HomeMy WebLinkAboutNCD980602163_19811207_Warren County PCB Landfill_SERB C_John H. Emerson letter-OCR.. ~ ~k JL Of. ~ North Carolina -:a
Department of Administi ·on~
James B. Hunt, Jr., Governor
Jane S. Patterson, Secretary
Division of State Construction
/
Ray F. DeBruhl, P. E., Director
(919) 733-7962 December 7, 1981
Mr. 0. W. Strickland
Solid & Hazardous Waste Management Branch
Department of Buman Resources
Division of Health Services
Raleigh, North Carolina
Subject: PCB Waste Disposal Site
Warren County, North Carolina
Code 14900 -Item 1111-1990
Dear Mr. Strickland:
Transmitted herewith are responses to the U.S. EPA Region IV review of the
above subject project. It is our understanding that this review is being
handled through your office. A formal letter of approval will be required
prior to this office authorizing the receipt of bids on this project. If
you have any questions concerning the designer's response, please correspond
directly with the Consulting Engineer, Sverdrup & Parcel.
Very truly yours,
JHE:bs
Q,J~H~~\ 0 Chief Engineer
Enclosure
cc: Mr. David E. Kelly
G. H. ANDREWS
C. L. CUTTING SVERDRUP & PARCEL
JCHN I. PARCEL 1 "2a-1965
L . J . SVERDRU,-1"28-1976
E. M. DOUGHERTY
ELI LEMCOE CONSULTING ENGINEERS
C. N. LCTELLIER
W. LITTLEFIELD
C.M.METCALF
W. H. RIVERS
2211 WBST MBADOWVIBW ROAD SUJTB 114
ORBBN8BORO, NORTH CAROLINA 2T40T 9 1 9/855-9260
G. E. ROSENKOETTER !I. R. SMITH, JR.
I. R. VERON
R. C. WEST
December 2, 1981
Mr. David E. Kelly
Assistant Secretary of Public Safety
North Carolina Department of
Crime Control & Public Safety
P. O. Box 27687
Raleigh, NC 87611
Subject: PCB Waste Disposal Site
Warren County, NC
Gentlemen:
Code 14900 Item 1111-1990
Response to EPA Comments
We submit herein our response to the comments in the US EPA, Region IV,
letter dated November 10, 1981. The responses are numbered/identified
the same as in the referenced letter,
(a) through (c) No response required
(d) Post closure surveilance will be handled by the State through one
of the State Agencies, Police, DOT, etc.
(e) Sediments and the liner from the silt pond are to be removed and
enclosed within the landfill prior to final closure. This is
specified in the specifications, page lSA-4, paragraph 5.6.
(f) We, the consultant, can assure this only if our contract with the
State is extended to cover full-time inspection.
(g) Specification page 2D-l, paragraph 2.2, specifies that final
locations and depths of groundwater monitoring wells shall be
determined in the field. Field conditions may show that a cluster
of wells will be needed to adequately monitor the groundwater.
(h) The area in question is on a hill and as best as can be determined
from the data available at this point in time, there is not a major
fluctuation in groundwater. However, observations made during
construction should provide data for a more positive comment.
·~-/
/
Mr. David E. Kelly
December 2, 1981
Page Two
Post closure procedures
handled by the State.
frequent initially to
monitoring will take on
Very truly yours,
SVERDRUP & PARCEL
~---~ .. --~ ./--
Frank B. Rainey
Manager
cc: M. C. Adams
W. Meyer
J. H. Emerson
Addressee
are beyond the scope of our contract and will be
In all probability, monitoring will be more
make sure everything is working and thus
a less frequent but regular basis.