Loading...
HomeMy WebLinkAboutNCD980602163_19811214_Warren County PCB Landfill_SERB C_Sverdrup & Parcel letter - Response to Land Quality Comments-OCR' )fotj,_ /, / G. H. ANDREWS C. L. CUTTING E. M. DOUGHERTY ELI LEMCOE C. N. LETELLIER W. LITTLEFIELD C.M.METCALF" W. H. RIVERS G. E. ROSENKOETTER B. R. SMITH. JR. I. R. VERON R. C. WEST SVERDRUP & PARCELL.•' CONSULTING ENGINEERS 2211 WEST MEADOWVIEW ROAD SUITE 114 GREENSBORO, NORTH CAROLINA 2T40T 1/l:::i JOHN I. PARCEL 1928-196!5 L. J . SVERDRUP 1928· 1 976 91 9/8!5!5-9260 iQo a::' , :r: DEC 1 5 1981 o:J : December 14, 1981 North Carolina Department of Administration 121 West Jones Street Raleigh, NC 27511 Attention: Mr. John H. Emerson, PE Chief Engineer I Y'. . .. >- Subject: Department of Crime Control and Public Safety PCB Waste Disposal Site, Warren County Code 14900 -Item 1111-1990 Response to Comments by Land Quality Gentlemen: Submitted herewith are responses to the comments contained in Mr. John Holley's letter dated December 9, 1981, concerning the subject project. We have indicated the response for each comment immediately following the comment, We are enclosing one copy of the revised specification pages and one print of the revised soil erosion control print for your final review and to be inserted into your documents, Very truly yours, SVERDRUP & PARCEL ' ~~ /3 ,:2~cJ-r,. Frank B, Rainey, Jr. Manager Enclosure cc: John L. Holley, Jr, -with one copy enclosure David E, Kelly -with one copy enclosure -with one copy enclosure . ' . 2H-l SECTION 2H SOIL EROSION CONTROL 1. SCOPE 1.1 Furnish all labor, material, tools, and equipment necessary for soil erosion control during and after construction of the landfill as shown on the drawings and as specified herein. 1.2 Related Work Specified Elsewhere: Earthwork as specified in Section 2B, seeding as specified in Section 21. 2. GENERAL REQUIREMENTS 2.1 The Contractor shall take whatever measures are necessary to minimize soil erosion and siltation by his operations. The Contractor shall also comply with the applicable regulations of all legally constituted authorities relating to pollution precaution and control. The Contractor shall comply with all regulations which in any way affect the conduct of the work especially the State of North Carolina Rules and Regulations for Erosion and Sediment Control. All control devices must be installed prior to grading and must maintain a minimum of 50% of original capacity during lifetime of project, Controls must not be removed until all grading areas are seeded. 3. EROSION CONTROL MEASURES 3.1 Diversions -Construct the diversions and beams as shown on the plans, and as needed. The diversions shall be removed after the project is complete. 3.2 Silt Check Dams and Temporary Silt Fences -Installed as shown and as needed. 3.3 Seeding -Slopes, stockpiles, and ground left exposed more than thrity working days or 120 calendar days will be seeded, 4. PAYMENT 4.1 Payment for all work in this section will be included in the lump sum price in the Contractor's Proposal. Kind of Seed Kentucky 31 Fescue Brown Top Millet or SOrgham-Sudan Pounds/Acre 60 35 21-3 The seed shall be lightly covered by approved mechanical equipment of making and the soil compated by rolling. Annual rye applied at the rate of 25 pounds per acre shall be added if seeding occurs between the months of October and February. 4.3 Within 24 hours after seeding is done, a mulch material shall be evenly strewn over all surfaces. 4.3.1 Mulch shall be uniformly spread by hand or by approved mechanical spreaders or blowers at a rate of 3,000 pounds per acre. Mulch shall be held in place by applying a sufficient amount of asphalt or other approved binding material to assure the mulch is properly held in place. The rate and method of application of binding material shall meet the approval of the Engineer. 4.3.2 Where a hydroseeder is used to apply fertilizer and seed at the rates above, the seed shall not remain in water containing fertilizer for more than 30 minutes prior to application unless otherwise permitted by the Engineer. 5. PAYMENT 5.1 Payment for all work in this section will be included in the lump sum price in the Contractor's proposal.