HomeMy WebLinkAboutNCD980602163_19840608_Warren County PCB Landfill_SERB C_Results of PCB Landfill Environmental Monitoring, June 1984-OCRRonald H. Levine, M.D., M.P.H.
DIVISION OF HEALTH SERVICES
P.O . Box 2091
Raleigh, N.C. 27602-2091
MEMORANDUM
TO:
FROM:
SUBJECT:
June 8, 1984
O. W. Strickland
Thomas C. Karnoski
PCB Landfill Monthly Inspection ·
ST A TE HEAL TH DIRECiOR
Attached is a copy of the latest PCB landfill
monthly report. The NC DOT has reseeded the
landfill cap. The irrigation system is still
inoperable. In addition to the already damaged
sprinkler riser and influent line, a second
sprinkler riser appears to have been damaged
during the reseeding activity. There is, at
present, no need to operate the irrigation.system.
A semi-annual sampling event was completed. That
analytical data will be forwarded as it becomes
available.
TCK:ns
Enclosure
Jomes B Hunt, Jr/ Sarah T Morrow, MD , MPH.
STATE OF NORTH CAROLINA DEPARTMENT OF HUMAN RE SOURCES cc R GOV!'RNOR Sc RETA Y
.. · PCB LANDFILL MONTHLY REPORT
1. Entrance Road
2. Monitoring Wells
Casings, locks
Fences, gates, locks
3. Landfill fence, gate, locks
4. Air Vent
5~ Landfill Cover
Erosion, vegetation
Subsidence
6. Leachate Detection System
Water in sump
7. Leachate Collection System
Access Pipe
Pump
Piping
8. Treatment Works
Influent Piping
Sand Filter
Carbon Filter
Effluent Piping
9. Surface Impoundment
Erosion, vegetation
10. Irrigation System
Influent Piping
Pump
Sprinkler Units
NO
PROBLEM
POTENTIAL
PROBLEM OBSERVATIONS
,eeSttl>.tJ) cAP
12c.rc.c. ,v, ! t1 Fu~'-
C WA,vl:.£ £>IL
'.
PCB LANDFILL MONTHLY REPORT (CONT.
DATE _ __;::b:;;..,a/....:,'--'-/=-i_,_'f ______ NAME TC. /<ARAJO SKI
Pumping Data
Pumping Times
Pumping Volume __ ,,,--_-. __ ..;;/_0_0 ___ 6_,q~l;;_l;;;,__O...;_;u~S ___ _
·irrigation Data
Irrigating Times
Irrigating Volume
I iJ fLLJ£t..JT S~Mf'Lc
£ ff iu e ;.> r s 19 M f' L £
t . .r 6PM
{OlO
COllf.C re L) 10'-lo