James B. Hunt, Jr., Governor August 24, 1983
Mr. Frank B. Rainey, Jr., P.E.
Sverdrup & Parcel
2211 W. Meadowview Rd.
Suite 114
Greensbo ro, NC 27407
Dear Frank:
l-!1;in,J11 k. Cldrk., Secretary
Enclosed is a copy of a letter from the United States
Environmental Protection Age ncy which notes discrepancies in the
11 As Built11 plans submitted by your firm to the State of North
Carolina. Enclosed also are the original tracings of the plans.
Please have the corrections as noted made and returned to us as
quickly as possible.
Sincer,ly, -/.~)A ,
1 iam W. Phillips, Jr. r
Assistant to the Secretary
WWPjr:jj
Enc.
cc: Carl t on Myrick -DOA
Tom Moffitt -AG ✓
0. W. Strickland -OHR
R. F. Helms -NRCD
M. C. Adams -DOT
Joe Lennon -Warren County
Al Hanke -EPA
Jim Scarbrough -EPA
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION IV
345..C:OURTLAND STREET
ATLANTA. GEORGIA 3 0365
August 16, 1983
REF -4AW-ER
Mr. William W. Phillips, Jr.
Assistant to the Secretary
North carolina Deparbnent of
Crime Control and Public Safety
P.O. Box 27687
Raleigh, North Carolina 27611-7687
Dear Mr. Phillips:
A Certified Professional Civil Engineer attached to our staff has reviewed
the "As Built" plans you submitted to us during our August 3, 1983 site
visit to the Warren County PCB Landfill. The following minor discrepancies
were noted and should be corrected.
-Sheet #5 -The drawing still shows a stockpile area with silt
fence. This feature is no longer in place.
-Sheet #6 -Regarding the grading contours, the elevati on of the fill needs
to be cited to be certified "As Built."
-Sheet #7 -The drawing still states that the manhole covers are needed
where, in reality, they are in place.
Sheet #8 -The drawing still states that the temporary anchors should be
removed and the lower and upper liners seamed. Has this been accanplished?
If so, the drawing should reflect the canpleted work.
Sheet #8a -The double swing gate shown on this sheet is incorr ectly
located. It should be drawn as shown on Sheet #6.
We would appreciate having these discrepancies corrected prior to submission
of the Final Project Report which is due September 13, 1983.
A. R. Hanke
Project Officer
Emergency & Remedial Response Branch