Loading...
HomeMy WebLinkAboutNCD980602163_19830824_Warren County PCB Landfill_SERB C_Correspondence re As Built plan discrepancies-OCRNorth Carolina Departm ent of Crime Control ~, , . -& Pub]ic Safety 512 N Su/is/Jury Stred P. U l3o'. 2/(i87 Hule1!Jh 27611 7687 (919) 733-2126 James B. Hunt, Jr., Governor August 24, 1983 Mr. Frank B. Rainey, Jr., P.E. Sverdrup & Parcel 2211 W. Meadowview Rd. Suite 114 Greensbo ro, NC 27407 Dear Frank: l-!1;in,J11 k. Cldrk., Secretary Enclosed is a copy of a letter from the United States Environmental Protection Age ncy which notes discrepancies in the 11 As Built11 plans submitted by your firm to the State of North Carolina. Enclosed also are the original tracings of the plans. Please have the corrections as noted made and returned to us as quickly as possible. Sincer,ly, -/.~)A , 1 iam W. Phillips, Jr. r Assistant to the Secretary WWPjr:jj Enc. cc: Carl t on Myrick -DOA Tom Moffitt -AG ✓ 0. W. Strickland -OHR R. F. Helms -NRCD M. C. Adams -DOT Joe Lennon -Warren County Al Hanke -EPA Jim Scarbrough -EPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IV 345..C:OURTLAND STREET ATLANTA. GEORGIA 3 0365 August 16, 1983 REF -4AW-ER Mr. William W. Phillips, Jr. Assistant to the Secretary North carolina Deparbnent of Crime Control and Public Safety P.O. Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Phillips: A Certified Professional Civil Engineer attached to our staff has reviewed the "As Built" plans you submitted to us during our August 3, 1983 site visit to the Warren County PCB Landfill. The following minor discrepancies were noted and should be corrected. -Sheet #5 -The drawing still shows a stockpile area with silt fence. This feature is no longer in place. -Sheet #6 -Regarding the grading contours, the elevati on of the fill needs to be cited to be certified "As Built." -Sheet #7 -The drawing still states that the manhole covers are needed where, in reality, they are in place. Sheet #8 -The drawing still states that the temporary anchors should be removed and the lower and upper liners seamed. Has this been accanplished? If so, the drawing should reflect the canpleted work. Sheet #8a -The double swing gate shown on this sheet is incorr ectly located. It should be drawn as shown on Sheet #6. We would appreciate having these discrepancies corrected prior to submission of the Final Project Report which is due September 13, 1983. A. R. Hanke Project Officer Emergency & Remedial Response Branch cc: Jim Scarbrough, Residuals Management Branch