent Piping ·
Pump
Sprinkler Units
NAME_j-=--_c __ ~_;;....;;-'---"";._.;,.._. __ _
NO
PROBLEM
✓
J
✓
✓
✓
/
POTENTIAL
PROBLEM
✓
OBSERVATIONS
\} t,er,f,tl> ,v ,ve.EoJ
to {sf. cro.,.;i &O
,e U f TU r€¢
.. '
PCB LANDFILL MONTHLY REPORT (CONT.
DATE __ _....;.'f..:....;/,c.a..,,/~s"-4,~---,-----NAME _ __,,I_c-=a---""'~-=-.J~=-=---· ---
Pumping Data
Pumping Times
lo '-tr
Pumping Volume 70 /"f/,v\) t[J ,<J-r I. s-6-4t..l.OM/ ----~=--.-:..:~=...J..-'-"'---'-'<....a..--= 7n,~
Ct!Jc..lec. rt.o .
{O JO