Loading...
HomeMy WebLinkAboutNCD980602163_20000203_Roadside PCB Spill (Warren County PCB Landfill)_FRBCERCLA LTRA_Detoxification Project Drawings-OCR• SOLL CITY LARCO LAKE ,...____ ~ I Warren County, North Carolina D 158 ~::::::, PROJECT ,-.r LOCATION PROJECT LOCATION MAP NOT TO SCALE NORTH V s 0 N 58 I FOR CAROLINA AND DE,PARTMENT OF ENVIRONMENT RESOURCES OF NATURAL W1 A S T E M A N A G DRAWING NO. 1 2 3 4 5 6 7 8 9 10 11 N C D E N R 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 I •f-__,f 1,1=:::J) < ) 35 ----- -1r5n~ 36 37 ENVIROM_ENTAL. INC. I 38 39 40 41 BJii' A Environmental Consultants 42 43 Barnes:, Ferland and Associates:, Inc. I 44 45 I ----... ---. ---. ~r----;:--: ----,--- --·----:-:-. c----~- E M E N T DRAWING INDEX SHEET DESCRIPTION NO. G-1 PROJECT COVER SHEET G-2 OVERALL PROJECT MAP ANO AIR MONITORING LOCATION MAP C-1 EXISTING CONDITIONS SURVEY PLAN C-2 DEMOLITION PLAN C-3 SITE PLAN C-4 SITE GRADING & DRAINAGE PLAN C-5 SITE GRADING & DRAINAGE SECTIONS C-6 NEW LINED PONDS • SECTIONS AND DETAILS -STORM SEWER PROFILE C-7 PROJECT DETAILS -EXISTING LEA CHA TE TREATMENT SYSTEM C-8 SITE FENCING DETAILS C-9 SITE CONSTRUCTION DETAILS C-10 STORM WATER MANAGEMENT PLAN SCHEMA TIC C-11 STORMWATER PUMPING STATION AND DRAINAGE DETAILS C-12 TYPICAL EXISTING LANDFILL SECTION -<EAST AND WEST> C-13 EXCAVATION SECTION -EXIST. LANDFILL PROFILE (NORTH • SOUTH) AND MATERIAL QUANTITIES C-14 EXCAVATION SECTION • PROFILE LINE "A" EXCAVATION AREA NO. 1 C-15 EXCAVATION SECTION • PROFILE LINE •A• EXCAVATION AREA NO. 2 C-16 EXCAVATION SECTION • PROFILE LINE "A" EXCAVATION AREA NO. 3 , BACKFILL AREA NO.1 C-17 EXCAVATION SECTION -PROFILE LINE •A• EXCAVATION AREA NO. 4• BACKFILL AREA NO. 2 C-18 EXCAVATION SECTION -PROFILE LINE "A" EXCAVATION AREA NO. 5, BACKFILL AREA NO. 3 C-19 EXCAVATION SECTION • PROFILE LINE "A" EXCAVATION AREA NO. 6, BACKFILL AREA NO. 4 C-20 EXCAVATION SECTION -PROFILE LINE "A" EXCAVATION AREA NO. 7• BACKFILL AREA NO. 5 C-21 EXCAVATION SECTION -PROFILE LINE "A" EXCAVATION AREA NO. 8• BACKFILL AREA NO. 6 C-22 EXCAVATION SECTION -PROFILE LINE "A" BACKFILL AREA NO. 7 C-23 EXCAVATION SECTION -PROFILE LINE "A" BACKFILL AREA NO. 8 W-1 NEW WATER MAIN· PLAN W-2 NEW WATER MAIN· PLAN W-3 WATER MAIN DETAILS ER-1 EROSION CONTROL PLAN ER-2 SEDIMENTATION & EROSION CONTROL DETAILS ER-3 SEDIMENTATION & EROSION CONTROL DETAILS ER-4 SEDIMENTATION & EROSION CONTROL DETAILS R-1 POST DETOXIFICATION -SITE DEMOLITION AND RESTORATION PLAN S-1 STRUCTURAL • PLAN, SECTIONS, AND DETAILS S-2 STRUCTURAL -PCS APT PROCESS -PRE-ENGINEERED MET AL BLDG -PLAN AND ELEVATIONS S-3 STRUCTURAL -WORKING AREA PRE-ENGINEERED BARN PLAN AND ELEVATIONS E-1 ELECTRICAL -SITE PLAN E-2 ELECTRICAL -POWER RISER PFD-200 BCD DETOXIFICATION EQUIPMENT LAYOUT PFD-201 MATERIAL PREPARATION PROCESS FLOW DIAGRAM PFD-202 CBCD PROCESS FLOW DIAGRAM PFD-203 BBCD PROCESS FLOW DIAGRAM PFD-204 PROCESS CONDENSATE SEPARATION AND AQUEUOUS PHASE TREATMENT PROCESS FLOW DIAGRAM PFD-205 LBCD PROCESS FLOW DIAGRAM PFD-206 COMMON SYSTEM PROCESS FLOW DIAGRAM / / NO. REVISIONS I I I I I I I COUNTY BY DATE I MONITORING WELL LOCATION I I I I I OWNED / / / / / / LANDS / / / COUNTY \ \ I \ \ \ \ \ \ \ \ \ I \ \ \ \ I I \ \ \ V \ \ ,._..--··-· ·-··-··-··-_·/'I I . \.---··-··-··-(· I LANDFILL AREA I ,r-··-··-··-··-l._,_ !£": ________________ ....:·.~ OWNED L A N D S - ACCESS EASEMENT WELL MW-1A MW-3 (s) MW-3 (d) MW-5 (s) MW-6 (d) MW-7 (s) MW-7 (d) MW-11 MW-12 \ \, \, \, . \ \, . CASING DIAMETER 2· 2· 2· 2· 2· 2· I I I I I I OVERALL PROJECT MAP SCALE: N. T.S. B I -NORTH CAROLINA DEPARTMENT OF ENVIRONMENT ! - - - ---GD~ AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT I ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT I I I I DEPTH 43.37' 40.82' 66.68' 41.97' 64.30' 37.00' 47.54' 42.32' 38.40' I I I I I I I I , , ' , , , , , , , , , I ' ' ', • I l I I I I I I , I I \ \ • I , I I I I , ' \ , , • , B FA Environmental Consultants Barnes, Ferland and Associates, Inc. AIR MONITORING LOCATION MAP SCALE: 1"=60' OVERALL PROJECT MAP AND AIR MONITORING LOCATION MAP DRAWING INF"OR~ATION PRCl..ECT NO.: 99001 DESIGNED BY: CEH DRA'MI BY: WKP/TWC CHECKED BY: PAS DRAYl!NG FIL£: 99001 G2 DATE DRA~NG ND. 2/03/00 G-2 SCALE: AS SHOWN SHT. 2 OF 45 / / --- \ \ / ,, ' -· 0 rMW-2 '\ , ___ ------- --- --- --- ------ ------ ---------------- -----.---... ·. -------------- ,- ---------_,, ' ---------------------- / / -- --------- ---------------- ...._ __ _ ---------------------- --------------------- : ... _ ------- NO. REVISIONS ---------- __ ....._ .,,,, ... --....... ,,,. ... --' -' BY DATE ' ' ' C'?t - -- -GD~ ENVIROMENTAL, INC. • , ----------- ----, ' ' ' ' ' ' ' I \ \ I I I I ----------------" \ \ I I I I I I \ \ ' \ ' --\ - \~\ '-, ~-__:.._ ·_:.:_ ' "· ' -I \ I I I I \ \ ' I - ::;._, ' -=--==- • - -- t .._ N O 9 • 1 0' 4 5 ~j W: ~ __ - ........ -. -- I -,- ----.-... . . . --- ----------~ 1--810. 0 0 \ ,,,. ------- ---------- --- ------------------------"t------8 -.,,..--------....... __ . ---. ----- ' ' . ,_ '\. / i, ---, ' ' ' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES --- DIVISION ~ WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT -·-. BFA Environmental Consultants Bames, Ferland and Associates, Inc. EXISTING CONDITIONS SURVEY PLAN .... ---- DRAWING INFOR~ATION PROJECT NO.: 99001 DATE DRAWING NO. DESIGNED BY: CEH C-1 DRA\IN BY: WKP TWC 2/03/00 CHECKED BY: PAB DRAWING FlLE: 99001 Cl SCALE: AS SHOWN SHT._:_OF _:_ NO. Lt. ~ .&. & & EXISTING POND CLEAR AND GRUB AREA OF ALL TREES AND BRUSH PROTECT MONITORING WELL /DURING LANDFILL EXCAVA110N @) MW-2 REVISIONS BY DATE N ~~~~~~(~~ C I ----- -Gil ~ I ABANDON MONITORING WELLS RETAIN PERIMETER FENCE ON EAST SIDE OF LANDFlLL - ----- -------- ---L MW®/~ ACCORDANCE WllH DETAIL __ ------.----~--=-=,-------;-p---o ---~ --· ~I ---oF-~---o=-p---o---=o-+---o=----=t I I ABANDON MONITORING WELLS ~ IN ACCORDANCE WllH DETAIL ~I I . •., I l I I I / . ~' -~ ::., .. ,. '· -1c -RE•DVE EXISTING lfACHA~ ---+ ----1-I ---I ----' ✓/·7·~ i I~ I ·, TREATMENT SYSTEM, PUMPS ,,, ~ , AND PUMP BUILDING I _.-( REMOVE OBSERVA110N WELL AND DISPOSE OF IT DURING LANDFILL EXCAVA110N ; ; CLEAR AND GR V OF ALL TREES A // // // / /~ // // ~ : ,L--~ ; ~~D~JE~AR'i' "'t ~~&~:.-; c~i"~, ~I m ,E / / I I I ··, .. f··~....... I . ~IMW-7(s)1';; / REMOVE EXIS11NG ELECTRICAL , ~ MW-7(D) ~~ POL.£S AND OVERHEAD LINES / COORDINATE WORK WllH POWER COMPANY '·-I ,,, -----------.____ --------<,-------'·. I -• --I;; I I ·. I , ,, / -~...J-/-- ~~\~~\~\~~-rm,."""_~~~\~~~~~~\~~~ _ "~~1\'-""-"'"'"""''&,_"'"'~"'"'"'""'&,_""•"'~"-\~"'"'~-"'~~"'~"'"'{~~~~"-\-"-"-~"'"'~"'~I ABANDON MONITORING WELLS r IN ACCORDANCE WllH DETAIL ABANDON MONITORING WELLS IN ACCORDANCE WllH DETAIL ~~~~~~~~~~~~~~~~~(~~(~(~~~~(~~&'fu~~~(~~~~~~~~~~~-=· @ MW-12 \ \ \ \ \ \ 0 15' 30' 60' 90' -~-~-2-1111'•~~~~~1 c■ • • ■ • 111111--• GRAPHIC SCALE: 1• = 30' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT DRAWING INfORt.lATION BF .A Environmental Consultants AND NATURAL RESOURCES PROJECT NO.: 99001 DIVISION OF WASTE MANAGEMENT DEMOLITION PLAN DESIGNED BY: CEH Barnes, Ferland and Associates, Inc. DRAWi-i BY: WKP TWC DATE 2/03/00 ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT CHECKED BY: PAB DRAWING FILE: 99001C2 SCALE: AS SHOWN 0 0 N aJ I"-- ~ Ii) a, -tj- 0 co Cf) DRAWING NO. C-2 SHT • ....£.or 45 ,- / _, I i: 0 C j ;, --' -~® i-,__ -- ---------- NO. I --o,-----o 0 0 0 0 0 0 0 REVISIONS ' i ,- ,1'-hf---f'-------"'-CONCRETE MITERED -'-_ END SECTION i EXCAVATE AND REGRADE -EXISTING POND. - '. EXCAVATED-MATERIAL SHALL · : -BE TESTED FOR PCB CONTAMINATION. e CONTAMINATED MATERIAL SHALL a' BE TREATED. w c§ -----------,___ i ------------32 ~_;._----321-~-~ -------322t----- t: I ---312.51- -------::----32 -------318i----- -------316-t---...:: ,,---TOP 314---.... _:~-BOTTOM 306 NEW LINED POND 06 BOTTOM 314 TOP ---314 TOP --l,--,j..-~312.5 --------3!2----t-t----- BY DATE . ., '. +_ I tC2 c;;=---D ..a f ENVIROMENTAL, INC. _, / : I ' I \ ' ' ' \ -~ 1~ft11uJIDl!IJ~ill~?~~!W~1MLiu~~I ~ --__ -- 1 • .-_- ~F --_...---+-=----==-=---.::=-+------__::---l--_.;_-+----=--=------t--------"--------+-----==-==-=t------t---__:_--t-:---\, :t-----'---:-11 :.-I -----' \ I 16' WIDE-HAUL ROAD FOR CLEAN MATERIAL --, ., ' ii --'-----:.::_=--=--I-.:.-.=.:.::.... ____ ,1.... _______ -1--.....::::... _ _:_ ___ +--------+--------+--------+---JL------+--------:::::---+------:----,,,-t--~,--:---1 ;1 .. -------~ - - r I .--------.. ----- / . I ----- -· .. -. HAUL ROAD IN PHAS[s_ ---..::~:~ ·--·- . - .. -.. CONSTRUCTED ----1------ ----.. ; . -.. ----1-1... -----~ I SOD AREA BE~~N~ TERI AL / ---PROCESSING-AREA AND HAUL RD. ' STAKE SOD IF NE ESSARY. ~ I 1 I ';' ---'--v ~· _.___.r ;, I I ' " I j ' 1 I i 0 i , I ' '/ ! i i ! --t---:-4-====r--r-1 ®i I I ,, f L -1· t 5 ~ ~: ,I ~ i ' i i_ ,r ' ';;-' l "~,i-_ f. ~. ! _; .. _ -"' ~ r / ! I 1- '. !i \ q, I ' STABILIZED STQCKPILE .c _ AREA >· ' 1: .-. . \. { \ Ii '~ •. I °' ~\ ' ;-:'"' i --,__. _i ( /; ,j •. --- ,- ~-~ I \ ...,,-\ i ,,- -lt -~ :--_:::: ==-=-1-~--.j..........,..-=a......,_~""'-t"-~~~--t'--'-......... "=""=''---=""'=f-':=-'-" · 3,:ztfr-___j.__,._~"'-+-'--~~~---+~-~------'-1--~-+=~~~-+--~---t--........... ----., ----15• WIDE HAuL1 ROAD FOR coN _ ~~~~W~~Jm~11111;~~]~1n~ -ACCESS RAMP ---- ;_ 328_0 _ 328.0 CERTIFIED -r -TRUCK SCALE , -:.F~ ,.-~ '~-: / h --- BLENDED ---_ STOCKPILE -"AREA,; MATERIAL _. ' __,,,,,-PRE-ENGINEERED ~ ·• BARN PROCESSING -/ • AREA -._ - (BBCD AND CBCD) -..._ --,; -4 H-- a• WIDE CURB TYP. PRECAST CONCRETE TEMPORARY_ BARRIER \ MATERIAL PREPARATION AREA \ PRE-ENGINEERED METAL BUILDING WALLS ---,"-'-'4----..--_ r.D N I'"} g~R~DEl ~-.. ',._ STORM WATER ·._ TREATMENT -SYSTEM 30"RCP @ N 942843. 72' \ , E 2245867.4! ~URB INLET -• 324.75 TOP=326.0 " 324.50 NOTE: SEE DRAWING C-6 FOR STORM SEWER PRQflLE I I INLET TOP=326.0 I __;;;__326.8 __,,.,,.,,_ MANHOLEl} . ·-~ 15"RCP •. CL (_) et:: • --,0 ~ ;:; , .. 7 DOUBLE fNLET :::,..,,f@ TOP=327.0 ,,.--:,;:_ '- ,--------, ·--·,--~ :; . ~~ r-...-----=.::........;_---,;.--"----+-1::cFLc-:O~O-=-Rc-:Dc::R-:-Al:-:--:Nc-:TYP=:-:::'. J._324.75. (3 cc MIN.)---- - -16' WIDE ' -r< --~ ~:. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NA TUR AL RESOURCES ACCESS ROAD 324.50 • --- 32a.o • TREATED INLET roe=327.o sees TREATED STORAGE ' ' r'---.._ ·~ \ __,.,--ft-PRECAST J--.. CONCRETE TEMPORARY ' ARRIER ALLS l_ f -~. DIVISION OF WASTE MANAGEMENT Barnes, Ferland and Associates, Inc. SITE GRADING AND DRAINAGE PLAN WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ' TYPE •c~. INLE ,JOP=327.0, ; , . . ' " - \ ' -MOUNTABL CURB \ ""~1 ' \ DRAWING INFORMATION PRo..£CT NO.: 99001 DESIGNED BY: CEH DRAWN BY: WKP CHECKED BY: PAB DRAWING FILE: 99001 C4 '----•' ~--:_..! ~ ' \ $ _/·-.....__,--...._ _ _.,,... __ _ DATE 2/03/00 SCALE: 1 = .30 i - '. .... 0 90' I :, DRAWING NO. C-4 SHT._6_Df45 ... .... ... 332 328 ... = 310 312 -•20 302 ... ... ...., ... 332 328 ... = 310 ---420 ... ..... 340 ... 332 :m ... = 310 -420 NO. REVISIONS BY DATE ~ PROPERTY LINE --- v---PROPERTY LINE ' . . ' -- , , , , , , -JOO ~ PROPERTY LINE ----JOO • > -- -----GD~ ' ' ' ' ENVIROMENTAL, INC. ' ' -300 n• ' -300 _...., -340 _...., ' 11 · 1\.1 I D, II I -- -320 -300 ---200 ' -320 -JOO -200 • ' I .._, r" , ' " '" ... . ... - -J20 -JOO -200 -200 NORTH CAROLINA DIPARTh1ENT OF ENVIRONMENT AND NATURAL RESOURCES -240 -240 -240 DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ;:.------------r--~,~~~~ · .. ~-~~~ ;;,:_:'i/ ; __ :,,~·.1: -220 -220 -200 • • -200 ' ' -100 -100 SECTION 3 --' -100 -100 SECTION 2 -18CI ' ' ' -100 SECTION 1 J BF .A Environmental Consultants Barnes, Ferland and Associates, Inc. • -140 • -140 -140 16' WIDE HAUL ROAD . ' . -120 -- -100 16' WIDE HAUL ROAD -., .. -120 -100 16' WIDE HAUL ROAD r ,,. . -120 -- -100 -eo -eo CL EXIST. LANDFllL ~ -ea -40 -20 0 I t . ' 0 6+00 20 SCALE: 1"=20' HORIZ. & VERT CL EXIST. LANDFILL ~ I t . ' -ea --40 -20 0 20 4+00 SCALE: 1"=20' HORIZ. & VERT CL EXIST. LANDFILL ~ --40 -20 I t ' ' a 2+00 - 20 SCALE: 1"=20' HORIZ. & VERT 320 310 312 302 ... ..... 340 ... .., 320 ,. . 320 ... ... ..... ...., ... M2 328 ,. . 320 311 SITE EXCAVATION / FILL TABLE MA TERI AL CUT = MA TERI AL FILL = TOTAL= 19,600 cy 9,500 cy 10,100 cy NOTE: QUANTITIES EXCLUDE LANDFILL AREA, SEE LANDFILL SECTION SHEETS DRAWING INFORMATION DATE PROJECT NO.: 99001 DRAV.,NG NO. SITE GRADING AND DRAINAGE SECTIONS DESIGNED BY: CEH C-5 ORA\IN BY: WKP/TWC 2/03/00 CHECKED BY: PAB SHT. 7 OF 45 DRAV.,NG Fll.E: 9901C5 SCALE: ,--=20- NO. TIJRN DOWN LINER AS SHOWN PROPOSED GRADE • st- 330 325 320 -- 315 310 305 I .. -· --·--·--------------64' 30"RCP 56' 30"RCP 165' 24"RCP 25' 15"RCP 105' 15"RCP ---------·· ◄ c:n .... ,..,,.-. .. I"'\ l"i' -tr="--. .... ,T I'-' I• -·-~ ·-'·-,--,.,--,.., ,--, ~~ -.... ,.. ... n -----,,...,...,.."7 -,.. ........ ....,. -. --'"-' -. -_.,._,...., -·--,_ -·-__ ..., -,..., ___ -. ---·----- -- PROPOSED GRADE, ---,,,.,,,.. J:"--11i-----....... .f. I -, --• • .&. I workina t_auipment La yout :::.toraae ,_, Areas ' -----------!Vt'--I Vt'-T;!_D • A I \ A_rea T/'\P Aren ~ TOP= .JLI.U \ ·..,,,_,,v \ -32/.0 \ jzo.uu, . • II .._. -\ """ " '\ J 326.25 ' ' / 1 I ---" ' I I ·-' ' \ , / 1-J --/ ---/ ~ --; -----MANHOLE ---v / ~MANHOLE --/ / -/ --. / --• • \)<" / .... --,J •, ' " / -/ -1---'\. l="XIST. GRAf')I=" -1 / " " " -· ,, __ ,..,.. ., ,?n a" .../ --/ \ --' \. '-FL 319.93 t:'I ,?n 1, ..../ '-FL ~Y>n.19 rL 'JLU.Tu I ._. ...,._..,. • ..,...,. TOP-114.0 --...,£..._ -~ \ " r ,...""' r ,...,.., .. ' r c::n-., c sn?) ( C::()1 ) ---------/ \ '--tL •jltl.uu '-,. / \..FL=317.95 '\/ ,,..-,..._;::-.,_ ----·-·--... ...., __ __, ---NEW I INED POND '-~ r,...,...-,, ( SO8) "-11 FS .-i -~1 n n \ ~ ' \ 1B OTTOM=306.00 -tL---',)IU. IU PROFILE -STORM SEWER SCALE: HORIZ. 1"=30' VERT. 1"=5' 10 6' 10 2 - - -------320 ,--44:::11 -si::o!___::O_PI~:-m11unM~ltElt1i----,--,--_-___ -_1_"-------iEfvX~ISTT.riG~RAM1D~E--=--:------------i----,,--,--_-=-::::-::-=--'-----=='-------------:::::::,;---'""""-------, 320 t~I~ I. \,-, ~-" II---.... / , ... ---i------..._ --- '\._ ( t---------~'c--,~ / \ I ----,...__ ----MAX. WATER LEVEL iur-~314.U ~ '-,,,,,,,--~Ir--...___;::;:;;;----==---------'~'---------------j 310 _ -----/ "-/ -......._ -/ ---·---"'----'"--------~-+----------~--------------::+----+-~-------- / ' "' /'-.. 310 L 1 -............__ ______________ :.:lllJ:...:;l ,:,_·.:..:,:,uo:.::;.:.::....U_....1..._,,,;,,r/ '-._ =-.ni:-_. '-1.5: 1 SIDE SLOPE ~---------..1.1111l~---------"l'rtttt-et'll"'l'l:-n:t'9tt't;l11"'-:,,....L-'---------------------'=-::,:::--'-"""='-"'='"'---'=---------------------.'JU MIL r'UL1r:.ln!L[J1j[_ TYP. A SECTION -NEW LINED POND SCALE:. 1"=10' \ EXTRUSON WELD 1 B" 1 B" Pfp[ Plus Dt,4. 12• \ PIPE BOOT /,\ NEW LINED POND ~ 30 MIL. LINER -;--"~.--i: POLYETHYLENE EXIST. GRADE __/ LINER LINER EDGE DETAIL SCALE: N.T.S. REVISIONS BY DATE ----,:;: j \ii ENVIROMENTAL, INC. LINER ANCHOR TRENCH SCALE: N. T.S. NORTH CAROLINA DEPARTMENT OF EN\1RONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ~ Environmental Consultants Barnes, Ferland and Associates, Inc. 3655 Maguire Blvd. Suite 150, Orlando, FL, 328()3 PH.-/407) 896-8608 FAK (407) 896-1822 ~ i;r:,-,' -7' --y--p·• ·....-·-~-;;-;~, '.1:° -\ ' . ' . ' : r-~~;-.,.: .~: (·/ 1:~ ' ! ·1: :!. ·''' I PIPE BOOT DETAIL SCALE: N. T.S. NEW LINED POND -SECTION AND DETAILS STORM SEWER PROFILE 330 325 320 315 310 305 DRAWING INFORMATION PRO.ECT NO.: 99001 DESIGNED BY: CEH DRA'IIN BY: WKP QIECl<ED BY: PAB DRA~G Fil£: 99001C6 SS BAND CLAMP NEOPRENE GASKET DATE 2 03 00 SCALE: 1 =10 DRAWING MO. C-6 SHT ..... ~ _ _(lf 45 NO. & .&-. Li. ffi ,s-- 2' CLEAR OPENING MANHOLE r FRAME AND COVER - 2 PLACES I I ~-----/-------------- 1 I I I I 11 \ I \ I I\ I \ ;'I I "-,,i "-,, I I --..__ --..__ I I I I I ~-------------------J SAND FILTER NOTE: 2' CLEAR OPENING MANHOLE / FRAME AND COVER I I ----7-----------1 __ I I 0,, ', I I 1 \ I I ( 1 I I \ / I I '-,, I I ___ -~_: __________ I CARBON FILTER 1. CONTRACTOR MUST REMOVE AND DISPOSE OF THIS SYSTEM PRIOR TO COMPLETION OF DETOXIFICATION ACTIVITIES. 2. THE CONTRACTOR HAS THE OPTION OF KEEPING THIS UNIT IN OPERATION OR REROUTING THE LEACH A TE TO THE PROPOSED STORMWATER TREATMENT SYSTEM 3. THE EXISTING SAND AND CARBON IN THIS SYSTEM SHALL BE TREATED ON-SITE 4. ALL STRUCTURES, EQUIPMENT AND PIPING WHETHER SHOWN ON THIS DRAWING OR NOT, SHALL BE DECONTAMINATED ON SITE PRIOR TO DISPOSAL. TOP Pl.AN -SAND AND CARBON FILTER SCALC:: 3/8" = 7'-o" ' : OVERLAY ALL PERFORATED PIPE r WITH a• MESH GALV. SCREEN \ g• -s· 3' -o· . \ 7'-s· 1------~~---+----~1 i-----~~--------i 3" PVC INFL:UENT PIPE FROM \ LEACHATEl / 4" PVC INFLUENT 4" PVC INFLUENT, \ • co I in I ' i l I .---.-, r-- 4• X 3• RED. /j 4" GLOBE VALVE 4" PVC INFLUENT PIPE 1500 GAL. PRECAST REINFORCED CONC. TANK 9' -6" X 5' -8" X 5' -9" I.D. WlTH 6" THK. WALLS AND 5" THK. TOP -~ -B -8 - B' a I I -- I I = t ~ I J I 4" PVC OUTLET_} PIPE TYP. SAND FILTER 1 I \ \ \ \ \ ~ \ .J. a ~ ' i. ~ -~ ~ -IH~ = - T \ t ~ ~ a I I ' \ \\ I 4" GLOBE VALVE-L 4" UNION 4" PVC OUTLET_\ PIPE TYP. CARBON FILTER Pl.AN -SAND AND CARBON FILTER • 0, I in SCALE: 3/8" = 1'-0" 3" PVC INFLUENT , 4" GLOBE VALVE PIPE FROM 1\ LEACHATE\ r 4• PVC INFLUENT \ I / '7 t-" "i t-" \=E::::flwt:Bi9-\~~==/:fh-.:------====:::!!~"'=WA=;TE=::R=E:--LE_V._ +---+-r- 4• x 3• RED//V ~-+-• <Cl I -• N st 1 4" PVC INFLUENT 4" UNION / ' SEAL WALL PENETRATION WITH NON-SHRINK GROUT TYP. / 4" GLOBE VAf.Vf_ ~ 4" PVC OUTLET PIPE • <Cl I i-J 750 GAL. PRECAST REINFORCED CONC. TANK 7'-6" X 3'-6" X 5'-3" I.D. WITH 6" THK. WALLS AND 4" THK. TOP SEAL WALL PENETRATION r----WITH NON-SHRINK GROUT / TYP. 4" PVC INFLUEN PIPE I iq r9 .......+---'-----'------~ --+-+---~ ---~----~ I , REVISIONS BY DATE -- -- -~·--. ·-,s••· - -,._ I \iii ENVIROMENTAL, INC. 4" PVC WITH 2-ROWS OF 1" DIA. HOLE EQ. SPACED IN PIPE. 16 HOLES/ROW = 32 TOTAL HOLES IN EACH PIPE • SAND FILJ[R 0, I 4" PVC WITH 2-ROWS OF 1" DIA. HOLES/ EQ. SPACED IN PIPE. 14 HOLES/ROW = 28 TOTAL HOLES IN EACH PIPE I I 4" PVC OUTLETJ PIPE TYP. CARBON FILJER SECTION -SAND AND CARBON FILTER SCALE: 3/8" -1'-0" NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ~• a1r A r::nvironmenta1 eonsu1tants PROJECT DETAILS -DIVISION OF WASTE M A N A G E M E N T WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT f3arnes, Ferland and Associates, Inc. EXISTING LEACHATE TREATMENT SYSTEM I I ,. · .. , ., ' ... / ·._\ .(;, ~/i /:\ ; __ ·\.\. '·i·i .:': ;, /, .: ·, . ( J , ' • IC) I -:.i- -I ~ 4" GLOBE VALVE J I L 4• PVC OUTLET PIPE • .,, I in DRAWING INFORMATION PRo..ECT NO.: 99001 DESIGNED BY: CEH DRAWN BY: WKP/TWC CHECl<ED BY: PAB DRAWING Fll.E: 99001C7 DATE DRAWING NO. 2/03/00 C-7 SCALE: AS SHOWN SHT, 9 Of 45 NO. Post Ca /0 1 Max. -----',. __ .. ,. Barbed wire, for attachment detail see this dwg. 101 Max. ' _ _:__ Post Cap Corn~ • 101 Max. 101 Max. Varies, 2.1 Max. -------,1-1--Ties Ii 2411 Centers_,. __ .,._ _ _,.~1---..... --Varies, 2' Max ...... --........... ---<,.__ _.,___-++-_....._ _ __,...,._...,,....;,.__....,.. _____ ---11-----1----611 Min. -----Iv Ties Ii Z4" Centers _..,_ _ __.,,......,1,1-_....,.. _ __,,.__ ...... _ __,,.__,_..,.. _______ ....., __ ..,_ _ _,. __ 6" Min. Chain Link Fabric No. 9 Z' Mesh, Twisted And B Top And Bottom Selvage Tension Wire-b ' Ties Ii -~. Centers tlJ LINE POST GENERAL NOTES µq ~1 PULL POST I. Chain link fabric, posts, rails, truss rods, tension wires, tie wires, stretcher bars, gates and all miscellaneous fittings and hare/ware shall meet the requirements of AASHTO M/81 unless otherwise specified t1f this index. Stipulated AASHTO and ASTM signify oorrent reference. 2. Fence Component Options, A. Line post options, , m Galvanized steel pipe, Schedule -40-It nominal dio. galvanized at the rote of 1.8 oz/sf: ASTM A53 Tobie X2, ASTM F/083, and AASHTO Mill. 8. Comer, end, and pull post options, ,r (!J Galvanized steel pipe, Schedule -40· 2!' nominal dla. galvanized at the rate of 1.8 oz/sf: ASTM A53 Table X2, ASTM F/083, and AASHTO MIii C. Rall options, (f) Galvan/zed steel pipe, Schedule -40· if nominal d/o. galvanized at the rate of 1.8 oz/sf: ASH/ A53 Tobie X?, ASTM F/083, and AASHTO U/11. ti D. Chain /Ink fabric options (Z' mesh with twisted and barbed selvage top and battom for all optionsi: m AASHTO M/8/ Type I -Zinc Coated Steel, No. 9 gage !coated wire diameter!, (l<Jlvanlzed at the rate of 1.8 oz/sf !M/81 Closs D 2.0 oz/sf modified to 1.8 oz/sf). E. Tension wire options: /I) No. 7 gouge steel wire zinc golvonlzed at the rote of 1.8 oz/sf: AASHTO M/81. !2J Aluminum alloy wire conforming to the requirements of ASTM 8211, Alloy 606/, Temper T89 or T94, with a wire diameter of 0.1875" or larger. !3J No. 7 gauge aluminum coated steel wire coated at the rate of 0.40 oz/sf: AASHTO M/81. F. Tie wire and hl)g ring options: (!J No. 9 gouge steel wire galvanized at the rate of 1.8 oz/sf. /2) Aluminum alloy wire conforming to the requirements of ASTU 8211, Alloy 606/, Temper T89 or T94, with a wire diameter of 0.1443' or larger. (3) No. 7 gauge aluminum coated steel wire coated at the rate of 0.40 oz/sf. u Ground Line Concrete Base Crowned I" Above Ground At All Posts (Typical) Ties Ii 2.4' Centers b LINE POST LINE POST LINE POST TUBULAR POST ILLUSTRATED 3. Unless a specific material Is oalled for In the plans the Contractor may elect to use either a single type of material or a combination of mater/al types from the component options 1/sted above. Combinations of optional materials are restricted as follows, !al Only one fabric optional mater/al w/11 be permitted between comer and/or end post assembl/es. (bi Only one line post optional material will be permitted between comer anolor end post assemblies. !cl Pull post assemblies shall be optional materials identioal to either the 1/ne post optlona/ mater/al or the corner end post assembly optional mater/al, but, pull post assemblles shall be the same optional material between any set of corner and/or end post' assemblles. 4. Concrete for bases shall be Closs I as specified In Section 345 of the Standard Specifications except that the requirements contained In 345-5.I, 345-/0 and 345-11 si'K111 not apply. Materials for Closs I concrete may be proportioned b>j volume and/or l:ly weight. 5. Line posts ore to be set in concrete as detolled above. End, pull ano corner post assemblies shall be set In concrete as detailed above for all soil conditions other toon so/Id rock.. Posts within ossembl/es that ore looated on concrete structures or so/Id rock shall be set /:It base plate. Line and assembly posts set In concrete bases shall be set on oddltlono/ 3" In depth for each I' of fence height greater thon 6', 6. Pull posts shall be used at breaks In vertloal grades of 15• or more, or at approxlmotely 350' ctnters except that this maximum Interval may be reduced b>j the Engineer on curves where the degree Of oorvoture Is greater toon 3• . FENCE DETAIL SCALE: N.T.S. ' tlJ ~!~ LINE POST Tension Wire b ' "1 I 1z:1 ~t CORNER OR END POST 7. Corner posts are to be Installed at all horizontal breaks In fence at 15 • or mere and as required at vertloal breaks over 15" as determined /:It the Engineer. . 2.875" o.d. gate post . X X X J< X X X X X X XX Y X ),?>:\.: X )( X X .. X X X X X )( )( )( )< y y XX X Y X < X X X X X . 1.9 o.d. pipe for gate frame Latch for lock as provided by fence mfg. NOTE: 5' -011 wide walk through gote X )< )< { X ' )( )( )( X X X X )< )< )< X X X . X \ .\ .. ' 1. See fence detail on this sheet for fence components ACCESS GATE DETAIL SCALE: N. T.S. 24' -rJ' / Barbed wire, for attachment deto/1 / .. see this dwg • .. .. . = = \ = V R--',.__..,.__....,... ____ ,__ ___ -+<-ft .. .. . . . Class "c" cone. !typi . . .. X V?-x > X X X X X > "> )(x.;x X >. X '>< X X X X)()l.)I. fx xXx )( X X X X X )( X ' X )< > X X X X X X X X )< )()()1, X X X > 24' WIDE ENTRANCE GATE DETAIL REVISIONS BY DATE - ----=•a ENVIROMENTAL, INC. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Barnes, Ferland and Associates, Inc. SITE SCALE: N. T.S. DRAWING INFORWATION DATE PRO.ECT NO.: 99001 FENCING DETAILS DESIGNED BY: CEH DR"llN BY: TWC 2/03/00 CHECKED BY: PAB - b I <O DR"IMNG FILE: 99001C8 SCALE: AS SHOWN ---------------------, -;-· -...,.....,...-.....-.-'M""'" ".T f,• ,-• • ' ' .-:-', :_ ;-:, DR"\IIING NO. C-8 SHT.-2£.0F 45 -- r7 L _J r7 L _J GENERAL NOTE: MORTAR USED TO SEAL THE PIPE INTO THE WALLS OF PRECAST UNITS WILL BE OF SUCH A MIX THAT SHRINKAGE WILL NOT CAUSE LEAKAGE INTO OR OUT OF THE UNITS. MAXIMUM OPENING FOR PIPE SHALL BE THE 0.0. OF THE PIPE REQUIRED PLUS r;. DETAIL OF CHANNELIZATION NOTE: CHANNELIZATION REQUIRED AT ALL DRAINAGE STRUCTURES SMOOTH FLOW CHANNELS COMPOSED OF CONCRETE OR BRICK AND MORTAR SHALL BE CONSTRUCTED ON THE BOTTOMS OF ALL STRUCTURES TO A DEPTH EQUAL TO HALF THE DIAMETER OF THE LARGEST PIPE. INVERT DETAIL SCALE: N. T.S. APPROX. 24D LBS. r7 L _J N '~---!-•~· t ,.._ ~-+--~ ,.._ N r7 L _J N --~ :J I~ I ~ I : lt ,.._ r ~ i--2 1/8" 7/8" i--- 1 5/8" --1 7/8""-__ 2 7/8"-=----..-i 35 7/ff' ..Pi.Atj 1 I I I 1 1 1 1 t 1 1 1 1 I J I l I I ! I I I I ! _iLLI LJ_LJJi~L~i~L~i~L~L~l~=LJ~--~-~l~~J~i=J~ __1 1 /2" ~ ~7 /ff' 35 1/8" ELEVATION STORM SEWER INLET GRATE SCALE: N. T.S. REVISIONS BY DATE 1 /8" X 1" X 1" BEARING PAD .5.1.D.E .Y.lEW i: I i:i ENVIROMENTAL, INC. RAISED LETTERS 1" HIGH FLUSH WITH TOP OF COVER ~ R 3 1/4" J. 2 -CONCEALED PICKHOLES NOTE: 1· FRAME & COVER SHALL BE MACHINED OR GROUND AT TOUCHING SURFACES SO AS TO SEAT FIRMLY AND PREVENT ROCKING. ff 34 1/2" COVER (265 LBS.:!c 5 LBS.) ' vr JL:r•:;'.'.'"''•irc•::::::-;i. ,·: , ,,, 35 3/4" ---~-,r 1 1/f!' ---+1 ... _r ________ J, 3/~ 1 ,;2" I 8-RIBS ~ -41---L . L::~ t\is_,~ 5/f!' J 1 . 1-----403~2"---_-_-_-_-:_-:.-----<r 4 ,;4• L4 .. FRAME (215 LBS. APPROX.) 7 r 1 3/f!' ~ DETAILS ____i L 3/4" RIB DETAIL STORM SEWER MANHOLE COVER AND FRAME SCALE: N. T.S. ALL FILL TO BE COMPACTED TO MIN. 98l'i: MAX. DENSllY PER ASTM STD. J/l==/1 p 12" I:,. I:,. -Iii _\ I:,. ll CURB INLET FRAME GRATE NOT SHOWN BRICK WORK CURB INLET FRAIME 12·· MIN 8" 5"' DEPTH VARIES 8" 8" 'lo ' + ..., ..., 11· GRATE 36"" I.D. ·-· ·1 • 48" I.D. • I • 2" CLEAR 7 • I • I • I • ---.- 'lo Ill 'lo NOTE: CONC. DESIGN STIRENGTH 4,000 PSI ----------CURB IRON ·-I" • • I • I • I • I • I • ----------MORTAR SEAT 5" __----BRICK 2-#6(4-SIDES) W/#4 TIES O r5" O.C. GROUT, OR "RAM-NEI<" JOINTS AS REQUIRED PRECAST IN ACCORDANCE WITH LATEST EDmONS OF A.S.T.M. C478 PIPE MUST NOT BE IN CONSTRUCTION JOINTS PIPE SHALL BE FLUSH WITH INSIDE WALL ~--/140 9" O.C. B.W. BEARING CAPACfTY MINIMUM 2000 PSF STORM SEWER CURB INLET SCALE: N. T.S. MATCH SLOPE OF CONCRETE "COUAR/EROSION PROTECTOR" WITH THAT OF POND 4:1 MAX. FlNISH GRADE @ SOIL SUBGRADE LEGEND @ ONE LAYER OF TENSAR SS-1 GEDGRID OR EQUAL 16' WIDE WITH MINIMUM OVERLAP OF 3 FEET AT SEAMS. @ FIVE INCHES ROAD BASE @ THREE INCHES WELL-GRADED CRUSHED CONCRETE WEARING SURFACE (MAX. TWO INCH SIZE) MAX. 15%. PASSING No. 100 SIEVE. TYPICAL ACCESS ROADWAY SCALE: N. T. S. 4" CONCRETE "COLLARtEROSION PROTECTOR REINFORCED WITH 6"x6 ,10/10 W.W.F. MITER PIPE END TO MATCH SLOPE OF CONCRETE COLLAR AND POND BANK. c= -=--=--=--=--=--=-I >--. I I ' ~------......:;. _____ _ SEE PLAN FOR INVERT INFORMATION SHAPE TO SUPPORT PIPE WITH EXTRA CUT AT BELL ---0.5 P ----, ACCEPTABLE EXISTING FIRM UNDISTURBED MATERIAL. NOTE: EACH LIFT TO BE COMPLETELY COMPACTED TO REQUIRED DENSllY BEFORE STARTING NEXT UFT NO UFT TO EXCEED r5" WHEN COMPACTED. PIPE BEDDING CASE 1 SCALE: N. T.S. NORTH CAROLINA DEPARTMENT OF ENv1RONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ', ," - . ' f' . , ·_: )t " : .. ,, ' SECTION ~ Environmental Consultants Barnes, Ferland and Associates, Inc. VARIES PLAN CONCRETE MITERED END SECTION SCALE: N.T.S. DRAWING INFORMATION DATE PRo..ECT NO.: 9 1 SITE CONSTRUCTION DESIGNED BY: CEH DETAILS DRAWN BY: WKP TWC 2/03/00 CHECKED BY: PAB DRA'MNQ ALE: 99001C9 SCALE: AS SHOWN DRA'MNG ND. C-9 SHT._1_1 Of 45 . . .. :" .. T, ..... ! ,,. -------------------------------------------------~'--------------------------------------------------------------, NO. ------------------------------------------------------------------------~----' ✓-~ I \ f I I I I I I I I I I .. •. -CLEAN REWON I >STORM,WAlER ~~~~-~-~-~=~ -. I I DISCHARGE I I I I I I I I I I I I I RATE = 60 gpm · ·· _ . -· · I I ~~~TJ :;g~~s~A~~A ~~~~~-~~==~ •·REtrN\:PPONO ·~===i ©,J~,◄ I 1---1 ___ .·:-_----: : --• ·•----··· I 1 1 , -VOLUME = 40,537 cf I I · --·-EXISTING REltNTION II . . I CARBON - . STORAGE-PONO -_ -Pu~61~~c~~~ ~~~~1~NT ~===itti~·~~~~~ "~~~~tti~~===i I FILlER . 1 ~~~=itti~ tti~ •: •.• ~. -.. _-. - . ·--·· -. : N™'"""°"" I I ---: : I EXCAVATION RATE = 40 gpm ~ -----~ .. _ . _ I I I( r,-AR_EA __ -.,~==~~--~~===========~ ©,J~I"""-111111111111111111111111111111~ If! I I fit~I IJ "'"" m esoCEss ~ I ~M~~ I I I I I I I I I I \ \ DUST CONTROL ' -------------------------------------✓ ~ ----------------------------------------- STORMWATER MANAGEMENT PIAN SCHEMATIC SCALE: NONE NOTE: DESIGN BASIS STORM EVENT -100 YEAR STORM INTENSITY -9.5 INCHES/HOUR IMPERVIOUS AREA -52479 sq. ft. I / 1. THE PROPOSED STORM WATER MANAGEMENT SYSTEM SHOULD BE ADEQUATE FOR THIS PROJECT. HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR APPL YING FOR AND OBTAINING THE NECESSARY STORMWATER MANAGEMENT PERMIT THROUGH THE STATE OF REVISIONS BY DATE i=i..a ENVIROMENTAL, INC. NORTH CAROLINA DEPARTMENT OF ENV!RONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT 'i HFA Environmental Consultants Barnes, Ferland and Associates, Inc. STORMWATER MANAGEMENT PLAN SCHEMATIC NORTH CAROLINA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING NECESSARY DESIGN MODIFICATIONS THAT ARISE DURING THE PERMITTING PROCESS. DRAWING INFORMATION DATE DRAIMNG NO. PRO.Eel NO.: 99001 DESIGNED BY: CEH C-10 DRA'M'I BY: WKP/TWC 2/03/00 CH£Cl<EO BY: PAB 9iT.~ 45 DRAWING FU: 99001G3 SCAL£: AS SHO'M-1 CONTRACTOR SHALL PROVIDE A WATERTIGHT SEAL BETWEEN LINER AND SUMP NO. & PRECAST CONCRETE MANHOLE SECTION -~ REVISIONS CONC. GROUT FILLET. PER PUMP MFG. REQUIREMENTS - BY DATE POWER CORD SUITABLE FOR SUBMERSIBLE DUTY PUMP SHALL HAVE A SELF-CONTAINED FLOAT SWITCH • U) I "' 3" HOSE NOTES 3" X 3" FLG. TEE UP WITH 3" RISER PIPE ~-90" BEND W/QUICK CONN. COUPLING CONTRACTOR SHALL STABILIZE THE CONNECTION POINT WITH A CONCRETE FOOTER OR OTHER APPROVED METHOD 1. WETWELL BOTTOM SHALL BE SET ON 12" GRAVEL BED OF SUITABLE STABILITY TO INSURE ZERO SETTLEMENT. IF EXISTING BASE MATERIAL IS QUESTIONABLE, THE CONTRACTOR SHALL PROVIDE A STABILIZED BASE OR A POURED CONCRETE FOOTING AS DIRECTED BY THE ENGINEER. 2. CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE AND OPERATIONAL PUMP STATION UNLESS OTHERWISE NOTED. 3. SEE SPECIFICATIONS FOR PUMP REQUIREMENTS. SECTION -STORMWATER PUMPS N.T.S. ----,:;; j ... ENVIROMENTAL, INC. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ' ~ } )\( !\i .. i'.) ' ~ Environmental Consultants Barnes, Ferland and Associates, Inc. ' ,n I v aJ ' I o<) ' ([) 2· GROUT ALLET 1YP BRICK ADJUSTMENT 12" __,_.,., NORWJ.. 1 ff MAX. ci 8 "' t:: .... -JOINT _____ -,,; "' - PRECAST CONC ASTM-C-478 ---_ ___, io 4'-o" MIN STD. FRAME AND COVER PAVEMENT --- .75 DIA. 5' l'IP. __.j----7-2 COAlS (8 MIL E'A.) COAL TAR EPOXY IN'TERIOR AND EXTERIOR -_J..-- r ff MIN FLOW CHANNEL STORMWATER TYPE "A" MANHOLE 8"-21" N.T.S. INLET GRATE TO BE EQUAL TO U.S.F. & MFG. CORP. 3'-4" U.S.F. NO. 4635 OR 4609 _,,_f ____ .,.._,,, TOP EL NOTED ON PLAN 1 W/ANGLE CAST IN PLACE TO r7,===:c:c:=~7 EL 98.5 FIT GRATE ~~~GRATE SHOWN ..,.~ . , 2 1/4" 2 1/4" PLAN TOP OF BERM ON DWG. C-9 f4012" O.C.E. W. " " EL 96.0 L_ ....... ~...:_~~~_:::=~:,.,,3 J 3'-1o"x4·-11· J #4012" O.C.E.W. SECTION INLET TYPE "C" SCALE: N.T.S. 8'-0" TOP OF OVIERFLOW l,. LAYER OF COMPAClED ASTM NO. 57 STONE OVERFLOW DETAIL N.T.S. DRAWING INFORMATION DATE DRA'MNG NO. STORM WATER PUMPING STATION AND DRAINAGE DETAILS PROJECT NO.: DESIGNED IIY: DRAIIN BY: CHEa<ED BY: 99001 CEH C-11 WKP TWC 2/03/00 PAB DRA'MNG .flLE: 99001C10 SCA1.E: AS SHOWN SIH.~ 45 350. 340 " 330 · 320 · 310 -160 NO. -140 -120 REVISIONS BY DATE / EXISTING SUBGRADE -100 -80 - - --- -S::1\:1 ENVIROMFNTAL, INC. 30 MIL. PVC BOTmM LINER -60 24" CLAY LAYER -40 352.9± -- -20 . ' ' . ' ___ ._, -· ·~-• _l_ - v-~ LANDFILL 12• TOP SOIL 12" Fill MATERIAL l so· C[AY LAYER 0 317.0± 20 40 lYPICAL SECTION -EXISTING LANDFILL (EAST-WEST) SCALE: HORIZ.& VERT. 1" = 1 O' NORTH CAROLINA DEPARTMENT OF FNVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT RFA Environmental Consultants }:mes, Ferland and Associates, Inc. r· -• •. ·• . . ,' .. ' '' ' I 10 MIL .PVC TOP LINER g.• ~ fill FOR LOWER bfAC»A!fE COLLECTION 60 12• Fill MA lERIAL EXISTING. SUBGRADE ~ 80 100 120 NOTE: THIS DRAWING WAS DEVELOPED FROM RECORD INFORMATION PROVIDED BY THE STATE OF NORTH CAROLINA. THE CONTRACTOR SHALL VERIFY CONDITIONS ABOVE THE TOP LINER PRIOR TO STARTING EXCAVATION ACTIVITIES. 140 DRAWING INFORMATION TYPICAL EXISTING LANDFILL SECTION (EAST -WEST) PRO..ECT NO.: DESIGNED BY: DRAWN BY: OtECKED BY: 99001 CEH 'M<P TWC PAB DRA'MNG Fl..E: 99001C7 DATE 2/03/00 SCALE: AS SHOWN 350 340 330 320 310 160 DRAMNG NO. C-12 SHT.~Of 45 NO, EXISTING COVER - FROM TOP DO1',N VEGETATION 12" TOP SOIL 12" FILL MATERIAL 10 MIL PVC TOP LINER 24 • CLAY MA TE RIAL 12" FILL MATERIAL \ ' ~, SIi ' ......, " U)' ,,,1 ;: ~ ~i ~: ~•i 7 1 ~ 1 n1 0 ~ ·.ci ~1 i ~) o I ' ~i ------------------------7~.:-;7::-~::--;, -,-:-:. ;-;-.:-:-;-:.~-:-=~-..:--;;-.:-;-:-::~-=-:-;-.:.-;-:-::~::-:-:-.:-: 1 :. 1 • ---;;-:.-;-:-:;~ ~I ---------------------------~ 11 , ·~,; ------------··-··-··-•1-•1-••-·•-•1 --··-··-··-,,-,,-,,-,,----------' • -------1,-,1-•1-••-1• -----------------,,_,,_,,_,,_,, --------' . --------,,_,,_,,_,,_,,_ ----------------_,,_,,_,,_,,_,, ---------- REFERENCE POINT I / FILTER FABRIC LIMITS !/ V -------------=-~--=-t I -11 - 1 I - I I -~ :---- -- -- ---- -- --- ---= 11 -l I -t I - I I - I I - I I -:;--.:.~-:-----------------------------_,,_,,_,,_,,_,, -------------··-·•-,1-,,-,, ----------------------·-·•-'' -------•.i-.. , --------------....... -,1-' -----~~-----·· -,,_ ----------_, .... -1•-·•-... ,, ----'"= __ .___.......--..,).,.•-··---.... -----...... ___ -------------...... _, -~•:------ ___ , -· ·------- NORTH END -----_,_,_,.., P,..'B "A IT'D/AL -'.c-----....... ......, --,, Lrj m, rLn1, , __ !-!--~ -- .._ ·---...:,.~ l I I ~ - - -....... -----! .. _.... ..~----- -.. --.J .. •, -I~-------...... _ ------------·-.!..!'-.. 1•~-~--:..----- ....... ....... --.... ...!.!__.... ' I ~~------- - - -....... .._ --------!.J!"oo, __ ,.~---- ....... --------!_J:!Oar. ~~~c---••~••--------, ,....... -------✓--~.... -··-··-,·-,•-,1-••-··-·'-,.-,.-•,""!"'~-,.-.. -,,--__ I ! ...... -----...}__, .... . I I -I I -I I -I I -1 1 -I I -IO -I I -I I -I I -I I -I I -I l ... "!'-__!~_'...I -I I -I I ---...--' ---.. _ ,, ~~~~-,,_,,_,,_,,_,,_,,_,,_,, _______ --------------~· .............. --------~.,-,,-,,-,,-,,-,,-,,-,, __ ~•-·--··-··~•_!__~~-··-··-··-··------. --\. ---~ 9: ---, -------~----------~----~1 ~; -....._ ----------------------, --------------I ' .. :.· ' ....... ____________________________________ .. 476'± ,_ --------------------·------- // < I _ OUTLINE OF j' LOWER LINER ------------ SECTION -EXISTING CONDITION SCALE: 3/16"=1'-0" '-EXISTING LOWER LEVEL FROM TOP DOWN FILTER FABRIC 9" SAND 60" CLAY 12" FILL MATERIAL 30 MIL PVC BOTTOM LINER 9" SAND EXCAVATION AND BACKFILL TABLE TOTALS SOUTH END OUTLINE OF /1 FILTER FABRIC r~~----~--=--~-=---=--~---"""'------+---,1~=---=--~-=------~-1------,, MA TERIAL TYPE lf"GETA TION 12• TOP SOIL QUANTITY 12,866 J,410 J,470 12,866 6,940 J,410 UNITS OF MEASUREMENT s. Y. CY. C, Y. S. Y. CY. CY. C. Y. s. Y. CY. CY. CY. s Y. CY. MA TERIAL HANDLING / FINAL USE STRIP MULCH AND BLEND WITH TOPSOIL/FILL STRIP AND STOCKPILE ALL REVISIONS I I I ,,r-, / I I -----+ --+----I_/_ I I I I \ / I -.1 I / -------+---t--_.' --------8-0TTOMJ' ------- §, ,· // ,/ TO£ \ I I I I ~ ' ____________________________ J BY DATE ---------------+----+-----1 EXCAVATION/ FILL KEY PLAN SCALE: 1" =50' - ----=•a 0 25' 50' ~----e L■ ■ • GRAPHIC SCALE: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT PRORLE LIN£ nA n 1 oo· I 1'1 = 501, 200· ! IIFA Environmental Consultants ~ -·--~-------------+---+-----11 Barnes, Ferland and Associates, Inc. ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ' .. I ·.-; .· . ··,:.··.,":7--·--.---.-, ···---- ,•:,., ,' i 1· /., ,' , • 1 I • 12• ALL /IA TERIAL 10 MIL PVC TOP LINER 24" CLAY LA YER 12• ALL /IA TERIAL PCB CONTAMINATED MATERIAL ALTER FABRIC g• SAND LA 'tER 6" LA YER OF 60" 12A Y LA YER 12• ALL MATERIAL JO MIL PVC BOTTOM LINER g• SAND LA YER Pf?OCESSED/STOCKPfLE /IA TERfAL TOP SOIL CO'S? LA YER JB,000 12,100 1,800 1,200 2,4()() 2, 4()() 3,600 52,4JO J,410 CY. C. Y. EXIISTING LANDFILL PROFILE (NORTH -SOUTH) AND MATERIAL QUANTITIES :_: .. _ ·. .' ('J• -;--'//.\ ~':', ~--· .. :-· --;.: ,, .. I'. , . : .-:·' '' ! STRIP ANO STOCKPILE / ALL REMOVE ANO Cl£AN / DISPOSE IN Cl.ASS f LANDFfLL STRIP ANO STOCKPILE / BLEND WfTH OTHER ALL BCD TREATMENT/ FILL BCD TREA TUENT / ALL REMOVE ANO Cl£AN / DISPOSE fN CLASS f LANDFfLL BCD TREA TUENT I ALL REMOVE 6" LAYER/ BCD Tl?EATUENT / ALL LEA VE IN PLACE LEA If" IN PLACE LEAVE IN PLACE BACKALL ANAL BACKALL LA 'tER DRAWING INFORMATION PRO.ECT NO.: 99001 DESIGNED BY: CEH DATE DRAWN BY: WKP /TWC 2/03/00 . DRAYl1NG NO. C-13 CHECKED BY: PAB l-=DRA=\WN=Gc-cFl=LE:-=-·------c9=9o=o"'1c=7~, 1,-SCALE:='=.-A""S,...,S""H=oWN=c-l SHT. 15 Of 45 NO. 0, " "' ~ ~ I") NO"TE: STRIPED TOP SOIL, RLL MATERIAL ,t CLA Y TO BE STOCKPILED AND USED IN RNAL COVER CONSTT?tJCnON CLEAR ~GETA nON AS REOIJIRED REMO~ COVER 12" TOP SOIL 12" FILL MATERIAL 10 MIL PVC TOP LINER 24" CLAY MATERIAL LEA~ 5• TO 12• OF LAST 12" OF RLL MATERIAL AS PCB MA "TERIAL SHIELD ~ I") ----------------------------------------------------------------------------------------~----- !") ----------------------------:: -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I -f 1 -I I -I I -I I -I I -IO -I I -I I -I I -I I -I I -If -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I ----------------------7:. I 1-I I -II -11 -11 -11 -II -11 - - ------------ -------------------------------------------,-,1-,1-•1-••-1 -----------------------:-:-::-:-:-.:-:-;-:.-:-:-=-~-..: ~ ~-== ·~ ~ ~ - -- -- -- ----------··-··-----..., ------,...._-,,-,,~,, ------...... ___ -~~ ............. ..!.!~ ....... ...._..__I I ....... __ ~. 0 PCB MA "TERIAL ....... ----~ I ............. --..!......_~,. -·· ...... ~ff I I ~·'-"' ~ / NORTH END ...... -.. ....... ~~...... , .~~ """ ..___,, , , ------""" .......____~, -··-··-··-"-·'-''-11-11-••-··-·•-11-11-1,_ .c.---"""._ -~ -11-11-,,_,,_,,_,, _ ,, _., _ , ..... , -,,-,, -,,-,,-11-11 -11 ---...__ ~1' -_,,_,1_,,_,,_,,_,,_,,-11-11-,1-11 _ --"""..._,, -~,1-,,-,,-11-,1-,1-,1~1_1-11-11w11_,,_1,-11 II ---------- ....... ._ ------------------.............. ----------------------------------------- --------:--~------------~ ----o ro ~ ; cl) -r....: r--co ,., ~ ,., .----.----.---- r-1 ~ .., ,., ,., 476'± OUTLINE OF LOWER LINER ~ EXISTING LOWER LE~L FROM TOP DOWN flL TER FABRIC 9" SAND so· CLAY 12" FILL MA TERI AL 30 MIL PVC BOTTOM LINER g• SAND OUTLINE OF FILTER FABRIC SECTION -EXCAVATION AREA NO. 1 SCALE: 3/16"=1'-0" £XCA VA TION AREA NO. 1 CO~R EXPOSED SLOPE WITH TARP WHEN NOT EXCAVATING EXCAVATION TABLE IMPLEMENT DUST CONTROL MEASURES AS REQUIRED REFERENCE POINT '-----+---~so~•--------j/FILTER FABRIC UMl1S ------------. ,,_,,__ -------- ~·-II ----------------------- EXCAVATION AREA NO. 1 EXCA VA "TE CONTAMINA "TED MA "TERIALS AND HAUL TO TREATMENT AREA NOTE: EXCA VA nON DEPTH WILL BE DE"TERMINED BY SOIL SAMPLING. REMO~ RL "TER FABRIC, g• SAND AND MIN. OF 5• OF CLAY LA 'fER BEFORE SAMPLING. SAMPLE BOTT()I,( AND SIDE SLOPES ON A 50 FOOT GRID. SOUTH END MATERIAL TYPE QUANTITY UNITS OF MEASUREMENT MA TERI AL HANDLING / FINAL USE I I I I I ----+--+----+-- ~ i I I REVISIONS BY DATE TOP OF £XCA VA TED SLOP£ EXCAVATION/ FILL KEY Pl.AN SCALE: 1" = 50' -- -- r-PROFILE LINE ''.4 " TOE OF EXCA VA TED SLOPE 0 25' 50' 100' 200' ~M'il_'iii.-~.~-~-•"ti-~111111111111111111111!iiiiiiiiiiiiiiiiiiiiiiiiiiiiil GRAPHIC SCALE: 1"= 50' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ,r;; j 1:1 DIVISION OF WASTE MANAGEMENT BF A Environmental Consultants ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Bames, Ferl~nd and Associates, Inc. l,f"6UA 'llON 4,249 s Y. STRIP MULCH AND 8/.END 'MTH TOPSaL/flU 12• TOP SOIL 892 C. Y. STRIP AND STOCKPILE Fill 12" Rl1 MATERIAL 892 C. Y. STRIP AND STOCKPILE / AU 10 MIL PW:-TOP LINER 3,828 s Y. REMO'.f: AND CLEAN/ DISPOSE IN CLASS I LANDF!U 24• ClA Y LA 't£R 1,780 C. Y. STRIP AND STOCKPILE/ BLEND 'MTH OTHER Fill 12• Rl1 MATERIAL 892 C. Y. BCD ll?EA TMENT I Rl1 PCB CONTAJIINA TED MA TER!AL 3,372 C. Y. BCD TREATMENT I Fill ALTER FABRIC 1,424 s. Y. REMOVE AND Cl£AN / DISPOSE IN CLASS I LANDf7Ll. g• SAND LA 't£R 254 C. Y. BCD TREA TMENT I Fill 6• LA 'rfR OF 50• ClA Y LA YER 170 C. Y. REMOVE 6. LA'tER / BCD TREATMENr / AU 12• Fill MATERIAL --LEA vF IN PLACE JO /,Ill P~ BOmJM LINER --LEA vF IN PLACE g• SAND LA 'tfR --LEA VE IN PLACE PROCESSED/STOCKPILE MATERIAL 0 C. Y. BACKF!U 7'0P sat. COi.£'? LA 't£R 0 C. Y. FINAL BACKAU LA 'rfR EXCAVATION SECTIONS PROFILE LINE "A" EXCAVATION AREA NO. 1 DRAWING INFORMATION PRo.ECT NO.: 99001 DATE DESIGNED BY: CEH DRAWN BY: WKP TWC 2/03/00 DRAWING NO. C-14 CHECKED BY: P AB ...,,DRA~'MN=c~FU.E:-=-~g=go""occ-1 c=1~-=, 1~sc=ccALE:'='·-A=s~s=H=ol',T,l=c-1 SHT.~OF ~ NO. D NORTH END OUTLINE OF LOWER LINER 476'± EXCA VA TION AREA NO. 2 ~ EXISTING LOWER LEVEL FROl.4 TOP DO~ FlL lER FABRIC 9• SAND so· CLAY 12• FlU MAlERIAL 30 t.llL PVC BOTTOt.l LINER g• SAND NOTE: STRIPED TOP S{)(L, FILL MA TERIAL ct CLA Y ro BE STOCKPILED AND USED IN RNAL COVER CONSlRUCTION CLEAR VEGETATION AS REWIRED REMOVE COVER 12• TOP SOIL 12" FlU t.lATERIAL 10 t.llL PVC TOP LINER 24" CLAY t,jAlERIAL LEAVE 6" TO 12• OF LAST 12" OF RLL MA TERIAL AS PCB MATERIALS SHIELIJ COVER EXPOSED SLOPE WITH TARP WI-IEN NOT EXCAVATING SECTION -EXCAVATION AREA NO. 2 SCALE: 3/16"=1'-0" IMPLEMENT DUST CONTl?OL / MEASURES AS REQUIRED I I / -EXCAVATION AREA NO. 2 REFERENCE POINT f-------+--------'-""------------~I/ FILTER FABRIC UMllS NOTE: EXPOSED FACE OF PCB MATERIAL TO BE EXCAVATED IN A NORTHERN DIRECTION EXCAVATION AND '--EXCAVATE CON TAM/NA TED MATERIALS AND HAUL TO TREATMENT AREA NOTE: EXCAVATION DEPTH MLL BE DETERMINED BY SOIL SAMPUNG. REMOVE RLTER FABRIC, g• SAND AND MIN. OF 6" OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. BACKFILL TABLE SOUTH END v-------------------MATERIAL TYPE QUANTITY UNITS OF MEASUREMENT MA TERIAL HANDLING / FINAL USE --H N n N I I I I I ------t--+---+-- REVISIONS ~ 1 I I OUTLINE or FIL T£R FABRIC BY DATE - - ---------+---+-----I TOP OF EXCAVATED SLOPE I I l I I rl½-"r'-h:At'/;+-----OP[N ~ _ -+---__ WORK~ ~ I AlfEA I I I * TOE OF EXCAVATED SLOPE PROFILE LINE '11 » EXCAVATION/ FILL KEY PLAN SCALE: 1" =50' i.ia ENVIROMFNTAL, INC. o 25• 50• 1 oo· 200· ••"l_-~-2-lii'•!i~~~~iiiiiiiiiiiiiiiiiiiiii-l I WJ W Lw GRAPHIC SCALE: 1" = 50' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION Of WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ' Barnes, Ferland and Associates, Inc. !£<ETA TICXV 1,600 .s: Y. 12" TOP SOfL 474 C. Y. 12" All /IA TERIAL 474 C. Y. 10 U/L PVC TOP LINER 1,678 .s: Y. 24" CLAY LAYER 949 C. Y. 12" Rl1 UA TERIAJ.. 474 C. Y. PCB CONTAIIINA mJ /IA TERIAL 4,773 C. Y. ALTER FABRIC 1,557 .s: Y. 9 • SAND LA YER 262 C. Y. 6" LAYER OF 60" CLAY LAYER 174 C. Y. 12" Rll MA TERIAJ.. 0 C. Y. JO /Ill Pl-'t' BOTTO/I UNER 0 .s: Y. 9• SAND LA YER 0 C. Y. PROCESSED/STOCKPILE /IA TERIAL 0 C. Y. TOP SOIL COIER LA'rfR 0 C. Y. EXCAVATION SECTIONS -PROFILE LINE "A" EXCAVATION AREA NO. 2 SmtP MULCH AND BLEND llfTH TOPSOIL/Fill STRIP AND STOCKP/1£ All STRIP AND STOCKP/1£ / Rll REMOVE AND Cl.£AN / DISPOSE IN CLASS I LANOF/ll SmtP AND STOCKPI/£ / BlEND /#TH OTHER Rll BCO TREA TIIENT I Rl1 BCO TREA TIIENT / Rll REMOVE AND CLEAN/ DfSPOSE IN CLASS I LANOF/ll BCO TREA TIIENT / Rll REMOVE 6" LAYER/ BCD Tl?EATMENT / Rll LEA VE IN PLACE LEA 1£ IN PLACE LEA VE IN PLACE BACKRll ANAL BACKRl.l LA 'rfR DRAWING INFORMATION PRO.£CT NO.: 99001 DAlE DRA-NO. DESIGNED BY: CEH DRAIH BY: WKP TWC 2/03/00 C-15 CHECKED BY: P AB DRA~G F1LE: 99001C7-17 SCAl£: AS SHOWN SHT . .22..0F ~ ...;_-•- NO. '_,,:;,__ J~_'._,'~"'---~c,L'--'-~ce_l ,' ,'' I w ~ w n NOTE: STRIPED TOP SOIL, FlLL MATERIAL It CLA Y TO BE STOCKPILED ANO USED IN FlNAL COvfR CONSTRUCTION "' N ,n n CLEAR 1-fCETA TION AS REQUIRED REMOl-f COVER 12" TOP SOIL 12" FILL MAlERIAL 10 MIL PVC TOP LINER 24" CLAY MATERIAL LEA i.f" 6" TO 12" OF LAST 12" OF FlLL MA TERIAL AS PCB SOIL SHIELD ~ --------------------------------------------------) ------------------------_ 1,_ ,, _,1 _ ,, _ ,,_ ,, -•• -11-1,-,, -,1 -•1-11-• ------------,,-,,-,1-1•-·•-•1 --------- -------------------I I -I I -1 I -11 -I I -11 ---_ -_ --------------------,-,,-,1-••-'' ------ ---------------- I I -11 -11 -11 - I l =.,:___ _ - - - --------------_,1-••-1•-·· ----------,,-11~, --------•.....:-...... ~~ ..... __ ~ ' ~,, 0 '-....... ~~, :; -. ..._ -..._--!.._~ I I'} -. -. ---!.....~-l!.~ -. ...... -~ -. ~., -. ....... ~I \ \ PCB MA TERIAL 0 "' ,n n 1: 1.5 -_,., ...... ---.C-!.._1~ •• -·· _,,_ ,,_ ,,_ ,, -·· -•-•_-,,-,1-,,-,, -1,_,, IMPLEMENT DUST CONTROL / MEASURES AS REQUIRED "' .,; ,n n BLENDED 1'-o• AND FILL TOPSOIL -SEED ANO MULCH EXCAVATION AREA NO. 3 1: 1.5 BACKFILL AREA NO. 1 REFERENCE POINT -----~~-----------i----r----t----,/ FILTER FABRIC LIMITS 150' 50' 1: 1.5 CONS1RUCTION /7 r'---.__ STORM WATER RUNOI-T ~ '--../ RUNOFF l~:.P--~-- - -____ _ 1 ------ ---------- ,.._ <D ., n ---- 5% MIN. SLOPE TYP. ---- 25:11: MAX SLOPE TO MATCH EXIST. TYP. AT PERIMETER ---------- -. ~~ -ti -••-II -11-11-11-11-II -II -I\ -11--1-'-'' -""--'-'-=-.,_,~~~~~~ ~....... ~II -11 -11 -II -11 -ll -11 -11-II -I I -II -I I -II_.,_,,,_,_., ~.=_c,=--'-'--=-'--'-=~~ --·~~~~. -----------------------------------------....... _________________________ _ --------------- """'--I ------------------r----~ BCD PROCESS TREA TEO MATERIAL BACKFlLLEO INTO LANOFlLL IN UNIFORM HORIZ LIFTS ACROSS WIDTH OF LANOFlLL ANO COMPACTED PER SPECS. NORTH END +I C'\I l""J C'\I I I I I I OUTLINE OF LOWER LINER ----t----BOTTOM OUTLINE OF FILTER FABRIC ~ i I l TOP OF EXCA VA TED SLOPE 476'± [XCA VA T!ON AREA NO. J 0 ,; n EXISTING LOWER LEI-fl FROM TOP DOWN FILTER FABRIC 9" SAND 60" CLAY 12" FILL MATERIAL 30 MIL PVC BOTTOM LINER 9" SAND COVER EXPOSED SLOPE fffTH TARP WHEN NOT EXCAVATING NOTE: ,.._ «> n EXPOSED FACE OF PCB MATERIAL TO BE EXCA VA TEO IN A NORTHERN DIRECTION SECTION -EXCAVATION AREA NO. 3 : BACKFILL AREA NO. 1 TOE OF BACKFILL SCALE: 3/16"=1'-0" BACKFILL AREA NO. 1 ... r - TOE OF EXCA VA TED SLOPE f ; J ' l l ' -.i+-----' ! r l f I TOP OF BACKFILL PROFILE LINE ''.4 n MATERIAL TYPE VEGETATION 12" TOP SCI/. 12" RLL MATERIAL 10 MIL Pi,r;' TOP UNER 24" CLAY LA YER 12" Rll MATERIAL PCB CONTAMINATED MATERIAL FU.. TER FABRIC 9" SAND LA YER 6" LA YER OF 60" CLAY LA YER 12" RLL MA TERIAL JO Mil P~ BOTTOM UNER 9" SAND LA YER PROCESSED/STOCKPllE MATERIAL TOP !iaL COl£R LA YER l COMPACTED SOIL BERM OR TUBE BERM TO MAINTAIN STORM / CONSTRUCTION RUNOFF SEPARATION EXCAVATE CONTAMINATED MATERIALS AND HAUL PUNCH HOLES THROUGH UNDISTURBED PORTION OF LOWER LINER TO TREATMENT AREA EXCAVATION AND BACKFILL QUANTITY UNITS OF MEASUREMENT 1,350 .s: r. 432 C. r. 432 l'. r. 1,416 .s: r. 836 C. r. 432 C. Y. 5,152 C. Y. 1,319 .s: r. 196 C. Y. 131 C. r. -- -- -- 2,429 C. r. 294 C. Y. EXCAVATION/ FILL KEY PLAN 0 25' 50' 100' 200' lll!i•"a""i•~--.-~~~~11111111 liiiiiiiiiiiiiiiiiiiiiiiiiiiil ,, ___ _ SCALE: 1" = 50' REVISIONS BY DATE - - - ---,r;;;. \:I ENVIROMENTAL, INC. GRAPHIC SCALE: 1" = 50' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT BFA.EnvironmentalConsultants EXCAVATION SECTIONS -PROFILE LINE "A" Barnes, Ferland and Associates, Inc. EXCAVATION AREA NO. 3 : BACKFILL AREA N0.1 TOP OF ORG. PCB LANOFlLL LINER NOTE: EXPOSED FACE TREATED MATERIAL SOUTH END TO BE BACKRLLED IN A NORTHERN DIRECTION NOTE: EXCA VA TION OEPTH WILL BE DETERMINED BY SOIL SAMPLING. REMOl.f" FILTER FABRIC. 9" SAND AND MIN. OF 6" OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM ANO SIOE SLOPES ON A 50 FOOT GRID. TABLE MA TERIAL HANDLING / ANAL USE STRIP MULCH ANO BLEND MTH TOPSOIL/71LL STRIP AND STOCKPILE RU STRIP AND STOCKPILE / FTU R£1,fOVE AND Cl£AN / DISPOSE IN CLASS I LANDFTU STRIP AND STOCKPILE/ BLEND IWTH OTHER Flll BCD TREA TJ.IENT / FTLL BCD TREA TJ.IENT / RU REMOVE AND Cl£AN / DISPOSE IN CLASS I LANDFlll BCD TREA TJ.IENT / FTU REMOVE 6" LA YER / BCD TfiEA TMENT / All LEA~ IN PLACE LEA VE IN PLACE LEAVE IN PLACE BACKFIil FTNAL BACKFILL LA YER DRAWING INFORMATION DATE PROJECT NO.: 99001 DESIGNED BY: CEH DRAWN BY: WKP TWC 2/03/00 OIEa<ED BY: PAB DRA'MNG FILE: 99001C7-17 SCALE! AS SHOWN DRA'MNG NO. C-16 SHT.~a' 45 NO. NOTE: STRIPED TOP SOIL, ALL MATERIAL it CLA Y TO BE STOCKPILED AND USED IN ANAL COVER CONSTRUCTION CLEAR VEGETATION AS REWIRED REMOVE COVER 12" TOP SOIL 12" ALL MATERIAL 10 MIL PVC TOP LINER 24" CLAY MATERIAL LEAVE 6" TO 12• OF LAST 12" OF ALL AIA TERIAL AS PCB MA TERIAL SHIELD IMPLEMENT DUST CONTROL MEASURES AS REWIRED EXCAVATION AREA NO. 4 BCD PROCESS TREA TED MA TERIAL BACKALLED INTO LANDALL IN UNIFORM HORIZ LIFTS ACROSS WIDTH or LANDALL AND -~ BLENDED 1 '-0" AND FILL TOPSOIL SEED AND MULCH 50• O> 1------------/.______ ______________ ___.,,,,,,._______C_OM._'P._~_C_TEi_D_P._'Ei_R_SP._'Ei_C._S. __ ----+----+-------+---!/ ~~~Rri~~llS ~ N "' ~ ~ n ~ -----------------~~n 0 ------------------,~-1--.d ~~ ,,-j --------------------I I - I I - I I - I I -I I - I l - I I - I I ~,•,trtn~~~ .. ,.,.~ .... :~ .. ~,wmmw.wr,'-m ~ ---------------,,-,,-,1-••-··-1•-·' ------- ----------------11 - I I -t I - I 1 -11 - I I - -- -- -- -----------,1-••-··--------------------··-··-·•-'·--------------1-1•-'' -------,1_1,..._,,i' ----------.:----._-......:._, ~ ---....... ~' ....... ~, -........ c-,..c_~~ ...... ~!-!_'.!'Ill, ..... .._ ~~ ""-....-. ~~ ...... __ ~~ ...... ~. ............ ~., 0 PCB MATERIAL 1: 1.5 ...... ~ ._...... ~---/ I I -I I -I I -I I -I I -I I -11 -I I ~-I I -I I ............ ---~/1 -11 -11-11 -II -• •-11-11-II -••-II""'!" 11-It -11-II -ti -11 -11 -II_,, -11-II -It -11 -11 NORTH END --------------------------------------------------------------- EXISTING LOWER LEVEL FROM TOP DOWN ALTER FABRIC 9" SAND 60" CLAY 12" ALL MI\TERIAL 30 MIL PVC BOTTOM LINER 9" SANO O> '° n COVER EXPOSED SLOPE 'MTH TARP WHEN NOT EXCAVATING NOTE: 0 ,-: ;;; EXPOSED FACE or PCB MATERIAL TO BE EXCAVATED IN A NORTHERN DIRECTION BACKFILL AREA NO. 2 50' 1: 1.5 CONSTRUCTION /7 ~ STORM WATER RUNOFF ~ './ RUNOFF +~ ff7 ~ -1'-::::.1------------------------------------------ COl,fPACTED SOIL BERM OR EXCAVATE CONTAMINATED MATERIAL AND HAUL TO TREATMENT AREA TUBE BERM TO MAINTAIN STORM/ CONSTRUCTION RUNOFF SEPARA TlON NOTE: ---------- EXPOSED FACE TREATED MATERIAL TO BE BACKALLED IN A NORTHERN DIRECTION SECTION -EXCAVATION AREA NO. 4: BACKFILL AREA NO. 2 -H N t') N REVISIONS u ~ 0 I I I I I OUTLINE OF LOWER LINER TOE -+-- " I t I I I TOP OF EXCAVATED SLOPE BY DATE 476'± TOE OF BA CK FILL EXCA VA TION AREA NO. 4 80 BACKFILL AREA NO. 2 SCALE: 3/16"=1'-0" PROFILE LINE nA n . ~ . OUTLINE OF ~ FILTER FABRIC TOE OF EXCAVATED SLOP£ TOP OF BACKFILL EXCAVATION/ FILL KEY PLAN 0 25' 50' 100' 200' --~-.. •!Jill•-----~111111111111111111111~--~ c::e • • • • ---• SCALE: 1• =50' i=ia GRAPHIC SCALE: 1" = 50' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT §FA Environmental Consultants ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Sarnes, Ferland and Associates, Inc. i ' ,: • ! ' EXCAVATION AND BACKFILL MATERIAL TYPE QUANTITY UNITS OF MEASUREMENT 1-f"GETA TION 1,321 s. Y. 12" TOP SQL 384 C. Y. 12" RLL MATERIAL 384 C. Y. 10 MIL PW:: TOP UNER 1,386 s. Y. 24" ClAY LAYER 769 C. Y. 12" FTll J.IA TERfAL 384 C. Y. PCB CONTAMINATED MATERIAL 5,331 C. Y. AL 7ER FABRIC 1,319 s. Y. g• SAND LA YER 275 C. Y. 6" LA YER OF 60" CLAY LA 'fER 184 C. Y. 12• AU MATERIAL -- JO 1,1/L PW:: BOTTO/,/ IJNER -- 9" SAND LAYER -- PROCESSED/STOCKPILE MATERIAL 7,276 C. Y. TOP SOIL COVER LA YER 754 C. Y. EXCAVATION SECTIONS -PROFILE LINE "A" EXCAVATION AREA NO. 4: BACKFILL AREA NO. 2 5% MIN. SLOPE ;I TYP. 25% MAX SLOPE i TO MATCH EXIST. p----._!_---.'._~::-~-.1.-___ :TYP:. -~~~:~~ETER --------------------- TREA TED MA TERIAL TOP OF ORG. PCB LANDFILL LINER PUNCH HOLES THROUGH UNDISTURBED PORTION or SOUTH END LOWER UNER NOTE: EXCA VA TION DEPTH WILL BE DETERMINED BY SOIL SAMPLING. REMOVE ALTER FABRIC, g• SAND AND MIN. OF 6" or CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOl,f AND SIDE SLOPES ON A 50 FOOT GRID. TABLE MA TERIAL HANDLING / ANAL USE STRIP MULCH AND Bl.£ND l'ITH TOPSOIL/All STRIP AND STOCKPILE All STRIP AND STOCKPILE / FTll REMOI-£" ANO CLEAN / DISPOSE IN CLASS I LANDAll STRIP AND STOCKPILE / BLEND l'll'H OTHER All BCD TREA TUENT / All BCD TREA TUENT / FTU REMOI-£" AND CLEAN / DISPOSE IN CLASS I LANDAll BCD TREATMENT/ RLL REMOl-f" 6" LA'fER / BCD TREATUENT / ALL LEA I-£ IN PLACE LEAVE IN PLACE LEA I-£ IN PLACE BACKAU ANAL BACKALL LA YER ORA WING INFORt.tA TION DATE PRO.£CT NO.: 99001 DESIGNED BY: CfH DRAllN BY: WKP TWC 2/03/00 CHECKED BY: PAB DRl\llllNG Fil£: 99001C7-17 SCALE:-AS SHOWN DRA\WNG NO. C-17 SHT._!2_or ~ NO. NOTE: STRIPED TOP SOIL, FILL MA TERIAL &:-CLA Y TO BE STOCKPILED AND USED IN FINAL COVER CONSTRUCTION CLEAR 1-fGETA TION AS REQUIRED REMOl-f COl-fR 12" TOP SOIL 12" FILL MA"IERIAL 10 MIL PVC TOP LINER 24" CLAY MA"IERIAL LEA 1-f 6" TO 12" OF LAST 12" OF FILL MA TERIAL AS PCB MATERIAL SHIEL m N "' ,,., EXCAVATION AREA NO. 5 IMPLEMENT DUST CONTROL MEASURES AS REQUIRED ' --- ----- j BCD PROCESS TREATED MA TFRIAL BACKFILLED INTO LANDFILL IN UNIFORM HORIZ LIFTS ACROSS WIDTH OF LANDFILL AND COMPACTED PER SPECS. --i BLENDED 1'-o• AND FILL TOPSOIL SEED AND MULCH REFERENCE POINT l---------+---------------------l50' _____ -+----+-------------+-------t/ FILTER FABRIC LIMITS 5:11: MIN. SI.OPE TYP. " BACKFILL AREA NO. 3 ':' 25:11: MAX. SLOPE -------------. I -~II -11 -'I _ ----------••""'IC~-~¼----... ~~. -----·~ -.. -... ~ ...... __ '...!._~, -....__,...., ...... ...... ....... ____ --!...!...._..._ ----tJ ---...... ~ .. -~'. ...... --..:..z, ...... --..::...!._1 -- -~I ...... ✓~ ...... -...:......._,, 11-11-11-11-••-·•-11-••-•1-•1 0 PCB MATERIAL 1: 1.5 1: 1.5 RUNOFF ~ L,,/ CONSTRUCTION ./"-i , ~ STORM WA"IER RUNOFF ~ !Fil. ---'W'----::.J. '-:::3 ____ _ 1: 1.5 jiii' _______ j__ ____ ~,,.,~~~-1.~l:0:MATCH EXIST. TYP. AT PERIME"IER -· ----------------------------------~ --------------------------- TREATED MA TFRIAL ---~•,-11-••-··-··-·•-•1-,,-,,-,,-,,-1,-11-,1-• --.... --. ---------------------------------.,. ,-: NORTH END 1 I TOE I I I .... -... ______________________ _ -------------------------------------- CO!-fR EXPOSED SLOPE WITH TARP WHEN NOT EXCAVATING EXISTING LOWER LEI-fl FROM TOP DOWN FILTER FABRIC 9" SAND so· CLAY 12" FILL MA "IERIAL 30 MIL PVC BOTTOM LINER 9" SAND 476'± TOE OF BACKFILL 1 NOTE: EXPOSED FACE OF PCB MATERIAL TO BE EXCA VA TED IN A NORTHERN DIRECTION EXCAVATION AREA \ NO. 5 . BACKFILL AREA NO. 3 :. . ~ '_;. __ j~-----1--~·-· ----------7"'-"-, I I I . , .. _; _.,-..~,"~· . I I I I I I I I 0 ,-: ,,., \ "' " ..., \_ EXCAVATE CONTAMINATED MA TFRIALS AND HAUL TO TREATMENT AREA COMPACTED SOIL BERM OR TUBE BERM TO MAINTAIN STORM/ CONSTRUCTTON RUNOFF SEPARATION SECTION -EXCAVATION AREA NO. 5 : BACKFIU. AREA NO. 3 SCALE: 3/16"=1'-0" MATERIAL TYPE VEGUA TlON 12• TOP SOIL 12" FILL MATERIAL · PROFILE LINE 'A " 10 MIL P~ TOP UNER 24" a.AY LA'rfR 12" FILL /IA TERIAJ.. NOTE: EXPOSED FACE TREATED MATERIAL TO BE BACKFILLED IN A NORTHERN DIRECTTON PUNCH HOLES THROUGH UNDISTURBED PORTION OF LOWER LINER NOTE: N ,,., EXCAVATION DEPTH WILL BE DETERMINED BY SOIL SAMPLING. REMOl-f ALTER FABRIC, 9• SAND AND MIN. OF 6" OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. EXCAVATION AND BACKFILL QUANTITY UNITS OF MEASUREMENT 1,331 .s: Y. 433 C. Y. 433 C. Y. 1,396 .s: Y. 866 C. Y. 433 C. Y. ----+--+---+------+--------·--PCB CONTAMINATED MA TERIAJ. 5,447 C. Y. OUTLINE OF LOWER LINER REVISIONS ~ i I I I I I t ' . ~ ' I - . - . I .•.. A •• -· •• , •• • •• - I ·r· ._., -· ·--~ --, .. -. .· _..., .. · -· I I OUTLINE OF: FIL T£R FABRIC 1,323 .s: Y. g• SAND LA 'rfR 220 C. Y. 6" LA YER OF 60" Cl.A Y LA 'rfR 147 C. Y. 12• FILL /IA TERIAL -- --/1-------:,l,",','~~ .. ,.../.,..,,..,,.r,,;,,<,<t-----·· --:-----~:. ~--------.. -.. -.. -.--~~ FILTER FABRIC JO MIL Pl,t' BOTTOM UNER TOP OF EXCA VA TED SLOPE BY DATE -· 1· ,. :· ·-. ·,-. c.,. . .~.-.... •,..., ..J. -., •. -_ •••. -. 1.-.. ·~>·>·".--.·. ·. •'-•' .. ·.· TOE OF EXCA VA TED SLOPE iii TOP OF BACKFILL g• SANO LA YER -- PROCESSED/STOCKPILE MATERIAL 7,139 C. Y. TOP saL COVER LA YER 460 C. Y. EXCAVATION/ FILL KEY PI.AN 0 25' 50' 100' 200' ••l•lliiil-~l•~•!ii~~~~l=iiiiiiiiiiiiiiiiiiiiiiiiii.i SCALE: 1" =50' --- -,r;;jg ENVIROMENTAL, INC. cL• • • w • GRAPHIC SCALE: 1· = 50' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT i ftFAEnvironmentaI Consultants EXCAVATION SECTIONS -PROFILE LINE "A" Barnes, Ferland and Associates, Inc. EXCAVATION AREA NO. 5: BACKFILL AREA NO. I ... -~----}--- ----- ,I , . . 3 \_ TOP OF ORG. PCB LANDFILL LINER SOUTH END TABLE MATERIAL HANDLING / FINAL USE STRIP MULa-t AND BLEND 111TH TOPSOIL,Jrlll STRIP AND STOCKPILE FILL STRIP AND STOCKPILE/ FILL REMOVE ANO CLEAN/ DISPOSE IN Cl.ASS I LANDRLL STRIP AND STOCKPILE / BlEND WITH OTHER FILL BCD TREATMENT/ FILL BCD TREATMENT/ FILL REMOVE ANO CI.EAN / [)JSPOSE IN Cl.ASS I LANDFTLL BCD TREATMENT/ FILL REMOVE 6" LA YER / 8CD TREATMENT/ FILL LEA VE IN PLACE LEA VE IN PLACE LEA VE IN PLACE BACKFILL FINAL BACKFILL LA'rfR DRAWING INFORMATION DATE DRAWING NO. PRO.£CT NO,: 99001 DESIGNEI) BY: CEH C-18 DRAWN BY: WKP TWC 2/03/00 CHECl<ED BY: PAB DRAWING ALE: -99001C7-17 SCALE! AS SHOWN SHT. 200F~ NOTE: STRIPED TOP SOIL, FILL MA TERIAL & CLA Y TO BE STOCKPILED AND USED IN ANAL COi/ER CONSTRUCTION CLEAR 1/EGETA TION AS REQUIRED REMOI/E COi/ER 12" TOP SOIL 12" Fill IAA lERIAL 10 IAIL GEOIAEIABRANE 24" CLAY MATERIAL LEA 1/E 6• TO 12• OF LAST 12• OF FILL MA TERIAL AS PCB MA TERIAL SHIELD . ;.l IMPLEMENT DUST CONTROL MEASURES AS REQUIRED BCD PROCESS TRfA TED MATERIAL BACKFILLED INTO LANDFILL IN UNIFORM HORIZ UFTS ACROSS 1+1DTH OF LANDFILL AND COMPACTED PER SPECS BLENDED 1'-0" AND FILL SEED AND MULCH TOPSOIL REFERENCE POINT ;-------+---------/------------~---___ ---------+----=JOO'=---f--------------,L----------------1/ ALTER FABRIC UIAllS EXCAVATION AREA NO. 6 ;:;I .. , n ; 1 -::: ;"'~~~~~~~~-~-~--~-~--~-~--~-;--~-;--~-~-i.;.;;;;;;;;!!!~!ii ~ur~lffl,,n,vd ------------I I -I I -I I -I I ---------,_,,_1, -----------1•-,·-· ------------~·,-·•~ --- ----· ............ -....... s ~., 0 ................... "' ~, :;; ......: ~~' I") ............ --.c....!.._~, ........... ~ -.. ~ -.. ~ .. ............ ---.!..!._~ PCB MA TERIAL n - T: 1.5 1: 1.5 CONSTRUCTION _.,/1----, I ,-"'-._ RUNOFF '-----,----.J L,/ 50• STORM WAlER RUNOFF 1: 1.5 BACKFILL AREA NO. 4 5,c IAIN. SLOPE ,-. TYP • ~-----___..!._ _______________ __:~u(~_j_~2~5" MAX SLOPE TO MATCH EXIST. TYP. AT PERIMElER --------------------------------------------------------------------------- TREA TED MA TERIAL ---------- i ...... ...... ...... ...... ~~~I -I I -I I -I I -I I -I I -I I -I I -I I -I I -I I -I -I I -I I -I I .. ----------------------------------------------------------~ ........... _________________ ---------------- -EXI TING LOWER LEI/EL "' ~ ~ FROIA TOP DOWN FILTER FABRIC 9" SAND 60" CLAY 12" Fill MATERIAL 30 MIL PVC BOTTOM LINER 9" SAND ~ ~ EXCAVATE CONTAMINATED MATERIALS AND HAUL TO TREATMENT AR£-~ -COMPACTED SOIL BERM OR PUNCH HOLES THROUGH UNDISTURBED PORTION OF LOWER UNER NOTE: EXPOSED FACE TREATED MATERIAL TO BE BACKFILLED IN A NORTHERN DIRECTION TOP OF ORG. PCB LANDFILL LINER NORTH END COi/ER EXPOSED SLOPE WITH TARP Wf-fEN NOT EXCAVATING NOTE: TUBE BERM TO MAINTAIN STORM / CONSTRUCTION RUNOFF SEPARATION NOTE: SOUTH END EXCA VA TION DEPTH mLL BE DETERMINED NO. & EXPOSED FACE OF PCB MATERIAL TO BE EXCAVATED IN A NORTHERN DIRECTION 476'± BY SOIL SAUPUNG. REMOI/E FILTER FABRIC. 9• SAND AND MIN. OF 6. OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. SECTION -EXCAVATION AREA NO. 6: BACKFILL AREA NO. 4 SCALE: 3/16.=1'-0" TOE or BA CK FILL [XCA VA TION AREA EXCAVATION AND BACKFILL TABLE -H . N ~ N OUTLINE OF LOWER 'NER NO. 6 TOP or EXCAVATED . SLOPE REVISIONS BY DATE I . I I , BACKFILL AREA NO. 4 I I PROFILE LINE "A" I I I I OPEN I ---1-___.c.· -,-~- WORK l•·-< ---+-4-----~ AREA I I I 1 . BOTTOM ------------------OU TL/NE OF FILTER FABRIC TOE or EXCAVATED TOP OF BACKFILL SLOPE - EXCAVATION/ FILL KEY PLAN SCALE: 1• =50' - - -- 0 25' 50' 100' 200' -~-;1_-lljjl-~l·liil-~~11111111111111!" =-=---i ---=-, re, - - - -_::] GRAPHIC SCALE: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 1"= 50' MA TERIAL TYPE 'rf:GETA TJON 12• TOP SOIL 12• ALL MAm?IAL 10 MIL Pl-t' TOP LINER 24" aA Y LA 'tfR 12 • ALL MA TERIAL PCB CONTAJIINA TED IJA m?IAL ALTER FABRIC 9" SAND LA YER 6" LA 'tfR OF 60" aA Y LA 'tfR 12• ALL MAm?IAL JO MIL PIIC 8077()1,( LINER 9• SAND LA YER PROCESSED/STOCKPILE MATERIAL TOP SOIL CO!lf7i' LA 'tfR QUANTITY 1,341 368 368 1,406 737 368 5,427 1,318 256 170 - - - 1,246 416 UNITS OF MEASUREMENT s. Y. C. Y. C. Y. .s: Y. C. Y. C. Y. C. Y. .s: Y. C. Y. C. Y. - - - C. Y. C. Y. Environmenta!Consultants EXCAVATION SECTIONS -PROFILE LINE "A" s:ia ENVIROMENTAL, INC. DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Barnes, Ferland and Associates, Inc. EXCAVATION AREA NO. 6: BACKFILL AREA NO. 4 -.-,,.. ·••r ,, I ," ' / ) • • • ' I ,-,• i' :·,:'r,' ;·,-,;,'. ,I·,: j • ' • ' it• •· ,.) . ·,' ' ' ' • <-•• , • ' ,.,._. ',,.,, .... " ' •' .... ~ MA TERIAL HANDLING / FINAL US£ SlfflP MULCH AND BLEND WITH TrPSOIL/FlLL STT?IP ANO STOCKPILE ALL STT?IP ANO STOCKPILE / ALL REMOVE ANO CJ.EAN / DISPOSE IN aASS I LANOFlLL SlfflP ANO STOCKPILE / BLEND WITH OTHER ALL BCD TREATUENT / ALL BCD TREATMENT I ALL REMO'rf: AND CLEAN/ DISPOSE IN a.ASS I LANOF7lL BCD TT?EATUENT / ALL REMO'rf: 6" LA 'tfR / BCD TREATMENT / ALL LEA 'rf: IN PLACE LEA VE IN Pf.ACE LEA VE IN PLACE BACKFILL ANAL BACKFILL LA YER DRAWING INfORMATION PRO.ECT NO.: 99001 DESIGNED BY: CEH DA1E DRAIIN BY: Wt<P TWC 2/03/00 CHECKED BY: PAS DRAWING F1LE: 99001C7-17 SCALE: AS SHOWN DRAWING NO. C-19 SHT.2!_a, ~ CLEAR VEGETA 770N AS REQUIRED REMO VE CO VER 12" TOP SOIL 12" FILL MATERIAL 10 MIL PVC TOP LINER 2~• CLAY MATERIAL LEA VE 5• TO 12• OF LAST 12• OF FILL MA TERIAL AS PCB MA TERIAL SHIEL NOTE: I I I IMPLEMENT DUST CONTROL MEASURES AS REQUIRED ·. - ' __ : - - -• I . BCD PROCESS TREATED MA TERIAL BACKFlilED INTO LANDFlll IN UNIFORM HORIZ LIFTS ACROSS WIDTH OF LANDFILL AND COMPACTED PER SPECS. BLENDED 1'-o• AND FILL TOPSOIL SEED AND MULCH STRIPED TOP SOIL, FILL MATERIAL It CLA Y TO BE STOCKPILED AND USE IN FINAL COVER CONSTRUCT70N REFERENCE POINT r-----------------------------------+-----+----350'---------+----------------------------1/ FILTER FABRIC LIMITS I "' EXCAVATION AREA NO. 7 BACKFILL AREA NO. 5 0 n .. n ~ ---wm -~fl" --w --rrlF. ---.. • .,-;, --~n, 1, ,,~tf.,ffl::;:,,, ~«'" ___ ..,,, J~J $~ ,,,,,,,,,,,,,,,~VH ~Hf~,,,_ .. --------J% ,., ............... ::::,.,::::::::::::, .. ,,,.. ... ,,ura~,,... .. ...... . -----1 I -I l ,•,-:unuu,~)111 ~W, • -----~, ~ ........... ~,, ...... ~,. ...... --z.._...._ ...... ___ ,,, ,....... --...:--...::..,, ...... ---~,, 0 PCB MATERIAL -... ~ 1:1.5 ............ ~-. --7------~ ............ --..!..!..~. ...... ~ EXIST7NG LOWER LEVEL ~ ........................ _ __,_,...,, -,, -, , -,, NORTH END FROM TOP DOWN Fll lER FABRIC 9" SAND 60" CLAY 12" FILL MATERIAL 30 MIL PVC BOTTOM LINER 9" SAND COVER EXPOSED SLOPE WITH TARP WHEN NOT EXCAVAT7NG NOTE: EXPOSED FACE OF PCB SOIL TO BE EXCAVATED IN A NORTHERN DIRECT70N ----------------- ,n n EXCAVATE CONTAMINATED MATERIAL AND HAUL TO TREATMENT AREA 50• i-----------1 ~-. ----- 1: 1.5 CONSTRUCTION /7 RUNOFF '--._,--J 0 STORM WATER RUNOFF -- - ---"v\,A....1 -AN------:---------------------- 0 PUNCH HOLES THROUGH UNDISTURBED PORT70N OF LOWER LINER COMPACTED SOIL BERM OR TUBE BERM TO MAINTAIN STORM/ CONSTRUCT70N RUNOFF SEPARA 770N -5:11: MIN. SLOPE TYP. " iii,,,----~----------------------------~~~~,,,__LJ25~ll: MAX SLOPE TO MATCH EXIST • TYP. AT PERIMETER -------------... TREA TED MA TERIAL ----------------- -------------------------------------------------------------------- NOTE: EXPOSED FACE TREATED MATERIAL TO BE BACKFILLED IN A NORTHERN DIRECT70N " ,0 ,,, NOTE: EXCA VA 770N DEPTH WILL BE DETERMINED BY SOIL SAMPLING. REMOVE FILTER FABRIC, g• SAND AND MIN. OF 5• OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. --- ----------------------- TOP OF ORG. PCB LANDF/ll LINER SOUTH END SECTION -EXCAVATION AREA NO. 7 : BACKFILL AREA NO. 5 NO. SCALE: 3/16"=1'-0" 476'± -------·-· --------------------1 TO[ OF BACKFILL EXCA VA TlON AREA [!A CKFILL AREA NO. 5 -t, N --n N ~ t, i TOP OF EXCA VA TEO SLOPE NO. 7 ~ I ~ I I I REVISIONS BY DATE TOE OF EXCAVATED SLOP[ TOE BOTTOM · TOP OF BACKFltL I I I I I -----t ~ ___ ,_ - I I if I I . ~ ~ ': 0 OUT LINE OF LOWER LINER EXCAVATION/ FILL KEY PLAN SCALE: 1" =50' -- ---- GRAPHIC SCALE: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT 1-"'"-l-------·-···· -·-·-. & -=•g ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT EXCAVATION AND BACKFILL TABLE MATERIAL TYPE QUANTITY UNITS OF MEASUREMENT MA TER!AL HANDLING / ANAL USE VEGUATTON 1,674 .s: Y. 12• TOP SCXL 488 C. r. 12" All MATERIAL 488 C. r. PROFILE LINE "A " 10 MIL Pvt TOP UNER 1,756 .s: r. 24" ClAY LAYER 976 C. r. 12• All MATERIAL 488 C. Y. PCB CONTAMINATED MATERIAL 4,982 C. r. FR. TER F ABRJC 1,327 .s: r. 9" SAND LA YER 251 C. r. 6" LA YER OF 60" Ci.A Y LA YER 168 C. Y. 12" ALL MATERIAL -- JO MIL Pvt BOTTOU UNER -- 9" SAND LA YER -- PROCESSED/STOCKP/l£ MATERIAL 1,399 C. Y. TOP SOIL COVER LA'IU? 4(}(} C. Y. 200' gFAEnvironmenta!Consultants EXCAVATION SECTIONS -PROFILE LINE "A" Barnes, Ferland and Associates, Inc. EXCAVATION AREA NO. 7: BACKFILL AREA NO. STRIP MULCH AND BLEND HATH TOPSOIL/Fill STRIP AND STOCKPll£ All STRIP AND STOCKPll£ / All REl,fOVE AND CLEAN / DISPOSE IN CLASS I LANDAll STRIP AND STOCKPllE / Bl.ENO WTH OTHER All BCD TREATMENT/ All BCD TREATMENT I All REMOVE AND CLEAN / DISPOSE IN a.ASS I LANDFfll BCD TREA TJIENT I ALL REMOvf 6" LAYER/ BCD TREATUENT / All LEA 'ff IN PLACE LEA 'ff IN PLACE l£A 'ff IN PLACE BACl<All ANAL BACl<All LA YER DRAWING INFORMATION DATE PRO.E:CT NO.: 99001 DESIGNED BY: CEH 5 DRAYIN BY: 'M<P TWC 2/03/00 atEa<Ell BY: PAB DRAWING Fil£: 99001C7-17 SCALE: AS SHOWN DRAWING NO. C-20 SHT. 22 or~ NO. EXCAVATION AREA NO. 8 \ IMPLEMENT DUST CONTROL MEASURES AS REQUIRED BACKFILL AREA NO. 6 BCD PROCESS TREA TED MA 7ERIAL BACKALLED INTO LANDAU IN UNIFORM HORIZ. LIFTS ACROSS W/D77-1 OF LANDALL AND COMPACTED PER SPECS. r BLENDED 1'-o• AND FILL TOPSOIL SEED AND MULCH REFERENCE POINT ~----\----------+-------------------------'-------------'--430:..:_'--J~--+-----------------+------------------------------1/ FlLlER FABRIC LIMITS -----.... --.....:-II -I I ----...... .......... .......... ..... __ 0 ------- <O <ri " "' -- NORTH END NOTE: EXPOSED FACE OF PCB MATERIAL TO BE EXCAVATED IN A NOR77-IERN DIRECTTON -----..... _ -- EXCAVATE CONTAMINATED MATERIALS AND HAUL TO TREATMENT AREA 5X MIN. SLOPE r--TYP. ~--------------'------------------------------~~-~~~-l-2!5~,i; MAX SLOPE TO MATCH EXIST. lYP. AT PERlt.lElER --------------------------------------------------------------- --- -------- -- - - ----- ---- ------- 50• 1: 1.5 CONSTRUCTION ~ r"---_ STORM WATER RUNOFF ~ L,_,/ RUNOFF TREATED MA TERIAL 1: 1.5 ---------------------------------------------------------------------------------------- EXISTTNG LOWER LEVEL FROM TOP DOWN FlL TER FABRIC 9" SAND 60" CLAY 12" FlLL MATERIAL 30 MIL PVC BOTTOM LINER g• SAND 476'± PUNCH HOLES 77-IROUGH UNDISTURBED PORTTON OF LOWER LINER COMPACTED SOIL BERM OR TUBE BERM TO MAINTAIN STORM / CONSTRUCTTON RUNOFF SEPARATTON 0 " ;;; NOTE: EXPOSED FACE TREATED MATERIAL TO BE BACKALLED IN A NOR77-IERN DIRECTTON ro r--;;; SECTION-EXCAVATION AREA NO. 8: BACKFILL AREA NO. 6 SCALE: 3/16"=1'-0" r--.; ;;; r-- "' " TOP OF ORG. PCB LANDALL LINER NOTE: EXCA VA TTON DEP77-I lt1LL BE DETERMINED BY SOIL SAMPLING. REMOVE ALTER FABRIC, 9" SAND AND MIN. OF 6" OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. SOUTH END TOE OF BACKFILL EXCAVATION AND BACKFILL TABLE TOTALS EXCA VA TION AREA NO. 8 REVISIONS -H N t") N BY DATE OPEN WORK AREA - - ---=• \a I •• I I I ' I I I .. I I L I - BACKFILL AREA NO. 6 TOE BOTTOM TOP OF BACKFILL -OUTLINE OF FIL TER FABRIC I I I I I ~--t~-+---~ ' I I I ~ ' OUTLINE OF LOWER LINER PROFILE LINE ':4 » EXCAVATION/ FILL KEY Pl.AN 0 ; 25' 50' 100' 200' !!i~ll-.il~~--!ii-~•-~~~~•--iiiiiiiiiiiiiij SCALE: 1" =50' GRAPHIC SCALE: 1" = 50' MATERIAL TYPE 1£GETAT10N 12" TOP SOIL 12" ALL MATfRIAL 10 MIL PK: TOP UNER 24" aAY LAYER 12" ALL MA TfRIAL PCB CONTAIIIINA TED MATERIAL FILTER FABRIC g• SAND LA YER 6" LA YER OF 60" a.A Y LA ITT? 12• ALL MATERIAL JO MIL P~ BOTTOfll UNER g• SAND LA YER PROCESSED/sTOCKPILE MATERIAL TOP SOIL COVER LA YER QUANTITY 3,515 J, 111 85 56 1,474 411 UNITS OF MEASUREMENT .s: Y. C. Y. C. Y. .s: Y. C. Y. C. Y. C. Y. .s: Y. C. Y. C. Y. C. Y. C. Y. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT HFAEnvironmentalConsultants EXCAVATION SECTIONS -PROFILE LINE "A" ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Barnes,FerlandandAssociates,lnc. EXCAVATION AREA NO. 8: BACKFILL AREA NO. 6 MA TERIAL HANDLING / ANAL USE STRIP AND STOCKPf/.£ I ALL STRIP AND STOCKPILE / ALL STRIP AND STOCKPILE / ALL REMOI£ AND CLEAN/ DISPOSE IN a.ASS I LANDFlll STRIP AND STOCKPILE / BLEND r.tTH OTHER ALL BCD TREATJIENT / FILL BCD TREATJIENT I FILL REMOI£ AND CLEAN / {)(SPOSE IN a.ASS I LANDFILL BCD TREA 'fMENT / FILL REJJOI£ 6" LA YER BCD TREA TIIIENT / ALL LEAi£ IN PLACE LEA 1£ IN PLACE LEAi£ IN PLACE BACKALL FINAL BACKALL LA YER DRAWING INFORMATION PRO.ECT NO.: 99001 DESIGNED BY: CEH DATE DRAIWI BY: WKP TWC 2/03/00 DRAIIING NO. C-21 CHECKED BY: PAB --=DRA=-=G--=Al£:c=--· -cg=go=o=,c=7_---,-,7'7 -c-SC.c-,-#J..E:'"--• A'""s.....,s=Ho=WN=---SHT. 23 OF 45 • NO. ffi 0 ,..; .. n BACKFILL AREA NO. 7 IMPLEMENT DUST CONTROL MEASURES AS REQUIRED BCD PROCESS TREA TEO MATERIAL BACKFILLED INTO LANDFILL IN UNIFORM HORIZ LIFTS ACROSS WfO TH OF LANDFILL ANO COMPACTED PER SPECS. BLENDED 1'-o• AND FILL TOPSOIL SEED ANO MULCH REFERENCE POINT r--------r---------+-----+--------~------------350'-----+--------------------------------------~/ FILTER FABRIC LIMITS 5" MIN. SLOPE " TYP. "' TO MATCH EXIST. f: f.5 TYP. AT PERIMETER ~---------------------------------:-----------------------~~!· }~~-L125~" MAX SLOPE --------------... ------------,~-------------------------~ --""------._ STORM WATER -----._ -RUNOFF --~ -:--1::.: ----~--., -~ ~~--------------- COMPACTED SOIL BERM OR ------------------------------------ -- - - -- ---- f: f.5 TREA TEO MATERIAL - ----- --------------------------------------------------- "' .,; ;;; NOTE: EXPOSED FACE TREA TEO MATERIAL TO BE BACKFILLED IN A NORTHERN DIRECTION 0 " ;;, ------------------------------------------------------ ,._ "' <Xl ,._ ,..: .; ;;; ;;; ;;; I -- NORTH END EXISTlNG LOi'rFR LEVEL FROM TOP DOWN TUBE BERM TO MAINTAIN STORM / CONSTRUCTlON RUNOFF SEPARA TlON \ NOTE: \_ TOP OF ORG. PCB LANDFILL LINER SOUTH END 60" CLAY 12" FILL MATERIAL 30 MIL PVC BOTTOM LINER g• SANO ------ TOE or 'A CKFILL ---- I I I I · i OPEN WORK u I /; I AREA I I ...... PUNCH HOLES THROUGH - UNDISTURBED PORTION OF LOYrFR LINER BACKFILL AREA NO. 7 I. . ... r I I .·· . I I I I I ' I ., .• .. 476'± EXCA VA TlON DEPTH WfLL BE DETERMINED BY SOIL SAMPLING. REMOVE FILTER FABRIC. g• SAND AND MIN. OF 6" OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. SECTION -BACKFILL AREA NO. 7 TO£ - BOTTOM OUTLINE or FILTER FABRIC I I I I I SCALE: 3/16"=1'-0" ---4 -, -+-,-..--,.. -- I t I I . /; PROFILE LINE ''.4 » I -1, . -. . . . . . . . . -,, /~----I~~ --r----,.----- -_..,___;__·_ - -........._ --....,;__ - - - - - - -~e--1 I . . . REVISIONS BY DATE I I . I - - -- TOF' or BACKFILL EXCAVATION/ FILL KEY PLAN SCALE: 1• =50' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES · OUTLINE Of LOWER LINER 0 25' 50' ~1111••------100' I GRAPHIC SCALE: 1• = 50' 200' BACKFILL TABLE MATERIAL TYPE QUANTITY UNITS OF MEASUREMENT MA TERIAL HANDLING / FINAL USE VE~TAllON 0 s. Y. STRIP MULCH AND Bl.END "11711 TOPSOIL/FILL 12• TOP SO/l 0 C. Y. STRIP AND STOCKPILE RLL 12" RLL MA 'FER/AL 0 C. Y. STRIP AND STOCKPILE / RLL 10 MIL pi,c TOP LINER 0 s. Y. REMOVE ANO Cl.£AN / DISPOSE IN a.As:5 I LANORLL 24" Cl.A Y LA YER 0 C. Y. STRIP ANO STOCKPILE/ Bl.ENO tw711 0711ER RLL 12" RLL MA TERIAL 0 C. Y. BCD TREATMENT/ RLL PCB CONTAJIINA TED MATERIAL 0 C. Y. BCD TR£A TMENT I RLL f1L TER FABRIC 0 s. Y. REMOVE ANO CI.EAN / DISPOSE IN CLA.S:S-I LANORLL 9• SANO LA YER 0 C. Y. BCD TREATMENT/ RLL 6" LA YER OF 60" ClA Y LA YER 0 C. Y. REMOVE 6" LA YER / BCD TREATMENT / RLL 12" FILL MATERIAL --LEA VE IN PLACE JO MIL Pi-t' BOTTOM LINER --LEA VE IN PLACE 9• SAND LAYER --LEA VE IN PLACE PROCESSEO/STOCKPIL£ MATERIAL 7,JJ5 C. Y. BACKRLL TOP SOIL COVER LA YER ,f()l C. Y. RNAL BACKRLL LA YER DRAWING INFORMATION PRO..ECT NO.: 99001 DATE DRAllll1HO NO. fr. ~sc-+---------------;----,---------·-& -=•a DIVISION OF WASTE MANAGEMENT B!'!:A Environmental Consultants EXCAVATION SECTIONS -PROFILE LINE "A" BACKFILL AREA NO. 7 DESIGNED BY: CEH C-22 ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT l[larnes, Ferland and Associates, Inc. DRAWN BY: WKP TWC 2/03/00 CHEO<ED BY: P AB 1-.;:;DRA=WIN""G~fU:=---=99=00~1=c7C--_~17;-;sc=AC-:-J..E:=---.A"""S ""'SH=o=WN.rl SHT.~ ~ ,...,-----------...--- I NO. IMPLEMENT DUST CONTROL MEASURES AS REQUIRED SEED AND MULCH BACKFILLED INTO LANDFILL IN UNIFORM HORIZ LIFTS ACROSS WIDTH OF LANDFILL AND COMPACTED PER SPECS. BLENDED 1'-o• AND FILL r BCD PROCESS TREATED MATERIAL REFERENCE POINT f------------------------------------~---3_5_0_' ___ -+--------------------------------------/ FILTER FABRIC LIMITS 5" MIN. SLOPE ----------........................ ........ TOPSOIL ----~------_]"~TYi'~. ~ 25:11: MAX SLOPE TO MATCH EXIST. TIP. AT PERIMETER -------------- D ---------------TREA TED MA TERIAL .... _____ _ :;;: --------1: 1.5 "' PUNCH HOLES THROUGH UNDISTURBED PORTION OF LO~R LINER NORTH END -- FROM TOP DOWN so· CLAY 12• FILL MATERIAL 30 MIL PVC BOTTOM UNER g• SAND ----------------------- -----------------------------------------------------------------------------------------\ ------------------------------------------------------ rn I L BACKFILL AREA NO. 8 NOTE: EXCAVA 770N DEPTH WILL BE DETERMINED BY SOIL SAMPLING. REMOVE FILTER FABRIC. 9• SAND AND MIN. OF 6" OF CLAY LA YER BEFORE SAMPLING. SAMPLE BOTTOM AND SIDE SLOPES ON A 50 FOOT GRID. 476'± .,; .; D " "' "' ,.: .; SECTION -BACKFIU. AREA NO. 8 SCALE: 3/16"=1'-0" TOP OF ORG. PCB LANDFILL LINER BACKFILL AREA NO. 8 ~ "·· OUTLINE OF FIL TER FABRIC BACKFILL TABLE ' REVISIONS ~----------------·· ------ TOE ., I I I PROFILE LINE "A " I I I I I I ----+---++-~BOTTOM ---+--t---·-- BY DATE ~ i I I I I ~ /L--~--------·-------------------------~,--' OUTLINE OF LOWER LINER EXCAVATION I FILL KEY Pl.AN 0 25' • 50' 100' 200' SCALE: 1" =50' - - ---= j \ii ENVIROMENTAL, INC. Mrhti-. s~--- GRAPH1c SCALE: 1" = 50' NORTH CAROLINA DEPARTMENT OF ENVIRONME"JT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT I J BFA Environmental Consultants ' Barnes. Ferland and Associates, Inc. MATERIAL TYPE QUANTITY UNITS OF MEASUREMENT 1-f"GETATlCW 0 .s: Y. 12" TOP SOIL 0 C. Y. 12" RLL MATERIAL 0 C. Y. 10 Mil PVC TOP UNER 0 .s: Y. 24" Cl.A Y LA '/ER 0 C. Y. 12• FTLL MATERIAL 0 C. Y. PCB CONT,41,1/NATED MATERIAL 0 CY. FTL TER FABRIC 0 .s: Y. g• SAND LA YER 0 C. Y. 6" LA YER fT 60" Cl.A Y LA YER 0 C. Y. 12" RLL MATERIAL -- JO Mil Pi.t": BOTTOM UNER -- g• SAND LA YER -- PROCESSEI)/STOCKPILE MATERIAL 6,133 C. Y. TOP SOIL COl-£1? LA YER 327 C. Y. EXCAVATION SECTIONS -PROFILE LINE "A" BACKFILL AREA NO. 8 ~-·-~-.~· -:-~--}-');}~ r:w:r;,~-- 1 ... , '. • '' • ---- SOUTH END MA TERIAL HANDLING / FINAL USE STRIP MULCH AND BLEND l#TH TOPSOIL/ALL STRIP AND STOCKPILE RLL STRIP AND STOCKPILE / RLL REMOW AND Cl.£AN / DISPOSE IN CLASS I LANDRLL STRIP AND STOCKPILE/ Bl£ND l#TH OTHER FTLL BCD lREAll,/ENT / FTLL BCD TREA ll,/ENT / FTLL REMO'.£: AND CLEAN/ DISPOSE IN CLASS I LANDFILL BCD TREATMENT/ FTLL REMOW 6" LAYER/ BCD TREATMENT/ RLL LEA I£" IN Pl.ACE LEA I£" IN Pl.ACE LEA I£" IN Pl.ACE BACKFTLL FTNAL BACKRLL LA YER DRAWING INFORMATION PR0..ECT NO.: 99001 DATE DRAWING NO. DESIGNED BY! CEH DRA11H BY: WKP WC 1/10/00 C-23 CHECKED BY: PAB t-cDRA=WIH~G =Fll.E::--::·---;;9"'"'90cc-;;01=c""""7--=-17.-=sc,cccu,'="•-,A""S"S"'HO=WN..-t SHT.~Of ~ NO. REVISIONS NEW 6" PVC WATER MAIN BY DATE 0 • Fi NEW 6" PVC WATER MAIN 0 0 - = = -S::l\a ENVIROMENTAL, INC. I 0 15' 30' 60' 90' ••~•liil•~• ~-Q~~~ liiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiil ,_ ___ _ GRAPHIC SCALE: 1" = 30' NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT r ,_, ,I ,.'; I r I 1 .,, OPEN-CUT AND RESTORE PAVEMENT e!\l!':A Environmental Consultants Barnes. Ferland and Associates, Inc. TYP. STORM SEWER CROSSING, SEE DETAIL I 0 NEW WATER MAIN /ij ,! 0 !f 0 PLAN I I 0 0 I !f 0 NOTE: THE CONTRACTOR SHALL COORDINATE INSTALLATION OF THIS WA TERMAIN 'MTH WARREN COUNTY. 0 15' JO' 60' 90' ~~~•liil••~-~--~-~-~~~-1 iiiiiiiiiiiiiiiiiiiiiiiiiiill GRAPHIC SCALE: 1" = JO' DRAWING INFORMATION DATE DRAWING NO. PRO.ECT NO.: 99 01 DESIGNED BY: CEH W-1 DRAWN BY: WKP TWC 2/03/00 a-tECKED BY: PAB SHT. 26 or~ DRAWIIG FI..E: 99001W1 SCALE: AS SHOWN • • . , ' I ' " 1 I ,· ' 1 . -··1 " ::_:j_ -.. _ .. .. ,_ .. _ . •J -~--~-1 -: " , • l C ';I ·,.: 1::_,_J '.g ~-:::;) .. ~.::? ·, .-• ~; -"' :_/:;i "=~--': :. ~· ,-.~-:c ---., ·•-= .. •I . -. ·• . . .• -:: .,;_· ·.'1 "':_; ._._-:,1 --. ' _, __ >~1 ''.:' I " f)l>i~l&»IE>llP!~ I " :!I F.i "' "' 0 ~ 0 -<D ·! )> (/) (/) :,: 0 ~ !j! ,.. fTJ "' !<! VI 0 z VI !!I.! I~ ~ nl'I §-111 ~ ,·:a z () =:!: J> :::0 :::0 rrl z 0 0 C z =< 7J 0 CD r J> z 0 "'Tl r r 0 rrl -I 0 X "'Tl 0 J> :::I 0 z 7J :::0 0 c.. rrl 0 -I ~ s ~ c:, < V) z -0 ;u 0 -l I z n ► :,,.Al ozP ,,oz z► ►o :e -l fTl C 'lJ ;u > ► ► ,;u V) -< ;u s= -l l"'7 fTl (./) z rr, 0 -l co ;u '1 n l"'7 :e: (/) ~ < > ;u z 0 z > s= fTl G") z -l rr, .::::: rr, z -l ~~ ~ ~ 2. [ Ill ::i a Cl. ::, t ~ l ~-~ ! [ • ::;-sr ('\ ::, . !it z fTl :E :E )> -I fTl ::::0 s::::: )> z -0 r )> z I !ii: i I 0 i i ~ z ~ ~ a ~ z ... 0 " j 0 "' "' )> ,., "' ~ co " .:,: 0 0 -~ 0 z N ------I~ 0 "" ------0 0 !ii: :E j ':l ~ I z !ii " It N z p I I G") ~ :I: 0 V) ~ F.i ~ • II vi 0 ('111 -~ ~ I ij :I: () V) ~ r fTI .. ~ • II vi 0 I 0 ~ (}1 vi 0 C1) 0 <D 0 0 ~ (}1 . vi 0 C1) 0 <I> 0 ~~ -~-5,-~ ~ / ~ ~. ',,\<9. · lJo.52 321,,90 J.}o,f.llt / • J41.50 . J.4<l.i9 . .., / o"'<,,; J.497.09 / "'-"/ :e z ►IT1 rl :::e ::0 cr, • .::::: ,:J ~< zo l -------· 330.70 """' _ "-. \ J:n.23_ ,, """ • J.J0.9' .,,,_,,/ / <j(o . 0',_; 6 1/' 0 JJ0.17 O tx ) tx~· . S ,Q. CJ o-<-✓ :;; o<' • 34-2.0J • J.f-0_..., . JJg 56 0 0 • J.M. . .._. , J•1.a1 0 f<: .o'<' /,.._ i<: ,,',.~,,,.< J.t-1.0, ~ ,,o'f' 341.2,s c0<c:, J.J/.72 0 . JJa.J7 :::e z > ,,, rl :::e ::o en • :e: ,:J ~< Z() f<: d' ·e.ss . J.J6.74 o"<,,; • J3t1_134 ;: l, ..... . / ..... 5. JJ lr'I.IVE-:Rr 32.91 ~~ J.J:i.6J 34.12 <,,; ,d' .l.J. lJ~.29 JJ1.s2 • JJ-4,27 -~--le ' 336.a.:s · JJS,OJ . ,.,. .. · JJ◄.111 :::e z ►!Tl rl :::e ::Oen • :e: -u ~< zo . .1.}s.•1 ~ ~ / . JJ / 1/" 'f-~v '<-o~. ~'" r::,'<-/ / o"" 'J.◄s ·.n / JJ2.e;, . JJ.2.aa / / ,.,, " o"',;; / ~-',;; . J V Jo1Q JJJ,60 /' .o-<-c,; 329.,w. J21.9z • J2g_55 .12e.~ · J2s.s, • J2:,,_94, .Jic.49 • J2.1a• · J1S,8J • J21.,..,. . J••oe J2J.5,f. · JTJ.92 • JJ1.,e +'" 0 0 0 0 -• l1B.t12 . .ll4.aJ • J3CJ.!11 l2,!l_517 z 0 CD a __,_ 0 -P -J22.Js (_J7 --~ ~·-• JJo,;s · JIS.5J lJ<>.52 329.M • J24,42 JJJ.24 / .o-<-,;; . ~-&l . .lJ"J.9,2 // ~ 1/ ~o ....... _,. ~ '(-~'v / r::,'<-/ / / 3J4,.57 JJ.f..1:1 ;,H.a2 ':JJ,5J; JJ2.0i -,~y -..,.,,_/ .o-<-<,,; 40J // o"c,; // o-<-,;; ----. JJ2.3.5 JJ.2.02 • J2a.D-f. / · .J29.~ <,,; .d' 327.72 • J2&29 ft: d' S87°58'32''[ . ----. 7680.29' ----~ V),, 1"'70 ,,, ;:o c:, () i5~ . :::I () z IC v,► :::I ~ ' JJJ,57 ; """:;(,,, /"' ( • I>. ~ ,7 0"-(j · J2a.25 • J2J.i,5 J2J.29 • J21.21 l19.is • Jr ... a, lJ<>.o., • J29.eo \ • J2J.4;, . JJ,5..57 /"'~ /7:; / rjl''-/ ~ 11 ~,, '~ ~. o-',;; c,. 'J. 12 ,. I • I'.' k , .. t1 i· ~-,. i'. I. ,.-. ,·~ tt ,_ r : I: r·: I i~ NO. 24" ,---:--" / . ' ' BRASS IDENTIFICATION TAG INDICATING "WATER", VALVE SIZE &: VALVE TYPE RIVET OR EPOXY TO INSIDE OF VALVE BOX (MAX.) ;t' BELOW LIO. - i . \ I • • 3" (TYP.) \ • _ /", 77-#4 REINr. BAR (TYP.) \; NOTES: .3000 PSI CONCRETE PAD lo MECHANIC\ JOINT "'l PIP I Flt-llSHED GRADE «< ,;;. • ,:, . /• ,/ ___ 24" DIA .. 5' rHK /-.... -....; CONCRITE PAO (ALL AROUND VALVE BOX) _,---¥.ALVE / /J'ESTAINED / DINT '<'«~W~~~~~~-:;<'./ UNDISTURBE~ .... EARTH 0. 57 STO"'E 1. POURED IN PLACE (NOT PRECAST) CONCRETE PAD SHALL BE FLUSH WITH GRADE. 2. LOCATING WIRING REQUIRED. SEE DETAIL W-44. VALVE & BOX FOR UNPAVED LOCATIONS SCALE: N.T.S. 7 W &#M.11 UNDER PA"'NQ ~~ "'-"""" "' -"'" ""' /_17 Of' DllS11NG Pll'E 5tW.L I!£ -· - l,l(CHHICIJ. JOINT 11 ,;~. 22 1/'r °" 40' E1VC1 (SIZE~) NOTES: 1. IF EXISTING UTILITY PIPE IS A WATER tJAtN 6-INCHES OF SEPARATION is REQUIRED. 2' lollNIIU,I M I.DIG"n1 Oli' PP£ TO Bt: ll00ED $Hl,J.. II( .. MX:QAtWa IM'Tll TA8LE FOfl WECIW«:II.. RBflWO(I LlM,lTHS. (SH OCTAL W-Jl) f'ftOf'OSED .... TER wr.lN SIZEl:T'l'!'EVAAIEl!i aru. lt1NG (TYP,) '----L y< fHRE.WE.D Sflll. IIOO Ill' Nl.!TS • LOCI( lllll.SH!1t LDIGTH ...S l!EQUIRED ---------------Y"" 11(1 lHMAX[) £VE IIOlTS w H111S 4 LOCK W,i,S1-0S lDGTl< .OS "f:Qllllfll 2. IF EXISTING UTILITY PIP!:: IS A FORCE i,,WN. 9-NITARY SEWER. R!:::CLAIMt.D WATER MAJN OR STORM SEWER, 18 NCHES OF SEPARATION 1$ REQUIRED. tf THIS ·.S IMPRACTICAL AND EXISTING UTILl:Y MAIN IS C900, C905 OR D.L PIPE, SEPARATION CAN BE REOIJCED TO 6-IN::HES. A FULL LENGTH ◊"° PIPE SHALL BE CENTERED UNDER EXISTING UTILITY MAJN TO PROVIDE MAXIMUM JOINT SPACING FOR All CROSSINGS. 4 DEPTH or BURY TO BE JS" MINIMUM :N PAVED AREAS MEASURED FROM FINISHE..D GHADE. DEPTH OF BURV lO BE Jlj MINIMUM IN UNPAVED AR~. 3 NUMBER OF l!E RODS REQUIRED IS AS FOLLOWS: --S-BM DIAMETER M,4,IN 2 TIE ROOS PER JOiN! 1 rf'-1 'l" DIAMETER MAIN - 4 TIE RODS PER JOINT 14M-2<1 DIAMETER MAIN 6 TIE RODS FER JOINT 24M -.36" DIAMETER MAIN -8 TIE ROOS PER JOIN[ 42~ -48" DIAMETER MAIN -10 T!E RODS PER JOINT ADJUSTMENT UNDER EXISTING UTILITIES-TIE RODS I JO" liltN. 'T m JT' D£PTH VARIES 3ff MIN. UNDER PA.\IING 'I::=--I ,. ___.--PROPSED WATER w.lN SIZE &: TYPE VARlf:S F"UI -l..FNGTH or P!PE CENTERED ~l, c~lil"" ~,-.....0,, EXISTING i.JTIUTY PIPE l.lAXllilU~ 80X Of" MA.NUF"ACTURER'S ,,.,,.,,-RECO~MENDATION f"OR JOINT DEFLECTION. MIN. HORIZONTAL LENGTH REQUIRED AS PER MANUFACTURER MIN HORIZONTAL LENGTH REQUIRED ,1,5 PfR w.NUfACTLIRER F OEFl..ECT PIPE VERTICALLY TO ,1,\IQIO OBSTf.UCTION I 9' li!IN . ..-2'._~1.N,, -1-TO DEFLECT PIPE 'IE:RT!OllY TC AVOID OBSTRUCTION I NOTES: 1 IF EXISTING UT!LJTY PIPE IS A WATER MAIN 6··-INCHES OF SEPARATION IS REQUIRED 2. IF EXISTING UTILITY PIPE IS A i:-oRCf MAIN, SANITARY SEWER, RECLAIMED WATER MAIN OR STORM SlWER, 18 INCHES OF SEPARATIO~ IS REQUIRED. IF THIS IS IMPRACTICAL ANO EXISTING UTILITY MAIN IS C900, C905 DR D.I. PIPE, SEPARAT10N CAN BE R::DUCEO TO 6 · ·NCHES. A FULL Ll:.NGIH OF PIPE SHALL BE CENTERED UNDER EXISTING UTILITY MAJN TO PROVIDE MAXIMUM JOINT SPACING FOR ALL CROSSINGS. ADJUSTMENT UNDER EXISTING UTILITES PIPE JOINT DEFLECTION SCALE: N.T.S. REVISIONS BY ATE i;; i Iii ENVIROMENTAL, INC. • r L:MINIMUM LENGTH TO BE RESTRAlNEO ON· EACH SIDE Of FITTING (FEET) ~ £ ,; rn §: C C .. • • I • • • -0 2 E • ; ~ ~ 0. Ci CJ 0 0. • • > "' .. w jj jj 2 0 ~ I I N ~ " C C "' "' • 0 0 • ~ N N w C C :;; :;; ! 0. 0: 0: 0 0 C C 0 0 r I 0 0 N N ~ :;; :e u ~ ~ N ·c • t 0 C ~ ~ r r 0 0 ~ ~ ,. N N C • 0 -N ~ b 0 "' "' z -N ~ r r ... ... 4 2 4 7 18 20 -cun ' -bronch 39 16 / 3 6 2 5 10 25 2D -run 1 -branch 55 23 / 4 8 3 6 1J 32 20 -run 1 -branch 72 30 I 5 10 4 B 16 38 20 -cun 1 -branch 86 36 / 6 12 4 9 19 45 20 -cun 1 -branch 102 4? / 8 14 5 10 21 51 20 -wn 10 -branch 116 48 I 9 16 6 11 23 57 20 -wn 26 -branch 131 54 I 10 18 6 12 26 62 20 -,un 41 -branch 145 60 / 11 20 7 13 28 68 20 -wn 55 -branch 158 66 / 12 24 B 16 32 78 20 -con 58 -branch 185 77 I 1 1 30 9 18 38 92 20 -wn 77 -branch 221 92 I 17 36 10 21 44 105 20 -wn 115 -bronch 256 106 / 20 NOTES 1. Table assumptions: PVC pipe, Safety Factor = 1.5, Test pressure = 150psi Soil = GM or SM, .3 ft. bury depth to top of pipe, Trench typi!! 3, Branch on Tee is one size smaller thon run of tee size and 20 feet of pipe t ~ C ,; .. C ~ -• • • -u 0. • : vi 0. "' • 0 • E .. .. .. ~ • • • "" "' " • 0 0 • ~ " " -0 J • • > > 2 C 0 N N -. ~ '--~ u -o rn U C N N •• N N <r J 8 / 1 n/a 11 / 2 28 14 / 3 30 17 / 3 29 20 / 4 50 23 / 4 30 26 / 5 3-0 29 I 5 29 36 I 6 29 37 / 7 55 44 / 8 77 51 I 10 77 is instol1ed past the tee on the run side (smaller branch sizes must be calculated by the engineer). Vertical offsets are 3 feet deep on top and 8 feet deep on bottom. Reducers are calculated tor one size reduction. Other conditions will require additional calculations. 2. Al: fittings must be restrained. One of the following methods may be used: A Mechanical restraints at fitting and at adjacent joints to a length as specified in chart 8. Tie rods at fitting and through joints to a length as specified in chart. 3. Valve restraints shalt be restrained the same distance as horizontol plugs. MECHANICAL RESTRAINT LENGTHS SCALE: N.T.S. STANDARD TAPPING SLEEVE & VALVE AS RE'OUIRED r SEE HYDRANT SUMP r.3/4" Tr<READED STEEL ROD DETAIL V,-15 3/J' MIN. - - - -1 f5' PIPE \ < ~ ~ 6" VALVE \ '~CXISTING WA1'R M~N I I I I I L ____ _J ~ THRUST BLOCK REQUIRED 1 1 /4" SQ. NUT SEE W-J8 .3-WAY FIRE HYDRANT WATER VALVE BOX FINISHED GRADE "'- 4'x4' SQUARE x ff' THiCK CONCRETE SLAB IMMEDIATELY BELOW FRANGIBLE FLANGE &: LEVEL w/TOP OF GRADE.---~ 3000 psi CONCRETE w/f4 REBAR 0 12• 0.C. EACH WAY HYDRANT EXTENSION AS REQUIRED FOR ADDITIONAL DEPTH OF BURY ... L_ 3/♦ ROD. 2 REQUIRED __ / LEAVE DRAIN HOLES OPEN NOTES· 1) LOCATING WIRING REQUIRED. 11/t /ll.Y 4-8" MAX. ,-FRANGIBLE FLANGE 1 / LOCATION FOR "TRAFFIC" 8" Ml TYPE HYDRANT AT GROUND LEVEL. 0 0 0 I I __J \ SEE HYDRANT SUMP DETAIL W-15 2) FIRE "1YDRANTS SHALL BE INSTALLtD BETWEEN BACK OF CURB AND FACE OF SIDEWALK EXCEPT WHERE CONDITIONS AND/OR REGULATIONS PROHIBIT. HYDRANT INSTALLATION WITH TIE RODS USING TAP SLEEVE & VALVE SCALE: N.T.S. TYPICAL PROflLE • BEU. Jt. TO F>I.NN END w/~R~ m ""'-' 80.l Jt. f>.V.C. 0 0 0 RESTRAINED BELL JOINT SECTIONS FORCE" A - • REDUCER .. •• 'MtOI ..W.. ~ lHE JOIHTS AA£. RESTRANJ), RR:E A M.N«:£5 FOIICE I •• ... . . ... FIRE HYDRANT LATERAL • TYPICAL PROFILE ** ME:CfWillC.IJ.. Jl. TO PUJN ENO 11/t.lE;CHANtCM. RESIBAINERS r "' ""-' / 111..Jt. 0.1. FTTTlNCS. RE"STRAJNED MECHANICAL JOINT • • • • MECHN-IICAL. JOINT SLEEVES TOPR£\'tH1"1HC~Otoo.cNT NrO TM( POCkET Of' THE AESTIWNT llll«ilS • A O:r.'EM Of 1 ll mil >'Ol. ffTh"tUN: ·--~-ne"""' -NUWIIER Of TIE ROOS l,EQIJIR(I) • • -s'-lf --l ROOS 1C'"-12" 1iWN -• 1100S 1,("-211' --8 !IOOS 2./,"-Jff IIWN -I IIOOS •T-+tf IUIN -10 RODS THRUST COUAR ANCHOR TO Bt:" USlll NSl9ll Of TOTAL RfSTRUUI I..DCll1 (OPTIONAL) Sil[ ,\$ PD' TltRllS'T BtJ)CI( DET.U. {W-Je) SfE O£tlrriLS W-le fl W-31 .. FORCE B - MECHANICAL RESTRAINT DETAILS SCALE: N.T.S. = BACKFLOW PREVENTERS MUST BE UTILIZED AT ALL PROCESS CONNECTIONS INTO THE MAIN LINE STANDARDS A.S S.E. 101] A..W.W.A. C506 FCCCHR OF USC \ • /) ------------'-,a----- / / ANGL£DF 6 DIRECTION CHANGE • HORIZONTAL BENDS I I UPPER BEND RUN - TEES RUN ~ L * -~ ~ ~------l~I - BRANCH DE.AD END VERTICAL OFFSET LOWER BEND """ "' ~ •• •• THRUST - P ,.._ Q __. THRUST - P IN LINE VAI...VE MECHANICAL RESTRAINT DETAILS SCALE: N.T.S. SALL TYPE SHUT OFF VAL YES FLOW RELIEF VAL VE DISCHARGE 1 2M +PIPE DIAMETER (MINIMUM DISTANCE) SCHEDULE BO PVC OR COPPER PIPE FINISHED GRADE 3•-0" MIX. TRENCH WID!li (SEE NDTt 8) EXIST. ASPHALTIC SURFACE 3/411 TO 211 REDUCED-PRESSURE BACKFLOW-PREVENTION ASSEMBLY (RPBA) ,. ~ ~ ~ °' ,. G: ~ ~ iii I=' 0 z I;; I ~ ~ ~ ~ .1. ~ ,., COMMON Fill ~ ,. 24" (TYP.) ~ C, -" SELECT ~ $ ::;; COMMON ,. Fill ill z ~ UNDISTURBE ~ t:J t;: EARTH .. :;; (SEE NOTE J) ~ ~ ,., = 1. PIPE BEDDING: SELECT COMMON FILL COMPACTED TO 95,:; OF THE MAXIMUM DENSITY AS PER MSHTO T-180 TO 2~" ABOVE CROWN OF PIPE. 2. TRENCH BACKFILL: COMMON FILL COMPACTED TO 95% OF THE MAXIMUM DENSffY AS PER MSHTO T-180 TO GRADE. 3. PIPE BEDDING UTILIZING SELECT COMMON FILL OR BEDDING ROCK IN ACCORDANCE WITH TYPE A BEDDING ANO TRENCHING DETAIL MAY BE REQUIRED f,S DIRECTED BY THE ENGINEER. 4. WATER SHALL NOT BE PERMITTED IN THE TRENCH DURING CONSTRUCTION. 5. ALL PIPE TO BE INSTALLED WITH BELL FACING UPSTREAM TO THE DIRECTION OF THE FLOW 6. FINAL RESTORATION IN IMPROVED AREA5 SHALL BE IN COMPLIANCE WITH ALL APPLICABLE REGULATIONS or GOVERNING AGENCIES. 7. SAWCUT PAYEl,,IENT FOR OPEN TRENCH. RESTORE PAVEMENT PER WARREN COUNTY STANDARDS TYPE 11B11 BEDDING AND TRENCHING DETAIL SCALE: N.T.S. SCALE: N.T.S . .... .-............... h· .................... J :: .',:.: .: ·:::'1-·: ·.-:•: :.-:.-:•. l-,._~_J HYDRANT SUMP SCALE: N.T.S. DRAWING INFORMATION GRAVEL OR BROKEN ROCK FOR DRAIN SUMP NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT ~ Environmental Consultants . Barnes, Ferland and Associates, Inc. PRo.ECT NO.: WATER MAIN DETAILS DESIGNID BY: DRAl'M BY: 99001 DATE CEH l'IKP TWC 2/03/00 DRA'IIING NO. W-3 WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT a-lECKED BY: PAB SHT. 28 Of 45 DRA\\ING FILE: 99001W3 SCALE: AS SHOWN ·,-1. ·•·•.· ..__ ....__ ----..___ '-.;_ ..___ ..___ ---...__ ----.... NO. I ---- ..__ ..___ , REVISIONS --- I I ---- I t I BY I ! I I I I I I I I r I I I w i'.i I ! I I I I ..__ 2 LL n BOTTOM 306 N E W LI Nf]Y --PDND _.,.. r / / ----310 --r------ -·· I I I I I\ I. ./ ---------------\ DATE - - --s=l\a / / '-. ......-; I /-----~---/-- I / / I I. ,,----· --- / I I ! I I I I I I I I I I I ( I I I I I I I I --------·- i, ./·- I; , •-/ / \ \ \ I I 16' WJDE-+ll'illL ROAD FOR CLEAN MATERIAL - HAUL ROAD ---L -------j-_ 1~ ~~[S_ -- I I I . L ~ -- ----- CONSTRUCTED --..___ ------+-----I ---/ --------,....<...._ \ ( I j_ I -->-------. --+-<"------+---1----- \ I \ ' I \ \ I 1 I -.....;.. - I \ I I / I I \ I \ \ )- ' --+---------·------. AREA ~~R~DE t STORM WATER ', TREATMENT " SYSTEM 30"RCf'r @ -- E X I S T I I_L/,,,-~-- ------ -- 24"RcP\ NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT .. ---· --- I _c ___ L_A_N_· D~F-1 L L Barnes, Ferland and Associates, Inc. / • 324.50 324.00 ---, ' , STAKED HAY , BALES ' ' EROSION CONTROL PLAN ENYIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT I I \ SEED AND MµLcH oRlcovER STOCK PILE ).REAS WfiEN LEFT IN PLACE Q,VER / 3 WEEKS q I \ I\ \ \ .. , l \ \ I (rPERTYr LINE ( I I i I \ \ t· I~ -!-) \ . --r I / .. --I / I I ( I I / I } I ! I ! I I : . ~ I I I J I \ 1,-I \ \ I > J \ I ' I • \ I \ \ \ \ \ \ \ I .· \ \ \. ---Nv--+- S TAB I~ 1 ZED STOC~ILE /i / AREA . \ \ I \ I . I \ I I ,\.. _, GRAPHIC SC.AL~ DRAWING INFORMATION PRo.ECT NO.: 99 0 DESIGNED BY: CEH DRAIIIN BY: WKP ----.....-.....- .....---.....- .....- .....- .....-.....- I I I I I I < DATE 2/03/00 I t '-•. -. ·, .. \ \ \ \ DRAWING NO. ER-1 CHECKED BY: P AB l--=DR=-cA=WIN=Gc-cFll.E:==-----c9=90=0=1 E=Rc---1 --=sc.,..•"'U:=--..,.,, ~=-.-30,,,--1 SHT. 29 OF45 NO. Lr,. EROSION AND SEDIMENT CONTROL NOTES 1. 2. 3, THE CONffiACTOR IS RESPONSIBLE FOR REMOVING SILT FROM SITE IF NOT REUSABLE ON-SITE AND ASSURING PLAN ALIGNMENT AND GRADE IN ALL DITCHES AND SWALES AT COMPLETION OF CONSffiUCTION THE SITE CONTRACTOR IS RESPONSIBLE ,OR REMOVING THE TEMPORARY EROSION AND SEDIMENT CONTROL DEV'CES AFTER COMPLE110N OF CONSTRUCTION AND ONLY WHEN AREAS H.AVE BEEN STABILIZED ADDITIONAL PROTECTION -ON-SITE PROTECTION IN ADDITION TO THE ABOVE MUST BE PROV1DED TI-lAT \/•,LL NOT PERM 1T SILT TO LEAVE THE PROJECT CONFINES DUE TO UNSEEN CONDITIONS OR ACCIDENTS. 4. CONTRACTOR SHALL INSURE THAT ALL )RAINAGE STRUC11URES, PIPES, ETC. ARE CLEANED OUT AND WORKING PROPERLY AT TIME OF ACCEPTANCE. 5. 6. 7. 8. 9. WIRE MESH SHALL BE LAID OVER THE DROP INLET SO THAT THE WlRE EXITNDS A MINIMUM OF 1 FOOT BEYOND EACH SIDE OF THE INLET SffiUCTURE. HARDWARE CLOTH OR COMPARABLE WIRE MESH WlTH 1 /2- INCH OPENINGS SHALL BE USED. IF MORE THAN ONE STRIP OF MESH IS NECESSARY, THE STRIPS SYALL BE OVERLAPPED. DOT NO. 1 COARSE AGGREGATE SHALL BE PLACED OVER THE WlRf MESH AS INDICATED IN D-903. THE DEPTH OF STONE SHALL BE AT LEAST 12 INCHES OVER THE ENTIRE INLET OPENING. THE STONE SHALL EXTEND BEYOND THE INLET OPEN,NG AT LEAST 18 INCHES ON ALL SIDES. IF THE STONE FILTER BECOMES CLOGGED WlTH SEDIMENT SO THAT IT NO LONGER AOEQUA TEL Y PERFORMS ITS FUNCTION, TI-IE STONES MUST BE PULLED AWAY FROM THE INLET, CLEANED ANO REPLACED. BALES SHALL BE EITHER WlRE-BOUNO OR STRING-TIED WlTH THE BINDINGS ORIENTED AROUND THE SIDES RATHER THAN OVER AND UNDER THE BALES. BALES SHALL BE PLACED LENGTHWISE IN A SINGLE ROW SURROUNDING THE INLET, WITH THE ENDS OF ADJACENT BALES PRESSED TOGETHER. 10. THE FILTER BARRIER SHALL BE ENTRENCHED AND BACKFILLED. A TRENCH SHALL BE EXCAVATED TO A MINIMUM DEPTH OF 8 INCHES. AFTER THE BALES ARE STAKED, THE EXCAVATED SO!L SHALL BE BACKFILLED AND COMPACTED AGAINST THE FILTER BARRIER. 11. EACH BALE SHALL BE SECURELY ANCHORED AND HELD IN PLACE BY AT LEAST TWO STAKES OR RfBARS DRIVEN THROUGH THE BALE. 12. LOOSE STRAW SHOULD BE WEDGED BETWEEN BALES TO PREVENT WATER FROM ENTERING BETWEEN BALES. 13. STRAW BALE BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. 14. CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED BALES, END RUNS AND UNDERCUTTING BENEATH BALES. 15. NECESSARY REPAIRS TO BARRIERS OR REPLACEMENT OF BALES SHALL BE ACCOMPLISHED PROMPTLY. 16. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE STRAW BALE BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 17. SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED IMMED,ATEL Y AFTER EACH RAINFALL AND AT LEAST GAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY 18. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY. THE FABRIC SHALL BE REPLACED PROMPTLY. 19. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH S~ORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY o,~E- THIRD THE HEIGHT OF THE HARRIER 20. ANY SEDIMENT DEPOSITS REMAINING IN PLACE MIER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSEC TO CONFORM WlTH THE EXISTING GRADE. PREPARED ANO SEEDED 21. THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED. 22. SEDIMENT SHALL BE REMOVED AND THE TRAP RfSTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1 /3 THE DESIGN DEPTH OF THE TRAP. REMOVED srnIMEN-,-SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. 23. THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWlNG THE BEST EROSION AND SEDIMENT CONffiOL PRACTICES AS OUTLINED IN THE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL 24. FOR ADDITIONAL INFORMATION ON SEDIMENT AND EROSION CONffiOL REFER TO THE EROSION AND SEDIMENT CONTROi Pl ANNING AND DESIGN MANUAL. 25. EROSION ANO SfDIMf.NT CON fROL BARRIERS S~ALL BE PLACED ADJAC~NT TO ALL WETLAND AREAS WHERE THERE IS POTEN~AL FOR JOWNSTREAM WATER QUALITY DEGRADATION. SEE DETAIL SHFTT FOR TYPICAL CONSTRUCTION. 26. ALL DISTURBED AREAS SHALc BE GRASSED, FERTILIZED, MULCHED AND MAINTAINED UNTIC A PERMANENT VEGETATIVE COVER IS ESTABLISHED. 27. SOD SHALL BE PLACED IN AREAS WHICH MAY REQUIRE IMMEDIATE EROSION PROTECTION TO ENSURE WA ffR QUALIIY ST ANDA RDS AR[ MAINTAINED. 28. ANY DISCHARGE FROM DEWATERING ACTIVITY Sf<ALL BE FILTERED AN) CONVEYED TO THE OUTFALL IN A MANNFR WHICH PREVENTS EROSION AND ffiANSPORTATION OF SUSPENDED SOLIDS ,o THE RECEIVlNG OUTFALL. 29. DEWATERING PUMPS SHALL NOT EXCEED THE CAPACITY OF THAT WHICH REQUIRES A CONSJMPTIVE USE PERMIT 30. ALL DISTURBED AREAS TO BE STABILIZED THROUGH COMPACTION, SILT SCREENS, HAY BALES, AND GRASSING. ALL FL SLOPES 3: 1 OR STEEPER TO RECEIVE STAKED SOLID SOD 31. ALL DEWA TERING, EROSION, AND SEDIMENT CONTROL TO REMAIN IN PLACE AFTER COMPLETION OF CONSffiUCTiON AND REMOVED ONLY WHEN AREAS HAVE STABILIZED. 32. THIS PLAN INDICATES THE MINIMUM EROSION ANO SEDIMENT MEASURES REQUIRED FOR THIS PROJECT THE CONTRACTOR IS RESPONSIBLE FOR MEETING ALL APPLICABLE RULES. REGULATIONS AND WATER QUALITY GUIDELINES ANO MAY NEED TO INSTALL ADDITIONAL CONTROLS. 33. THE CONTRACTOR SHALL BE REQU>RED TO RESPOND TO ALL NCDEHNR INQUIRIES, RELATIVE TO COMPLIANCE OF EROSION AND SEDIMENTATION CONTROL. THE COST OF THIS COMPLIANCE SHALL BE PART OF THE CONTRACT. R \1SIONS BY ATE -Sidewalk _ __,/ 0 Curb & Gutter Anchor Boles With 2 -2· x 2H x 4• Stokes Per Bole. t ' '. -'--_: - - Ditch ,,,,,.-Typl!'! A Or B Fence Note: Bales to be stoked at the direction of the Engineer. PARTIAL INLE' COMPLETED INLET DITCH BOTTOM INLET "--.__ Loose Soil Placed By Shovel And Lightly Compacted Along Upstream Face Of Boles. Limits PROTECTION AROUND INLETS OR SIMILAR STRUCTURES Of Construction~ I il i /Sod lb I ~ Sil ----~ ----J',,.L -~-----I l{:: ':;},I I 50' Max. 50' Mox. I /// /// /// ... --------... ''' -- Sod :~ Di~tl~orT1_!_ri.!e_t_ ---7 ------' 'l-10' (Typ.) --' ---, -" - ' 50' Max. 50' Max. Ditch Cross Drain -~ ... ... /// /// //L 50' Max. 50' Max. ' I Jl;C: :'JI End wall ------------~1 --------~-=- J Sod/ t Barrier t Median Ditch Silt Barrier Silt Barrier I I 'C . L1m1ts Of Construction DITCH INSTALLATIONS AT DRAINAGE STRUCTURES BALES BACKED BY FENCE As Required Anchor Bales With 2 - Stokes Per Bale. .. ~-~.-~ I .-.c_ ; 50' On Centers ( T~. r-~--~I I • • I • • PLAN r x 2" x 4' ~ Overlap Ends ~ ~Fill Slope ELEVATION TO BE USED AT SELECTED SITES WHERE THE NATURAL GROUND SLOPES TOWARD THE TOE OF SLOPE Boles To Butt :i ➔ Flow .~ :1 ➔-Anchor Boles With 2 -r x 2" x 4' Stokes Per Bale. Pl AN Loose Soil Placed By Shovel And lightly 6~. ~Compacted Along The Upstream Edge Of Boles. ql~?~Fill Slope t:.LEVATION TO BE USED AT SELECTED SITE$ WHERE THE NATURAL GROUND SLOPES AWAY FROM THE TOE OF SLOPE BARRIERS FOR FILL SLOPES HAY BALE LOCATION ELEVATION TYPE Ill SILT FENCE Type Ill 01 Type IV Silt Fence N.T.S. SECTION Twe II! Or Type 1V Silt Fence Protection Around Ditch Bottom Inlets. • Do not deploy In o manner that sNt fences will act as a dam across permanent flawing watercai.,rses. Silt fences are to be used at upland locations orid turbidity barriers used at permanent bodies of water SILT FENCE APPLICATIONS SILT FENCE TYPE III N.T.S. ♦ ♦ Twe IV Silt ~ence Note: Silt Flow T)'l)e Ill Silt Fence Spacing for Type Ill &: TYPE IV Fence to be in accordance with Chart 1, Sheet 1 of 3, DOT Index No. 102 and ditch installations ot droinoge structures Sheet 2 of 3, DOT lnde)I No. 102. - ---NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES ,:;; • a ENVIROMENTAL, INC. DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Environmental Consultants arnes, Ferland and Associates, Inc. r· -- • ! : Silt Flow Anchor Bales With 2 -2" lC 2" K 4' Stokes Per Bole. Sod PLAN Roll ELEVATION Sod Post -loose Soil Placed By Shovel And Lightly Compacted Along Upstream Edge Of Boles. 1' Min. Recommended Spacing: Bale barriers for paved ditches should be spaced in occon:kmce with Chart], Sh~t 1 of 3, lnde• No. 102 5' Min. - Roil _.,,..----Woven Filter i=-obric In Absence Of Established Grass (Approx. 12' x 12'). Secure Edges By Entrenching And Extend Under Bogs and Boles. Fobrlc Sholl Meet The Requirements Of Section 985 Of The Standard Specifications. Cost Of Fabric To Be Included In The Contract lump Sum Price For Erosion & Sediment Control, . . . . . . . . . . . . . . . . PLAN --.oose Soil Placed By Shovel And lightly ::01Tipocted Along The Upstream Edge Of Boles. PLAN BARRIER FOR Loose Soil Placed By Shawl And lightly Compacted Along The Upstream Edge Of Boles. Anchor Lower Boles With 2 -2" x 2• x 4' Stakes Per Bole. Anchor Top Bales To lower Boles With 2 -2" )( 2" )( 4• Stokes Per Bale. ELEVATION AnchOf' Boles With 2 -r x 2· )( 4' Stokes Per Bale ELEVATION Application and Spacing: The use of T)1)es I & II bale barriers should be limited to the conditions outlined in_ Chart I, Sheet t of 3, Index No_ 102 TYPF II TYPE BA.RRIER FOR UNPAVED DITCHES HAY BALE BARRIERS TYPE I & II N.T.S. PAVED DRAWING INFORMATION PRO.ECTNO.: 99001 DITCH DATE DR/\1"1NG NO. SEDIMENTATION & EROSION CONTROL DETAILS DESIGNED BY: CEH ER-2 DRA'IIN BY: WKP TWC 2/03/00 CHEa<ED BY: PAB SHT. 30 Of 45 DRAYl1NG FIi.£: 99001ER2 SCALE: AS SHOWN NO. _____,r--- IJIRE SCREEN L CURB !NL.ff_~~ -==----;L ~ ,,------ I/ I /~ - 0 I~ I L G~AVEL ~ JL TER r tIL TERED 'w'ATER SEDIMENT _; RUNOFF VIRE SCREEN 2'x4• w'□□D STUD _J \_ CURB INLET SPECIF IC APPLICATION THIS METHOD or INLET PROTECTIJN IS APPLICABLE A~ CURB [NLfTS: '.'HERE AN OV[RtLD\J CAPAB:L lTY JS 1>,1[CESSARY TO PREVENT [XCESSIV[ PONDING IN FRONT OF TY[ STRUCTURE_. BLOCK & GRAVEL CURB INLET SEDIMENT FILTER N.T.S CURB INLET WATER\ ~- ... ;1 SEDIMENT ___) • I CONCRETE GUTTER __J •• \\__ CLRB INLET SPEC:FIC APPLICATION THIS METHOD OF INLET PROT:::CTlON 'S APPLICABLE AT CURB INLETS 'M-IERE PONOlt.G It-. FRONT OF "l-lE STRUCnJR[ IS NOT !..IKE::l Y 10 CAL~t. INCONVENIENCE OR JAMAGE TO AD.,ACENT STRLCTURES AND LNPfWlt.CJL; ARE.AS GRAVFI CURR :NI FT SED:MENT FILTER 18' MIN -- GRAVtL (12" MIN. OEPTrl) RUNOFF WA TFR I "'1TH SEDIMENT SEDIMENT FIL TER~J WAllR WIRF MFSH WITI-- FILTER FABRIC SPECIFIC APPUCA TION THIS METHOD OF INLET PROTECTION IS APPUCABL£ WHERE HEAVY CONCEN- TRATEO FLOWS ARE E)(P[CTE:D, BUT NOT 'M-IERE PONDING AROUND TI-ff STRUCnJRE MIGHT CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. GRAVEL AND WIRE MESH DROP INLET SEDIMENT FILTER GRAVEL INLET SEDIMENT TRAP N.T.S. REVISIONS BY DATE - - - -,r: j \a ENVIROMENTAL, INC. ""' ~ WIRE SCREEN , CONCRETE BLOCK \ FILTERED WATER RUNOFF \ WATER~ f\3° SEDIMENT \\._0 ~ . . .. . . DROP INLET WITH GRATE 0 0 0 0 0 • ... ~-SEDIMENT SPECIFIC APPLICATION THIS ME"fl-,OD Of INLET PR01'ECTION IS APPLICABLE WHERE: HEAVY FLOWS ARE EXPECTED AND WHE~[ AN OVERFLOW CAPAClTY IS NECESSARY TO PREVENT EXCESSl\/E PONDING AROUND THE STRUCTURE. BLOCK & GRAVEL DROP INLET SEDIMENT FILTER N.T.S. / DROP INLET / 'w'ITH GRATE... ~ STAKLD STRA\./ BALE __,' COMPA CTED SOIL - 0 TO PRE VENT PIPING 0 0 -I \Ill" 11111 ~ FH.TERED 0 -RUNOFF \JATERTl -\JITH SE DIMENT ' \./ATER I 11\1 I 11\11 -~~ I) I I I I\ I I\ I I 11 • ' 11111 111111 ~>-J . . . . . . 0 . STRAW BALC:S STAKED \./ITH 2 s~AKES PER BALE HAY BALE SEDIMENT FILTER ... SPECIFIC APPLICATION lHIS ~ETHOD OF INLCT PROTECTIOO IS APPLICABlE Yil-lERE THE INlET DRAINS A RElA TI.-El Y FlAT AREA (SLOPt.S NO GR[A TER THAN 5 PERCENT ) 'M-lffiE SHEET OR 0\/ERL-'ND FLOWS (NOT EXCEEOING 0.5 cfa) ARE TYPICAL. THE METHOD SHAI...L NOT APPLY TO INLfTS RECEIVING CONCENTRATED FLOWS. SUOl AS IN STREET OR HIGl-'WAY MEDIANS. ~ _) STAKES ---11 BURLAP FA BRIC ----l RJNOFF \JAT[R \JITH SE;MEN~ BURIED BURLAP FABRIC FABRIC SEDIMENT FILTER SPECIFIC APPLICATION THIS t,jETHOO Of INLET PROTEClTON IS APPLICABLE 'M-!ERE THE INlET . .. . . . . ... DRAINS A RELATI'vt:LY n...AT AREA (SLOPES NO GREATER THAN 5 PE:RCENT) IM--IER[ SHITT OR ~LAND fl.OWS (NOT EXCEEDING 0.5 ch) ARE TYPICAL TI-IE METHOD SHAU NOT APPLY TO tNL£l'3 RECEIVING CONCENTRATED FlOWS. SUCH AS !N STREET OR HIGHWAY MEDIANS. DROP INLET SEDIMENT TRAP N.T.S. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT :-< C -~ ~ a. 0 V1 NOTr: 7 I--'------+----+- Spocings ,hown in thl!!! chart or@ ore based on generalized conditions and should be ad),Jsted based on actual site performance or hydroulic computations. Fl.OW RATES {CFS) 4 3 50 100 -0 ~\, <Jc '"• LEGENO "·· Solle Very ~t Light < 5 > S < 10 Moderat11 > 10 < 15 Heavy > 15 < 25 Vory H!!Ovy > 25 < 40 ___ _j SOILS Cohesive Non Cohtslv. Firm loom Cloy Sori!UI "°'" Har~a Fine Sand Course Sond Gra"8hl ----, SQndy L..oom SRt loom 15D 200 25D 350 400 Spo.cing (In Feet) CHART I RECOMkolENOED SPACING FOR TYPE I AND TYPE II HA.Y BALE BARRIERS, AND TYPE Ill ANO TYPE IV SILT FENCES AND PAVED DITCH HAY BALE BARRIERS SPACING RECOMMENDATION FOR SILT FENCES & HAY BALES N.T.S. 1. S£T POSTS ANO EXCAVATE A 4•x4• TRENCH UPSLOPE AlONG THE LINE Of POSTS 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND lT INTO THE TRENCH 2. Sl .a.PU: WIRE H.NCiNC TO THE POSTS. 4. BACKFILL ANO CCMPACT Tl-ff EXCAVATED SOIL FILTER FABRIC EXTENSION OF FABRIC AND ~]RE (NT□ THE TRENCH. CONSTRUCTION DETAILS FOR SILT FENCES N.T.S. 1. SET THE STAKES. 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. PLAN ELEVATION 2. EXCAVATE A 4"x4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. CONSTRUCTION OF A FILTER BARRIER FLO\J POINTS A SHOULD BE HIGHER THAN B A PROPER PLACEMENT OF A FILTER BARRIER IN A DRAINAGE WAY FILTER BARRIER CONSTRUCTION DETAIL 'I, T .S. Binding 'wire--, or Twine Filtered Runo Lntr--encE>d CROSS-SECTION OF A PROPERLY INSTALLED STRAW BALE STAKED HAY BALE N.TS. CoMpo.cted Soll to Prevent Piping Sed;Mo.nt Lo.den Runoff DRAWING INFORMATION PRO..ECT NO.: 99001 ~ Environmental Consultants Barnes, Ferland and Associates, Inc. SEDIMENTATION & EROSION CONTROL DETAILS DESIGNED BY: CEH DRAWi'! BY: WKP CHECl(EI) BY: PAB DRAWING Fll.£: 99001ER3 -i---' - DATE DRAWING NO. ER-3 2/03/00 SCALE: NONE SHT.~OF~ NO. REVISIONS BY DA " I - ---,r:jg ENVIROMENTAL, INC. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT 3: 1 Slope or Flatter 2' Min. -Compacted Soil R:/ {½~5; ~~~'ib'ib~§f>ft§J:/fb5 ~'ib~%~~ I cut or fill slope 4.5' Min. TEMPORARY DIVERSION DIKE DIVERSION DIKE N.T.S. 2. PLACE AND STAKE STRAW BALES. 1. EXCAVATE THE TRENCH. J. WEDGE LOOSE STRAW 8ET\lt£EN BALES. 4. BACKFILL AND COtrdPACT THE EXCAVATED SOIL. CONSTRUCTION OF A HAY BALE BARRIER. POINTS A SHOULD BE HIGHER THAN POINT 8 PROPER PLACEMENT OF HAY BALE BARRIER IN DRAINAGE WAY HAY BALE BARRIER CONSTRUCTION DETAILS N.T.S. SILT FENCE W/ HAY BALES TO BE IN PLACE UNTIL THE COl.lPLETION OF THE PROJECT. OUTLET PROTECTION N.T.S. DRAWING INFORMATION PRO.ECT NO.: 0 DAlE HFA Environmental Consultants , Barnes, Ferland and Associates, Inc. SEDIMENTATION & EROSION CONTROL DETAILS DESIGNED BY: CEH DRA~ BY: WKP TWC 2/03/00 CHECKED BY: PAB DRA!MNG FILE: 99001ER4 SCALE: AS SHOWN -----,~ ,' ~--,;,- ., < ' / l . • • S '-,,, ·•.·. ' t, •,i i.) ': ,; ' ' ' i DRAWING NO. ER-4 SHT. 32 OF 45 • / / / / I I / / / I I I I I I I ,/ I ' / _.,('_ / I I I r I I I I I I I I I I / I I I / / I I ' / / I I I I / /. I I / I ,' "-! I • I I / I REVEGEl)ffE ALL DISTU~~ AREAS ,, I / / / I I I I I I I I I I I 1 , I I I I I I ' I r I I ' 1 I I I I I I I I I I I I I I I I I I , .I / / I / I I I I I I , ..r---", .--r- I I ,,,.,. I I / I I I I I / I I I ' I I I I ' r I I I I ' I I I I ' I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ,_ I I ;. ) I r ( I / I I I I I I I I I I I I , I / I I A ~-l ' I ' I ' ' ' ' I , r ' I I I I I I ' l 1' \ I ' ,' ' \ ~·~ W- -~,,. \ I I / , \ / I , ,/ / / I ' \ \ \ / \ \ \ \ \ \ ' ' ' \ I • \ ' \ ' ' ' ,) CONCRETE MITTERED / ,✓' END SECTION .,_ I r I I REMOVE ACCESS RAMP AND TRUCK SCALE ' \ \ ' ___.,_.,..._-----------326---~~ \ \ \ \ -----~--------324'""7'::=-,,-.::.;:X \ \ ----- REMOVE AND DISPOSE ',, OF LINER -:-----.....__ ', ----\ \ \ \ ', SC~RfF'Y-..SQTTOM OF --------322------ ------320---c-,-__ --- .. -______ ,3.18-' ---- -----316 ---,,,-..,,:: / -------314-'--__.313-·--·-.,,.,.,,,,-_ _ ___ ,Tef"-314 --. ..,--TOP 314--..... BOTTOM 306 ',, POND -~'-sa-c--------1~+----+1++----+-+-~ NEW LJNffi \ ', I ··· --·f"OND I -- SOD TOP-OF-BERM I INSTALL CONCRETE ---AND INSIDE SLOPE_____ I MllJERED-SEC-TION OF'B£1t~-~---=-:--\~------_-_--_-.L.-1· ----_· -, 06 BOTTOM ·,,_ .,,,. T-\---\-~----------...--- -----------.. /' , . " ' /-.......... . ' \ \ Top-1-,...-~ lOP-+-- -=.:._----,,,.,:--312 .--+--~ ----310--+--- --------------------~ ---------------\ , ' I \ I \ I I \ \ ' I \ I I I ' I I I I ' I I ' I ' I 30"RCP \ '· REVISIONS BY DAT i= I \:i ENVIROMENTAL, INC. --- _ MAJERJAL .P-RE-12ARA TION --~ AREA -- ,._-, g~R~DE I f · REMOVE ', STORM WATER ',, TREATMENT ~YSTEM 30"RCP.. @ --..... ....._ ............ \ ' -..... \ ,,_ -, NOTE: SEE DRAWING C-6 FOR, STO~M SEWER '~ROFILE ' I I ' I ' I \ \ 24"RCP\ ·c ' ', INLEl\ TOP=326.0 .8_,.,.,_. ' ' ' ' \ ' ' \ I \ I ... _____________ , I I I I ,t I I , ----·' 7-~---------~C 7 - 328-.o • •32s · .o 328.o•-', PRE-ENGINEERED . ..i,· BARN I B" WIDE CURB TYP, ~ DOUBLE INLET TOP=327.0 , , . nn ___ :::::"-<r-''"'-----:.--~._,..-------RRQCESSI NQ : . -------I AREA : f¾;SAPT AREA ! I I ------ 32a.o• MATERIAL ~ i~~- .......-----~ I 328.0 • NLET TOP=326.0 ' ' ...._____. D \ ® I : c.o. I I ---ct-- .327.6 327,6 I ~----=---=~e7~ REMOVE \ ' \ • \ ',, 324. 75 • ' ', UTILITY --~~"' ---- ----- ------ FLOOR DRAIN TYP. .Ll--=-MlN.}-------- _____ ,,-16' WIDE ACCESS ROAD • 324,50 __ / t---JOB ,, ________ _ _::.~,,--~-~'----',-1.-----,;--------'-----'-'lR.;;_A;;;;;ILE;;;;;R.,;,;S;__ ______ ..,...._324 ------/18~ 1 CMP ":,,..._. ___ ...,.,. _ _.,;._;_:~=--.:._--------------'---322----------------322 -------!!----~' ~-''.:..1-1 ----.i.'1-1-----.:.\ _________________ ;,._ __ 320 -----------------_.,,_ .... -... ------....,,,...._-__ -_--,320--tt-- \ I -----..... ..._'"",,-----¥i,----...;',..., ...,,.-------'-----,------318 ------31 ~-----------""-""'_.,..._ ________ __,IN""V..,.--=3--15""~".:'"5..,...---,,,. ' , \ ---------------~.,---316 ---=--=c.:-c:;-_--_______ 315 ................... .................... " \ -- ----, _ "~ .... , ....::::...-.... _ _ ___ --:--7i--___ Sf~-__ .. ___ . __ . __ -_;,._._--.::.... ..... -_ •~ ~'~ ,-)-~-~-~--,_ P~U~:"-; 'c'A~---"-~J~--r1 -,~ , ~~---~-•-~~-=-~~~-=-~~j' ~-~~-1_-----t"1-r.;;.-1.-:.t • _ • , ~-....... t 1 __ "' --EXISTING 4"'FM._ ___ _ ____ , REMOVE OVERFLOW TO ',,__ 'AfJER REMOVAL ---------,... . SILT FENCE REMAIN--~ OF STOBMWA TER TREA TMOO-SYSID,,i _ __ ,---------~ ---------------------- -------------------------- --318 __ ......,__, ' . \ ' I -I I I -I I I'~ I I I ----.. ", \ ' \ \ ',, REMOVE STAKE'.11 ,,/ ',, HAY BALES ',/ i ' I ' I I I ', I ' I , r, , . NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ' ~ Environmental Consultants Barnes, Ferland and Associates, Inc. POST DETOXIFICATION SITE DEMOLITION AND RESTORATION PLAN . . ',.• .. '~. . -----' \ ' \ .... ----...__ . \ ............. ...,_ ,.._ I '-. . -...I I ,,✓ •. I ,, ----~ '.; ,-,' I •I ,,,. f . I I r. I .,. -.__ I ,· \ ... -...:_., ' ~-\ I I I I I \ I I \ , I C ,,\ ·,,-,J \ .~ \ . ~ . . \ . _____.. . ' . \. ___ ,.;: ...... 1.-1 I -1\1 _""!' ___ 7 I \ ". / I \ -, r I r I I ,·./ / ( / / / i I I I I I I I I J I I I I I I I I I I I I I I I I I I I I I I ' I I I I I I I I I I I I I I I I ~/ \ ' I , I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ' I I ', : . . . ~~ ' \' I \I I II I 1 I ,, ,-, I , r ' I I I I \ \ I I INLET \ , TOP=327.0 /\ ~! I ' ' I i r MOUNTAB CURB ' ' \ I I I I I I I \ I I I I I 11 11 /.,,,. I I // I , / I / I t / / I ~,1 ; I / J • : / : L. ' I . f I ,✓ I . I I I I I +,,vv+:: I J I I I I (, I l 1 1 I I I I t .., I ! ! . I I I I I I I I I I I I J I I I I I t I \ I I \ I / I I I I I \ \ ' I : \. I I ' I \ \ ' I I I I \ ' \ ' ' / / / \ I I \ II \ \ \ \ I . . \ \ ··· :REGRADE \ \ STABl~'.ZIZEfTO~~ILE \ I \ ' .L •• \ 1' 'T""V V V--1 l I I I I I I I I I 1 I I I I I I J \ / , \ __ ,, I I I I I I ' I I I I I I .,___~REMOVE \ STABILIZED I ROAD ' I I I \ I ' \ \ I I \ / I I I I I ' ' . I I , I \ \ \ \ ' I .\ \ . \ \ ' ' ' ' \ ' ' ' .. ' ' ,...+--~ DRAWING IHF'ORMATIOH PRO.ECT NO.: 99001 DESIGNED BY: CEH DRA~ BY: WKP OIECKED BY: P AB " I I \ ' \ \ \ \ \ \ \ ' \ DATE 2/03/00 DRAllrlNG FILE: 99001ER1 SCALE: 1 =30 \ \',, , __ --- : /- ', ' --- r· r., I ' . ·t'\ I I I I I I , ' I I I I I ', I \ I I I I \ I. ',, ................ I DRAllrlNG NO, R-1 NO. CERTIFIED TRUCK SCALE ____,,~ 6" 6" CURB MOUNTABLE CURB ---~ EXCAVATED STOCK PILE AREA MATERIAL PREPARATION AREA ~STORM WATER TREATMENT SYSTEM CONCRETE STRUCTURAL NOTES: ASPHALT b I . . • • .. d • . • • .. . 1 /2" PREMOLDED JOINT FILLER CONCRETE SLAB • . • • . • • • • •• • . • • 1 • ]6" . • • • CURB SECTION IN CONCRETE AREAS SCALE: N.T.S. REVISIONS BY DATE i:: 11:i I I I I I I I . BLE~DED STOCKPILE PRE-ENGINEERED BARN TREATED MATERIAL ARtA PROCESSING AREA i----MOUNTABLE CURB (BBCD AND CBCD) PRE-ENGINEERED ~-PRECAST .. CONCRETE . . . • TEMPORARY> BARRIER WALLS~~- METAL BUILDING\ . . · . ',--\_ -----7 PROCESSING AREA . (LBCD) .· STORMWATER STRUCTURES (TYP.) l!) ") I I PCSAPT AREA I I I _,______~ ----- - - I ,a· . PI.AN -WORKING, STORAGE AND EQUIPMENT AREA 0 1 O' 20' 40' TREATED MATERIAL STORAGE AREA ~'-"W-PRECAST . 60' .. CONCRETE TEMPORARY BARRIER WALLS - - NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT ----GRAPHIC SCALE: 1"= 20'-0" CONCRETE CURB ASPHALT .. CURB SECTION IN ASPHALT AREAS SCALE: N.T.S. 3/4" R 7-1/2" STD. fi' MIN.--, 1 '-6" g• 3/4" R , .. 4 .:i .. . . . . . . . . .. .. .. 3/4" R MOUNTABLE CURB DETAIL SCALE: N.T.S. DRAWING INFORMATION PROJECT NO.: 99001 STRUCTURAL -PLAN , SECTIONS & DETAILS DESIGNED BY: CEH OR,_l!IN BY: DATE ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT l$ EA Environmental Consultants '/3arnes, Ferland and Associates, Inc. a!ECKED BY: WKP TWC 2/03/00 PAB Off" 'MNG FIi.£: 99001S1 SCALE: 1 =20 OR,__G NO. S-1 SHT. 3401' 45 NO. & & ' & & "" ---ACCESS DOOR WITH WINDOW ---------' ~ _ __,_ ___ - ss·-o· i----4·-o·x s·-o· LOUVER 12 I 1 RAINFALL COLLECTOR W/DOWNSPOUT i----------------------------------1--------------------------------l (TYP. OF 3) \ ~--12' WIDE x 12' HIGH COIUNG DOOR (COORDINATE LOCATION W/ EQUIPMENT LAYOUT) i----4'-0"x a·-o· LOUVER • 0 I IO I') FLOOR PL.AN SCALE: 1/4"=1'-0" J' -0• X 7'-Q" ACCESS DOOR WITH WITH WINDOW--~ i----12' WIDE x 12' HIGH COIUNG DOOR (COORDINATE LOCATION W/ EQUIPMENT LAYOUT) RAINFALL COLLECTOR W/DOWNSPOUT (TYP. OF 3)\ 4•-o·x e·-o· LOUVER I I I I • ' 0 \ » ~~~~!::!::::"::=~~===~====~~~:::==!::::!::!::!::=~~~ \ \_ \-ACCESS DOOR WITH 12' WIDE x 12' HIGH COILING DOOR ~ 0 WINDOW (COORDINATE LOCATION W/ EQUIPMENT LAYOUT) NORTH ELEVATION SCALE: 1/4"=1'-0" 12 11 •----1>-tt++H--4•-o·x s·-o· LOUVER ~::!:::!::::!:::!:::!::=~::!:::!::::!:::!:::!::=!::!::::!::!~:!::!:::!::~~====~~===~~===::'=!=~::!:!::!====~~~=:!:=~~=:!:=~~=:!:=~~::!::!::!:=:!:=~::!::!::!:=:!:=~=l=:====!:::!::!::!=!;:'--'.::]~ -----'----~----6 -_/~-=,' \~~~:!::======i===~~~~~ L_ ACCESS DOOR WITH \_ REVISIONS BY DATE --------=• \:I WEST ELEVATION SCALE: 1/4"=1'-0" NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT ENVIROMENTAL, INC. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT I HFA Environmental Consultants Barnes, Ferland and Associates, Inc. . . ·,• ' WlNDOW 12' WlDE x 12' HIGH COILING DOOR (COORDINATE LOCATION W/ EQUIPMENT LAYOUT) PCSAPT PROCESS BUILDING PRE-ENGINEERED METAL BUILDING PLAN AND ELEVATIONS SOUTH ELEVATION SCALE: 1/4"=1'-0" DRAWING INFORMATION PRO..ECT NO.: 99001 DESIGNm BY: CEH DRAIIN BY: WKP/TWC CHECKED BY: PAB DRAWING F1lE; DATE DRAWING NO. 2/03/00 S-2 SCALE: AS SHOWN SHT.~ 45 -- NO. LOCATE COLUMNS AS REQUIRED TO CLEAR EQUIPMENT (INCLUDING MAINTENANCE CLEARANCE) 10" • CONCRETE FILLED SCH. 40 / STEEL PIPE BOLLARDS AT EACH COLUMN o,rri-'---,------r----------------'-'i::n' ,~ ~o "'----..--- c Ho C o REVISIONS ' 0 I "' N ~ BY 100·-o· FLOOR PLAN St-:AIF: 1/16"=1'-0"' DATE - -- -- -a;;; I \ii ENVIROMENTAL, INC. 0 D OH 0 ,,-, :-!; }~:. ' 0 O' · OH 0 u 0 RAINFALL COLLECTOR W/DOYINSPOUT (TYP. Of 3) NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 1 DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT END ELEVATION SCALE: 1 /1611 =1 1-011 BF A. Environmental Consultants , Barnes, Ferland and Associates, Inc. ..--,---·-. . ' ',, ' ' ,,, ;,: ,· ·l ·,, ', ; I . ~ n WORKING AREA PRE-ENGINEERED BARN PLAN AND ELEVATIONS I I I I I I I I I 1 1 12 11 I I I I ~ LU I I I I 0 z I I I I iii ~ z I I I I ~ I I I I e-' ~ ... I I I "" I N < I 1 1 I I r I! n I N ci ~ 10" • CONCRETE FILLED SCH. 40 STEEL PIPE BOLLARDS AT EACH COLUMN SIDE ELEVATION SCALE: 1/16"=1'-0" DRAWING INFORMATION DATE ORAIIING NO. --. PRo.ECT HO.: 99001 OESIGN£0 BY: CEH S-3 ORAIIN BY: WKP/TWC 2/03/00 CHECKED BY: PAB SHT. 36 Of 45 DRAIIING Fll.E: SCALE: AS SHOWN o~---c------------o--·----~-------0----0---0---+--o tXIS l ING f'Ot,U / ~------- 0 0 I 0 0 -------- -PROF·OSED CHAIN u~~L< ~f',JCE 0 0 I 0 0 0 \ \ ; • \ \ ' ' ' I EM J consulting specialties, inc. ELECTRICAL-MECHANICAL-INSTRUMENTATION (407) 359-0747 NO. REVISIONS BY DA NEW LINED POND STORMWATER DUMP STA .. L r -r.-.,,. i 01 CJ 0 ' L.Ji : i ,q-i N, I'-i ~· Di C1) ' z I --- -a;:ju, ENVIROMENTAL, INC. S 09"12'36" E EXISTING CHAIN LINK F£1vCE TO REMAIN 560.00' o----o----o-------<o-----o-------<>-----0--,---0 0 "·,,., ____ _ I i I I ---·------APF'ROXIMA.TE I EDGE er LiN[R I I I 16' WIDE HAUL ROAD FOR CLEAN MATERIAL HAUL ROAD CONSTRUCTED/ IN PHASES ------ EXISTING LANDFILL 0 0 l-,::'__~-===================:yt(J==========================="-~\ 560.00' B B B 0 0 0 -st N r--- ;st" 0 co (/) I I I , I i . I TYPE ',9' / POLE/~ID / , I ' . STABILIZED STOCr;PILE AREA --HAUL ROAD FOR TREATED MATERIAL PROPOSED CHAIN LINK FENCE----, Mf\ fLRl1'1l PREP/,RA.[IUN ARE.A _r STORM WATER / [8EATME~JT SYSTEM 3#10-3/4" T Bl.ENDED STOCKPILE AREA 3#10-3/4" TO C2 PROCESSiNG f\f?EA (BBCD AND CBCD} PRE-ENGINEERi::.D M(TAL BUILD:NG r7n PROCESSING AR A LBCD PCSAPT AREA TREA 'ED i Mt,Tf;f3J-6lo- STOR/\Gt:_ i £;RE/, ■ [g] B B ---------'~'--=-=<==~B--_ ~-'I r JOl3 TR A,iLERS • /} I/; JOB TRAILERS 1 '250W '\,\ TD. ~ 'Sa ( / -________________ ___:_:N.::_EW::....:::.SW:.:,:A.:.:::L.:::.E..:.:A::.::RE:::..A:__ _____ --;;;;;:;;---------IL--\ / EXIST. PROPERTY LINE / · .. ·-----&·-)-,,---· ·-· ·-· ---0 -·----------&-----·--------~-.L-'---~-----------0 N09"10'45"W 1076.00' EXIST. ACCESS ROAD 0 15' 30' 60' 111•'rJ.•~•il•2•~~~~~I c-.----90' 0 0 0 N 00 r--- 0) ~ 0 00 (/) GRAPHIC SCALE: 1'' = 30' NOT FOR CONSTRUCTION PURPOSES NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT T I " ~ Environmental Consultants Barnes, Ferland and Associates, Inc. ELECTRICAL -SITE PLAN DRAWING INFORMATION DATE DRA'MNG NO. PRo.£CT NO.: 99 01 DESIGNED BY: WCH E-1 DRAIIN BY: JMK JAN. 2000 CHE0<EO BY: WCH SHT. 37 OF 45 DRA'MNG FIL£: 99001C3 SCALE: AS SHOWN ' ' • 0 I C, (") ' " i I I ' • C, I ' v , - f-- □ I L_ LUMINAIRE, ONE PIECE DIE CAST ALUM. HOUSING 250"1 HPS TYPE IIL BRONZE FINISH, C\,/AT HPF BALLAST, ANODIZED ALUM. REFLECTOR, UL "1ET LOCATION, GASKETED JPL -42.3-P-5-2-R-CG-6R 277V DR EQUIVALENT / FIBERGLASS TAPPERED ROUND POLE, DARK BRONZE SMOOTH FINISH, IOOMPH \,// 1.3 GUST FACTOR, CAST ALUM. HANDHOLE ALUM. ANCHOR BASE AS MANF, BY VHATLEY DR EQUIVALENT _____,.,~--HANDH□LE --------~ • 0 I (\I LJ /OMPACT -1 I I lill 1111 1111 STRUCTURE LIGHTING ST AND ARD TYPE A N.T.S. EMJ consulting specialties, inc. ELECTRICAL-MECHANICAL-INSTRUMENT ATJON (407) 359-0747 NO. REVISIONS BY DATE - -- -,:;; j \a ENVIROMENTAL, 1NC. •• - T ,. -◄ 1000"1 HPS 7X7 FLOODLIGHT, SUITABLE FOR "1ET LOCATION, DIE-CAST HOUSING, SEALED, GASKETED, ACTIVATED CHARCOAL FILTER, AIMING DEGREE INDICATOR, MAG-REG BALLAST-277V GE-HLX PO\,/ER FLOOD OR EQUAL -----~~--~ ALUM. BRACKET FOR D \ • j 0 TENON MOUNTING _____ _,, 40FT. CLASS III --"10□D -------- ------------------- T lllll TTl-11 111 l=I' i D \ • j a 111111~11=- I I I . -I I 12'-0' SHUNT TRIP PER ___ _ LOCAL CODES ----~ 2000A, 3P MAIN BKR 65KAIC RATED, GFR SHUNT TRIP IN NEMA 3R ENCLOSURE #4/0 GND TO (4)-5/8"x10' COPPER WELD GND ROD-----------_ 10FT APART METER AS DIRECTED BY LOCAL UTILITY ----~----- UTILITY PAD MTD. _,, TRANSFORMER ___ __,.,- 277 / 480V, 311l, 4W -- I 0 ST I MB ' ~v---'-, ~----(6)-4" W/3-500KCMIL, 1#4/0N & 1#4/0 GND EA. 2000A, 277 / 480V, 311l, 4W PANEL P1, 65KAIC RATED ~ ___ INDOOR, COPPER BUS, FULL NEU. SQ-D I-LINE, PROVIDE: ( 1 )-3P, 1600A (ATS) (12)-3P, 225A (SPACES) CONC. PAD AS DIRECTED_~/ BY LOCAL UTILITY ~ 1 (4)-4"PVC W/ 3-600KCMIL (6)-4" PVC W/3-600KCMIL _____ _,,/ /,..-------------& 1#4/0N, 1#4/0 GND EA. & 1#4/0N EA. (4)-4"PVC W/ 3-600KCMIL & 1 #4/0N, 1 #4/0 GND EA. '\ 277 / 480V, 311l, 4W GENSET ---------'--------------J A T s r----ST 900KW/1125KVA ~n CPf--------.,-------------l ..,L-,-J #4/0 GND TO (4)-5/8"x10' COPPER WELD GND ROD 1 OFT APART ___ _,, ..--..---..-/·..-- _..- ~------1600, 277/480V, 311l, 4W, MLO PANEL EP, 65KAIC RATED INDOOR, COPPER BUS, FULL NEU. SQ-D I-LINE PROVIDE: (16)-3P, 1 OOA (SPARES) (1 )-3P, 1 OOA (PNL L 1) WIRE FOR GENSET _ _,, MFR ..-~_..-.,---..--..- / 3#2-1" -- ~ 75KVA, 480-120/208V, 3l1l 11/,,l-----_L_-~ LIGHTING TRANSFORMER 1/, ~ ~- 1600A, 4P AUTOMATIC _______,...,.,- TRANSFER SWITCH INDOOR UL 1006 RATED (4)-4"PVC W/ 3-600KCMIL & 1 #4/0N, 1 #4/0 GND EA. POWER RISER 16'X16' CONC BOX VITH CAST IRON TRAFFIC COVER AND OPEN BOTTOM~ I 18' 24' ~- [\ /If-------------, i-------4#4/0, 1 #4GND-2" / GRADE PANEL L 1 225A, 120/208V, ---..___311l, 4W, 42CIR, 225A, 3P MB, NEMA 1, PROVIDE: (42)-1P, 20A (SPARES) EXOTHERMIC VELD BY CALD\,/ELD OR EQUAL 8'111 CLAY SOIL PIPE FILL VITH CRUSHED ROCK .,-..----5/S'DIA X 20FT ~ C□PPER'w'ELD GND ROD SERVICE GROUND ROD AND WELL N.T.S. STRUCTURE LIGHTING STANDARD TYPE B N.T.S. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT BFA Environmental Consultants Barnes, Ferland and Associates, Inc. ELECTRICAL -POWER RISER NOT FOR CONSTRUCTION PURPOSES DRA'MNG INFORMATION DAlE DRAIMNG NO. PROJECT NO.: 99001 DESIGNED BY: WCH E-2 DRAM,J BY: JMK JAN. 2000 CHECKED BY: WCH SHT.~ 45 DRAIIING FILE: 99001C3 SCALE: AS SHOWN • NO. L}; / / / / / / / I I t I EXISTING LANDFILL I I I I I I ........_ ........_ ........_ " ........_ " ........_ l(. _ -. -.. -.. -.. -.. -.. -.. -.. -.. -.. -.. -.. -.. -.. -.. -.. -. ·.---: .. -:-.. -.. " . . . -.. -.. -.. -.. -.. -.. --. -.. -.. -.. -.. -.. -.. -.. -.. ---: :-J 0 I :J 16' WIDE HAUL ROAD FOR CONTAMINATED MATERIAL ACCESS RAMP STORMWATER TR~TMENT SY TEM ~--CERTIFIED TRUCK SCA! E OVERSIZE n DEBRIS 0 MAGNET EXCAVATED STOCK PILE AREA ~ SCREEN MATERIAL PREPARATION AREA CONVEYOR CARBON 0 0 SAND FlLTERS D HOPPER u DECON AREA SILO XITR CONVEYOR • 3"FM --------,t:'.= ___________ __ JOB TRAILERS REVISIONS BY DATE -- --,r;:jg ENVIROMENTAL, INC. ' -. PRE-ENGINEERED i BARN ' CBCD DESORBER FEED HOPPER AND C8Cll TWIN SCREW tEIDER CBCO all7 SWEEP GAS RECYa..E ~JTION 7,1-' C8Cll DESOOBER BBCO m:o i-la'PER 0 HOTCl'tl.ONE SCREW @(§) ' CONDENSER/VACUUM BBCD DISCHARGE COOLING SCREW--i PUMP UTILITY AREA 15,!l!)O ~ALLON ,uEL TANK COMMOO >11,EA CRUSHED ONE OllilR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NA TUR AL RESOURCES ---+1-,caco DISCHARGE SCREW STE~ s<i~~ WORKING AREA ,~..JTACKING I STOCK PILE \ ~ffi ~Gf1C CAUSTIC TANK t:SCO. REACTOR .OT EXCHANGER7 lill1E:. PRE-ENGINEERED MtJAL BUll:DING L SANO Fll.ltR COODENSERS/\!ArulM PUMP/CONDENSATE TANKS ALL ON ONE.SKID CATALYST TANK TREATED at TANK 16' l\40£ ACCESS ROAD DIVISION Of WASTE MANAGEMENT BFA Environmental Consultants WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Barnes, Ferland and Associates, Inc. I • .,,-I • l TREATED MATERIAL LBCO COOlROI..S TREATED MATERIAL STORAGE ~ BCD DETOXIFICATION EQUIPMENT LAYOUT JOB TRAILERS ,---i- ,; ' STABILIZED STOCKPILE AREA . ~ "-.-:~ '",j_ :.-:, .t:' o 1 o· . 20· 40• 60' ' --~-~-~-~-'1~~~~1 --~ r••••• . GRAPHIC SCALE: 1"= 20' DRAWING INFORMATION DATE DRAIIING NO. PRO.ECT NO.: 9 0 1 PFD-200 DESIGNED BY: CEH ORA'IIN BY: TWC 2/03/00 CHEa<ED BY: PAB SHT.~OF~ DRAWING F1lE: PFD-200 SCALE: , .. "" o· LANDFILL NO. REVISIONS 0 BLENDED MATERIAL TRUCK SCALE PUG MILL DISCHARGE STACKER -------------► STOCKPILE ,---► BY I I I L _______________ J DATE - ---s;; I \ii ENVIROMENTAL, INC. SCREEN OVERSIZE r----------------------------------------------7 ---------------------, I I 1 2" X2" , STOCK PILE SCREEN I I I I / I I SCREEN I I I MAGNETIC MATERIAL r----------------------, I I I ,---MAGNET I I I TO ---► DECONTAMINATION I OVERSIZE & DISPOSAL HOPPER .. 0 ...... ·~'-----~0', I 0 STOCKPILE CONVEYOR BCD REAGENT SILO SILO ROTARY VALVE , ___ DUST SCREENED MATERIAL CONVEYOR COLLECTOR WEIGH BELT SCALE~ _J <t: 0::: w ~ L 0 w z w w 0::: u (f) MAGNETIC STOCKPILE ---► PUG MILL HOPPER TO DECONTAMINATION & DISPOSAL I /.,, .... 0--=-• »'-------0=--· » • PUG MI LL / I '----------------' I PUG MILL DISCHARGE CONVEYOR TO CBCD SYSTEM (DWG PFD-2O2) TO BBCD SYSTEM (DWG PFD-2O3) NORTI-1 CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES PUG MILL PUG MILL FEED CONVEYOR HOPPER CONVEYOR DIVISION OF WASTE MANAGEMENT BFA Environmental Consultants Barnes, Ferland and Associates, Inc. MATERIAL PREPARATION PROCESS FLOW DIAGRAM WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT LEGEND: ------------ ------- -·-·-·-·-·-·-·-·- -··--·-··-··-··-··-··- DRAWING INFORMATION PRC>.ECT NO.: 99 01 DESIGNED BY: CEH DRAl'IN BY: WKP TWC FUEL, N2 & AIR SOLID MATERIAL LIQUID GAS & VAPORS COOLING WATER PROCESS WATER DATE DRA'MNG NO. 2/03/00 PFD-201 CHECKED BY: P AB t-;DR=A='MN=c-==-=---_---=SCAI.E:~-N..--a. T=.s.----1 SHT. 40 OF 4ti NO. 1 -{DWG PFD-2011 I SCREENfP/BIENDEP I M,\TFRI& I CBCD CONYfYOR WElGH SCAl,£ OWG PF0-206>---,-------------, FROM N2/ INERT GAS STORAGE BURNER EXHt,1/ST STACKS TO ,._TMOSPHERE BVPASS STACK DAMPER TO ATMOSPHERE i I I ----------1·-·-·! I I EEEP MAIEBIAL HOPPER CONVEYOR I I TAl'IK ' ' • fj I I REHEATER "-'A.,,_ FEED MATFRIN I INCLINED CONIIEYOR I I .CBCP PESORBER IlEP HOPPER SWEEP GAS RECYCLE r---·- f cecp DESORBER JWJN ,,..---,-.. SCREW FEEDER DWG PFD-206>----,----I 1----1 1----l r----1 .CBCP z ...... .-1----FROM PROPANE STORAGE TANK EMERGENCY PROPANE POWERED .PRlllE DWG PFD-206i}----,----lti- FROM No. 2 FUEL OIL TAl'IK TO No. 2 FUEL OIL TANK .CBCP No. 2 FUEL OIL PUMPS CYLINDER .llfillE .CBCP COMBUSTION FUEL OIL BURNERS (THREE ZONES) OWG PFD-206t------t---------------~ I I r------i ·-·-·---, ,------1...--1--, I ----t-'--..-1 ------ .CBCP HOT CYCLONE CBCD YRS HOT CYCLONE SCREW r I I I I I I I I I .CBCP .sm.M SCRUBBER I I I L;1 I I I I ' I I TO ATMOSPHERE I srrAM ~UBBER I PUMP$ I r---+----7 I I 'ltWW',V -l ~-r---, .CBCP OlJFNCHfB/ SCRUBBER I I I I .wr ~CHANGER 7 I OUENCHER/ -+ J SCRUBBER n-- RFCYCI E PUMfS ~ I I (owG Pro-2041-! ____ _J I BLEED TO CONDENSATE COLLECTION TANK r ___ _J f -'JR OUTLET .--_J I I ' I I . -I i----~--+i I I I CHU I ED WATER SCRUBBER I ' ! I I I I I L __ I I I I ♦ I I i I L-+-·-· I ----..v-- .HEAT EXCHANGER I ' ~i .. EY---l I cw, !~ATER I 1 BfCYCI E PYNPS I .. EY- I I I COOLING IOWER IP fAN ----~OWG PFD-2031 I FROM BBCO QUENCH~ _J COOUNG TOWER SCRUBBER I (DWG PFD-2014l~le-----~-. r .... 'i_J.. BLEED TO I \:_} : I COND~TE CBCP -WET El fMRQSJAJlC PBECIPITATOR (WESP) corn ING l.t.CKET WESP SUMP I i I _wrsp • f RECYCLE PVMP . . . . L--------·--· --_J + r7·-cz:>r .wrse RECYCLE PVMP OWG PFD-20141-----' CHlllfR ' -'JR AMBIENT I . . .i;aco COtfil~UQUS ~ MCNIIDB (CSM) L-®--~--o--t -·-· I .fl.6Mf YAPQR RECOVERY · ARRESTER r-!-·-·- $YSJEN IP FAN I I I OWG PF0-20~ FROM LBCD CONDENSER EI!l ED E:AN I OWG PFD-20 ; FROM PROPANE TANK TO ATMOSPHERE -·-·-·- r .CBCP F'LWEI ESS Il:tERUAL OXIDIZER (FTO) TO ,._TMOSPHERE I CARBON BED EMERGENCX BYPA.5$ CBCO DISCHARGE SCREW -- SCREW GAJES I I I I I I ! ·h -½, I c,-1 cnv corn ING TOWER I : COLLECTION TANK I RECYCI[ PVMFS ;-1. .. 7 .·-··iOWG PFD-203) ~-(_0-]-----.JI I TO 8~:e:~CHER I . I i ~j._ _____________ __, I I REVISIONS r __________ _J I I I I I I I I t TO CBCD FEED HOPPER I i [\ I L --4-- I I I ----------J_' !I _wA=-11 --<OWG PFD-20~ FROM WATER STORAGE T,._,..K CBCD MIXER/COOLER CBCP MIXER/COOLER BY PASS CONTAINER BY DATE - - --,r;:jg ENVIROMENT AL, INC. "" CBCP $TACKING CONVEYOR JBAYEBSING UNPfR CARRIAGE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT -~ I I (OWG PFD-20.}--· · - · · _j TO NON CONTACT CONDENSERS (BBCD) L----lowG PFD-206) BLOW DOWN TO WA"IER STORAGE TANK TO CBCD STEAM SCRUBBER ',----- i l___ CBCP TREATED SOIi STOCKPU f CHU I FD WATfR BECIRCUI AJION .PUMP TO CBCD CHILLED WA"IER SCRUBBER i J_ TO CBCD WESP ' J_ FROM IOWG PFD-203>--1 BBCD --< CITY WA"IER ~ Environmental Consultants rnes, Ferland and Associates, Inc. CBCD PROCESS FLOW DIAGRAM ! . L--·-·-·-·-·-·-·---1-.t CARBON 8EO EMEBGENCX BYPASS .._ ____ .., LEGEND: FUEL. N2 & -'JR SOLID MATERIAL ----------LIQUID GAS & VAPORS COOLING WATER PROCESS WATER _wm;; WHERE TWO PUMPS ARE SHOWN, ONE IS OPERATING AND ONE IS A SPARE. DRA'MNG INFORMATION DATE PROJECT NO.: 99001 DESIGNED BY: CEH DR,._l\tj BY: WKP TWC 2/03/00 CHECKED BY: PAB DRA'MNG ALE: -SCA1.E: AS SHOWN DRA'MNG NO. PFD-202 SHT.~OF 45 NO. BBCP BURNER COMBUSDON AIR FAN • BURNER EXHAUST TO ATMOSPHERE HYDRAUUC PRIVE UNIT BBCD FEED CON\/EYOR DWG PFD-206 >----,--+-e 1--~--~----'-----t DWG PFD-205 TO FROM FUEL OIL TANK DUPLEX OIL PUMPS DWG PFD-2061---~------------' TO FUEL OIL TANK LBCD REACTOR HEATING UNIT I I I I I I L I L I --, t .flB.CD .J:iOI CYCLONE COi I ECTION CONTAINER r-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··-•-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··1-··-··-··-··-··-··-··-··-··1 I . I ' r ··-· ·-· · -··-··-· ·-··-· ·-··-·-··-··-··-··-·· -· ·-··-·· -··-··-·· -··7 : CHILLED : I WATER I OUT I SECONDARY CONPfNSER CHlll.ED WATER IN AMBIENT AIR I .BBCJl !·-·-·-·-·-·-·._·-·-·-·-·-·-·-·7 r·-·-·-·-·-·-·-·1 r·-.J L.7 CONTINUOUS ~ MONITOR _(CsM) I .BllC.O QUENCHER/ SCRUBBER I --7 ----r SCRUBBER RECYCLE PUMP ! I PRIMABX CONDENSER ..----•---1! DWG PFD-202) .l::IEAI EXCHANGER TO COOLING TOWER • (DWG PFD-2021 1 CONDENSATE TANK #1 I i I I I ·-·-·-·_j .BBCJl VACUUM PUMP l I -1-··-··-··-··-··-··J ' I SEAL WATER TANKS SEAL WATER HEAT EXCHANGER I L I I : fl.AME . I ARRESTERt r·---------•-•..Jf'-·~ -·-©· I ! BBCD FTQ I FP FAN I I L .. -·· -. ·------.. -.. -.. -tr ...... - . ·-··--.. -·· J I :::l ·-,: fl . ID lo . I- I "- --.-TO BBCD I FEED HOPPER I .. E)---J .. I I ! I ~ ! t I I I BBCD SIEAM SCRUBBER STEAM TO ATMOSPHERE £AN I w---j l L _________ _J_ _______________ .......__-w--• !owe ~~-204) CONDENSATE CENTRIFUGE PUMP FEED TANK I - TO ATMOSPHERE -·-· _BBCD fJAMfJ ESS It:tEBUAL C:?!.IDIZEB lEilll OWG PFD-206 FROM PROPANE TANK TO r·- I ATMOSPHERE _BBCD CARBON REP EMERGENCY BYPASS ....._ ___ __, I ---1 I .11.BCQ r.ARBON Bf0 ,----...---- I BBCP STEAM SCRUBBER I ,- 1 I .-r"7 I I I I I _______, I I DWG PFD-206}-1-t-_J R~LE E)---J • I FROM t WATER STORAGE I J ,--~~-+--------- BBCP STEAM PUMP5 • I DWG PFD-202) TO CHlll.ER !owG PFD-202)-.. -.. -. --.. -.. -.. _ ··-........ __ .. _. __ .. _ .. ____ . __ .. ___ _J FROM CHlll.ER L--·-·-·-·-·-·-·-·--1 EMERGENCY BYPASS t I I ' /1\ LEGEND: L I L I L I L I L I L I I I I I L I L I FUEL, N2 & AIR SOLID MATERIAL BBCD lllSGl:IABGf/.COQLING SCRJcW REVISIONS BY DATE ---=• \a ENVIROMENTAL, INC. IBEATfll STOCK PILE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION ~ WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT -----------LIQUID GAS&: VAf'ORS COOLING WATER PROCESS WATER Barnes, Ferland and Associates, Inc. BBCD PROCESS FLOW DIAGRAM ,.,-;-, , "-~--;~r: ??? •1_ ,::~. ·.: .. ·.'':· NOTE: WHERE TWO PUMPS ARE SHOWN, ONE IS OPERATING AND ONE IS A SPARE. DRAWING INFORMATION PROJECT NO.: 99001 DESIGNED BY: CEH DRA\\N BY: TWC CHE0CED BY: PAB DATE 2/03/00 DRA'MNG FILE: 202 SCALE: N. T.S. DRAWING NO. PFD-203 SHT. 420F~ NO. IDWG PFD-203)-----7 FROM BBCD I CONDENSATE TRANSFER PUMP BBCD CENTRIFUGE FEED TANK I L / " . ----- REVISIONS CENTRIFUGE FEED PUMP BY DATE - 1 -------~ DWG PFD-205) , LIGHT ORGANICS TO LBCD ORGANIC PROCESS CONDENSATE SEPARATION SYSTEM ,--BBCD CENTRIFUGI; / ri FEED TANK ,-------<DWG PFD-2021 ' I I I I I I I I , 1 FROM CBCD _j SYSTEM Vl,---_ _J ,----<DWG PFD-2051 ~ •, 1.----_J FROM LBCD ~. I ! ______ 9RGA_NICS _ TRA~SFE~ TA~~----------------------------------------<owG PFD-205 I ~1 I I I -----------------------------------------7 FROM ORGANICS 5l, 1' , 1 , r FILTER PRESS BY-PASS , TRANSFER h I I I ,-----, I -, I TANK I ' t ~ t ·, 1' r-~ 1' 1' z a::: :::) ti a::: I I ,---T-, ! ! I n I , . , i i. , CONDENSATE '1 I 1' 1 I ---..-.---r-r-r,rr-r-r--r-r-r-r,-, ~ 'r( I I COLLECTION I I -----+----~ I I I r-r-_g LI I I TANK i I I ! I L__ l=-1 ' l""--i ! ---- 1 L __ r1---i f , FILTER PRESS '--~- ! i i ( 1 - -~ I r---.............................. ~-_ ___1 ! 1 , 1 _ _j '! sLuDGTEANHKOLDING L ___ J ! 11 F~L~:~~E I FILTER FEED I I I -:---, I PUMPS I I I I ~ '~-, I I • I , r-\~ ,, , J _i-----~ t LJ _ _J -~. -] : 1 ""' L--< DWG PFD-2051 i EP-_ _j ' ' i--------J CONDENSATE TRANSFER PUMPS PRECOAT FEED TANK PRECOAT FEED PUMP TO BBCD I ' FILTRATE STORAGE TANK I I I ________________________________________ j i--------t----------------------------- i L---------7 AQUEOUS PHASE TREATMENT SYSTEM i i i i I I --------------------~ SAND FILTER a-----L/. .__ _________ ___ ,_______, -7 I - BACKWASH PUMPS I CARBON 1---------i CARBON ~ - - - - --j DWG PFD-206 ) TO WATER STORAGE TANK AQUEUOS PHASE TREATMENT FEED PUMPS L _______ ~ACKWA~-------< DWG PFD-206 I FROM WATER STORAGE TANK 1 -~ DWG PFD-205) ! TO LBCD ORGANIC FEED TANK LEGEND: --------- fillJL FUEL. N2 & AIR SOLID MATERIAi.. LIQUID GAS & VAPORS COOLING WATER PROCESS WATER WHERE TWO PUMPS ARE SHOWN, ONE IS OPERATING AND ONE IS A SPARE. - - --~,a ENVIROMENTAL, INC. NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ·.' . ' HFA Environmental Consultants Barnes, Ferland and Associates, Inc. I '' :;:;,.):.}·: ii\: :,;:,\' .. ( J , . , ,, ' •.:: :r PCSAPT PROCESS FLOW DIAGRAM DRAWING INFORMATION PRo.ECT NO.: 9,uu1 DESIGNED BY: CEH DRAYIN BY: TWC CHECKED BY: PAB DRA'MNG FILE: - DATE DRAWING NO. PF-204 2/03/00 SCALE: AS SHOWN SHT. 430F~ NO. & & -,, & 4'-& 1"-•. No. 2 FUEL OIL TANK .---~/DWG PFD-202 FROM DUPLEX OIL PUMPS CBCD '----~'DWG PFD-203 I FROM DUPLEX OIL PUMPS BBCD ,---~: DWG PFD-202 TO CBCD DUPLEX FUEL PUMPS '--~: DWG PFD-203 TO BBCD DUPLEX FUEL PUMPS NITROGEN CYLINDERS REVISIONS / t---------i: DWG PFD-202 TO CBCD SEALS & WESP PROPANE TANK DWG PFD-202 TO CBCD DWG PFD-203 TO BBCD TO EMERGENCY GENERATOR PLANT AIR COMPRESSOR WITH DESICCANT DRYER 1---;_ _____ _ TO CBCD TO BBCD TO CBCD VRS TO BBCD VRS TO GENERAL PURPOSE PLANT TO PCSAPT TO LBCD BY DATE --- ---a -----=• ENVIROMENTAL, INC. 1 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT ( DWG PFD-202 h TO CBCD I I I ( DWG PFD-203 H TO BBCD t I I I I I . ' ·, _:_:_._ - ~------L,r FROM COOLING TOWER CITY MAKE-UP WATER '\ '--1 - WATER STORAGE TANK TREATED WATER FEED PUMPS I ~-------____. '-.I TREATED WATER FEED PUMP · HFA Environmental Consultants Barnes, Ferland and Associates, Inc. I I COMMON SYSTEMS PROCESS FLOW DIAGRAM LEGEND: FUEL, N2 & AIR SOLID MATERIAL ---------LIQUID GAS & VAPORS COOLING WATER PROCESS WATER DRAWING INFORMATION DRA'MNG NO. PRO.ECT NO.: 99001 DATE DESIGNED BY: CEH DRAIIN BY: TWC 2/03/00 PFD-206 CHEa<EO BY, PAB DRA'MNQ Fl.£: SCALE: AS SHOWN SHT. 45 Of' 45