Loading...
HomeMy WebLinkAboutNCD003200383_19970312_Koppers Co. Inc._FRBCERCLA RA_Groundwater Operation Maintenance Plan-OCRC..,,.UMMINGS 'K{!~~TANTS, INC. Ms. Beverly Hudson USEPA -Region IV North Superfund Remedial Branch Waste Management Division 345 Courtland Street, N.E. Atlanta, GA 30365 March 12, 1997 Project 1A~CEfVEO MAR 14 1997 SUPERFUND SECTION RE: GROUNDWATER OPERATION AND MAINTENANCE PLAN KOPPERS COMPANY, INC. SUPERFUND SITE· MORRISVILLE, NORTH CAROLINA Dear Ms. Hudson: On behalf of Beazer East, Inc., Cummings/Riter Consultants, Inc. hereby submits five copies of the Groundwater Operation and Maintenance Plan for the Koppers Company, Inc. Superfund Site in Morrisville, North Carolina. The O&M Plan consists of three separate plans: • Groundwater Monitoring Plan; • Groundwater Treatment System O&M Manual; and • Health and Safety Plan for Groundwater Monitoring and Treatment System O&M. Please note that only one of the enclosed copies contains a complete set of appendices to the Groundwater Treatment System O&M Manual. These appendices consist of vendor information for components of the treatment system, such as catalogue specifications and repair instructions, and are useful primarily to the O&M contractor (Fluor Daniel GTI of Morrisville, North Carolina). If you have any questions or would like additional information, please contact me directly at ( 412) 373-5240. Sincerely, Cummings/Riter Consultants, Inc. Bruce Geno Sr. Project Engineer BG/WCS/jmc Attachments pc: 1421145 Mr. James Cook -Beazer East, Inc. Mr. David Lown -NCDEHNR (two copies w/o O&M Manual appendices) 339 Haymaker Road• Parkway Building• Suite 201 • Monroeville, PA 15146 (412) 373-5240 • FAX (412) 373-5242 Regional Office • 258 Chapman Road • Suite 202 • Newark, DE 19702 • (302) 731-9668 • FAX (302) 731-9609 L I I I I I I I I I I I I 'I I I I I I I CUMMINGS 7<.{'{~~TANTI, INC. GROUNDWATER OPERATION AND MAINTENANCE PLAN KOPPERS COMPANY, INC. SUPERFUND SITE MORRISVILLE, NORTH CAROLINA PREPARED FOR: BEAZER EAST, INC. 436 SEVENTH AVENUE PITTSBURGH, PA 15219 PROJECT No. 93145.30/60 MARCH 12, 1997 339 Haymaker Road• Parkway Building• Suite 201 • Monroeville, PA 15146 (412) 373-5240 • FAX (412) 373-5242 Regional Office• 258 Chapman Road• Suite 202 • Newark, DE 19702 • (302) 731-9668 • FAX (302) 731-9609 L I I I I I I I I I I I I I I I I I I RECEIVED GROUNDWATER OPERATION AND MAINTENANCE PLAN KOPPERS COMPANY, INC. SUPERFUND SITE MAR 14 1997 MORRISVILLE, NORTH CAROLINA This Groundwater Operation and Maintenance Plan consists of three standalone documents as follows: SUPERFUND SECTION • The Groundwater Monitoring Plan (Cummings/Riter Consultants, Inc., March 1997), which describes the procedures to be used to assess attainment of groundwater remedial action performance standards; • The Groundwater Operation and Maintenance Manual for the Groundwater Extraction and Treatment System (Rust Environment and Infrastructure, January 1997); and • The Health and Safety Plan for Operation and Maintenance Activities (Fluor Daniel GT!, January 1997) which describes site hazards and establishes procedures for the protection of workers during O&M activities. {:PMMINGS 'f(_ITER I I I I I I I I I I I I I I I I I I I CUMMINGS 'R_{'{~*1TANIT,, INC. GROUNDWATER MONITORING PLAN KOPPERS COMPANY, INC. SUPERFUND SITE MORRISVILLE, NORTH CAROLINA PREPARED FOR: BEAZER EAST, INC. 436 SEVENTH AVENUE PITTSBURGH, PA 15219 PROJECT No. 93145.30/60 MARCH 12, 1997 339 Haymaker Road• Parkway Building• Suite 201 • Monroeville, PA 15146 (412) 373-5240 • FAX (412) 373-5242 Regional Office• 258 Chapman Road• Suite 202 • Newark, DE 19702 • (302) 731-9668 • FAX (302) 731-9609 I I I I I I I I I I I I I I I I I I D 1.0 2.0 3.0 TABLE OF CONTENTS PAGE INTRODUCTION ............................................................................................... 1 1.1 BACKGROUND ........................................................................................... I 1.2 GROUNDWATER MONITORING PLAN ......................................................... 2 PERFORMANCE ST AND ARDS ...................................................................... .3 GROUNDWATER MONITORING ACTIVITIES ............................................. 4 3. I WATER LEVEL MEASUREMENT ................................................................. 4 3.2 GROUNDWATER SAMPLING ...................................................................... .4 3.2.1 Groundwater Sampling Frequency ............................................. .4 3.2.2 Groundwater Analytical Parameters ............................................ 5 3.2.3 Groundwater Quality Assurance .................................................. 5 4.0 REPORTING ....................................................................................................... 6 FIGURE 1: MONITORING WELL LOCATIONS r-t-toc/1 ➔5 {:PMMINGS 'f(_ITER I I I I I I I I I I I I I I I I I g I GROUNDWATER MONITORING PLAN KOPPERS COMPANY, INC. SUPERFUND SITE MORRISVILLE, NORTH CAROLINA 1.0 INTRODUCTION This Groundwater Monitoring Plan has been prepared using information presented in the U.S. Environmental Protection Agency (USEPA) approved Performance Standards Verification Plan (Final Design Report, Cummings/Riter, December 1994) describing the procedures to be used to assess attainment of groundwater remedial action performance standards for the Koppers Company, Inc. Superfund site (Koppers site) in Morrisville, North Carolina. The Performance Standards Verification Plan was developed pursuant to Task V of the Statement of Work (SOW). A brief history of the Koppers site is provided below. 1.1 BACKGROUND Koppers acquired property, including the site area in I 962, from Unit Structures and produced glue-laminated wood products. A wood treating plant, consisting of a single treatment cylinder, was operated in the southeast section of the property from 1968 to 1975. Wood was treated using the Cellon process, which consisted of pressure injection of pentachlorophenol (penta) in a liquefied butane carrier. The Cellon treatment process was discontinued and dismantled in 1975, after which treated wood was received from other sources. On March 31, 1989, the USEP A placed the Koppers site on the National Priorities List (NPL). Pursuant to an Administrative Order on Consent dated April 21, 1993, Beazer East, Inc. (Beazer) conducted a remedial investigation (RI) for which soils, groundwater, sediments, surface water and fish were sampled and analyzed. The RI report identified penta, polychlorinated dibenzo-p-dioxins/polychlorinated dibenzofurans (PCDD/PCDF), and phenolic compounds as constituents of interest (COi) for groundwater. r4/145 -]- CJ/MMINGS '[(_ITER I I I I I I I I I I I I I I I I I I I The Record of Decision (US EPA, December 23, 1992) (ROD) established aqueous-phase carbon adsorption for groundwater as a component of the remedial action. A Unilateral Administrative Order (Order) for remedial design and remedial action (RD/RA) was issued to Beazer by the USEPA on April 21, 1993 (USEPA Docket No. 93-09-C). Construction of the groundwater extraction and treatment system commenced April I, 1996. The Final Construction Inspection of the groundwater treatment system was conducted December 18, 1996. 1.2 GROUNDWATER MONITORING PLAN The following sections list the performance standards identified in the SOW and describe activities to verify attainment of the performance standards for groundwater extraction prior to treatment. The Operation and Maintenance Manual for the Groundwater Extraction and Treatment System (RUST Environment and Infrastructure, January 1997) describes the activities developed to verify performance standards for treated . groundwater. r4/145 -2- CJ!MMINGS 'f{ITER I I I I I I I I I I I I I I I I I I I 2.0 PERFORMANCE STANDARDS The SOW identifies the following four performance standards for groundwater remediation: I. Extraction of groundwater with concentrations of site constituents exceeding cleanup standards identified in the ROD. ROD cleanup standards are provided below. GROUNDWATER CLEANUP STANDARDS CONCENTRATION PARAMETER (parts per billion) pentachlorophenol I (MCL) PCDD/PCDF 3 x 10·' (MCL) 2,4-dichlorophenol 20 Source· Table 9.1 of ROD 2. Treatment of groundwater by carbon adsorption to remove site constituents. 3. Discharge of groundwater from the groundwater treatment system in compliance with final treatment standards developed during the remedial design and the substantive requirements of the National Pollution Discharge Elimination System (NPDES) permitting program under the Clean Water Act. 4. Compliance testing to ensure that all performance standards are met in accordance with the Performance Standards Verification Plan. Performance Standards 2 and 3 are being met by groundwater treatment with the on-site groundwater treatment system. This Groundwater Monitoring Plan addresses Performance Standard I and the portion of Performance Standard 4 associated with verification of attainment of Performance Standard I. r4/145 -3- Cf!MMINGS "f{ITER I I I I I I I I I I I I I I I I I I I 3.0 GROUNDWATER MONITORING ACTIVITIES 3.1 WATER LEVEL MEASUREMENT Groundwater level data will be used to verify that groundwater capture is attained at the wells with concentrations of COi exceeding cleanup standards. Water levels will be measured at on-site and near off-site monitoring wells to assess the influence of pumping Well PW-I on local groundwater levels. Groundwater levels will be measured at those monitoring wells identified on Figure I in order to provide a comprehensive data base of water level information for the site. Water level data were collected prior to start-up of the groundwater extraction system on March 26 and March 27, 1996, and will be collected quarterly after start-up for the first year of monitoring. After the first year of monitoring, Beazer will hold discussions with the North Carolina Department of Environment, Health, and Natural Resources (NCDEHNR) and USEPA to reevaluate groundwater level monitoring requirements. Measurement points and collection events may be decreased or increased based on the reevaluation. Groundwater level data will be used to produce potentiometric maps depicting the capture zone of the extraction well. 3.2 GROUNDWATER SAMPLING Groundwater samples will be collected and analyzed to evaluate the reduction in the constituents of concern with time. The monitoring wells to be sampled are as follows: Well Type Sample Location Pumping Well PW-I Shallow Wells CI0A, Cl2A, Cl4A, C27A, C28A, M-4 Intermediate Wells CIB,C9B,CI0B,CIIB,Cl3B,Cl4B, Cl5B, C27B, C29B 3.2.1 Groundwater Sampling Frequency Groundwater samples were collected before the groundwater extraction and treatment system was started to establish baseline groundwater conditions. Baseline groundwater samples were collected March 27 and March 28, 1996. Wells with baseline penta r4/145 -4- C!JMMINGS 'f{ITER I I I I I I I I I I I I I I I I I I I concentrations greater than I part per billion (ppb) are to be sampled after six months of system operation and again after one year. Wells with baseline penta concentrations below I ppb are to be sampled after one year of system operation. After one year of operation, Beazer will hold discussions with the NCDEHNR and USEPA to reevaluate groundwater monitoring requirements. 3.2.2 Groundwater Analytical Parameters All groundwater samples will be analyzed for penta and 2,4-dichlorophenol as well as for field parameters such as pH, temperature, and specific conductivity. Additionally, groundwater samples collected as part of the annual sampling of wells with baseline concentrations of penta greater than I ppb will be submitted for PCDD/PCDF analysis. USEPA Method 8270 (modified with single ionization monitoring) will be used for the penta and 2,4-dichlorophenol analysis. USEP A Method 8290 will be used for the PCDD/PCDF analysis. As approved April 8, 1996 by USEPA Region IV (Ms. Beverly Hudson) and NCDEHNR (Ms. Judy Garrett) dioxin will be monitored as 2,3,7,8-TCDD for surface water discharge monitoring. 3.2.3 Groundwater Quality Assurance Quality assurance requirements for sampling and analysis of groundwater are documented in the USEPA approved Quality Assurance Project Plan (QAPP) (Chester Environmental, June 1993). Equipment blanks, field duplicates, and matrix spike/matrix spike duplicate samples will be collected at the rates prescribed in the QAPP. Data quality levels will be Level III or Level IV, as defined in the QAPP, with approximately 5 percent of all laboratory analyses meeting Level IV USEP A Contract Laboratory Program deliverable requirements. After one year of operation, Beazer will hold discussions with the NCDEHNR and USEPA to reevaluate groundwater monitoring data quality assurance requirements. r4/I45 -5- {:PMMINGS r{ITER I I I I I I I I I I I I I I I I I I I 4.0 REPORTING Groundwater monitoring results will be reported to USEPA and NCDEHNR within 30 days of receipt of validated data. r4/145 -6- CJ!MMINGS 'f{_ITER I I I I I I I I I I I I I I I I I I I -st- ~ m l[) -st- ~ n Ol <.:let: Zw -en ~:::, ct: ::, oz Q. --r(@) 0 _.,,,,.. /,-/\EASTERN ~98 C9A+ C9C DRAINAGE LEGEND: +C13A EXISTING MONITORING WELL LOCATION PROPERTY OWNED BY BEAZER EAST, INC. :l,_38 C3A / 1fillL I I WELL LOCATIONS, AND PROPERTY FEATURES WERE PROVIDED BY OTHERS. C11 A REVISION \ FIRE POND \ csfr UNGRADED WOODED AREA APPROXIMATE SCALE 0 400 400 FEET DATE DESCRIPTION #-C258 C25A --0 -------., MEDLIN POND OUTFALL FIGURE MONITORING WELL LOCATIONS KOPPERS COMPANY, INC. SUPERFUND MORRISVILLE, NORTH CAROLINA PREPARED FOR BEAZER EAST, INC. PITTSBURGH, PENNSYLVANIA D / I SITE UMMINGS JITER CONSIJL'DUffll. INC. DRAWING NUMBER 93145814 DRAWN BY: T. GROSSO DATE: 9-16-94 CHECKED BY: DATE: 4- APPROVED BY: DATE: / / I I I I I I I I I I I I I I I I I I I OPERATION AND MAINTENANCE MANUAL GROUNDWATER EXTRACTION AND TREATMENT SYSTEM Beazer East Koppers Superfund Site Morrisville, North Carolina Rust E&I Project No. 34321 000 Rust Environment & Infrastructure Raleigh, North Carolina January 1997 Revision No. I Kcvision No. 0 RECORD OF REVISIONS Date 12/96 1/97 Description Original Document Cummings/Riter I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Sert ion 1.0 2.0 3.0 4.0 TABLE OF CONTENTS Pagr INTRODUCTION ........ I -I .......... I -I . ..... I -I I.I Site Location .. 1.2 Facility Description. REGULATORY REQUIREMENTS .......... 2-1 2.1 NPDES Permit.. . ......... 2-1 COMPONENT AND PROCESS DESCRIPTION.. . ......... 3-1 3.1 General. . ........ 3-1 3.2 Groundwater Extraction System........ .. .. 3-1 3.2.1 Extraction Well Pump ............................................................................ 3-3 3.2.2 Well Vault ............................................................................................. 3-3 3.3 Groundwater Treatment System .......................... . ......... 3-4 3 J. I Equalization Tank and Control Logic .. . . ................... 3-4 3.3.2 Transfer Pumps. . ................. 3-4 3.3.3 ~1anual Control. ......................... 3-5 3.3.4 7-.ledia Filters .. .......... 3-5 3. 3 5 .-\ctivated Carbon Adsorbers.. .. ........ 3-5 33.6 SumpPump.. . ................................. 3-6 3.3.7 ControlSystem .. 3-6 3.3.8 Process Valves ...................................................................................... 3-8 3.4 Controls Summary .......................................................................................... 3-11 OPERATION AND CONTROL PROCEDURES ....... . 4.1 Start-up Sequence ............................................................................................ 4-1 4.1.1 Start-up Tasks....... .. ..... 4-1 4.2 Shut-down Sequence.......... ...4-3 4.2.1 Shut-Down Tasks .................................................................................. 4-3 4.3 Media Filter Change-out.. .................................................................................. 4-3 4.4 Activated Carbon Vessel Backwashing .............................................................. 4-4 4.5 Activated Carbon Removal and Replacement .................................................... 4-5 5.0 SAMPLING AND MONITORING REQUIREMENTS... ..5-1 5.1 Purpose ... 5-1 5 .2 Sampling Procedures.. . ........................... 5-1 5.3 Sampling Program........................ . .. 5-1 5.3.1 Analytical Parameters ............................................................................ 5-2 Project\34321.000 6.0 54 5.3.2 Sampling Frequency. Sample Handling and Shipment ..... MAINTENANCE .. 6.1 General . 6.1. l Major Equipment Manufacturer"s Recommendations 6.1.2 Preventative Maintenance Summary Schedule .... 6.1.2.1 Cleaning ...... . 6. 1.2.2 Adjustments and Minor Repairs .. 6.2 Special Tools and Equipment ............. . 63 Equipment Maintenance . ......... 5-2 .......... 5-3 . ........ 6-1 ······ .... 6-1 ....... 6-1 . ................ 6-1 . .......... 6-I ·········6-2 . .... 6-2 7.0 8.0 TROUBLESHOOTING GUIDE .............................................................................. 7-1 WASTE MANAGEMENT AND DISPOSAL 8.1 8.2 Appendix A Appendix B Appendix C AppendixD · AppendixE Regulatory Status .... Waste Management and Disposal Methods LIST OF APPENDICES NPDES Permit Equipment List Supplier Information Inspection and Maintenance Checklist GEOPURE O&M Manual and Limited Warranty Project\34321.000 ........ 8-1 . ........ 8-1 ................ 8-1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 34321-S-0I 34321-1-01 34321-M-0 I 34321-E-0l 34321-E-02 34321-E-03 Project\34321.000 LIST OF DRAWINGS Ill Site Plan Process and Instrumentation Diagram Equipment Arrangement Electrical Distribution Control Diagram Control Panel 1.0 INTRODllCTION I.I Site Location Beazer East has installed a Groundwater Extraction and Treatment Svstem at the Koppers Superfund Site in Morrisville, Nonh Carolina. The site is bounded by Church Street, McCimmon Road, and State Route 54. Drawing 34321-S-0 I contains the site map for the facility. 1.2 Facility Description The proposed treatment system was developed to initiate control and removal of wood treating residuals which have impacted local groundwater. The groundwater will be recovered from an · on-site extraction well using a submersible pump. The extracted groundwater will be pumped into an equalization tank located in the treatment system building. From the equalization tank, the groundwater will be pumped through two media filters installed in parallell. The filtered groundwater will then flow through two activated carbon adsorbers installed in series and then discharged to a site drainage ditch under the substantive provisions of NPDES permitting requirements. The system is designed to operate unattended with minimal operation and maintenance. This manual is presented as a guide for the operation and maintenance (O&M) of the Beazer East Koppers Company Super-fund Site Groundwater E:>.1raction and Treatment System in Morris\'ille. Nonh Carolina. The procedures recommended in this manual represent the best available technology currently in use for activated carbon systems. Process requirements and operating procedures may change with time to accomodate improvements in technology or changes in site conditions. Controls and alarms have been calibrated for proper operation of the treatment system. Remote monitoring and telemetry transmitters have also been installed. Project\34321.000 I - I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 2.0 REGULA TORY REQUIREMENTS 2.1 Substantive NPDES Permit Requirements Substantive NPDES discharge criteria for treatment system effluent were issued by the North Carolina Department of Environmental Health and Natural Resources (NCDEHNR) and are presented as Appendix A. These discharge criteria consist of effluent limitations, monitoring parameters, and monitoring frequency for the treatment system. In general, the substantive permit requirements call for the instanteous measurement of flow with reporting of the parameters listed in Table 2-1 at the indicated frequency. Table 2-1 Substantive NPDES Permit Requirements Parameter Flow Phenol Dioxin Pentachloro-Chronic (2,3,7,8-phenol Toxicity TCDD) Sample Frequency 2/Month 2/Month Quarterly 2/Month Quarterly Sample Type Continuous Grab Grab Grab Grab Discharge Limits None None None 20.0 ug/1 NIA During construction of the groundwater treatment system, a discrepancy between the monitoring requirements presented in the Record of Decision (ROD) and the substantive NPDES discharge criteria for dioxins/furans was identified. While the ROD required that concentrations of dioxins/furans be reported as Toxic Equivalent Concentration (TEC) of the 2,3,7,8- tetrachlorodibenzodioxin (2,3, 7,8-TCDD) congener, the NCDEHNR effluent discharge criterion for dioxins/furans is monitoring cif 2,3,7,8-TCDD (per Ms. Judy Garrett, NCDEHNR, April 8, 1996), which is consistent with enforcement of NPDES permits issued under NCDEHNR jurisdiction. 2.2 Additional Requirements The ROD for the Koppers Company, Inc. Superfund Site includes a performance standard for 2,4-dichlorophenol of20 µg/1. Consequently, effluent monitoring will include 2,4-dichlorophenol. Project\34321.000 2 -I 3.0 COMPONENT AND PROCESS DESCRIPTION 3.1 General The groundwater extraction and treatment system was designed to extract and treat groundwater containing wood treatment residuals (phenol, 2,4-dichlorophenol, pentachlorophenol, and dioxin) based on the requirements of the Record of Decision and Statement of Work The following sections contain a component and process description that describes the major equipment and components of the groundwater extraction and treatment system. The description has been divided into the following sections: • Groundwater Extraction System, • Groundwater Treatment System, • Groundwater Discharge Monitoring, and • Controls Summary A general layout of the groundwater extraction and treatment system is shown on Rust drawing 34321-S-01. The process and instrumentation diagram (P&ID) for the treatment system is shown as drawing 34321-I-01. Because the system is intended to be low maintenance with periodic monitoring, components of a remote alarm notification system have been included. The components will connect to a remote terminal unit or process logic controller (PLC) to be provided by Beazer East. Either system will notify Beazer East personnel of the nature of the alarm condition. A summary table of the major instrumentation is provided in Appendix B. 3.2 Groundwater Extraction System The extraction system consists of one extraction weU with an estimated yield of 5 gpm. The extraction weU is equipped with a submersible pump designed to transfer groundwater from the extraction weU to the equalization tank. The extraction well is enclosed within a concrete vault which contains well pump level controls, pressure gauge, sample valve, gate valve, flow transmitter, flow totalizer, gate valve, check valve, and ball valve. Project\34321.000 3 -I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I PROCESS Extraction Well Pumps Equalization Tanlc Transfer Pumps Media Filters Carbon Adsorbers Sump Pump Project\34321.000 TABLE J-1 DESIGN BASIS SUMMARY OPERATIONAL PARAMETERS Quantity Capacity, gpm (each) Total Dynamic Head. feet (each) Quantity Volume, gallons Average Influent Flow. gpm Normal Hydraulic Retention Time, min. Quantity Capacity, gpm (each) Total Dynamic Head. psi (each) Quantity Capacity, gpm Max Operating Pressure, psi Quantity Capacity, pounds Design Pressure, psi Contact Time, min. Quantity Capacity, gpm 3-2 DESIGN CONDITIONS I 7 100 I 1,500 5 80 2 10 60 2 25 90 2 1,000 100 30 I 25 3.2.1 Extraction Well Pump The extraction pump is used to extract groundwater for treatment. The pump is Grundfos Redi- Flo4 Environmental submersible pump, Pump Type 5E5 1/3 HP, stainless steel construction, 230 volt, single phase. The extraction pump is designed to operate at a flow rate of 5 gpm at a total dynamic head of 80 feet. The operation of the extraction well is based on the presence of a sufficient level of groundwater in the well. The extraction well pump is controlled by a pressure transducer installed within the well which opens or closes electrical switches depending upon the depth of water in the well. The switches serve to start the pump on high water level in the well and to stop the pump on low water level. The extraction well pump is normally operated from a Hand/Off/ Auto switch located on the treatment system control panel. A power switch to control the pump is also located in the well vault. 3.2.2 Well Vault The well vault consists of a 4 foot square by 5 foot deep concrete box with 4 foot by 4 foot hinged double door aluminum covers to provide full access to components within the vault. The well vault has been backfilled with gravel to within 3 feet of the top of the vault to eliminate • confined space entry issues. The well vault contains the discharge piping and associ.ated fittings. The vault also contains the following pump control and monitoring instruments: • Flow Transmitter • Level Switches • Flow Totalizer • Liquid Detector • Pressure Indicator • Sample Valve • Check valve • Ball valve • Gate Valves I I I I I I I I I I I I I The groundwater flow from the well is measured by a flow transmitter. The transmitted signal is I sent to a flow indicator in the treatment system building. The flow indicator can display flow rate, total flow, and peak flow and can transmit the total flow to a remote location via RS 232 serial I communication. The vault also contains a mechanical flow totalizer to allow a reading of the total flow at the well vault. A sample valve has been installed in the extraction well discharge piping for obtaining groundwater treatment system influent samples. A liquid detector is provided in the I . secondary containment piping from the vault to the treatment building to detect leakage of the conveyance pipe. . Project\34321.000 3-3 I I I I 3 .3 Groundwater Treatment System I The treatment system is installed in a pre-fabricated metal building and consists of the following: I I I I I I • • • • • • • • • Equalization Tank Two Transfer Pumps Manual globe valve for flow control Rotameter flow rate indicator Activated carbon adsorber units Differential pressure transmitter Flow transmitter Flow totalizer Sump Pump The treatment system is designed for a maximum flow rate of 10 gpm of groundwater flow. The extracted groundwater will be pumped from the well into the equalization tank. The groundwater from the equalization tank will be pumped through a manual globe valve and rotameter to control the flow rate from the transfer pumps. The water will then flow through two media filters operated in parallel and then through two activated carbon adsorbers operated in series prior to discharge to an on-site drainage ditch. I 3.3.1 Equalization Tank and Control Logic I I I I I I I I I Groundwater from the extraction system is fed into a 1,500 gallon, closed top, flat bottom, high- density polyethylene equalization tank. If the liquid level in the tank drops to the set point low level (LS301L) which is 12 inches above the bottom of the tank, the transfer pumps will stop. Once the liquid level in the tank reaches the high level set point (LS-30IH) which is 24 inches above the tank bottom, the lead transfer pump will start. If the liquid level in the tank continues to rise past the high level set point to the high-high level (LS-301HH) which is 36 inches above the tank bottom, the lag transfer pump will start. If the liquid level in the tank continues to rise past the high-high level to the alarm set point (LS-301 A) which is 42 inches above the tank bottom, the extraction well pump will stop and an alarm light will illuminate on the treatment system control panel. Level switch LS-301L acts as a reset for the alarm switch LS-301A. 3.3.2 Transfer Pumps Groundwater from the equalization tank is fed through the two media filters and two activated carbon adsorbers by one of two transfer pumps. The pumps are Teel Water Systems Model 3P687B jet pumps with 1 1/2 HP, 230 volt, single-phase motors. The two pumps are placed in parallel; one acts as a standby to the other. In case of any mechanical failure of the transfer pump in operation, the flow will automatically be switched to the standby pump. Project\34321.000 3-4 3.3.3 Manual Control A globe valve and rotameter are installed down stream of the transfer pump to control the rate of flow through the treatment system. In order to minimize cycling of the well pump, the flow of the process pump should be set approximately IO percent higher than the flow rate of the well pump using flow control valve FCV-30 I and with observation of flow indicator FI-30 I. 3. 3. 4 Media Filters The media filtration system consists of two Ametek Model #20 Big Blue filter housings ( with pressure relief) installed in parallel. The housings are fabricated of polypropylene and have a maximum pressure rating of 90 psi. The filter media consists of Ametek Model PP30-BB (30- micron) series polypropylene pleated cartridges with a rated flow capacity of 25 gpm. The filtration system also consists of a pressure gauge upstream of the filters, a pressure relief valve with a set pressure of 7 5 psi, and a differential pressure transmitter. The flow from the relief valve (PRV-30 I) is directed back to the equalization tank. The signal wiring from the differential pressure transmitter leads to the electrical panel for connection to a remote terminal unit or PLC to be supplied by Beazer. The transmitter would provide a remote operator with a reading of the pressure drop across the filtration system and an alarm to provide an indication of filter media change-out. The alarm set point is adjustable, and should be set between IO and I 5 psi (Ametek recommends at least IO psi). Start-up tests indicated that the process pumps will provide feed pressures of approximately 60 psi upstream of the media filters at flow rates of between 3 and I 0 gpm using flow control valve FCV-30 I to adjust flow. 3.3.5 Activated Carbon Adsorbers The activated carbon adsorption system consists of two Geopure Continental HPL I 000 vessels installed in series. Each vessel is 42-inches in diameter, and 85-inches high, and weighs about 1,800 pounds (empty). Each vessel contains 1000 pounds of granular activated carbon. The vessels are rated for a maximum flow rate of 50 gpm and a maximum operating pressure of I 00 psi. The activated carbon adsorption system includes air vents on each vessel, pressure relief valves, pressure gauges at the discharge line of each vessel, sample valves at the discharge of each vessel, and vessel drain valves. Pressure relief valves will activate at 75 psi, with discharge from the relief valve to the equalization tank. The vessels are interconnected to the piping system and to each other by hoses. Inlets and outlets are one-inch diameter schedule 80 PVC and have been fitted with quick-disconnect Karn-lok® couplings. The Kam-lok® hose connections permit the operator to reverse the lead/lag orientation of the vessels without moving the vessels and to easily prepare the carbon vessels for backwashing. 3.3.6 Sump Pump The treatment building is constructed over a concrete block sump which has a volume capacity equal to that of the equalization tank to act as secondary containment for the tank. A Meyers model SP25AL, 1/4 horsepower sump pump is located in a recessed portion of the sump floor Project\34321.000 3 - 5 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I . ,. ~ ., . •, ... near the southeast comer of the building, and may be accessed through a hatch in the building floor. This pump is equipped with a liqu_id-level ,,switch to tum the sump pump on and off A liquid level transmitter is installed in the sump to pfovide a remote operator with the liquid level in the sump. 3.3.7 Control System The groundwater extraction and treatment system is divided into three logic loops. Loop I 00 contains the recovery well system, loop 200 includes the building sump, and loop 3 00 includes the treatment system. The following is a listing of instrumentation and function of each logic loop. Appendix B provides an instrumentation list of the extraction and treatment system. Recovery Well -Loop 100 Lt-IO I LS-IOIL LS-IOIH HS-IOI FT-101 FI/FQ-101 FQ-102 Project\34321.000 Level transmitter. A pressure transducer in the well transmits a 4 to 20 mA signal which is linearly proprotional to water depth in the well to operate level switches LS-IO IL and LS-IO I H. Level switch -low level. Stops groundwater pump P-10 I at low water level in the extraction well. Level switch -high level. Starts groundwater pump P-10 I at a high water level in the extraction well. Hand switch. Pump P-10 l start/stop switch located in the well vault. Flow transmitter. Transmitter installed in the well vault transmits a 4 to 20 mA signal which linearly proportional to flow rate in the extraction well discharge line to the flow rate indicator (FI/FQ-10 I) mounted in the treatment building. Flow indicator/Flow totalizer. Panel mounted flow indicator/totalizer in the treatment system building provides a continuous digital display of extraction well discharge flow. The indicator can also display total flow and average and peak flow, and can transmit to a remote location the total flow using RS 23 2 communication. Flow Totalizer. A mechanical flow totalizer installed in the well vault provides a reading of total flow and an indication of flow rate at the extraction well vault. 3-6 YA-IOI Building Sump -Loop 200 LT-201 LS-202L LS-202H HS-201 Liquid Detector. Detection of leaks in the pipeline from the vault to the Treatment Building. · Level Transmitter. Transmitter in the building sump has the capability to transmit a 4 to 20 mA signal, which is linearly proportional to depth ofliquid in the sump, to a remote location. Level switch-low level. Stops sump pump P-20 I at a low water level in the treatment system sump. Level switch-high level. Starts sump pump P-20 I at a high water level in the treatment system sump. Hand Switch. A three position Hand/Ofl7 Auto switch is mounted on the treatment system control panel to control the operation of the sump pump. Treatment System -Loop 300 LS-301L Level switch -low level. Stops transfer pumps P-301 and P-302 at low water level· in the equalization tank, and acts as a reset for level switch LS-30 I A. LS-30 IH Level switch -high level. Starts lead transfer pump at a high water level in the equalization tank. LS-301HH Level switch-· high high. Starts lag transfer pump if the water level in the equalization tank rises above the LS-301H switch set point. LS-301A Level switch -alann. Stops extraction well pump P-101 if water level in the equalization tank rises above the LS-301HH switch set point. Switch LS-301L acts as reset for LS-301A. HS-301 Hand switch. Three position Hand/Ofl7Auto switch for control of transfer pump P-30 l. HS-302 Hand switch. Three position Hand/Ofl7 Auto switch for control of transfer pump P-302. FI-30 I Flow indicator. Inline rotameter provides an indication of the flow rate from transfer pumps 301 and 302. Project\34321.000 3 - 7 I I I I I I I I I I I I I I I I I I I I D I I I I I I I I I I I I I I I I PT-301 PT-302 PT-303 PT-304 FT-301 FI/FQ-301 FQ-302 3 .3. 8 Process Valves Pressure Transmitter. Provides a 4 to 20 mA signal linearly I· " • '"{' proportional to the oifferential pressure across the media filters. The signal is transmitted to pressure transmitter PT-303. Pressure Transmitter. Provides a 4 to 20 mA signal linearly proportional to the differential pressure across the activated carbon adsorbers. The signal is transmitted to pressure transmitter PT- 304. Pressure Transmitter. Provides system capability to transmit the differential pressure signal across the media filters to a remote location. The transmitter includes a single point high pressure alarm. Pressure Transmitter. Provides system capability to transmit the differential pressure signal across the activated carbon adsorbers to a remote location. The transmitter includes a single point high pressure alarm. Flow transmitter. Transmitter installed inline prior to the system discharge transmits a 4 to 20 mA signal which is linearly proportional to system discharge to the flow rate indicator (FI/FQ- 3 0 I) mounted in the treatment building. Flow indicator/Flow totalizer. Panel mounted flow indicator/totalizer in the treatment system building provides a continuous digital display of treatment system discharge flow. The indicator can also_display total flow and average and peak flow, and can transmit to a remote location the total flow using RS 23 2 serial communication. Flow Totalizer. A mechanical flow totalizer installed inline prior to the system discharge provides a reading of cumulative total flow of the system discharge. The following provides an operating description of the extraction well and treatment system valves: Extraction Well Vault BV-101 Project\34321.000 Ball Valve Pressure gauge PI-IO I isolation valve. 3-8 SV-101 GV-101 GV-102 CV-IOI BV-102 Treatment System BV-301 BV-302 BV-303 BV-304 BV-305 CV-301 CV-302 SV-301 SV-302 Project\34321.000 Sample Valve Extraction well sample valve Gate Valve Discharge line and flow transmitter and flow · totalizer isolation valve Gate Valve Discharge line and flow transmitter and flow totalizer isolation valve Check Valve Prevents back-flow to the well when well pump P-101 is not operating Ball. Valve Extraction well system isolation valve Ball Valve Equalization tank isolation valve · Ball Valve Transfer pump P-30 I inlet isolation Valve Ball Valve Transfer pump P-302 inlet isolation valve Ball Valve Transfer pump P-302 discharge isolation valve· Ball Valve Transfer pump P-301 discharge isolation valve Check Valve Transfer pump P-301 discharge check valve prevents back-flow through pump P-30 I when pump P-302 is operating Check Valve Transfer pump P-302 discharge check valve prevents back-flow through pump P-302 when pump P-30 I is operating Sample Valve Sample valve at transfer pump P-301 discharge Sample Valve Sample valve at transfer pump P-302 discharge 3-9 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I PRV-301 BV-306 BV-307 BV-308 BV-309 GV-301 SV-303 BV-310 BV-311 BV-312 BV-313 BV-314 BV-315 BV-316 PRV-302 Project\34321.000 Pressure Relief Valve Media filter system pressure relief valve opens at high pressure upstream of the media filters to prevent deadheading of the transfer pumps. Relief flow is piped to the equalization tank. Ball Valve Ball Valve. Ball Valve Ball Valve Gate Valve Sample Valve Ball Valve Ball Valve Ball Valve Ball Valve Ball Valve Ball Valve Ball Valve Media filter F-301 inlet isolation valve Media filter F-30 I discharge isolation valve Media filter F-302 inlet isolation valve Media filter F-302 discharge isolation valve Treatment system manual flow control valve. Media filter system discharge sample valve and carbon adsorption system inlet sample valve Carbon adsorption unit CA-30 I drain valve Carbon adsorption unit CA-302 drain valve Normally open valve, close to return process flow to the equalization tank Normally closed valve, open to return process flow to the equalization tank Normally closed valve, provides process connection to the equalization recirculation line Normally closed valve, open to slurry carbon from activated carbon vessel. Normally closed valve, open to slurry carbon from activated carbon vessel. Pressure Relief Valve Carbon adsorption unit CA-30 I relief valve opens at high inlet pressure to the carbon unit. Relief valve flow is piped to the equalization tank 3 -10 PRV-303 AV-301 · AV-302 SV-303 3.4 Controls Summary Pressure Relief Valve Carbon adsorption unit CA-302 relief valve opens at high inlet pressure to the carbon unit. Relief valve flow is piped to the equalization tank Air Vent Vents air accumulated in carbon adsorption unit CA-301 to atmosphere Air Vent Vents air accumulated in carbon adsorption unit CA-302 to atmosphere Sample Valve Sample valve at treatment system discharge I I I I I I I Appendix B contains a summary of the controls and appropriate set points associated with the I major pieces of equipment. Project\34321.000 3 -11 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 4.0 OPERATION AND CONTROL PROCEDURES This section provides operational prncedures and describes controls associated with the groundwater extraction and treatment system. Section 4.1 describes the start-up procedures for the system, Section 4.2 describes the shut-down procedures for the system, Section 4.3 describes change-out of the media filters, and Section 4.4 describes change-out of the spent activated carbon. The primary objective of the treatment system is to ensure that the effluent meets the substantive NPDES requirements and the treatment performance standard for 2,4-dichlorophenol set in the Record of Decision. Presented below is a list of objectives that the operator should keep in mind as guidelines in maintaining the treatment system. I. Routinely maintain equipment in the treatment system to lengthen their useful life and reduce down time. The recommended maintenance schedules will be available in the operating manuals provided by vendors (included in Appendix C) of the various pieces of equipment and a system check list is provided in Section 6.0 and in Appendix D. 2. Prevent accidents and injuries. Operators must understand the dangers associated with each piece of equipment. This information is available in the operating manuals provided by vendors. Specific operation and maintenance schedules for each major piece of equipment are supplied by the vendor in the appropriate equipment manuals. In addition, troubleshooting guidelines are also supplied by the vendors. The manufacturers and equipment numbers for the major components of the treatment system are provided in Appendix B. 4.1 Start-up Sequence Initial start-up and adjustment of the treatment system must be coordinated with Beazer East project managers and regulatory agencies. Motor rotation, valve position, transducer settings, tlowmeter operation, differential pressure switch settings, and extraction well controls will be set during the initial start-up. These parameters will be adjusted and tuned during the initial performance testing of the system. Whenever the system has been shut-down for a sustained period, the following tasks should be performed. 4.1.1 Start-up Tasks The operator(s) should follow the following procedures prior to start-up of the groundwater extraction and treatment system: Projcct\34321.000 4 - I I. ENSURE that the following valves are: Extraction Well Vault: Treatment System: OPEN GV-101 GY-102 BY-IOI BV-301 BV-302 BV-303 BV-304 BV-305 BV-306 BV-307 BV-308 BV-309 GV-301 BV-312 CLOSED SY-IOI SV-301 SV-302 BV-310 BV-311 BV-313 BV-314 BV-315 BV-316 WARNING: NEVER OPERATE THE TRANSFER PUMPS P-301 OR P-302 WITH INLET AND DISCHARGE ISOLATION VALVES (BV-301, BV-302, BV- 303, BV-304, AND BV-305) IN THE CLOSED POSITION. DAMAGE TO THE EQUIPMENT OR PERSONNEL INJURY COULD RESULT. 2. TURN the well pump electrical switch (HS-IO I) in the well vault to the ON position. 3. RECORD dial readings on flow totalizers FQ-102 and FQ-302. 4. TURN the well pump three position switch (HS-102) on the treatment system control to the AUTO position. OB SER VE flow entering the equalization tank . NOTE: Immediate observation of flow will be dependent upon the water level in the extraction well being above the LS-IO I H sei point. 5. After flow is observed entering the equalization tank, RECORD the extraction well flow rate indicated on flow meter FI-IO I. 6. TURN transfer pump three-position switches (HS-30 I and HS-302) to the AUTO pos1t1on. NOTE: The lead pump should start . when the liquid level in the equalization tank is above the LS-J0IH set point. Project\34321.000 4-2 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 7. 8. OBSERVE the control panel to ensure that all switches are in the AUTO position, and OBSERVE all operating lights are green and no alarm conditions are present. When the lead transfer pump starts, OBSERVE the flow rate reading on flow indicator (rotameter) FI-301 and CLOSE valve GV-301 until the observed flow rate equals the rate indicated on meter FI-101. 9. RECORD pressure readings on gauges: PII0I, PI30\, PI302, PI303 and PI-304. 4.2 Shut-down Sequence This section is included to provide the operator guidance for the shut-down of the system in a manner that will prevent damage to equipment and prevent discharge of untreated groundwater. 4.2.1 Shut-Down Tasks The operator(s) should follow the following recommended shut-down procedures as listed below: 4.3 2. 3. 4. TURN well pump three position switch HS-IO I to the OFF position. OBSERVE that the flow reading on Fl-IOI drops to zero. TURN transfer pump three position switches HS-301 and HS-302 to the OFF position. OB SER VE that the flow reading on FI-30 I drops to zero. Media Filter Change-out Observation and recording of the pressure readings on gauge PI-301 will provide the operator of an indication for change-out of the media filters. The exact pressure which necessitates filter change-out will be developed with experience; the media filter manufacturer has recommended a pressure drop of at least 10 psi across the media filters before change-out. The operator should perform the following steps for changing the media filters: 1. 2. 3. 4. SHUT-DOWN the system in accordance with the procedure of Section 4.2. OBSERVE that the reading on gauge PI-301 is zero. To change media in filter F-301, CLOSE valves BV-306 and BV-307. To change media in filter F-302, CLOSE valves BV-308 and BV-309. 5. Open filter drain valves to drain filters. Project\34321.000 4-3 6. UNSCREW filter housings F-301 and F-302 using the special wrerich provided by the filter manufacturer. 7. REMOVE the media filters from the top of the housing by pulling down on the filters. CAUTION: USE GLOVES APPROVED BY THE SITE HEALTH AND SAFETY PLAN WHEN HANDLING SPENT FILTER CARTRIDGES. 8. PLACE spent filter cartridges into a container approved for that use. 9. PLACE and SECURE new filter cartridges to the top of the filter housings. 10. SCREW the filter housings into the filter top section hand tight then LIGHTLY tighten the housings using the special wrench provided. CAUTION: DO NOT OVER TIGHTEN THE FILTER HOUSINGS. DAMAGE TO THE HOUSINGS OR THE WRENCH COULD RESULT. 1 I. OPEN filter isolation valves BV-306 and BV-307 and BV-308 and BV309. 12.. REST ART the treatment system by following steps 2 through 9 in Section 4.1 4.4 Carbon Vessel Backwashing The adsorbers are designed for backwashing to alleviate a potential pressure drop problem that could occur if suspended solids are filtered by the activated carbon. Backwashing may also be beneficial if preferential flow pathways develop through the carbon bed, and to loosen the activated carbon before carbon change-out. The differential pressure across each of the adsorbers in the activated carbon system will be remotely monitored by differential pressure transmitters with adjustable high-pressure differential alarms. When the differential pressure exceeds the preset alarm pressure, the alarm will notify the operator of the need for backwashing ( or changeout). By backwashing the activated carbon, the following occurs: • Only suspended solids are removed from the· activated carbon bed. • Equilibrium for the organics adsorbed by the activated carbon is not significantly affected for the short time that backwashing takes place. • The organic wavefront in the adsorber is not appreciably disturbed. The procedures for backwashing the lead carbon vessel are as follows: Project\34321.000 4-4 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1. SHUT-DOWN the system in accordance with the procedure in Section 4 .2 2. 3. 4. 5. 6. 7. 8. 9. > • I ·1• DETACH inlet hose of the lead carbon vessel from the feed line from the process pumps and place end in equalization tank. DETACH lead carbon vessel outlet hose from the lag carbon vessel inlet and attach to the feed line from the process pumps. TURN transfer pump three-position switch HS-301 to the HAND position. Allow backwashing to continue for approximately 20 minutes. TURN transfer pump three-position switch HS-301 to the OFF position. DETACH feed line from process pumps and REATTACH to the lag carbon vessel inlet. REMOVE end of backwash discharge line from equalization tank and REATTACH to feed line from process pumps. RESTART the treatment system by setting the extraction well pump control switch HS-102 and the process pump control switches HS-301 and HS-302 to the AUTO position. 4.5 Activated Carbon Removal and Replacement Given the anticipated 6 gpm treatment system flow, the detention time in each carbon vessel will be approximately 30 minutes. The activated carbon in the lead carbon vessel will be changed when the effluent monitoring parameters from the lead adsorber approach discharge criteria, or predetermined operating conditions set by Beazer East. The carbon usage rate has been estimated at about 4,000 pounds per year. Therefore, the first carbon changeout (1,000 pounds) is anticipated to follow 3 months of operation. If the discharge sampling from the lead carbon vessel indicates exhaustion of the carbon or if the pressure reading upstream of the vessel indicates restriction of flow through the vessel which cannot be corrected by backwashing, then the activated carbon should be removed from the vessel and replaced with new or regenerated carbon and the order of the lead and lag vessels reversed. Removal and replacement of the carbon should be performed by an outside contractor, such as the original supplier (Geopure Contenential) or other supplier experienced in activated carbon change-out, since the carbon is removed and replaced in slurry form with vacuum as the motive force, which cannot be handled with the existing on-site equipment. During the transfer of the carbon, the slurry has a tendency to remain around the inner circumference of the adsorber at the bottom. The carbon remaining at the bottom of the vessel can be vacuumed by accessing the vessel through the hand hole near the bottom of the vessel. Approximately 500 gallons of slurry Project\34321.000 4-5 water and spent carbon will be transferred into the receiving container. The receiving container can be dewatered, sending the liquid back to equalization tank for treatment. In order to remove fines from the fresh carbon which otherwise might cause a pressure drop problem, it is recommended that the carbon vessel be backwashed before reactivating the treatment system (Section 4.4). The carbon provided for the initial fill was 8 by 30 mesh granular carbon, with a minimum iodine number of 950. Testing and disposal of spent carbon will be the responsibility of Beazer East. Procedures for carbon changeout are as follows: I. 2. 3. 4. 5. 6. 7. SHUT-DOWN the system in accordance with the procedure in Section 4.2 REMOVE spent carbon and REPLACE with new carbon or regenerated carbon in the lead carbon vessel. DISCONNECT the discharge hoses from the lead and lag carbon vessels effluent couplings on the system piping to drain the carbon system piping of water. DIRECT the flow ofwaterto the building drain. DISCONNECT the inlet hoses from the lead and lag carbon vessels influent couplings on the system piping. CONNECT the inlet hose from the lead vessel to the piping system lag carbon vessel influent coupling , and the discharge hose from the lag vessel to the piping system lead vessel effluent coupling. CONNECT the inlet hose from the lag vessel to the piping system lead carbon vessel influent coupling, and the discharge hose from the lead vessel to the piping system lag vessel effluent coupling. RESTART the treatment ·system by following steps 2 through 9 in Section 4. I Project\34321.000 4-6 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I S.O SAMPLING AND MONITORING REQUIREMENTS 5.1 Purpose System monitoring is required to evaluate the performance of the treatment system, and to comply with substantive NPDES requirements. Performance of the groundwater treatment system will be verified by comparison of influent sample analytical results to effluent analytical results, and comparison of effluent analytical results to substantive NPDES permit discharge criteria and the performance standard of20 µg/1 for 2,4-dichlorophenol established in the ROD. 5.2 Sampling Procedures Sample valves are located in the piping system at major treatment system components. When collecting samples from the sample valves, the valves should be opened a minute before sample collection to flush the valves and associated piping of stagnant water to collect a sample representative of the process stream. A suitable container should be used to collect water flushed from the system and the container should be emptied into the building sump or into the equalization tank To collect a water sample for analysis, the laboratory supplied bottle should be placed beneath the sample valve port and the bottle filled with sample. For each sample taken, the operator must record, at a minimum, the following information I. The exact place, date, and time of sampling. 2. The dates the analyses were performed. 3. The person(s) who performed the analyses (including lab name and i.d. number). 4. The analytical techniques or methods used. 5.3 Sampling Program Performance of the treatment system will be assessed by sampling flow before, between, and after the carbon units. Samples collected before and after the carbon units will be used to evaluate the effectiveness of the treatment system. Samples collected from between the carbon units will be used to monitor breakthrough of analytes from the lead carbon unit. Samples will be collected from the following sample taps: TABLES-1 SAMPLE COLLECTION POINTS Sample Location Sample Tao No. Before Carbon Units (oretreatment) SV-101 Between Carbon Units SV-302 After Carbon Units foost-treatment) SV-303 Project\34321.000 5 - I i, Drawing 34321-1-0 I, shows the location of the sample taps. 5. 3. I Analytical Parameters Treatment system influent samples will be analyzed for penta, 2,4-dichlorophenol. and 2,3,7,8- TCDD. Samples collected from between the carbon vessels will be analyzed for penta and 2,4- dichlorophenol. Eflluent monitoring parameters are flow, phenol, 2,4-dichlorophenol, dioxin (2,3,7,8-TCDD), penta, and chronic toxicity. Penta is the only monitoring parameter with a discharge limitation (20 µg/1). 5.3 .2 Sampling Frequency During the first month of operation, treatment system performance will be monitored on a weekly basis. Following the first month of operation, provided that the system is operating satisfactorily, sampling frequency will be reduced. Sampling to assess breakthrough of the lead carbon unit will be conducted quarterly. The sample analytical schedule is as follows: Parameter Pema 2,4-Dichlorophenol Phenol Dioxin (2,3, 7,8- TCDD) Chronic Toxicity Flow TABLE 5-2 SAMPLING FREQUENCY Sample Frequency Location S\'-10 I Start-up and Group I S\'-302 Start-up and Group 2 SV-303 Start-up and Grouo 3 SV-101 Start-up and Group I SV-302 · Start-uo and Group 2 SV-303 Group 3 SY-IOI Startup and Group 4 SV-303 Startup and Grouo 2 SV-303 Group 2 SV-303 Group 3 Method US. EPA 1'1ethod sno• U.S. EPA Method 8270* U.S. EPA Method 8270* U. S EPA Method 8290 NC Chronic Bioassay Procedure -Rev. 9/89 Instantaneous Group I -weekly for the first month, monthly for the first quarter, and quarterly thereafter Group 2 -quarterly Group 3 -bimonthly Group 4 -first quarter and after one year • -U.S. EPA Method 8270 modified with single ionization monitoring Performance of the treatment system or changes in the operation of the system may warrant sampling in addition to that prescribed above. Project\34321.000 5-2 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I SA Sample Handling and Shipment ,.,., ' ' :. All analyses of system water samples will be performed at an independent laboratory certified in the State of North Carolina. Appropriate sample containers should be obtained from the analytical laboratory, and all the sample should be labeled prior to or immediately upon collection. The sample bottles should be tightly sealed and placed in a cooler with ice to reduce the temperature of the samples to 4'C. Water samples sent delivered to the laboratory should be accompanied with a properly completed chain of custody fonn. Project\34321.000 5 -3 \ 6.0 6.1 MAINTENANCE General This section provides extraction well and treatment system preventative maintenance information and procedures. 6.1.1 Major Equipment Manufacturer's Recommendations Manufacturer's recommendations are contained in the equipment literature supplied with each item. Manufacturer's catalog and maintenance. information is contained in Appendix C 6.1.2 Preventative Maintenance Summary Schedule Preventative maintenance is the duty of the operator, and includes cleaning, adjustment, minor repairs, painting and rust removal, and inspection of the units for proper operation to preveni equipment breakdown. The scheduling of preventative maintenance will be closely related to what is required by the manufacturers of the various pieces of equipment. The operators performing the preventative maintenance will need to keep the equipment records up to date "ith the results of their inspections. dates of· lubrication.' changes in equipment adjustment. minor repairs and replacements. etc. Preventative maintenance must be planned so that required weekly, monthly, and seasonal items are done when needed. These items are all performed by the system operator. 6.1.2.1 Cleaning The operator should set-up a schedule so that all housekeeping operations (i.e., sweeping, dusting, equipment clean-up, and clean-up of spills, etc.) are done on a regular basis. The following is a brieflist of some of the particular tasks which should be done: 2. 3. 4. 5. Sweep, dust and mop the treatment building and clean all system fixtures. Dust pumps, controls, and other equipment. Retrieve and store h_oses and tools immediately after usage. Return all testing equipment to their appointed place after usage, and wash all equipment immediately after use. Deposit all trash in waste containers. 6 - I I I I I I I I I I I I I I I I I I I I I • I I I I I I I I I I I I I I I I I 6.1.2.2 6. 7 Brush rust from bolt threads and apply silicone coating Brush rust from steel surfaces and apply touch-up paint to cleaned areas to prevent funher deterioration Adjustments and Minor Repairs There are very few adjustments required for proper operation of the groundwater extraction and treatment system. 6.2 Special Tools and Equipment For routine maintenance, no special tools or equipment are required for the groundwater extraction or treatment system. For change-out of the carbon from the carbon adsorbers, the services of a specialized contractor is generally required to remove spent carbon by vacuum or in slurry form and to install new carbon. 6. 3 Equipment Maintenance A maintenance and equipment check list for the groundwater extraction and treatment is included as Appendix D. The schedule for conducting system checks is generally weekly. Specific information relating to the maintenance requirements for the equipment is included with the manufacturers literature in Appendix C. 6-2 '·- 7.0 TROUBLE SIIOOTING Guidelines for equipment trouble shooting are contained in the vendor literature in Appendix C The following is a listing of vendor literature which contain trouble shooting guidance Tag No. FT-IOI & FT-301 FI/FQ-101 & FI/FQ-301 PT-303 & PT-304 P-101 P-301 & P-302 Description Brooks Electromagnetic Flow Meter KEP Flow Transmitter Ronan Pressure Transmitter Grundfos Well Pump Teel Transfer Pump idec PLC Location App. C, Sec I App. C, Sec I App. C, Sec I App. C, Sec 2 - App. C, Sec 2 App. C, Sec 3 I I I I I I I I I The following provides additional guidance for trouble shooting system extraction well and I transfer pumps: Project\34321.000 7 - I I I I I I I I I --- El ct. IR e nca ecovery Problem - -- - - - ----- **Warning** Controllers, Pumps, Floats, and Electric Valves are possible electric shock hazards! p ump T rou es ootin_g ec I Ch kl'st Possible Cause Solutions Sections - Groundwater recovery pumps 'MIi I . No electrical power. A. Check the Hand/Off/Auto s......,tch tor the pump on the r.ia.Jn conrr o'!er. not run. and make sure that it is not in the Off posit,on. n. Check. the level in the 'Nell and make sure that rt ,s h1g,~ er.oug~ to sra.-; t""'e pump. Is the Low Level light On. C. Check the main po........er light on the controller and ma.1.:.e sure tha: rt 1!. I·~ If th,s light is not lrt: I . Check the fuse ,n the controller. Replace " ,f" has blown 2. Oleck the breaker (or mam controller po ..... -er a:id make sure '.'1J~ rt is not tripped. If the breaker has tnpped. reset the breaker. D. Check the circuit breaker for the pump and make sure !hJ.t rt is no! tripped. E. If the breaker has tripped, reset the breaker. F. Place the Hand!Off/Auto switch for the pump ,n the Hand pos,t,on: I. If the pump starts see sect,on G. 2. If the contactor for the pump pulls 1n. and the pumo C8-es riot start, have a qualified electrician or a GeoPure techruc•a.'1 check the power supply. 3. If the contactor does not pull m. notify GcoPure of the prob!e1:1 G. If the Jevel in the ...vell is high enough to run the pump, but the pump,,..~,· not run with the swtch in the Auto posrtron. then check t'ie level con~rol system. C ent rif u~a IP ump T rou bl h es ootrn~ ec ,st Ch kl' Problem Possible Cause Solutions Sections Transfer pumps \MIi not run. I. No electrical power. A. Check the Hand/Off/Auto sWtch for the pump on the: niairi ccntr o!'c-~, and make sure that it is not in the Off posrtion. B. Check the level in the sump and make sure that rt 1s high enoL'gli :o s~drt the pump. C. Check the main po-..ver light on the controller and mlje sure thJ.~ .1 1s 1~ If this light is not !rt: I. Check the fuse in the controller. Replace rt if rt has blo·,r.i. 2. Cleek the breaker for main controller pQ'Ner and ~.11.;,e sure th.1: rt is not tripped. If the breaker has tripped, reset lhe breaJ.:er. D. Check the circuit breaker for the pump and make sure that it ,s not ti 1pped. E. If the breaker has tripped, reset the breaker. F. Place the Hand,()11/Auto s"-litch for the pump ,n the Hand pos•,on: I. If the pump starts see sect,on G. 2. If the contactor for the pu,.;,p pulls ,n. and the pomp does not start, have a qualified electricran or a GeoPure technician check the po,,,.,, supply. 3. If the contactor does not pull ,n, notify GeoPure of the prob'ern G. If the leYel in the sump is high enough to run the pump, but the pump Vv"tl/ not run with the s'Nftch in the Auto posrtion, then che(k the level control . system. 2. Pump is frozen. If the shaft of the pump cannot be rotated physically by hand. or 1f the shaft of the pump is binding, then please refer to the supplied pump maintena.,ce mariual for troubleshooting of mechanical problems 3. The system high pressure sv,,itch is being activated. A. Check for a dosed valve. stuck check valve. or 1.;,,,1,,~d hose 1n the doscharge of the pump. -- - - - - --- ----- - --- .. Pump is running, but it is not pumping waler. - 4. High back pressure 5. Pump casing and impeller is fouled. Sump 011erllows because the pumps I. Pump casing and impeller is fouled. are not keeping up. lill!l!!!!!I C. Check the system d,scharge floV>?ath, including the 1nfi~rat1on galtery, or injection wen, and the backwash stop valve included 1n I OFG92L Mte'T's A. If the shaft or the pump cannot be rotated physically by harvL o, ,r ,,,e so,". of the pump is binding, then please refer to the supplied pu'T"IC' ,.,~ntie"Y"Ce manual for troubleshooting of mechanical problems. B. If the shaft rotates freely, but the running pump cannot 2.ch•e .e the des1.r~d pressure, then the pump must be cleaned. The pump mjy be c!ie-1.,.,ed bf pumprng a solution of muratic acid through the system. wo·.·..e·.e~. for a - thorough cleaning it is recommended that you d1~semble the pu·-rip r~• !t"-e enclosed manuaJ instructions. A. II the shaft of the pump cannot be rotated physically by hand. or ,r the sra". of the pump is binding, then please refer to the supplied pump ma,nte'1JJiCe mrtm1a/ for troubleshooting of mechanical problems. B. If the shaft. rotates freely, but the running pump cannot achieve the desIred pressure, then the pump must be cleaned. The pump may be cieaned b) pumping a solution of muratic acid through the system f-lo· ... -e•.-er. for a th()rough cleaning it is recommended that you d1sassemb:e the pumo per the endmed manual instructions. '" C Check the foot valve for scale deposrt.s. If !he fool ·!al ,e ,, d,rty or (lc.p;e1 clean or replace it. , D. Check all valves on the pump suction for proper ooera11on I( there ,s 3 bad or dirty check val11e, clean or replace~- E. Check for a closed valve. stuck check valve. or lo.:1nl...~d hose ,n me discharge of the pump. F. Check. the pressure drop across the Ag and carbon It:'~-If there s a., e>:cessive pres.sure drop (greater than 20 PSI) across any oftr>ese tJ.."·--s. this bank of is clogged and may need to be rep'ace . .Ags may be ma.nu.i!1y backwashed into the trickle filter. (See the manual b~Kl...w.uh rr1..,1..·..lur~ ,n the Stdrt-up instructtOns.) G. Check the system drscharge flo......-path, 1nclud,ng the rnMtra!1cn bJ.'1ery. er 1n1ect1on well, and the backwash stop valve included 1n I OFGB2L S)S:erns 8.0 WASTE MANAGEMENT AND DISPOSAL Solid wastes generated by the treatment of site groundwater consist of spent media filter cartridges and spent activated carbon. CAUTION SPENT MEDIA FILTERS AND ACTIVATED CARBON ARE POTENTIALLY HAZARDOUS MATERJALS. PERSONNEL PROTECTIVE CLOTHING AND PROCEDURES DESCRIBED IN THE SITE HEALTH AND SAFETY PLAN ARE TO BE FOLLOWED WHEN HANDLING OR CONT ACTING THESE MA TERJALS. 8.1 Regulatory Status I I I I I I The classification of waste materials generated by the groundwater treatment system is the responsibility of Beazer East Inc. Be¥er East will provide labeling and manifesting instructions I for all waste materials prior to shipment of those materials off-site. 8.2 Waste Management and Disposal Methods Spent media filters will be collected in a 55-gallon drum or other suitable container. The drum will be labeled as non-hazardous and v.~11 be kept closed except when adding filters. It is expected that low quantities of sediment will be retained on the filters. Since the groundwater potentially contains pentachlorophenol. phenol, 2.4-dichlorophenol, and dioxins. sediments retained on the filter could also contain these compounds. At least one sample of the sediment collected on the filters will be tested. The sample will be analyzed for pentachlorophenol, phenol, and 2,4- dichlorophenol using EPA Method 8270 and for dioxin using EPA Method 8290 reported as Toxic Equivalent Concentration using the Toxicity Equivalence Factors provided in Table 10 of EPA Method 8290. This sample will be used to classify the media filters. If the testing results allow Beazer East to classify the filters as non-hazardous, they may be disposed of as a solid waste. Since the filters may contain significant moisture, it may be necessary to add a drying agent such as cement or lime to the drum or container containing the filters prior to disposal. Other specific requirements may apply depending upon the selected disposal facility. Spent activated carbon will be slurried or vacuumed from the carbon vessels and collected in 55- gallon drums. It is estimated that 5 or 6 drums will be required to contain the I 000 pounds of carbon in each vessel. A composite sample of carbon will be collected from the drums and analyzed in the same manner as described for the media filters. The sample will be used to classify the spent activated carbon and determine the required method of disposal. Project\34321.000 8 - I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I KEITHOGOE E PROJECT MANAGER FLUOR DANIEL GTI SAFElY -FIRST AND ALWAYS FLUOR DANIEL GTI, INC. HEALTH AND SAFElY PLAN REQUESTED AND PREPARED FOR BEAZER EAST, INC 436 SEVENTH AVENUE PITTSBURGH, PA 15219 FOR SITE ACTIVITIES AT KOPPERS COMPANY SUPERFUND SITE 908 CHURCH STREET MORRISVILLE, NC JANUARY 10, 1997 ✓~-G- /~-IP-. C_H_M_M _______ _ HEALTH AND SAFElY REPRESENTATIVE The information in this HASP is provided solely for the protection of the health and safety of Fluor Daniel GTI employees and subcontractors working under the direct supervision and control of Fluor Daniel GTI on this project. Fluor Daniel GTI assumes no liability for, or responsibility to, any other parties for the accuracy or completeness of the Information contained herein for any use or reliance upon this HASP by any other party. Copyright© Fluor Daniel GTI All Rights Reserved. 1000 Pe,;mete, Pork D,;ve, Su;te 1 / Mocc;svdle, NC 27560 USA (919) 467-2227 FAX (9191 467-2299 Health and Safety Plan Koppers Company Superfund S110 January 9, 1997 TABLE OF CONTENTS LIST OF ACRONYMS ............................ ········· ................ v· Site Emergency Form .......................................................... viii Hospltal Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . ix Emergency First Aid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x 1.0 INTRODUCTION ......................................................... 1 2.0 3.0 4.0 5.0 6.0 7.0 1. 1 Site Description/Background Information ................................ 2 1.2 Project Personnel and Responsibillties .................................. 2 1.3 Hazard Analysis and Site-Specific Health and Safety Program Requirements ..... 6 1.4 Contaminants of Concern Profile ...................................... 9 HAZARD IDENTIFICATION AND CONTROL .................................. 13 AIR MONITORING ...................................................... 19 3.1 Air Monitoring .................................................... 19 CSE PROCEDURES .......................... . . ............... 25 CHEMICAL HAZARD CONTROL ...... 26 5.1 Chemical Handling Procedures . . . . . . . . . . . . ................ 26 5.2 PPE .................................................. 26 5.3 Site Control: Work Zones ........................................... 28 5.4 Decontamination Procedures ......... : .............................. 29 5.5 Example Decontamination Diagram ................................... 30 CONTINGENCY PLANS .................................................. 32 6. 1 Field Communications ............................................. 32 MEDICAL MONITORING PROGRAM ........................................ 35 7.1 ' Medical!Technical Advisors .......................................... 35 c:61~nd96\koppers n.uoa DAN■L cnt ~ I I I I I I I I I I I I I I I I I I I I I I I I B I I I I I I I I I I I I I HcaHh and Safety Plan Koppers Company Super1und Site TABLES Table 1. Table 2. Table 3. Table 4. Table 5. Table 6. Table 7. Table 8. Table 9. Table 10. Table 11. Table 12. Table 13. Table 14. Table 15. Table 16. c:61\ind96\kcwe,s Responsibilities of On-Site Personnel Hazard Analysis Matrix Contaminants of Concern Profile Fluor Daniel GTI Health and Safety Training Programs Potential Hazards and Control Air Monitoring Frequency Guidelines Air Monitoring Action Levels Hazard Summary Noise Monitoring Chemical Handling Procedures PPE Site Security and Work Zone Definition Decontamination Procedures Contingency Plans for Site Emergencies Field Communications Methods Medical Monitoring Program Iii January 9, 1997 nuoa DANIIL OTI ~ Health and Safety Plan Koppers Company Supcrtund S,te APPENDICES A Agreement and Acknowledgement Form HASP Amendment Sheet Visitor/Trainee Guidelines Trainee/Observer Agreement Form B C D E F G H J K L PIR Incident Reporting Guide LO/TO Procedures MSDS Definitions MDSDs Air Monitoring Form Daily Instrument Calibration Check Form Underground Utility Contact Prevention and Management Plan CSE Hazard Analysis Form Site-Specific Confined Spaces CSE Permit Confined Space Personnel Requirements Hot Work Permit Hot Work JSA HeaUCold Stress Procedures JSA Site Maps Fluor Daniel GTI Field Inspection Form M Daily Safety Tailgate Meeting Form c:611ind96\J<oppers Iv January 9, 1997 . fLUOR DANIIL lffl ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Ptan Koppers Company Supcrtund Sile LIST OF ACRONYMS ACGIH ANSI BP BT BTEX BWL BWT CET CFR CGI CHMM CIH COHN CNS CPR CRZ CSE CSP CZ OM DOT OT DZ EKG EMR EMS EPA EZ FID FP GFCI GM HASP HAZWOPER HBV HEPA HR HSM HSR HSS American Conference of Governmental Industrial Hygienists American National Standards lnstnute Breath pipe Body temperature Benzene, Toluene, Ethylbenzene, and Xylene Body water loss Body water temperature Certified Environmental Trainer Code of Federal Regulations Combustible gas indicator Certified Hazardous Materials Manager Certified Industrial Hygienist Certified Occupational Health Nurse Central nervous system Cardio-pulmonary resuscitation Contaminant reduction zone Confined space entry Certified Safety Professional Clean zone Dust-particulate monitor Department of Transportation Detector tube Decontamination zone Electrocardiogram Environmental Medical Resources Emergency Medical Services Environmental Protection Agency Exclusion zone Flame ionization detector Flashpoint Ground fault circuit interrupter Geiger-Mueller Health and Safety Plan Hazardous Waste Operations and Emergency Response Hepatitis B-vinus High efficiency particulate air-purifying Heart rate Health and Safety Manager Health and Safety Representative Health and Safety Specialist LIST OF ACRONYMS (continued) c:61~nd96\koppers V January 9, 1997 ,woa DANIIL ltTI ~ I I Heallh and Safety Plan vi Koppers Company Superlund Sile January 9, 1997 I HVDPE High vacuum dual-phase extraction HZ Hot zone I IDLH Immediately dangerous to life or health ILO International Labor Organization I IP Ionization potential JSA Job safety analysis LEL Lower explosive limit I LOrTO Lockout/tagout mg/M, Milligrams per cubic meter I mg/L Milligrams per liter MSDS Material Safety Data Sheet MSHA Mine Safe~ and Health Administration I N NIDA drug screen NA Not available NBR Nrtrile butyl rubber I NEC National Electrical Code NIDA National Institution on Drug Abuse NIOSH National lnstrtute for Occupational Safety and Health NFPA National Fire Prevention Association I NL NIDA-like drug screen NRR Noise reduction rating o, Oxygen I o, Ozone OM Operations Manager OJT On the job training I OT Oral temperature OSHA Occupational Safety and Health Administration PEL Permissible exposure limit I PIO Photoionization detector PIR Preliminary incident report PM Project Manager I ppb Parts per billion PPE Personal protective equipment ppm Parts per million I RB Random breathalyser RBP Random breath pipe RCRA Resource Conservation and Recovery Ad. of 1976 I REL Recommended exposure limit RN Registered Nurse LIST OF ACRONYMS (continued) I RR Relative responses RT Random ten panel drug screen I c:61 ~nd96\koppers FLUOR DANIIL on ~ I I I Heallh and Salety Plan vii I Koppers Company Super1und Sile January 9, 1997 SHSO Stte Health and Safety Officer I SLM Sound level meter sow Scope of work SPL Sound pressure level I STEL Short-term exposure limtt sz Support zone TLV Threshold limtt value I TP Fluor Daniel GTI ten panel drug screen TSF Tons per square foot TWA B-hour time-weighted average I UEL Upper explosive limtt ug/L Micrograms per Jtter UST Underground storage tank I VP Vapor pressure WBGT Wet bulb globe temperature I I ( I I I I I I I I I c:61\ind96\koppers nuoa DANIIL ctTI ~ Health and Safety Plan Koppers Company Superfund SIie SITE EMERGENCY FORM Contaminants of Concern: 2,4-Dlchlorophenol, Dioxin, Pentachlorophenol Minimum Level of Protection: Level D Hazard Determination: Serious__ Moderate__ Low_X_ Do not endanger your own life. Survey the situation before taking any action. Fluor Daniel GTI Office Telephone 919-467-2227 Site Location Address 908 Church St., Morrisville, NC Telephone Located at viii January 9, 1997 EMERGENCY PHONE NUMB~SHE EVENT OF~ EMERGENCY CONTACT PROJECT MANAGER (PM) OR HEAL TH AND SAFETY REPRESENTATIVE Ambulance 911 Fire 911 Police 911 Poison Control 800-722-2222 Hospital Name Rex Hospital Hospital Phone Number 783-3100 Project Manager Keith Ogden, 919-467-2227 Site Safety Officer Bill Brincefield, 919-467-2227 Health and Safety Manager Barry Bedaw, 518-370-5631 Client Contact Jim Cook, 412-227-2092 State Agency NCDEHNR c:61lind96\koppers FLUOI DANRL on ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Koppers Company Superfund Sito Ix January 9, 1997 HOSPITAL LOCATION MAP HOSPITAL DIRECTIONS: Take Rt. 54 south to Airport Bivd. Tum left onto Airport Blvd. Take Airport Blvd. to 1-40 east. Exit at Wadw Ave., go left on Blue Ridge Road. Rex hospital is at the intersection of of Lake Boone Rd. c:61\ind96\koppers HOSPITAL INFORMATION: Name: Rex Hospital Address: 4420 Lake Boone Rd. City, State: Raleigh, NC Phone: Emergency: 783-3100 nuoa DANIIL cm ~ Health and Safety Plan Koppers Company Super1und Site X January 9. 1997 EMERGENCY FIRST AID FIRST AID Ingestion: DO NOT INDUCE VOMITING. Call Poison Control • follow instructions. Administer cardiopulmonary resuscttation (CPR), if necessary. Seek medical attention. I I I I I Inhalation: Remove person from contaminated environment. Administer CPR ff I necessary. Seek medical attention. DO NOT ENTER A CONFINED SPACE TO RESCUE SOMEONE WHO HAS BEEN OVERCOME UNLESS PROPERLY EQUIPPED Skin Contact: Eye Contact: Exposure throat, Symptoms: Contingency Plan: STANDBY PERSON IS PRESENT. Brush off dry material, remove wet or contaminated clothing. Flush skin thoroughly wtth water. Seek medical attention ff inilation persists. Flush eyes ~h water for 15 minutes. Seek medical attention. Headache, dizziness, nausea, drowsiness, irrttation of eyes, nose, breathing difficulties. Report incident to PM and Health and Safety Specialist (HSS) after emergency procedures have been implemented. RESPONDER MUST HAVE A CURRENT CERTIFICATE TO ADMINISTER FIRST AID OR CPR I I I I 1. Survey the sttuation. Do not endanger your own lffe. DO NOT ENTER A CONFINED SPACE TO I RESCUE SOMEONE WHO HAS BEEN OVERCOME UNLESS PROPERLY EQUIPPED AND TRAINED. 2. 3. 4. 5. PROTOCOLS ARE FOLLOWED INCLUDING THAT A STANDBY PERSON IS PRESENT. Call 911 (if available) or the fire department IMMEDIATELY. Explain the physical injury, chemical exposure, fire, or release. Decontaminate the victim wtthout delaying lffe-saving procedures. If the victim's condttion appears to be noncritical, but seems to be more severe than minor cuts, he/she should be transported to the nearest hospttal by trained Emergency Medical Services (EMS) personnel: let the doctor assume the responsibiltty for determining the severity of the injury. If the condttion is obviously serious, EMS must transport the victim. Notffy the PM and the HSS. Complete the Fluor Daniel GTI Prefiminary Incident Report (PIR) ~hin 24 hours. c:61lind961koppers nuoa DANIIL on ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Kopper, Company Super1und Sile xi January 91 i997 EMERGENCY FIRST AID PROCEDURES To Stop BleedlnQ CPR 1. Give medical statement. 1. Give medical statement. 2. Assure airway, breathing, 2. Arousal: Check for consciousness. circulation. 3. Open airway with chin-lift. 3. Use DIRECT PRESSURE over the wou Id with clean dressing or your hand (use 4. Look. listen, and feel for nonpermeable gloves). Direct breathing. pressure will control most bleeding. 5. If breathing is absent, give 2 slow, 4. Bleeding from an artery or several full rescue breaths. injury sites may require DIRECT Jie Check the pulse for 5 to 10 seconds. PRESSURE on a PRESSURE POINT. pressure points for 30 • 7. If pulse is present, continue rescue 60 seconds to help control severe bleeding. breathing: 1 breath every 5 seconds. 5. Continue primary care and seek medical aid as needed. 8. If pulse is absent. initiate CPR; 15 compressions for each two breaths. c:61~nd96\koppers nuo■ DANIIL GTI ~ Health and Safety Plan Koppers Company Supertund Sile 1.0 INTRODUCTION Beazer East Inc. has retained Fluor Daniel GTI, Inc. (Fluor Daniel GTI) to perform environmental services at the Koppers Superfund Site, 908 Church St., Morrisville, NC. 1 January 9, 1997 The Health and Safety Plan (HASP) is written to ensure the well-being of all field personnel and the community surrounding the site. Accordingly, project staff and approved Fluor Daniel GTI subcontractors must follow the policies and procedures established in the HASP. All Fluor Daniel GTI personnel and subcontractors assigned to this project must sign the Agreement and Acknowledgement Sheet (Appendix B) to confirm that they understand and agree to abide by the provisions of the plan. All work will comply with Fluor Daniel GTI health and safe!)' guidelines in concurrence with all applicable sections of the Occupational Safety and Health Act (OSHA), 29 Code of Federal Regulations (CFR) 1910 and 1926; specifically 29 CFR 1910.120 and 1926.65 Standards, "Hazardous Waste Operations and Emergency Response,' (29 CFR 1910.120) as well as other federal. state, and local regulations that require the development and implementation of a HASP. Generation of this document certifies that the workplace has been evaluated for the hazards as described. A hazard assessment has been performed and the adequacy of the personal protective equipment (PPE) selected is hereby certified per 29 CFR 1910.132(d) and is duly noted by the signature(s) and date appearing on the cover page of this document. This HASP addresses the safety issues associated with this inactive site and and surrounding properties, and involving the following site tasks: • Gauging/Bailing/Sampling Wells • Surface Water Sampling • Pump Treat System O&M The minimum level of protection for this site is Level D. For each task, the potential hazards for employee exposure to site contaminants and/or air monitoring results, will determine the level of protection. Modified Level D will be worn during tasks that may have the potential for skin contact with contaminated media (soil or water). Upgrade to Level C and/or B will occur when the possibility of exposure exists from the onset of site-specific tasks or results of real-time monitoring exceed established action levels listed in Table 7, Air Monitoring Action Levels. This HASP must be modified or amended when circumstances or conditions develop that are beyond the scope of this plan. c:61 \ind96\koppers nuoa DANIIL en ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I HHfth and saro1y Plan Koppers Comf"'ny Suporfund s•• 2 January 9, 1997 Any changes in project work scope and/or site conditions es described must be amended in writing by the Health and Safety Representative (HSR) on the HASP Amendment Sheet (Appendix A). Table 1, Responsibilities of On-Site Personnel, lists those accountable and responsible for the implementation of the HASP. Table 2, Hazard Analysis Matrix, presents en overview of site-specific job tasks and the associated hazards. Table 3, Contaminants of Concern Profile presents an overview of the hazards and control measures associated with the site contaminants of concern. Lastly, Table 4, presents an overview of the Fluor Daniel GTI health and safety programs in which all field personnel are required to participate. These include the medical surveillance and comprehensive training programs in accordance with OSHA Hazardous Waste Operations and Emergency Response standard, 29 CFR 1910.120. 1.1 Site Description/Background Information Beazer East. Inc. The corporale successor to Koppers Co., Inc. entered into an Environmental Protection Agency (EPA) Administrative Order for Remedial Design in December 1992. The following summary is taken from the Administrative Order: Koppers Co. Inc., operated the site as a wood preservation facility Iron 1968 to 1975. The wood preservation process involved the pressure injection of wood with pentachlorophenol and was generally located in the southeastern portion of the site. Koppers initially discharged the wastewater from the wood preserving process into the Fire Pond. Koppers later installed two unlined lagoons and discharged the process wastewaters into those lagoons. The unlined lagoons were later drained end the liquids from th lagoons were spread over foe Ids adjacent to the lagoon area. Koppers owned the entire site until 1986, at which time Koppers sold a portion of the site. Koppers retained portions of the site containing the Fire Pond, the lagoon area, and certain process areas. In March 1989, the EPA placed the Koppers site on the NPL. A Remedial Investigation in 1989 confinmed the presence of the site contaminants in groundwater, surface water, surface sils, subsurface soils and sediments. 1.2 Project Personnel and Responsibilities Fluor Daniel GTI will oversee and act accordingly during all phases of the project. The following management structure will be instituted for the purpose of successfully and safety completing this project. c:61 ~ nuoa DANIIL en ~ Health and Safely Plan Kof>pe~ Company Superfund Site Technical Advisors Jeffrey Stumpf, CIH, CSP, CET, CHMM Fluor Daniel GTI, Englewood, CO David Crowley, CSP, CET, CHMM Fluor Daniel GTI, Norwood, MA The specific duties of the technical advisors include: 3 January 9; 1997 (303) 799-4241 (617) 769-7600 ■ providing technical input into the design and implementation of the site HASP, • . c:61~nd96\koppers advising on potential for wori<er exposure to project hazards along with appropriate methods and/or controls to efiminate site hazards. nuoa DAN1n on ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Koppe~ Company Superfund Sile • January 9, 1997 A site health and safety officer (SHSO) will be assigned on a full time basis to each srte during site activrties and shall assist and shall represent the Heatth and Safety Manager (HSM). The SHSO shall have the responsibilrty and authorrty to implement and enforce the approved HASP, this includes modrrying/hatting work, and removal of personnel from the srte rr work condrtions change and effect on-site/off-srte heatth and safety matters. The SHSO will serve as the main contact for any on-srte emergency situation. Table 1. Responsibilrties of On-Site Personnel General Tttle Description Responsibilities Project Reports to • Prepares and organizes background review of the Manager (PM) upper-level project, the work plan, the HASP, and the field management. team. Kenh Ogden Has authority • Obtains permission for sne access and to direct coordinates activnies wnh appropriate response officials. operations. • Sees that the work plan is properly carried oU1 Assume total and on schedule. control over • Briefs the field personnel on specific srte assignments. activrties. • Together wrth the SHSO sees that health and safety requirements are met. • Prepares final report and follow up on Preliminary Incident Report (PIR) events. SHSO Advises the PM • Periodically inspects protective clothing and on all aspects equipment. Bill of health and • Sees that protective clothing and equipment are Brincefield safety on properly stored and maintained. srte. Stops • Controls entry and exrt at the access control work rr srte points. operations • Monitors the workers for signs of stress, threaten including heat stress, cold exposure, and worker or fatigue. public health • Implements the HASP. and safety. • Conducts periodic inspections to assess whether Informs the HASP is being followed. health and • · Enforces the "buddy" system. safety • Informed of emergency procedures, evacuation speciafist of routes, and telephone number of local hospital, any changes in poison control center, fire department, and sne police department. condnions or • Notifies, when necessary, local public emergency project officials. status. • Submns Pl Rs promptly to sne supervisor and PM. • Maintains communication with health and safety representative on sne activnies. c:61\ind96\koppers FLUOR DANIIL on ~ •Heallh and Safely Plan Koppers Company Super!und Site 5 January 9, 1997 Table 1. Responsibilities of On-Site Personnel (continued! General Tttle Description ResponslbRities SHSO • Coordinates emergency medical care. {continued) • Sets up decontamination lines and decontamination solutions appropriate for the chemical contaminants encountered. • Controls the decontamination of equipment, personnel, and samples from contaminated areas. • Facilitates the proper disposal of contaminated clothing and materials. • Maintains the availability of required equipment. • Advises Fluor Daniel GTI Technology health services and medical personnel of potential exposures. • Notifies emergency response personnel in the event of an emergency. • Maintains and oversees operation of monitoring equipment and interpretation of data from the monitoring equipment. Project Reports to PM. • Conducts Daily Safety Tailgate Meeting and Supervisor Has authority documents attendance to direct {Appendix M). TBA response • Conducts periodic field health and safety operations. inspections (Appendix L). Assumes total • Manages field operations. control over • Executes the work plan and schedule. site • Enforces safety procedures. activities. • Coordinates with the SHSO in enforcing worker • protection levels. • Enforces site control. • Documents field activities and sample collection . • Notifies when necessary, local public emergency officials. • Submits PIRS and initiates follow up with PM and SHSO. Work Team Reports to • Safely completes on-site tasks required to project fulflll the work plan. supervisor • Complies with the HASP. for on-site • Attends and participates in Daily Safety Tailgate activities. Meetings. Work parties • Notifies SHSO or supervisor of suspected unsafe must comprise conditions. at least two • Submits PIRs to SHSO and Project Supervisor. people for high hazard operations. c:61 lind96\koppers nuoll DAN■L ctTI ~ I m I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Koppers Company Suporfund SIie 6 January 9, 1997 1.3 Hazard Analysis and Site-Specific Health and Safety Program Requirements Site-specific job tasks and the associated hazards are identified In Table 2, Hazard Analysis Matrix. For each task involved with the project are the type of hazards that may be encountered. Utilize the hazard analysis table as a guide for implementing specific health and safety programs. Table 5, Pote_ntial Hazards and Controls provide guidelines to follow when conducting the tasks involved with this project. c:611ind96\koppers n.uoa DANIIL cm ~ Health and Safely Plan Kappe~ Company Superfund SIie Table 2. Hazard Analysis Matrix Hazard& SoI1/Sedlmenl Water Samnllna S.moll= Contaminants or X X Concern E.xposun, OSHA Chemicals X ~•-un, Mechanical EquipmenV Construdion Electrical Fire and Explosion HeauCold Stress X X Vehicular Traffic X X Pedestrian Traffic Underground Utilities Noise Confined Space EntN (CSE) Poisonous Plants X X Snakes/Spide~ X X Insects c:61vnd96\koppers System Urv1rade• X X X X X X X System O&M X X X X X X X 7 January 91 1997 nuoa DANIIL en ~ I I I I I I I I I ( I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l Heallh and Safety Plan Koppers Company Supertund Sile Site-Specific Health and Safety Program Requirements 8 January 9, 1997 Based upon the site-specijic hazard analysis, the following programs must be implemented and the accompanying forms, found in the appendices of the HASP, completed. The completed forms can then be attached to this document. c:61 ~nd96\koppers ,woa DANIIL OTI ~ Heallh and Safety Ptan Koppers Company Superfund Sile SITE-SPECIFIC PROGRAM Air Monitoring Program 9 ( January 9, 1997 HASP APPENDIX Site,specijic LockouVTagout (LO/TO) Procedures Underground Utility Contact Prevention and Management Plan CSE E C F G HeaVCold Stress Procedure Hot Work Permit Daily Safety Tailgate Meeting I H M 1.4 Contaminants of Concern Profile Based upon information received from the background information, site history, and site characterization is a summary profile of the hazards and control measures to follow for the contaminants of concern. Summarized in Table 3, the profile provides an overview of the hazards associated with potential exposure to the contaminants of concern and the preventative measures. For more detailed and specific information, always refer to the Material Safety Data Sheet (MSDS) or equivalent information for the compound located in Appendix E. Table 3. Contaminants of Concern Profile Contaminant of Concern Profile of Hazards and Control Measures to Follow 2 ,4-Dichlorophenol 1. This is a key intermediate in the synthesis of the herbicide acetic acid. tt is generally prepared by ' chlorinated of phenol. 2. In apearence this is needle-like crystals with a strong medicinal odor. It is soluble in carbcn tetrachloride, benzene, and chloroform. 3. OSHA has not established a PEL. 4. Systemic health effects include eye, nose and throat irritation. It is toxic by ingestion and is a strong irritant to tissue. Dioxins 1. Dibenzodioxins occurs as 75.different isomers. 2. OSHA has not established a PEL. 3. It is generally a wMe crystalline and solid. 4. There are no known systemic health effects. c:61~nd96\koppers nuoR DANIIL ..,, ~ I I I I I I I I I I I' I I I I I I I I I I I I I I I I I I I I I I I I B I I Healltl and Safety Plan Koppers Company Supertund Sile Contaminant of Concern Pentachlorophenol c:61~""96\koppers 1. 2. 3. 4. 10 January 9. 1997 Proflle of Hazards and Control Measures to Follow Pentachlorophenol is used as an insecticide for termtte control, as a pre-harvest defoliant, as a general herbicide, and as a wood preservative. It is a colortessto whne, crystalline solid wtth a benzene-like odor. It is miscible in alcohols, ether, and benene. Systemic health effects include eye nose and throat . irmation. II produces anorexia, sweat, an increase then decrease in respiration, blood pressure, and urinary output, and fever. External contact produces headaches, dizziness, nausea, vomtting, chest pain, and high fever. nuoa DAN■L OTI ~ Health and Safety Plan Koppe~ Company Super1und SIie 11 January 91 1997 Table 4. Fluor Daniel GTI Health and Safety Training Programs Training Proaram RequlremenVActlon • Specific training program • Field personnel must complete a minimum of requirements are described 40 hours or hazardous waste activity in Fluor Daniel GTl's Health Instruction. and Safety Procedure Manual, Policy and Procedure #8, • Field personnel must complete a minimum of "Safety Training." 3 days supervised field instruction. • Training requirements and • Field personnel assigned to the site will programs comply with the OSHA also receive 8 hours of refresher training Hazardous Waste Operations each year. and Emergency Response standard, 29 CFR 1910.120. • On-site managers and supervisors directly responsible for employees engaged in hazardous waste operations receive an additional 8 hours or supervisory training. • Field personnel assigned to site also receive first aid/cardio-pulmonary resuscitation (CPR) and blood borne pathogen training. • Field personnel and subcontractors assigned to site must participate in "Daily Safety Tailgate Meeting" and document their attendance. • Competent person training • On-site managers and supervisors directly for excavation/trenching responsible for employees engaged in operations meet requirements excavation/trenching operations receive outlined in 29 CFR 1926, the Fluor Daniel GTI 4-hour "Competent Subpart P. Person Training Seminar." • Authorized supervisor, • Field personnel assigned to site who must attendant, and entrant supervise, watch over and/or enter permit training for permit required · required oonfined spaces receive the Fluor confined space entry meet Daniel GTI 8-hour (or equivalent) •confined requirements outlined in 29 Space Entry'' oourse. CFR 1910.146. • Fall protection training • Field personnel assigned to site who must that meets requirements in 29 work in areas with fall hazards six feet or CFR 1926.503 greater must receive the Fluor Daniel GTI 2-hour "Fall Protection" course. • Fluor Daniel GTI requirement • Field personnel assigned to site who are for removing underground tasked with the assessment and removal of storage tanks (USi). USTs must oomplete the 4-hour Fluor Daniel GTI "Underground Storage Tank Removal" oourse. c:61 \ind96\koppers nuo• DANIIL on ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Kopper! Company Superfund Sito 12 January 91 1997 Table 4. Fluor Daniel GTI Health and Safety Training Programs (continued) Tralnln11 Prooram ReaulremenUActlon • Orientation of plant • Project personnel who are on the project operations, hazards, safe site that falls under the Process Safety work practices. and Standard will receive orientation by a • emergency procedures to oompany representative. follow that meets the requirements of the OSHA Process Safety Standard, 29 CFR 1910.119. c:6 I ijnd96\k-fLUOR DAN■L OTI ~ I I I I I I I I I I I I I I I I I I I Heallti and Safety Plan Koppers Company Super1und Silo 13 January 9. 1997 2.0 HAZARD IDENTIFICATION AND CONTROL Based upon the hazard analysis of the tasks that will be conducted for the project, Table 5 lists the general procedures and practices to follow to prevent injury or illness. Appropriate training for specific hazards must be completed by field personnel prior to initiating work activities. Precautions must be taken to prevent injuries and exposures to the following potential hazards. For additional information, refer to the Fluor Daniel Health and Safety Policies and Procedures. or consult with your health and safety professional. Table 5. Potential Hazards and Control Potential Hazard Control Exposure to 1. Stand up-wind of chemical products whenever possible. Chemical 2. Minimize direct contact and contact time with contaminated media Products to prevent exposure. 3. Avoid walking through discolored areas, puddles, leaning on (See ~.ppendix E: drums, or contacting anything that is likely to be contaminated, MSOS Definitions unless wearing the appropriate PPE. and MSOSs) 4. Do not eat, drink, smoke and/or apply cosmetics in the hOt or warm zones. 5. Wear appropriate PPE when It is required to come in contact with contaminated media or surfaces. 6. Level D PPE must be worn as a minimum when on project site. 8. If unknown materials are encountered, call the HSR. Exposure to 1. All chemicals brought on-site by Fluor Daniel GTI personnel or OSHA Defined their subcontractors, such as pipe glues, solvents, reagents, Hazardous decontamination solutions, or any other OSHA defined hazardous Materials material must be adequately labeled and the MSDSs available on-site. (See Appendix E: 2. MSDSs brought on-site can be attached in Appendix E or in the MSDS MSOS Definitions binder that is kept in the company vehicle. and MSDSs) 3. Training on OSHA defined hazardous materials must be completed and documented. Use the Daily Safety Tailgate Meeting Form in Appendix M to record training attendance. Vehicular 1. Wear traffic safety vest when vehicle hazard exists. Traffic 2. Use cones, flags, barricades, and caution tape to define work area. 3. Use vehicle to block work area. 4. Engage police detail for high-traffic situations. 5. Refer to section 5.3 for specific details and guidance. c:61 \ind96\Jcopper.; FLUOR DANIIL GTI ~ Health and Safety Plan Koppers Company Suporfund Site 14 January 9, 1997 Table 5. Potential Hazards and Control (continued) Potenllal Hazard Control Fall 1. Assess the work to determine if there is a potential for falling. Protection 2. Make a determination of the distance of the potential fall. 3. A fall protection system must be used for potential falls greater than 6 feet. 4. Consult a competent person, such as the HSR, regarding the applicabilrty requiring fall protection and what type of protection systems should be used. 5. Inspect all fall protection equipment and anchoring points prior to their use. 6. Ensure Fall Protection training for applicable employees Is completed prior to initiating work activities. CSE 1. Ensure personnel assigned meet CSE training requirements. 2. Complete CSE Hazard Analysis Form in Appendix G. 3. Complete CSE permrt. Post sign. 4. Ensure pre-entry CSE safety meeting is conducted. 5. Remove vault cover using proper lifting techniques. 6. Promote natural ventilation by opening the space to fresh air, if needed utilize mechanical purge ventilation. 7. Conduct remote air monitoring prior to entry. 8. Attendant can act as CSE Supervisor and must be present at CSE entry point all times when entrant Is in CSE. 9. Access work for fall hazards and ensure provisions for non-entry rescue have been met. 10. Enter only when safe; conduct continuous air monitoring. Inclement 1. . Stop outdoor work during electrical storms and other ex1reme Weather weather conditions such as ex1reme heat or cold temperatures. 2. Take cover indoors or in vehicle. 3. Listen to local forecasts for warnings about specific weather hazards such as tomados, hurricanes, and flash floods. Utility Lines 1. Contact Dig Safe to have utility lines marked prior to Contact excavation/trenching 2. Refer to site drawings or customer interviews if on private property for utility locations. 3. Hand dig 3 to 5 feet down and 5 feet each side of utility marker to avoid breaking utility lines. 4. Refer to Appendix F for Underground Utility Contact Prevention Management Plan. c:61~nd96\koppers fWOR DANRL GTI ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Koppers Company Super1und Site 15 January 9, ,997 Table 5. Potential Hazards and Control (continued) Potential Hazard Control Noise 1. Wear hearing protection when equipment such as a drill rig, jackhammer, cut saw, air compressor, blower or other heavy equipment is operating on the site. 2. Wear hearing protection whenever you need to raise your voice above normal conversational speech due to a loud noise source: this much noise indicates the need for protection. 3. Hearing protection is required when measured sound pressure levels (SPL) exceed 85 dB(A) where employees stand or conduct work. Electric Shock 1. Maintain appropriate distance from overhead utilities; 20-foot minimum clearance from power llnes required; 2. 10-foot minimum clearance from shielded power llnes. Use ground-fautt circuit interrupters as required. 3. Perform LO/TO procedures (Appendix C). 4. Use three-pronged plugs and extension cords. 5. Contact your local underground utility-locating service. 6. Follow code requirements for electrical installations in hazardous locations. Physical 1. Wear hard hats and safety glasses when on-site. Injury 2. Maintain visual contact with the equipment operator and wear orange safety vest when heavy equipment is used on-site. 3. Avoid loose-fitting clothing (driller and drilte(s helper). 4. Prevent slips, trips, and falls; keep work area uncluttered. 5. Keep your hands away from moving parts (i.e., augers). 6. Test the emergency shut-off switch on the drill rig daily. Back Injury 1. Use a mechanical lifting device or a lifting aid where appropriate. 2. If you must lift, plan the lift before doing it. 3. Check your route for clearance. 4. Bend at the knees and use leg muscles when lifting. 5. Use the buddy system when lifting heavy or awkward objects. 6. Do not twist or jerk your body while lifting. Heat Stress 1. Increase water intake while working. 2. Minimize and/or avoid alcohol intake the night before working in heat stress situations. 2. Increase number of rest breaks and/or rotate workers in shorter work shifts; take breaks in shaded areas. 3. Watch for signs and symptoms of heat exhaustion and fatigue. 4. Plan work for early morning or evening during hot months. 5. Use ice vests when necessary. 6. Rest in cool, dry areas. 7. In the event of heat stroke, bring the victim to a cool environment and initiate first aid procedures. Refer to Appendix I. c:61 ~nd96\kopper.; fLUO■ DAN■L OTI ~ Health and Safoty Plan Koppers Company Supertund Site 16 January 9. 1997 Table 5. Potential Hazards and Control (continued) Potential Hazard Control Cold Stress 1 . Take breaks in heated shelters when working in extremely cold temperatures. 2. Remove the outer iayer of clothing and loosen other layers to promote evaporation of perspiratiOn, upon entering the shelter. 3 Be aware of cold stress symptoms such as shivering, numbness in the extremtties, and sluggishness. 3. Drink warm liquids to reduce the susceptibility to cold stress. Refer to Appendix I. . High Crime 1. Be aware of surroundings. Areas 2. Use the buddy system. 3. Request police detail when appropriate. Insects 1. Tuck pants into socks. 2. Wear long sleeves. 3. use insect repellent. 4. Avoid contact by always looking ahead to where walking, standing, sttting, leaning, grabbing, lifting or reaching-in-to. 5. Check for signs of insect/spider bttes, such as redness, swelling, and flu-like symptoms. 6. Use buddy system to check each other for signs of insect/spider bites. 7. Remove ticks immediately wtth fine tipped tweezers by grasping the tick as close to your skin as possible and gently pulling straight out. Do not squeeze the tick's body as this may inject fluids into you. Wash the Me area of skin and apply antiseptic. Poisonous 1. Don't enter areas infested wtth poisonous plants. Plants (Such 2. Immediately wash any areas that come into contact wtth poisonous. as Poison Ivy, plants. Oak or Sumac) 3. Protect exposed skin area wtth gloves and Tyvek® suns. 4. Be aware that the oil from the plant can be carried on boots, clothes and equipment. Always protect skin from contact. 5. If you have known or suspected allergies, carry an Epi-Pen at all times and notify co-workers that you are allergic. Poisonous 1. Avoid walking in areas where snake may nest or hide. Always look Snakes ahead to where walking for signs of snakes. 2. Use extreme caution when moving or rifting objects which could be used by snakes as cover. 3. Never reach under or behind objects or into other areas where snakes may hide. 4. Wear sturdy leather boots. c:61ijnd96\koppe,s JLUOR DANIIL 01'1 ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I \, I Health and Safely Plan Koppers Company Suporfund Sito 17 January 91 1997 Table 5. Potential Hazards and Control (continued) Potential Hazard Control Ladders 1. Assess work areas for fall hazards. 2. Make sure ladder rungs are sturdy and free of cracks. 3. Use ladders with secure safety feet. 4. Pitch ladders at a 4:1 ratio. 5. Secure ladder at the top or have another person at the bottom to help stabilize it. 6. Do not use ladders for access to air stripper towers. 7. Use non-conductive ladders near electrical wires. Fire Control 1. Smoke only in designated areas. 2. Keep flammable liquids In closed containers. 3. Keep site clean; avoid accumulating combustible debris such as paper. 4. Follow Hot Work Safety Procedures when welding or perfonning other activities requiring an open flame. 5. Isolate flammable and combustible materials from ignition sources. 6. Ensure fire safety integrity of equipment installations. Static 1. Do not create static discharge in-flammable atmospheres. Electricity 2. Electrically bond and ground pumps transfer vessels, tanks, drums, bailers and probes, when moving liquids. 3. Electrically bond and ground vacuum trucks and the tanks they are emptying. 4. Do not splash fill containers with flammable liquids. Well Gauging, 1. Wear appropriate PPE to avoid skin, eye, and inhalation contact Well Bailing, with contaminated groundwater and/or soil. Soil/Ground-2. Stand upwind when conducting tasks and minimize possible water Sampling inhalation exposure; especially when first opening monitoring wells. 3. Conduct air monitoring to determine level of respiratory protection. 4. Utilize engineering controls such as portable venturi air movers to draw away or blow away chemical vapors. Rapid Response 1. Ensure emergency response activities have been completed prior to beginning rapid response freld activities. 2. Conduct hazard assessment of project site and communicate findings through a "Daily Tailgate Safety Meeting" to all Fluor Daniel GT! employees and subcontractors prior to beginning rapid response field activities. 3. Communicate applicable Fluor Daniel GT! health and safety programs to other contractors on site that may be impacted and coordinate field activities with them. c:6rnld961koppeB FLUOR DANIIL OTI ~ Health and Safety Plan Kappe~ Company Supcrfund Site 18 January 9, 1997 Table 5. Potential Hazards and Control lcon1inued) Potential Hazard Control Welding, 1. Conduct fire safety evaluation. Cutting, 2. Complete Hot Work Permit (Appendix H). Brazing 3. Ensure flammable materials are protected from hot work, sources of ignttion. 4. Ensure fire watch/fire extinguisher is on standby by hot work location. Cleaning 1. Wear appropriate PPE to avoid skin and eye contact with isopropyl Equipment alcohol, alconox, or other cleaning materials. 2. Stand upwind to minimize any potential inhalation exposure. 3. Dispose of spent cleaning solutions and rinses accordingly. First aid kit, blood borne pathogen kit, emergency eye wash/shower station, fire extinguisher and absorbent pads will be located on-stte either in the decontamination zone, or in the Fluor Daniel GTI company vehicle. c:61lind96\koppers FLUOR DANIIL on ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Heallh and Safety Plan . Koppers Company Supertund Sile 3.0 AIR MONITORING 3. 1 Air Monitoring 19 January 9, 199 7 A review of literature regarding the chemicals of concern indicate that minimal threat to employees health exist. The remediation system is an enclosed pump and treat system. The low levels of contaminants are not voliatile and therefore, vapor air monitoring would not be effective. Hazards associated with this site will be addressed with personal protective equipment to include dermal protection for skin contact. In the event that the scope of work changes, air monitoring may be required. Both area and personal air monitoring readings are to be taken to characterize site activities. Air monitoring results must be documented on the Air Monitoring Form (Appendix E). ATTENTION: SITE PERSONNEL ASSIGNED RESPONSIBILITY TO CONDUCT AIR MONITORING MUST HAVE BEEN ,c' MONITORING EQUIPMENT OPERATION AND CALIBRATION PRIOR TO ITS USE. Calibration and maintenance of air monitoring equipment must follow manufacture specifications and documented. Recalibration and adjustment of air monitoring equipment must be completed when site conditions and equipment operation reveal the need. Record all air monitoring equipment calibration and adjustment information on form in Appendix E. Air monitoring action levels (Table 7) have been developed by the Fluor Daniel GTI HSM, to indicate the chemical concentrations in the breathing zone that require an upgrade in level of PPE. Action levels are typically set at either one-half the OSHA Permissible Exposure Limit (PEL), National Institute for Occupational Safety and Health (NIOSH) Recommended Exposure Limits (REL), or the American Conference of Governmental Industrial Hygienists (ACGIH) Threshold Limit Values (TLV). Rationale for establishing action levels is based upon the data available that characterizes contaminants of concern in soil or water. Calculation for estimating action levels is then completed using the principles of Henry's Law (volatiles in water), fugacity (volatiles in soil), and proportionality (particulates in soiO. When analytical data is not available, a qualitative assessment is conducted based on knowing the contaminants of concern and then setting action levels based on the c:6, lind96\koppers FLUOI DAN■L OTI ~ Hea11h and Saloty Plan Koppe~ Company Suporfund Site 20 January 9, 1997 · compound(s) with the lowest OSHA PEL, NIOSH REL or ACGIH TLV, and following an air monitor1ng schedule that will minimize any potential for over exposure. All worlcers on-site must have been property fitted with PPE (i.e., respirators) and have been trained in their use (i.e., donning and doffing). Air monitoring measurements will be taken in the breathing zone of the worlcer most likely to have the highest exposure. Transient peaks will not automatically trigger action. Action will be taken when levels are consistently exceeded in a 5-minute period. Similarly, ff chemical odors are detected that are a nuisance, bothersome, or irritating, an upgrade in respiratory protection can provide an extra level of comfort or protection when conducting site activities. Guidelines for frequency of air monitoring are presented in Table 6. Job tasks that require air monitoring, the applicable action levels that apply for those tasks, and the frequency of air monitoring are descr1bed In Table 6 and Table 7 respectively. Engineering controls such as the venturi air mover (supplied by compressed air) to exhaust or dilute solvent vapors emanating from monitor1ng wells or when conducting intnJsive activities can be utilized as a means to downgrade PPE requirements (Level B to C, Level C to D). c:61\ind96\l<oppers · nuoa DANIIL cm ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I \ Heallh and Safety Plan 21 January 9, 11197 Koppor3 Company Superfund Site Table 6. Air Monrtoring Frequency Guidelines Conduct periodic monrtoring when: 1, 2. It is possible that an immediately dangerous to life or health (IDLH) condrtion or a nammable atmosphere has developed, or There is an indication that exposures may have risen over established action levels, permissible exposure limrts or published exposure levels since the last monrtoring. Lock for a possible rise in exposures associated wrth these srtuations: ■ ■ ■ ■ • • ■ Change In site area -work begins on a different section of the srte. Change In contaminants -handling contaminants other than those first identified. Visible signs of particulate exposure from Intrusive activities such as drilling/boring and excavation. Perceplible chemical odors or symptoms of exposure. Change in on-site activity -one operation ends and another begins . Handling leaking drums or containers . Working with obvious llquld contamination (e.g., a spill or lagoon). Conduct air monrtoring when the possibility of volatilization exists (such as wrth a new monrtoring well or a well containing known product). c:61~nd96\I<-nuo• DAN■L en ~ I I Health and Safety Plan 22 Koppers Company Supertund Site January 9. 1997 I I I I I I I I I I I I I I I (,c-· I c:61~nd96\koppers ,woa DANIIL OTI ~ I ' I I Health and Safety Plan 23 I Koe~rs Come!nl Sue!rfund Site January 9, 1997 I I I I I I I I I I I I I I I \. 'I c:61 lind96\koppen1 FLUOR DANIIL OTI ~ Health and Safety Plan Kopper5 Company Supertund Site 4.0 CSE PROCEDURES 24 January 9, 1997 In the event site work may require personnel to enter confined spaces. No Fluor Daniel GTI employee or subcontractor shall enter an area Identified as a confined space without using the CSE procedures described In Appendix G and the site-specific entry procedures presented In Appendix G. The purpose of the CSE procedure Is to protect employees from potentially hazardous environments and to facilitate immediate rescue in an emergency situation. A CSE Permit must be posted at the entrance to each confined space. Permit required confined spaces identified for this project include (insert type of CSE and location, e.g. recovery well vault). c:61 und96\koppers FLUOR DANIIL lffl ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan · Koppers Company Supcr1und Silo 5.0 CHEMICAL HAZARD CONTROL 5.1 Chemical Handling Procedures 25 January 9, 1997 Personnel must practice the chemical-specific handling procedures outlined below. Table 10. Chemical Handling Procedures Chemical Description Procedures Acids and Ex1remely ■ Wear gloves and eye-splash protection while Bases corrosive using acid dispensed from a small dropper materials with a bottle during water sampling. Acids: variety of uses. ■ Wear a ful~face, air-purifying respirator including equipped wtth combination cartridges (organic vapor/acid gas) as well as Tyvek® hydrochloric, coveralls and nttrile and/or nttrile butyl nttric, and rubber (NBR) gloves for large volume su~uric applications. acids ■ Have an eye wash bottle or portable eye wash station on-stte. Bases: ■ Cap all drums after dispensing chemicals. including ■ Do not add anything into a virgin chemical sodium drum, including unused product. hydroxide ■ Avoid mixing strong acids and bases. Consult HSR for task-specific evaluation. If mixing is absolutely necessary, do tt slowly. Avoid vapors or fumes that are generated. ■ When diluting acids, add the acid to water in small quanttties and mix cautiously. ■ When diluting bases, add water to the base in small quanttties and mix cautiously. Activated Granular adsorbent ■ Use respiratory protection when activated Carbon medium used to carbon creates a dusty environment. remove residual ■ Avoid using Activated Carbon Filter Beds hydrocarbons from for Ketone Solvents -an exothermic water and/or air. reaction can develop over time and result in possible explosion. ■ Contad HSR for task-specific evaluation. 5.2 PPE Based upon the hazards that may be encountered during stte activtties, PPE as follows was selected. Only PPE that meets the following American National Standards lnstttute (ANSI) standards are to be worn. ■ Eye protection -ANSI 287.1-1989 c:61~nd96\koppers nuoa DANIIL ttTI ~ Heallh and Safofy Plan Koppers Company Super1und Sito • Head protection -ANSI Z89.1-1986 • Foot protection -ANSI Z41-1991 26 January 9, 1997 Employees must maintain proficiency in the use and care of PPE that is to be worn. Typically this is covered during formal and informal refresher training sessions presented by Fluor Daniel GTI. Level D Is the minimum acceptable level of protection for this project site. Upgrade to Modffled Level D occurs when the posslblllty of contact to Iha skin or work unfform can occur from contaminated media. Upgrade to Level C w/11 occur when results of air monitoring reveals action levels have beeh exceeded. Upgrade to Level 8 occurs when results of air monitoring reveals action levels have been exceeded, and site personnel meet training requirements. Weer hearing protection when In areas where high noise levels are generated. Table 11. PPE Level Reaulrements Level D • Work uniform • Steel-toed boots • Approved safety glasses or goggles • Hard hat • Fluorescent vest, when vehicular traffic is on or adjacent to the site • Nitrile gloves for water sampling handling --------------------------------------------------------------------------------------- . Modified One or more of the following: LevelD ■ Chemical resistance (acid or solvent) boot covers • PE-coated Tyvek® suit, NBR outer and nitrile inner gloves if skin contact with contaminants is possible. • Hearing protection (muffs and/or plugs) . LevelC • Level D and Modified Level D • NIOSH/MSHA-approved full-face respirator with organic vapor/high efficiency particulate air-purifying (HEPA) cartridges. LevelB • Level D and Modified Level D • NIOSH/MSHA approved full face positive pressure demand supplied air respirator, either airline or self contained. Prior to use, all equipment must be inspected to ensure proper working conditlon. c:61~nd96\koppers nuoa DANIIL en ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Heallh and Safety Plan Koppers Company Superfund Sile 5.3 Site Control: Work Zones Work zones will be established in order to: ■ ■ ■ Delineate high-traffic locations, Identify hazardous locations. and Contain contamination within the smallest area possible. 27 January 9, 1997 Employees entering the work zone must wear the proper PPE for that area. Work and support zones will be established based on ambient air monitoring data, necessary security measures, and site-specific conditions. Work zones will be identified as either Hot Zone (HZ)/Exclusion Zone (EZ); Decontamination Zone (DZ)/Contamination Reduction Zone (CRZ); or Clean Zone (CZ)/Support Zone (SZ). The following PPE requirements apply for Work Zones: ■ HZs/EZs requires Level D PPE ■ DZs/CRZs require Level D PPE ■ SZs/CZs require Level D PPE Listed are general guidelines for delineation of work zones. CRZs will be developed for decontamination procedures listed in Section 4.5. 1 . The HZ/EZ is identified to contain sampling area or maintenance area where the system has been opened. A minimum ten-foot distance surrounding this area will be demarcated with cones, barricades and/or caution tape depending on location to employees, general public, and high traffic areas. 2. 3. c:61Und96\ko~ The DZ/CRZ will be upwind of the sampling area or outside the system building and can include the back-end of the company pick-up truck. The DZ/CRZ will be demarcated at its boundaries with barricades, cones, and/or caution tape depending on location to employees, general public, and high traffic areas. Support areas are the areas away from any contamination. nuoa DANIIL CITI ~ Health and Safety Plan 28 January 9, 1997 Koppers Company Superlund Sile Table 12. Site Securrty and Work Zone Definrtlon WORKING IN STREET OR ROADWAY • Wear traffic vest and hardhat when vehicle hazard exists . • Use cones, flag-mounted cones, caution tape and/or barricades . • Use vehicle strobe light and block area wrth truck . • Develop traffic pattemization plan for high traffic srtuations: . use flag person, . use flashing arrow sign, . use "MEN WORKING" signs liberally, . obtain lane closing permrts, and . engage police details . WORKING AT EXCAVATION/TRENCHING SITES • "Competent person" is required per OSHA 29 CFR 1926 Subpart P . • Safetyguard open excavations by restricting unauthorized access . • Highlight work area using prominent warning signs (cones, saw horses/barricades and signage) placed a minimum of 10' back from excavation opening. • Maintain zone definrtion along perimeter wrth continuous atrJng of yellow orange caution tape. EXCAVATIONS LEFT UNATTENDED OR OVERNIGHT Use one of the following methods to address these situations: . • Surround entire perimeter wrth plastic or cloth construction net fencing. Anchor fence to ground using steel posts driven into ground. Space out posts no greater than 8 feet apart. Fence height minimum 4-feet high. Fence material must be of a qualrty capable of withstanding a pressure of 200 pounds. Place fence a minimum of 1 O feet back from excavation opening. • Place 8-foot long barricades affixed wrth flashing lights end to end with 4-foot high construction net fence attached to barricades. • Utilize temporary curbing or concrete "jersey" barriers affixed wrth flashing signal lights or other effective warning signs. 5.4 Decontamination Procedures Operations conducted at this srte have the potential to contaminate field equipment and PPE. To prevent the transfer of contamination to vehicles, administrative offices and personnel, the procedures presented in Table 13 must be followed. Specific decontamination requirements will be followed by utilizing the equipment for that purpose. Work uniforms and Level D PPE must not be brought to employee residences and left erther on-srte, at the office locatlon, or in the company vehicle. Laundering of company uniforms must be by Fluor Daniel GTI approved laundering services and not done at employees residence. . c:61\ind96\koppers nuoa DANIIL '"' ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan Koppers Company Superfund Site Table 13. Decontamination Procedures Item Examples Field equipment Bailers, interface ■ probes, hand tools, drill augers, and miscellaneous sampling ■ equipment Disposable PPE Tyvek® suits, inner ■ latex gloves, respirator car1ridges ■ Nondisposable Respirators ■ PPE ■ Boots and gloves ■ ■ Procedure 29 January 9. 1997 Decontaminate with a solution of detergent and water; rinse with water prior to leaving the site. Protect from exposure by covering with disposable covers such as plastic to minimize required decontamination activities. Dispose of according to the requirements of the client and state and federal agencies. Change out respirator cartridges on a daily basis and dispose accordingly. Wipe out respirator with disinfecting pad prior to donning. Decontaminate respirator on-site at the close of each day based upon extent of contamination. This procedure could include disassembling the respirator and cleaning, rinsing. sanitizing, and drying all parts with approved powders and solutions. Decontaminate outside with a solution of detergent and water, rinse with water prior to leaving the site. Protect from exposure by covering with disposable covers such as plastic to minimize required decontamination activities. All water used in decontamination procedures should be stored in portable storage tanks until sufficient amount are stockpiled to facilitate disposal treatment. Disposable sampling and PPE will be place in plastic bags and temporanly stored in designated drums. These drums shall be disposed of according to regulatory guidefines, if necessary. 5.5 Example Decontamination Diagram If Level C or Level B PPE is required, a CRZ will be constructed in a centralized common area with a travel path from the EZ demarcated with three-foot high cones. The decontamination procedure for this project site is a two stage process. c:61 lind961koppe,s nuo• DANIIL en ~ Health and Safety Plan Koppers Company Supertund Sile STAGE• Gross contamination removal wtth a brush. ■ Remove outer boots and dispose In a drum. ■ Remove Tyvek® sutt and dispose In a drum. ■ Remove outer gloves and dispose in a drum. ■ Walk to Stage 2. STAGE I Remove respirator. ■ Remove cartridge and dispose in a drum. ■ Clean respirator and insert into a bag. ■ Remove ,inner gloves and dispose. ■ Wipe hands wtth a toilette and dispose. ■ Walk out of decontamination area. Hot Zone Ground Caution Tape ~ . . .... !/ ___ ___;_(-------=---:.._ Delineation~/' ' \ Line f , \ '. ,------:;_ ', .. Plastic Clean Zone c:61\ind96\kopper.; Brush on Table Drum Toilette Respirator Sags Tape 30 January 9. 1997 fLUOR DANIIL 8TI ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Health and Safety Plan KopperJ Company Supet1und Sile 31 January 9. 1997 6.0 CONTINGENCY PLANS Table 14 (Sections 6.1 -6.4) presents contingency plans for potential emergency snuations. Ensure that the information in the contingency plans have been clearly communicated to all project personnel and those wnhin the vicinny that may be affected, such as plant personnel and other contractors on site. Table 14. Contingency Plans for Sne Emergencies Situation Action 6.1 Evacuation 1. Immediately notify all on-sne personnel of an emergency requiring evacuation. 2. Leave the dangerous area and report to a designated rally point. 3. Notify emergency medical service (EMS), as appropriate. 4. Account for all personnel. 5. Contact the PM and the HSR as soon as possible. 6. Maintain sne secumy and control measures for community safety until emergency responders arrive. 6.2 Medical 1 . Survey the sttuation: Emergency Do not enter an area that mar, Jeopardize your safety. • Establish the patient's evel of consciousness. • Call for help . • Contact EMS and inform them of patient's condnion . 2. Primary assessment (patient unconscious) • Arousal • Airway • Breathing • Circulation Only trained personnel should perform CPR or First Aid -State you are medically trained 3. Secondary assessment (patient conscious) • Check for bleeding: Control with direct pressure . • Do not move patient (unless location is not secure) . • Monttor vttal signs . • Provide First Aid to the level of your training . • Contact the PM and HSR as soon as possible . • Document the incident on Fluor Daniel GTl's PIR form . 6.3 Fire 1. Evacuate the area. Emergency 2. Notify the EMS. 3. Extinguish small fires wtth an al~purpose ex1inguisher. 4. Contact the PM and HSR. 5. Document the incident using the PIR form. c:61\lnd96\koppers nuo• DANIIL en ~ Health and Safety Plan Koppers Company Suporlund Sile 32 January 9, 1997 Table 14. Contingency Plans for Site Emergencies (continued) . Situation Action 6.4 SpilV Prevent problems by documenting the location of underground lines Release (e.g., product, sewer, telephone) before starting site work. If you drill through a line or tank or another leak occurs, document the spilVrelease in writing. Include dates, times, actions taken, agreements reached and names of people Involved. In the event of a spilVrelease, follow this plan. 1. Wear appropriate PPE; stay upwind of the spilVrelease. 2. Tum off equipment and other sources of ignition. 3. Tum off pumps and shu1 valves to stop the flow/leak. 4. Plug the leak or collect drippings in a bucket, when possible. 5. Place sorbent pads to collect product, If possible. 6. Call Fire Department immediately if fire emergency develops. 7. lnfonm Fluor Daniel GTI PM abou1 the situation. 8. Determine if the client wants to repair the damage of if the client will use an emergency repair ccntractor. 9. Based on agreements, ccntact emergency spill contractor for · containment of free product. 10. Advise the client of spill discharge notification requirements and determine who will complete and submrt forms. Do not submrt or report to agencies without the client's consent. Document each interaction with the client and regulators and note, in writing; name, title authorizations, refusals, decisions, and commitments to actions. 11. Do not transport or approve transportation of contaminated soils or product until proper manifests have been completed and approve. Be aware that soils/product may meet criteria for hazardous waste. 12. Do not sign manifests as generator of wastes; contact the regional compliance manager to discuss waste transportation. Notifications -a spl/Vrelease requires comp/el/on of a PIR and Class Ill notfflcal/on. The PM must contact the client or generator. The generator is under obflgation to report to the proper government agencies. If the spill extends into waterways, the Coast Guard and the National Response Center ([800] 424-8802) must be notified immediately by the dient or with their penmission. 6., Field Communications Communications at the work site can be acccmplished by verbal and/or non-verbal means to ensure contact with all Fluor Daniel GTI and subcontractors. Verbal ccmmunication can be impacted by the on-site background noise and while wearing respiratory protection. Table 15 lists the type of communication methods and equipment to use, depending on site ccnditions. Communication equipment must be checked daily to ensure proper operation and all project personnel must be c:61Wld96\l<oppers fLUOR DANIIL Cffl ~ I I I I I I I I I I I I I I I I I I I .I I I I I I I I I I I I I I I I (_ I Health and Safety Plan Koppers Company Super1uncl Sile JJ January 9. 1997 initially briefed on the communication methods prior to starting wor11 and reviewed in Daily Safety Tailgate Meetings as a reminder. Table 15. Field Communication Methods TYPE OF COMMUNICATIONS COMMUNICATION DEVICE SIGNAL Telephone On-Site Emergency notification Initiate phone call using or applicable emergency Cellular Telephone numbers Two-Way Radio Emergency notification Initiate radio among site personnel communication with Code Red message Compressed Air Hom Hailing site personnel for One long blast, one short non-emergency blast Compressed Air Horn Hailing site personnel for Three long continuous emergency evacuation blasts Visual Hailing site personnel for Arms waved in circle distress, need help overhead Visual Hailing site personnel for Arms waved in criss-cross emergency evacuation over head Visual Contaminated air/strong Hands clutching throat odor Visual Break, lunch, end of day Two hands together, break aoart c:61~nd96\k-,wo• DANIIL 01I ~ Heal1h and Safety Plan Kappers Company Supertund Sile 7.0 MEDICAL MONITORING PROGRAM 3-4 ! · January 9, 1997 Fluor Daniel GTI, under the oversight of the company's consulting physician, has developed a medical monitoring program to track the physical conditions of It's employees on a routine basis; starting with a baseline assessment, then periodic follow-up (annual or bienniaQ or specnic project requirements based upon site contaminants or as assessment tool to aid in determining possible exposure. 7 .1 MedlcaVTechnlcal Advisors Elayne Theriault, MD Fluor Daniel GTI, CONSUL TING PHYSICIAN Jeffrey Stumpf, CIH, CSP, CET, CHMM Fluor Daniel GTI, Englewood, CO David Crowley, CSP, CET, CHMM Fluor Daniel GT!, Norwood, MA The specific duties of the medical/technical advisors include: (800) 229-367 4 X 326 (303) 799-4241 (617) 769-7600 • recommending a suitable medical monftoring program for the site workers by the occupational health physician in conjunction with consultation of the above • • c:61\ind96\kcwers listed personnel, providing interpretation of medical monftoring requirements and technical guidance for developing project specific medical monitoring requirements, and advising worker exposure potential along wtth appropriate hazard reduction methods. IILUORDAN■Leff~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I Hoallh and Safety Plan Koppers Company Super1und Site 35 January 9, 1997 Table 16. Medical Monitoring Program " • .::it. c· rn e .!< <.:> > E .. ., " "' :i "' ., u (J "' ·:: UI U O C ·c. "O "' a: 1~ ... C E C "O > ·.= ·-C, :, :, " 0 .c II) .~ ·-V) < w x Ui5 0 n, I> C 0 !! G> c-5 ~ a..c.>cn C 1;j ., " ~ ., ., .. .r. ..; 0 -ni -o-·c. ..0 .6 !! "' -g .6 -C. ., ai ;: :, u .. ·-~~~5 ., C. V) < V) a: Vl ct f-Cl .r. E u V) BASELINE Regular • • • ■ • .. • NL/BP (10Y} Regular/DOT • • • ■ • • • N/BP (10Y} ANNUAL/PERIODIC Regular • • • ■ SY • • NL/BP RT/RBP (10Y} Regular/DOT • • • ■ SY • • N/BP RTIRNIRB (10Y} BIENNIAL .~egular • • • ■ SY • • NL/BP RTIRBP (10Y} ■ >40 years of age or for medial indications (pre-approved by EMR) # X-ray film sent to EMR for International Labor Organization (ILO) reading 1 Y -5Y Yearly frequency ( ) If not done within TP Fluor Daniel GTI ten panel drug screen BP Breath pipe N National Institution of Drug Abuse (NIDA) drug screen NL NIDA-like drug screen RT Random ten panel drug screen RBP Random breath pipe RB Random breathalyser An EKG is required on a baseline exam. Thereafter, an EKG is performed annually for anyone over · 40 years of age or for medical indications. A chest x-ray is required on a baseline exam, and then once every 5 years thereafter. A chest x-ray is also required upon termination (if it has been more than 1 year since the previous x-ray). Random drug saeens and tetanus are variable components; therefore, they are not included in the total examination price. These variable components will only be billed at the time they are included in the exam. Examination price is based on the utilization of the EMR medical facility network. Should Fluor Daniel GTI wish to choose the facilities at which some or all of the services are provided. it is agreed that Fluor Daniel GTI will pay any difference between these oomponent prices and those charged by those facilities designated by the client. In the event an EMR medical facility increases fees substantially over those component prices, Fluor Daniel GTI has agreed to pay any reasonable difference or to change to an alternative EMR-qualified facility. c:61\ind96\kopper., R.UOR DANIIL OTI ~ APPENDIX A AGREEMENT AND ACKNOWLEDGEMENT FORM HASP AMENDMENT SHEET VISITOR/TRAINEE GUIDELINES TRAINEEJOBSERVER AGREEMENT FORM \ FLUOR DANIIL en ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l AGREEMENT ANO ACKNOWLEDGEMENT SHEET Fluor Daniel GT! personnel have the authority to stop field activities at this site if any activity is not performed in accordance with the requirements of the HASP. All Fluor Daniel GTI project personnel, subcontractor personnel, and visttors are required to sign the Agreement and Acknowledgement Sheet prior to conducting field activities at this site. FLUOR DANIEL GTI AGREEMENT ANO ACKNOWLEDGEMENT STATEMENT 1. I have read and fully understand the HASP and my responsibilities. 2. I agree to abide by the provisions of the HASP. Name Skmature Comoanv Date Name Sk:lnature Company Date Name Sianature Ccmpany Date Name SKJnature Conv••21nv Date Name Sklnature Company Date Name Sicnature Comoanv Date Name Smnature Comoany Date nuo• DANIIL OTI ~ FLUOR DANIEL GTI, INC. Project Name: Project Number: PM: Location: Changes in field activities or hazards: Approved by: _________ ;__ ______ _ Project Manager Date nuoa DAN■L 9TI ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I VISITOR/TRAINEE GUIDELINES Fluor Daniel GTI is committed to providing a safe environment on all work sites for visitors, trainees, employees and/or passersby. In order to accomplish this, the following guidelines must be followed. Infractions of the listed requirements agreement will be viewed as extremely serious and will be subject to discipline up to and including termination for either the trainee and/or supervisor. 1. VISITORS Any person not actively participating in the work at the site is regarded as a "visitor" and must follow Fluor Daniel GTl's visitor/trainee guidelines while on-site. Visitors must be accompanied by a representative at all times. Visitors will attend and sign-off on a site orientation. The orientation will cover specific areas that visitors will not be allowed to access during certain work activity. Visitors are required to wear appropriate PPE on-site. Required PPE for visitors include: 2. • • • • closed toed shoes, hard hat, safely glasses with side shields, and other as required by SHSO (i.e., gloves, hearing protection, Tyvek® suit, etc.) TRAINEES Trainees are employees of Fluor Daniel GTI who have not yet completed Fluor Daniel GTl's required safety training program. New hires and in-house company transfers will be considered trainees until safety training requirements are met. Trainees will be informed of restrictions by their supervisor and must abide by them on-srte. Trainees will be permitted to visit Fluor Daniel GTI sites to obtain three days on the job (OJT) training as observers as long as the following conditions are met ■ Trainees are supervised at all times while on-srte. ■ Trainees do not perform work functions of any type while on-site unless under direct supervision. • • Trainees do not handle any equipment, tools and/or supplies while on-site unless under direct supervision. Trainees do not enter any hazardous or HZ or confined space areas while on-srte unless under direct supervision. Supervisors will be responsible for informing trainees of the above conditions and for ensuring that the conditions are met Supervisors will also ensure that trainees will not be asked to violate the conditions listed above. A Trainee/Observer Agreement Form must be signed by both the trainee and the supervisor and placed on file in the Regional Human Resources department fUIOR DANIIL Off ~ TRAINEE/OBSERVER AGREEMENT FORM The following section is to be filled out by trainee. Agreement between: Name (printllype) ________ and Fluor Daniel GTI. SS# Because we have your safety in mind, you will be considered a trainee until all training criteria are met. This means you must complete all training requirements prior lo performing work activities on-site. Training requirements include: Up to date medical clearance documentation, successful completion and documentation or 40-hour HAZWOPER .. Trainees also must attend an orientation of the HASP including specific training on hazards that there is a likelihood the worker would be exposed to. Prior to a trainee becoming a worker, the trainee must successfully complete three days of OJT. This three day OJT must be performed under direct supervision of a qualified supe.rvisor. I agree to adhere to the above conditions in all instances while on-site as a trainee/observer. Signature Date ------------------------------------------------------------------------· This section is to be filled out by supervisor. As supervisor to the above trainee, I agree lo the above restrictions and agree not to request him/her lo perform activities contrary lo those restrictions. Signature Dale nuoa DAN■L en ~ I I I I I I I I I I I I I I I I I I I I I I I I I APPENDIXB I PIR INCIDENT REPORTING GUIDE I I I I I I I I I I I '- I n.uoa DAN■L en ~ PRELIMINARY INCIDENT REPORT Ptrson Completing Report __________ _ omc.. _____ 0.te, __ _ Incident Oa1e ___ _ 1nc1den1 Time: ____ _ Location _____ _ Home Oept. •-----Visiting Oept. •----- Person Involved in Incident ________________ _ Driver Name {if motor vehicle accident) ____________ _ Type of Incident: 0 Near Miss Event 0 Unsafe ConcMion/Action 0 Fire/Explosion Telephone ___ • ___ • ___ _ Tele-phone ___ • ___ • ___ _ D Other □ · Mctor Vehicle Accident Aucx. Leasing Vehicle#: ________ _ .,_, __ _ C-01 __ ci- ■ __ _ :: Personal Injury/Illness = Chemical Exposure ~ Equipment Damage = Theft ;J Property Damage D Spill/Release D Customer Incident ~N••------------,----------11 FDGTI vehlcte, can Associates Leaslng at 800-255-2607. D Permit/Code Compliance 0 Newspape</Radi<YTV c.-de one based on Initial findings: Preventable/Non-preventable Personal Injury O Yes O No (If no, go to neJd section) 0 Firsl Aid Only D Hosp;tarization D Medical Tmrtment CJ Possible Injury, Not Confirmed Personlnjunld: □ Fu:,r Daniel GTI Employee Of so, c:cmplete Fnt Report of Injury) 0 Subccw1t11ctu 0 Customer/Public/Othef Nature of Injury, Illness or Exposure:-------------------------------------- Describe nature of incident, how~ OCC<Jrred, who was irM>IYed, witnesses and possible causal factors: (Attach additional sheets W necessary) 0 First Report of Injury Attached 0 Police Report Attached Describe immediate actions taken and persons notified: (Attach additional sheets W necessary) Ln Manager (responsible for fellow.up), ______________ _ Office ____________ _ DISTRIBUTION Provide this report to the line manager immediately. The line -is responsible for the proper -of the PIR form per the Incident Reporting Guide (see reverse side). Notify the Norwood Health and Safely Department of aD Class II and Ill incidents immediately by phone at CB00\ 876-0647. Mailbox "11911, and fax a -of the PIR to 16171769-9861 . Rev. ::i/96 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I INCIDENT REPORTING GUIDE Clan Ill: A highly algnlllc■nt Clan I: A"°""°' Clu■ II: A Mflou■ lncldont r9qulllng Incident r■qulrtng lnrnedl■le Incident lncidenl th.at Is de.alt lnmedlat■ dJob1buUon --u noUflcatlon and au.latance from Class with at the k>c.a.l level desctlbed below ■nd on the tint page. ReglonaJ M.an11ger and Corpor3te Examples o Firs! Aid injury o P•=I inj\.<y (more lhan llnl lid to om~, o Possible Lost We&. Day Injury or subcontractor or publk:) Incidents o Minor damage <$200 o Hospit.al\zation (of one or more o Any motor vehlcle accident persons) o NotHeportable quantity spill o Damage to property greale, than $200 but less o Multiple injury of employees, than $10,000 subcontractotS or public 0 Near miss event o Near miss incident that could have been very o Unprotected chemical exposure o Unsafe condition or serious action o Death o Fire/Expk>sion o Damage to property greater than o Non-emergency notification of regulatory agency $10,000 is required o Reportable quantity spill release o Served with subpoena o Emergency notifw:ation or (DO NOT ACCEPT; have subpoena delivered lo regulatory agency CT Co,poration System, oor Registered Agent a1 8()().336-3376 or contact Legal 0ept in Norwood o Regulatory agency response to for additional assistance; no written investigation incident srte (inspection) report is required fo< a wbpoena.) o Contact or appearance of ne-ws or oublic media Notificatio 1. On-scene person 1. On-scene pe~n notifies Line Manager· 1. On-scene pe~n notifies Line n Actions notifies Line Manager" immediately by phone. Manager• immediately by phone. immediately by phone. 2. Line Manager notifies the Oislrict Ma,_r; 2. Line Manager -ely 2. Pl'OYide PIR t'orm to Regional Manager, H&S RepranatlYi!(si-, rdifles District Manager, Regional Line Manage, ond H&S Human R...,...,.,. Represenlalive, Corporate H&S Manager, H&S Representative(s)"", Represenlative(s)-Director and CEO with PIR t'orm irnmeaiately Human Resources and Corporate immediately following the following the incident. Director H&S. PIR rorm is provided incident. by lax immediately to (617-76S- 3. Line Manager provides a detailed final 9861) addressed 1o Corporate 3. Line Manager investigation repo<1 within 48 hO<Jrs after the original Director H&S. investigates and foUows PIR is submitted. The final n,por1 must be up w;thin 48 hours. submitted to District Manager, Regional Manage<, 3. Incident management team H&S Representatlye(s), Human Resources conferences by phone and Representative, Gorpcrate Director H&S and CEO. formulates an action plan. Notes: Ir there is a question as to Class I or II, follow Class II notification actions. Rev. 9196 All Class II ard Ill iicidetllll must be COll'WIUllcated lo the NcrM>od -and Safely Departmenl ~ by phone at (800) 876-0647, Mailbax •11911; -■ Wi--T gt This wll -I clgilal -which is carried by I company - and safely professional 24 hO<Jrs a day. All losl-lime injury """"13 wiD be iffiestigalod by the respeclMI Regional Manager with a final n,porl lo the CEO. "Line management = reporting manager, project manager, or ope,ati,.,s/orrice manager. ••H&S represffltative = includes District H&S representative: and Regional H&S manager nuoa DAN■L 4'TI ~ APPENDIXC LOfTO PROCEDURES i, IPUIOll DANm. 911 ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I This form is required to be completed when equipment ( I.e. electrical, mechanical, pneumatic, chemical, thermal) that requires maintenance, which has stored energy, could be set in motion, thereby causing an injury. To complete the fonn: • • • Identify all equipment (I.e. blower motor, recovery pump, etc): Describe the operation to be conducted Q.e. change fuse, change motor brushes, etc.) Describe the lockout method/location (I.e. circu~ breaker panel outside remediation compound shed, using a single-pole, red plastic lockout clip) SITE-SPECIFIC LOITO PROCEDURES Equipment Operation lockout Method/Location RUO■ DANm n ~ APPENDIX D MSDS DEFINmONS MSDS n.uoa DAN■L OTI ~ i ' I I I I I I I I I I I I I I I I I 1. I : I I I I I I I I I I I I I I I I I I I MSDS DEFINITIONS (TLV-TWA) Thrashold Umlt Value• Time Weighted Average. The time-weighted average concentration for a normal 8-hour work day and a 40-hour work week, to which nearly all workers may be repeatedly exposed without adverse effect. (PEL) nr:ne-weighted average concentrations similar to (and in many cases derived from) the Threshold Limit Values. (REL) Recommended Exp05ure Umlt as defined by NIOSH similar to the Threshold Limit Values. (IDLH) Immediately dangerous to life or health. Any atmospheric condition that poses an Immediate threat to life, or which is likely to result in acute or immediate severe health effects. Oxygen deficiency is IDLH. (LEL) Lower Explosive Umlt. The minimum concentration of vapor in air below which propagation of a flame will not occur in the presence of an ignition source. (UEL) Upper Explosive Umlt. The maximum concentration of vapor in air above which propagation of a flame will not occur in the presence of an ignition source. Flash Point (FP) The lowest temperature at which the vapor of a combustible#liquid can be made to ignite momentarily in air. Vapor Pressure (VP) The pressure characteristic at any given temperature of a vapor in equilibrium with its liquid or solid form, often expressed in millimeters of mercury (mm Hg). Odor Threshold A property displayed by a particular compound. Low detection indicates a physiological sensation due to molecular contact with the olfactory nervous system (based on 50% of the population). Ionization Potential (IP) MSDS The amount of ionization characteristic a particular chemical compound displays. The following MSDS are for hazardous materials that will be encountered at this site. Contact your local HSR if you need additional information on these materials. RUO■ DANIIL G1I ~ I I I I I APPENDIXE I AIR MONITORING FORM DAILY INSTRUMENT CALIBRATION CHECK FORM I I I I I I I I I I I I nuoa DAN■L 011 ~ I I I I AIR MONITORING FORM Project Name: I Project Number: Contaminants: I Detector Ionization Tube I Date Time Detector Exploalmeter Rudlng1 Location Purpose lnitl•I• Readiov,o Readl--loom\ FIO PIO %LEL %0, I I I I I I I I I I I I I n.uoa DANIIL OTI ~ DAILY INSTRUMENT CALIBRATION CHECK FORM Project Name~------Instrument __________________________ _ Job Number _______ _ ID# ____________________________ _ INSTRUMENT .· BATTERY ZERO CALIBRATION READING CALIBRATED DATE CHECK OK? .ADJUST OK? GAS (PPM) (PPM) BY: COMMENTS - . ·9-96 PLUOII DANIIIL IITI ,or-,\ ------------------- I I I I I I I I I I I I I I I I I I I NOISE MONITORING FORM Project Name: Project Number: Noise: Eaui men! Used: e/Model • ., w._:w ~- "Pre-calibrate noise monrtor prior to conducting noise survey. nid-app.97 nuoa DANIIL cm ~ APPENDIX F EXCAVATION/TRENCHING SAFETY PROCEDURES TRENCH SAFETY DAILY FIELD REPORT SOILS CLASSIFICATION CHECKLIST SOILS ANALYSIS CHECKLIST . EXCAVATION/TRENCHING • UNDERGROUND UTIUTIES UNDERGROUND UTILITY CONTACT PREVENTION AND MANAGEMENT PLAN EXCAVATIONfTRENCHING • USTs UST REMOVALS ATTENTION: THE TRENCH SAFETY DAILY FIELD REPORT FORM MUST BE COMPLETED AT LEAST DAILY DURING EXCAVATION/TRENCHING OPERATIONS AND MORE FREQUENTLY IF CONDITIONS CHANGE. nid-app.97 nuGaDAN■Ltm~ I I I I I I I I I I I I I I I I! I I I I I I I I I I I I I I I I I I I I I I EXCAVATIONfTRENCHING SAFETY PROCEDURES Evaluation: Conducted by Competent Person 29 CFR 1926. • Two soil classifications must be completed to determine sloping/shoring requirements . • Conduct daily insoections of all o=n excavations orior to entrv . Earess: Excavation areas 4 feet 11.22 meters) or more deeo • Ladders must be spaced no more than 25 feet (7.62 meters) apart so that a person in the trench is alwavs within 25 feet (7.62 meters) of a ladder for earess. Shonna: Excavation areas 5 feet (1.52 meters) or more deep I • Excavations must be sloped or shored if personnel will be entering the excavation . • Soil classification may be done only by a competent person using both a visual and manual test. WARNING: One soil classification may not be enough. Outside disturbances during excavation may change even the best classification. Inspect the so/I after any condition change. Storaae: All excavations • Spoils and heavy equipment must be stored a minimum of 2 feet (0.61 meters) from the edge of the excavation. • Store spoils on the downhill side . Maximum Allowable Slopes Soil or Rock Type Maximum allowable slopes (H:V)" for excavations less than 20 feet (6.10 meters) deep2 Stable Rock' Vertical (90j Type A• highly cohesive soil 3/4:1 (53°) Type B • cohesive soil with some sand 1 :1 (45°) Type C • loose, wet, or sandy soil 1½:1 (34") Notes: ' Numbers shown in parentheses next to maximum allowable slopes are angles expressed in degrees from the horizontal. Angles have been rounded off. , Sloping or benching for excavations greater than 20 feet (6.10 meters) deep shall be designed by a registered professional engineer. 3 A short-term maximum allowable slope of½ H:1V (63j is allowed in excavations in Type A soil that are 12 feet (3.67 meters) or less in depth. Short-term maximum allowable slopes for excavations greater than 12 feet (3.67 meters) in depth shall be 3/4 H:1V (53j nid-app.97 fUIOR DANIIL Off ~ TRENCH SAFETY DAILY FIELD REPORT DATE: _______ _ Project Name: _______________________________ _ Project Manager: _____________ -'----------'------------ Weather Conditions: I hereby attest that the following conditions existed and that the following items were checked or reviewed during this inspection. INSPECTION ITEM YES NO All ooen trenches were insoected. Were anv tension cracks observed alon11 top of any slooes? Was anv water seepa11e noted on trench walls or trench bottom? Was bracina svstem installed in accordance with dA<:inn? Tvne shorino beina used Is shorina secure? Was there evidence of shrinkage cracks in trench walls? Was there anv evidence of cavina since the last field inspection? Trench box(s) certified with tabulated data? Traffic in area adeauatelv awav from trenchina o=rations with barricades Surface encumbrances and other hazards in area accounted for? Protective measures taken for standina water in trench. All site oersonnel wearina reflective vest Atmosoheric testina conducted in trenched < 4 feet deep. Vibrations from equipment or traffic too close to trenching operation? NA ·observations: _______________________________ _ Competent Person signature _________________________ _ nid-app.97 nuoa DAN■L en ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ·• • Solla Analysls Checklist This checkUst mu$1 be _completed 'M'len 1011 1natys. ■ conduct~ lo detennlne the excavsuon 1011 type. A aep1me anatysla musl be performed on each la'(f!r oft.Oil e){cavaUon walb. ·, Addltlonal aoG anatysla must also be performed for the excavation (trench) when 11 stretches over a distance ....-here soil type may change. Name: _________________________ Date: Tim<: ___ _ Competent person: _____ ,--____________________________ _ Where was the sample taken from7 _____________________________ _ Excavation: Depth, _____________________ Width,~~~~~~ Length, __ _ SOIL CLASSIFICATION. VISUAL TEST ITEM ,...~T =• - 1 Soil P1rtlcle Type • Fine Grained/Cohesive • Course Grained/Sand Of Graven 2 Excavation Water Conditions • Dry • Surface Water Present • Submerced Water Present 3 Soil Condition • Undisturbed • Disturbed • Layered Soil Dipping inlo Excavation • Excavation Exposed to Vibrations • Cracked/Fissures/Soal!inq Obsef'ved 4 Additional Excavation Hazards • Surface Encumbrances(lf YES -What Type) • Hazardous Atmosphere in Excavation (If YES - list Source and Conditions) SOlL AHAL YSIS • MANUAL TEST RESULTS THUMB TEST I Check hen! If conducted T~ A. Soil identified ~-lhumb wfth --t ,._,,_ of effort Tvne 8 -Soil identified ...., thumb with some ..t-ree of effort T-C -Soil identified ~-tt,umb wfth little """roe Of no effort RESULTS PFNETROM= --:,-,.;..;~ wflich ~. I Write In • nd/model : .·· Tvno A -Soil wrth uncoofined , .....__... of 1.5 tons ,_ ........... foot itsf\ or ---er T\mlll!' B -Soil wrth unconfined com.,,._.;... str__... > 0.5 to 1.5 tsf T-C -Soil with unconfined comoressiw ....__._ < 0.5 tsf 01 soil that is su~ed or -.-1 to water Soil Clmlllcation. .. .: □ Type A □ TypeB 0 TypeC . . S el11CU011 of Prot~:~~i;i/· . ,,· ·.··· .. ,•,. .. · ·•·. ) ,Fi .. , : ,·· ·. . : PROTECTIVE Sloping Specify angle SYSTEM Tvnber shoring Aluminum hydraufic shoring Trer,ch Shield Max n.nth in this soil Note: Although OSHA will accept the above tests in most cases, some states do not -check your state safety r-uirements for trenchin" r-uratfons. EXCAVATION/TRENCHING -UNDERGROUND UTILITIES nid-app.97 nuoa DAN■L cm ~ Documentation: ■ Contact the local utility service (Oigsafe, Mlsutility ... ), and document permit number • A company utility representative In questionable areas, elaborate trenching projects tight/tricky areas or whenever drilling adjacent to a building or. structure • Contact the orooertv owner and/or town buildina department for plans Phvsical Location: • Use a metal detector to aid in the Identification of obstructions • Observe utila,, markers. vent ..a ..... catch basins new1v caved areas. etc . ' Safetv Procedures: • Machine excavate five feet from any underground utility, tank, or utility marker • Hand dig in utilltv "five-foot tolerance zone· until the service is exposed • Utilize test nil« to establish and QC markers for sensitive utililv locations General Notes: • ■ • • Comply with local and state codes and regulations Utilize experienced and trained equipment operators Use appropriate subcontractors and appricable insurance riders Hand dig per customer mandate . Underground Utilities Schematic <Plan View> Macr,.,e Excavation Zone ;J ~-----------C Teat ffl .. f !--Vo.rioble ~ l 5 Foot Tolerance Zone Dig Sale Markings nid-app.97 n.uoa DANIIL on ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I UTILITY MARK-OUT RECORD SHEET Facility: ____________ _ Location: _____________ _ Fluor Daniel GTI Representative: _________ _ Date Called: _______ _ County of Work: _________ _ Township of Work: _________ _ Contact Miss Dig to have subgrade utilities marked. The nearest intersecting street for this site is: _______ . We need the entire site area marked since we do not know exactly where we will be drilling/excavating. The site needs to be marked by: ______________ _ List which utilities they will have marked. Confirmation Number.. _____________ _ List other known utilities in the area that they do not mark: _______________ _ Contact other known utilities not contracted by Miss Dig to have them mark the srte. MAJOR UTILmES MARKED BY COLOR CODE ELECTRIC • RED GAS· YELLOW COMMUNICATIONS/CABLE· ORANGE WATER-BLUE SEWER· GREEN OTHER CONTACTS: IMPORTANT NOTE: ALL UNDERGROUND UTILITIES MAY NOT BE LOCATED BY MISS DIG. nid-app.97 nuoa DAN■L en ~ UNDERGROUND UTILITY CONTACT PREVENTION AND MANAGEMENT PLAN Check Off When Comoleted STEPS D STEP 1 D STEP 2 D STEP 3 nid-app.97 TASK DESCRIPTION Obtain site blueprints from client, if available, to show buried utilityiconduils. If site blueprints are unavailable other methods should be employed to identify subsurface conduits in the field. Examples include privately contracted utility locators such as SM&P, a hand-held utility location device, field observations (cut pavement, signs and overhead lights, water, electric, and gas meters, etc.), and customer personnel with knowledge of conduit locations. No one tool should be relied upon. Instead, as many tools as practicable should be employed to Insure that all known/suspect conduits have been identified. Mark out any proposed digging locations with wh~e survev caint. Contact underground utility locating service (before you dig). Give proposed drilling dates, location, etc. Documented notification of the proper underground notification service at a minimum of 48 or 72 hours prior to the scheduled site work.• (Check with the state for notification requirements). If possible, arrange site visit with client, facilities maintenance manager, or other site knowledgeable person to verify, utility and drilling/excavation locations. Regarding subcontractors: at a minimum, excavation subcontractors will be required to supply sufficient labor to complete all reauested installation tasks. The HASP will be amended to include emergency telephone numbers for all utility companies identified during the notification nrocess. PM RESPONSIBLE EMPLOYEE PM and/or field personnel PM Assistant for contacting "miss dig" and/or field personnel PM PM Office safety coordinator updates HASP with PM approval. FLUOR DANIIL on ~ I I I I I I I I I I I I I I I I I I I I I ( , ·. I UNDERGROUND UTILITY CONTACT PREVENTION AND MANAGEMENT PLAN (continued) RESPONSIBLE I STEPS TASK DESCRIPTION EMPLOYEE D STEP 4 On the day that on-site activities are scheduled to PM and/or field personnel I begin, at the first tailgate s.ifety meeting, the locations of all known/suspect utilities (subgrade and overhead) will be reviewed with all personnel in the f'ield (Fluor Daniel GTI and I subcontractors). Make sure that all underground utility locator PM and/or field personnel I markings are visible for each noted utility, etc. Note any discrepancies. Visually inspect for undocumented trenches, laterals, etc. that may be visible as discolored areas, patched pavement, I and not marked accordinolv. D STEP 5 Pre-screen each drilling/digging location by hand Subcontractors to conduct augering and/or post hole digger to a depth of at hand augering and/or post I least 3 to 5 feet using a 3-inch OD minimum hole digging under Fluor clam-shell style post hole digger and/or hand Daniel GTI oversight. auger. Inspect excavation periodically with I flashlight to check for visual obstructions. Discontinue immediately upon encountering any substantial resistance to hand auger and/or post hole dinner. I D STEP6 During excavation/trenching activities, Field personnel barricades and cones with flags will be used to mark the 1 O.foot distance from a located I conduit. This will serve as a reminder of the conduit's presence and to alert the Fluor Daniel GTI supervisor that it is time to pay I close attention to excavation/trenching activities. I I I I I \_ I ni<Mpp.97 nuoa DAN■L 1911 ~ UNDERGROUND UTILITY CONTACT PREVENTION AND MANAGEMENT PLAN (continued) RESPONSIBLE STEPS TASK DESCRIPTION EMPLOYEE D STEP 7 In the unlikely event that a subsurface Fluor Daniel GTI field utility/conduit is encountered, Immediately halt all personnel secures area ENCOUNTER drilling/digging operations and secure the area. and contacts PM Try to determine the source Q.e., gas line, water immediately. line, etc.) and contact the emergency numbers for that utility. Contact the PM immediately. Take all safety precautions to Insure that all flames, etc. are extinguished, and all personnel are kept away from the area. Monitor for LEL, o,, PIO, and any other substances that may be present as appropriate for that utility encounter Q.e., gas line). The PIR is filled out by field personnel and submitted to the PM. PM contacts client, etc., lo discuss appropriate actions. Fluor Daniel GTI field peraonnel contacts local emergency officials as necessary Q.e., fire, police, EPA, public works, etc.). PM submits PIR to appropriate Fluor Daniel GTI management and preoares follow-up reoort. nid-app.97 rwoa DANIIL cm i§, I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I EXCAVATION!TRENCHING • UST Documentation: • Refer to existing UST plans for potential location . • Contact property owners for potential location . • Contact local Fire or Buildinn Deru11rtment for information . Phvsical Location Characteristics: Cross-check to exlstina documentation. If available • Determine tank capacity (from tank chart, owner, delivery records) . • Determine tank opening locations and spacing . • Determine tank diameter (from tank chart, inventory records or gauge stick) . • Determine if tank is fiberglass or steel; single walled or double walled • Refer to available UST vendor info charts on standard USTs for dimensions and tank onenina locations. Safetv Procedures: • Empty tank of flammable liquids prior to excavation activities . Inert tank of flammable vapors and eliminate ignition sources (If practical). • Drill no closer than five feet from suspected tank location or other nearby underground utilities. General Notes: • Concrete pad on top of the USTs is sized to overhang the footprint of the tanks by 1 to 2 feet in each direction. Beware of exceptions. • When possible, have the owner/client mark the locations for drilling and accept responsibility for potential mishaps in writing. • Redundant information cross-checking to reduce oversight errors • Visual inspection of augured or excavated materials for pre-gravel, etc., indicative of UST backfill/bedding. UST Schematic a fool ,_...,.,. Zone-- • r····· , .- nid-app.97 nuoa DANIIL en ~ UST REMOVALS" Minimum Action Site S.t-lln Precautions 1 . Ignition sources must be 1. Ground vacuum truck. 1. Verify tank lnerting has eliminated been accomplished by 2. Park vacuum truck measuring oxygen to 2. Designate a no smoking zone downwind of be less than 8%. or area. excavation. 2. Monitor LEL and 3 .. Use pneumatic/nonsparking 3. Vent vacuum truck organic vapors tools when appropriate. vapors at least 12 feet frequently in areas from the ground around tanks during 4. Define the work area with surface; refer to the removal process. barricades and hazard tape. American Petroleum Institute (API) Note: LEL 5. Contact local underground utility recommendations for measurements taken locating service: Check location greater clearance in oxygen deficient of all utilities including water and requirements. atmospheres (e.g., in sewer. inerted tanks) will 4. Inert the tank with dry not be accurate. 6. Wear Level D PPE: hard hat, ice (1 ½ lbs. dry ice per safety glasses, steel-toed and 100 gallons tank 3. Check local/state shank boots, and traffic _vest. capacity) or nitrogen. requirements for tank Upgrade to modified level D removal/disposal when possibillty of contact to 5. Wear Level B PPE regulations. skin or work uniform can occur. when cleaning tank Upgrade to level C when air interiors when 4. Assist subcontractor in monitoring reveals action levels indicated by HSR. performing tasks have been exceeded. This according to the applies to all on-site personnel HASP. including subcontractors. 5. Notify the PM 7. Perform air monitoring with an immediately when a oxygen/combustimeter and an sub-contractor will not organic vapor analyzer at follow site specific frequent intervals. safety protocols. The PM must inform the client. . Refer to Fluor Daniel GTl's UST Safety Training Manual for detailed information . nid-app.97 fUIOR DAN■L 911 ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I \ ... I nid-app.97 APPENDIXG CSE HAZARD ANALYSIS FORM SITE-SPECIFIC CONFINED SPACES CSE PERMIT CONFINED SPACE PERSONNEL REQUIREMENTS fUIOa DANIII. 911 ~ Fluor Danlel GTI, Inc. CSE Hazard Anal sis Form Site Name:. _______________________________ _ Site Address:. _______________________________ _ CSE Name/Number:. ____________________________ _ CSE Definition: TankNessel D D Vault Pit D D Other ____________ _ CSE Dimensions: Length=----------- Width =----------- Depth------------- Tasks/Activity/Reasons for Entry: D Well Gauging 0 Bailing Product D Pump Maintenance D Well Sampling D Product Recovery D ---------- Sketch: Potential hazards within space: D Oxygen Deficiency D Combustible Vapors D ToxicVapors D Engulfment D No Hazards Other CSE Hazards: 0 Greater than 5' deep 0 Difficult access/egress D Energy/isolation• D Prone to flooding D Slippery surface D Hot surfaces ~.e., pipes) "CNa IWII I LOfTO must ~ pertllnned nslM ~ ap1c:e. ··FOR us{~vA~~~E sG~ekV1s0R · :o.o.•:o.o.r: :::,.• . ······•.·-..csECI. ··· .. ·.,, ·.:,,,:.,• Class 1----"---"''----'-'--"---'--'--'-'-..=c . Class ll,....,..--,--,-,c~-"'-'""-"~"',';--'-''-"--""'-"'-~1~ 111,_._·.•··_.·' -".·• "' .. "-· "-"-C.,.C..-'-'=""-'~""-"-""'""-""' Completed by:. ______ ·.·.:o~~._:.:-'· ·_·. --'-"""-"-"'-' I< i ?\ ( · Reviewed by: ·. D~te._· .. _·." ._.: .. _· __ _ nid-app.97 fLUOI DANIIL OTI ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I SITE-SPECIFIC CONFINED SPACES Site work may require personnel to enter confined spaces. No Fluor Daniel GTI employee or subcontractor shall enter an area Identified as• confined space without using the CSE procedures described in this appendix and completing the site specific entry procedures presented in the CSE Penni!. The purpose of the CSE procedure is to protect employees from potentially hazardous environments and to facilitate immediate rescue in an emergency situation. A CSE Permrt must be posted at the entrance to each confined space. CONFINED SPACES Definition A confined space has limrted or restricted means of entry or exn, is large enough for an employee to enter and perform assi~ned work, and is not desioned for continuous occupancv by the employee. Examples These spaces may include, but are not limrted to, underground vaults, tanks, storage bins, pits and diked areas, vessels, and silos. Characteristics A permrt-required confined space is one that meets the definition of a confined space and has one or more of these characteristics: ■ Contains or has the potential to contain a hazardous atmosphere, ■ Contains a material that has the potential for engulfing an entrant. ■ Has an internal configuration that might cause an entrant to be trapped or asphyxiated by inwardly converging walls or by a floor that slopes downward and tapers to a smaller cross section, and/or • Contains any other recoonized serious safety or health hazards . . ··. ·.:·,· -'"'· . ,' ::-:<·.·· Protocol for CSE • Personnel trained lo conduct CSE procedures . ■ Perform the appropriate air monrtoring activity at various depths in the space prior to entry. Monrtor for: (1) oxygen level, (2) flammable vapors, and (3) toxic vapors. • Ventilate the atmosphere in the space so that entry may be made safe without respiratory protection. If this is not feasible, appropriate respiratory protection must be worn by authorized entrants and attendants. • Wear appropriate respiratory protection when ventilation alone can not achieve acceptable atmospheric levels of oxygen or flammable or toxic vapors. • Have appropriate retrieval equipment worn by employees in the event of a mishap . nid-app.97 IFLUO■ DANIIL on ~ Location nid-app.97 SITE-SPECIFIC CONFINED SPACES Pennit Buddy Requlrvd Required fY or NI fY or NI · Soeclflc Entrv Procedurvs n.uoa DAN.Ill. en ~ I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I · . CSE PERMIT Th;s permit must be completed pnor to enlertng anyrconllned 1pKe and lo ONLY VALID FOR THE DATE AND TIME INDICATED ON THIS FORM. All procedural n,qu;rerTI<flb contained In Fluor Daniel GTI Heafth end Safety PolK:y and Pr~ure No. t t roost be followed. In the event a confined space emergency tJtUlltlon dev9'ope and rHCue Is required, notify the following appropriate emergency l.ef'VM:es: Ambulance: ________ Fire: ___________ Police: _____________ _ Purpose of entry: _______________ Location of connned space: _________ _ Dale:--,---,---,----,----,-.,-c---,:-Aulhon:zed duration: Expires on:_,,.,..,------- Atmospheric Hazards: I I Oxygen Deflclency I I Flammable I I Toxic I I Other ______ I I Other ____ _ Physical Hazards: I I Mechanal I I Electrical I I Chemical I I Engutrment I I Other ____________ _ PRE.ENTRY REQUIREMENTS Yes NIA Yes NIA I I I I Non-opat1dng tools used I I I I Low YOl!age (less than 25v) lighting used I I I I Entry area is free of debris and objects I I I I Warning bame~ and signs are in place I I I I A1mospheric monrtoring ccnducted I I I I Electrical equipment rated for explosive -phefes I I I I AU hazardous hnes have been isolated I I I I Hot wc<1c permrt attached I I I I No compressed gas cyflnde<$ in the confined space I I I I Host employer and/or conuxtoB notified I I I I All ener(ff sources have been locked O\Magged O<JI I I I I The confined spac,i has been dra;nod and flushed I I I I Forced air or exhaust Vffllilatlon is p<oVided I I I I Entry end eme,gency p,ocodures have been reviewed I I I I AD personnel have been trained (classrt>om/exercise) I I I I Eledric:al equipment is pn,perty grounded I I I I Ground fauft cireuft lntenupters (GFCI) prDYlded I I I I AD personnel have been informed of potential hazards I I I I Attendant -at entrance and property inspected I I I I Rescue equipment on location and readily accessible PROTECTIVE EQUIPMENT Yes No Yes No Yes No 11 11 Hard Hat 11 11 Protective clothing 11 I I Communications Equipment 11 11 Eye/Face Protect. 11 11 Hearing protection 11 I I Ventilation to Provide Fresh Air 11 11 Boots 11 11 Retrieval Device/Tripod 11 I I Respirator (type) 11 11 Gloves 11 11 Harness and Lifeline 11 11 Other Atmosphere Acc..ptable Time Tune Time Trne TLfTle T,me Time Time Time Test(s) to be Yes No Entry taken· Conditions AUowable Enter A,jr Monitoring Findings Below umas . : .. · . o..,_ 19.5% • 22.0'll, Combustible Below 1 O'll, Gas LEL PID/FID Cart>on 0-15 PPM Monoxide Hydrogen 0-5 PPM Sulfide Hydrogen 0-2PPM Cvorndo Sulfur Dioxide 0-1 PPM Ammonia 0-10 PPM Benzene 0-0.S PPM Other SUPERVISOR APPROVAL: I certify th.at all necessary precautions h.ave been lilken to make this confined sp.ace safe for entering and conducting the work during the prescribed tsne(s) as well as emergency response procedures. Tome Print Name _____________ Sign Name --=--,--,,----,,-----Date _______ _ Entry Supervisor _________________ Permit Prepared by _____________ _ Atmosphere Tesler ______ ==---===----==-•Attendanl ___________________ _ ENTRANT ACKNOWLEDGMENT: I HAVE BEEN PROPERLY INSTRUCTED FOR SAFE ENTRY INTO THIS CONFINED SPACE AND UNDERSTAND MY DUTIES AND EMERGENCY PROCEDURES Print Entrant Name Sign Entrant Name Empoyee « S.S. No Date . Tme "An evaluation should be performed 1o .....-11 potenlial _. catat■aa wllich c:xud be praent and represen11 l'mard. Trne .------------~· ENTRANT INSTRUCTIONS All personnel who enter confined spaces must be thoroughly familiar with the following duties for entrants as listed below. Your primary responsibilities include: • Understand the hazards of the confined space to be entered and the physical effects of those hazards. • Continuously monitor the atmosphere Inside of the confined space with a calibrated, direct reading, air monitoring instrument. • Evacuate the confined space: If atmospheric hazards exceed the action level, If a hazardous condition is identified inside of the confined space, and Whenever attendant signals entrants to evacuate. I I I ■ Read and understand the rescue procedures. I • If PPE is required, the entrant must be property trained on the use of the equipment prior to entry. PPE must be in ood workin condition. ATTENDANT INSTRUCTIONS I You should be thoroughly familiar with the following duties when you assume the responsibility of attendant for a person or persons inside a confined space. Your primary responsibilities are the following: • Focus on the safety of the personnel inside. • Understand the hazards of the confined space to be entered and the physical effects of those hazards. • Maintain the conditions and requirements listed on entry permit. • Evacuate the space if you observe any condition which you consider hazardous. • Read and understand the rescue procedures. Get help if an emergency situation develops. never enter the confined space in an emergency unless you are trained and equipped with the proper equipment for confined space rescue operations O.e., self contained breathing apparatus, safety harness. life line) and are relieved by another attendant. • Keep an accurate count of all personnel inside of the confined space at all times. ■ Do not leave the entrance to the confined space while any personnel are still inside unless you are proper1y relieved. These instructions must be passes onto your relief. • If ou have an uestions re ardin the ·ob, check with our su ervisor or a health and safe rofessio', ENTRY SUPERVISOR'S INSTRUCTIONS You should be thoroughly familiar with the following details to quality as the Entry Supervisor for a permit- required CSE procedure. • Requirements for confined space entrant and attendant instructions. • Knowledge of the hazards that may be faced during entry, including information in the mode, signs and symptoms and consequences of exposure. • Ability to verify that the appropriate entries have been made on the permit, and that all tests specified by the permit have been conducted and that all procedures and equipment specified by the permit are in place before endorsing the permit and allowing entry to begin. • Procedures to terminate the entry permit when the CSE operations have been complete or when a condition exists that is not allowed under entry permit requirements. ■ Ability to verify that rescue services are available and that the means of summoning them are operable. • Procedures to remove unauthoriz_ed individuals who enter or who attempt to enter the permit space during entry operations. • Ability lo take responsibility for the confined space when entry is transferred to other personnel. • Ability lo determine that entry operations are sbll consistent with the terms of the CSE permit and that the prescribed intervals regardless of changes in entry personnel. ' '. nid-app.97 nuo• DANIIL GTI ~ I I I I I I I I I I I I I I I I I I I I I I I \. nid-app.97 APPENDIXH HOT WORK PERMIT HOTWORKJSA nuoa DANIII. ctn ~ HOT WORK PERMIT Project Name-::,---------Job# __________________ _ Hot Work Task Description: __________________________ _ Workers/Welders Conducting Hot Work _____________________ _ PERMIT MUST BE COMPLETED IN ITS ENTIRETY AND POSTED BEFORE HOT WORK BEGINS Action Item Has clienl representative been notilled of intended hot worx7 Hazardous materials lnvotved? Name: w,11 hot wooc impact the gen«'&! public, cust~ or __ .. employoes? Will the intended hot wooc ,_ lo be coordinated wtth -oonlrac:tcn who may be woocing on the site lo make them aware of anv hazards and the .,._ of~ ta be ,_.,ormed? Have hazardous energy sources been Identified, Isolated, and locked out• tacced out before the start of the o.-oiect7 Will hot wooc be conducted 1Mthin a confined space? All testing equipment (I.e., CGI, oxygen meter, etc.) and rue lighting equipment Q.e., eidinguisher, etc.) have been checiu!d to ensure """""' · and caDbnltlon before the start ol lhis oroied? Does task requ.e a designated lira -(30 minutes after workl? Flammable and -malerials within 35 feet have been cleared or shielded. All fuel sources have been identified and protected (USTs, ASTs, sewers. piping). The area has been restricted with proper barriers and signs. The area has been tested to be certain that atmosphere is 0% LEL before starting hot 'ollOrit. F13me sensitive areas and equipment (including cylinders and gas deli't'ery lines) exposed to slag, heat. and sparks are protected by flame a resistant blanket, shield, or removed from the area? Escape routes have been identified before starting "WOr1c? Is ventilation equipment needed? Type needed: THE FOLLOWING PROTECTIVE EQUIPMENT WILL BE REQUIRED (PLEASE CHECK): Welding Goggles/Shield_ Tint Safety Boots Leather Gloves Supplied Afr Respirato, APR _ Cartridge Yes No Ye:sNo Hearing-- Head Protection SafetyHamoss Weldlng ~·Top W9'ding lealhen -Bonom Yes No NA Co,d Cut On)y Method Required: ____________ _ Hot Cul Method~=----------- APPROVAJ.S: Fluor Daniel GTI Site Manager o, Site Safety Officer Name ol Employoo ""'1onning I:'<" Work __________ Fint Watch Rop,-.aw.., .. tatilh,.,o ____________ _ nid-app.97 nuoa DANm en ~ , I I I I I I I I I I I I I I I I I I I --------- - -1!!!!1!!!!!11 l!!!!l!!I 1111!!1 11!1!!!!1 ---;---- Hot\l. 1./JSA WeldingfT orch Cutting Job Hazards Safeauards/Precautlons. 1. Unsafe act a. Require qualified operators only. b. Provide training per 29 CFR 1910.1200. Untrained worker C. Provide proper PPE. d. Inspect area prior to welding/cutting. e. Use permit system. f. Use fire watch for 30 minutes following termination of work. 2. Welder's flash to eye a. Use filter lens based on actual hazard or welding technique in accordance with the American Welding Society Laws shade selector chart. b. Provide warning signals, barricades or similar means to protect other workers, general public. C. Provide screens or barriers to protect other workers, general public. 3. Radiation burns, skin a. Helmet with proper filter lens. burns, heat burns b. Gauntlet gloves, leather apron. C. Cotton shirt, long sleeves, buttoned at sleeves and collar. ••. d. Cotton cuffless pants. e. Steel toe boots, 6-lnch minimum height. f. Hearing/ear cover protection as appropriate. .. g, Work zone definition -see 2(a) and (b) above. -- 4. Faulty equipment a. Use equipment that Is In good working condition. b. Inspect valves, regulators, and hoses prior to use. C. Preventive maintenance performed per manufacturer SOAcifications. 5. Toxic fumes and gases a. Provide source ventilation. b. Provide respiratory protection, selected based on hazard. C. RoPe off area. define work area with cones, caution ta"" or similar (see 2(a) and (b) above). 6. Adjacent flammable/ a. Move combustibles at least 50 feet from work area. combustible materials b. It they cannot be moved consider protection by metal guards or flame proof curtain. C. Openings In walls, floors or ducts should be covered If within 35 feet of work area. d. Assure facility sprinklers are in working condition and will not be taken out of service. e. Suttable fire extinguishing equipment shall be readily available at the work area. t. Desianate a reliable means of contacting the Fire Department In the event of an emergencv. 7. Flammable/combustible a. If lri an environment classified as a hazardous location then define specific tasks using JSA technique. vapors b. Provide equipment per classification (i.e., explosion proof, etc.) C. Post sign: DANGER -NO SMOKING, MA TC HES OR OPEN LIGHTS. d. Ensure t>erson Is B"ainned as fire watch and fuilv charned extlnoulsher Is oresent. nld-app.97 PLVO■ DANIU on ~ . Hot Work/JSA Welding/Torch Cutting Job Hazards · ••• Safeauaids/Precautioiui · .<· 8. CSE a. Follow CSE procedures. b. Use CSE permit. C. Define specific JSA techniques for that work. d. Exercise caution when using inertion lo address 0 2 deficiency. e. Exercise caution when uslno OJacetvlene fuel mix address O. enrichment from ~linder leak. 9. Unsecured compressed a. Store cylinders upright. gas cylinders, cylinder b. S,ecure against stationary object. handling C. Cylinders In excess of 40 pounds in weight must be moved using wheeled cart or motorized truck. d. Lifting cylinders > 40 pounds In weight Is prohibited. e. Compatible storage practices = separate 0 2 cylinders from flammable combustible gases. f. Use tags on cylinders to mark full, in use or empty. g. Remove protective cap using hand method or use cylinder ·cap wrench". Do not jam screwdriver or wrench In cao slots to loosen. 10. Unsafe practice during a. Provide protective cap when cylinders are not in use. Inactivity b. Valves or gas cylinders shall be closed and line pressure relieved. c. Power source of electric weldinll eouloment shall be disconnected. 11. Improper flow of gases, a. Lebel cylinders per 29 CFR 1910.1200. gas mixing, pressure In b. Color code hoses (green• 0 2; red = fuel gases; black• Inert gas or air hoses). gas lines C. Install "flesh beck" arresters for fuel mixing welding. d. Use eceMene el 15 nnunds per souare Inch (osO or less. 12. Improper Ignition of 8. Use "spark lighter" to Ignite. 0",nen/fuel torch b. Don1 use claarette. match or lighter for Ignition. 13. Static electrlclty e. Provide and use grounding clamp for electric area weldlng equipment. nld-app.97 , .... nuo■ DANIU on ~- --- - --- - ----llliiil illil iiiii iiii liiii I I I I I APPENDIX I I HEAT/COLO STRESS PROCEDURES I I I I I I I I I I I I \ I nid-app.97 nuoa DANIIL .,. ~ HEAT/COLO STRESS PROCEDURES 1.0 HEAT'STRESS Heat stress is a significant potential hazard associated with the work task performed and the type and degree of protective equipment used in hot weather environments, Local weather conditions may produce conditions which will require restricted work schedules in order to protect employees, Monrtoring for heat stress will follow one of two protocols depending on whether impermeable clothing (tyvek, saranex, rain gear, etc,) or permeable clothing (cotton coveralls) is worn, This section will apply to both hazardous and non-hazardous waste workers at the site, The SHSO with direction from HSR will determine the environmental wet bulb globe temperature (WBGT) and physiological (heart rate [HR] and oral temperature [OR]) monrtoring to be conducted for both types of workers. 1.1 Workers Wearing Permeable Clothing The ACGIH have set TLVs for worker exposure to heat stress in which rt is believed that nearly all workers may be repeatedly exposed without adverse health effects. The TLVs assume that workers are acclimatized, fully clothed in permeable clothing with adequate water and salt intake, and capable of functioning effectively under the given working conditions without exceeding a deep body temperature (BT) of 100,4 °Fahrenhert (F). Measurement of the WBGT has been found to be the most adequately measurable environmental factor in which to correlate with the deep BT and other physiological responses to heat. The following table reviews the work/rest regimen to be followed by all permeably clothed workers based upon routinely measured WBGT, Permissible Heat Ex osure TLVs A licable to Workers Wearin Permeable Clothin Continuous work 75% work -25% rest, each hour 87 78 68 50% work -50% rest, each hour 89 82 2 25% work -75% rest, each hour 90 80 88 8 86 6 Values are given in "F WBGT. Rest means minimal physical activity. Rest should be accomplished in the shade. Any activity requiring only minimal activity can be performed during rest period. O Parentheses indicate the 10 degree adjustment for working in impermeable protective clothing. nid-app,97 nuoa DANIIL cm ~ I I I I I I I I I I I I I I I I I n R I I I I I I I I I I I I I I I I \. 1.2 Workers Wearing lmpenneable Clothing Workers who must wear impermeable clothing are tield at a higher risk of suffering heat stress. Impermeable clothing impedes sweat evaporation, one of the body's major cooling mechanisms. It is the duty of each employer to alert or notify the SHSO if symptoms of heat stress occur to their respective site personnel. Physiological and environmental monitoring of personnel wearing an impermeable protective equipment ensemble will commence when the ambient temperature rises above 70°F. Environmental monitoring will be conducted continuously for as long as the ambient temperature stays above 70°F and physiological monitoring will be conducted immediately before and after each work period. Frequency of physiological monitoring will increase as the ambient temperature increases or ii slow recovery rates are indicated. The break time must be sufficient to allow workers to recover from the effects of heat stress. This will be accomplished by measuring the recovery HR and OT. The break time duration will be determined using the following methodology and criteria: • Seat person being monitored, ■ Take OT, and • Measure pulse in the following sequence: Pulse #1: 30 seconds to 1 minute after sitting Pulse #2: 2½ to 3 minutes after sitting An excessive heat stress condition exists when any of the following conditions exist: 1. Oral or ear temperature exceeds 99.5°F 2. If pulse #2 is greater than 90 beats/minute 3. Pulse #1 is greater than 100 beats/minute Worker cannot return to work until: 11 Oral or ear temperature is below 99.5°F 11 Pulse rate is below 90 beats/minute 11 Recovery HR for workers with HRs over 90 beats per minute is less than 10 beats per minute less than the original HR Adhering to the guidelines for heat stress prevention and monitoring will greatly minimize the possibility of the occurrence of heat stress. Site personnel must also be aware of the symptoms of heat-related disorders and be prepared to administer the appropriate treatments. 1.2.1 Prevention · A. Provide plenty of fluids. A 50 percent solution of fruit juice or similar solution in water, or plain water will be available. For workers performing work inside an EZ, fluid intake may occur in the CRZ. Workers must first perform a partial decontamination process which will include removal of gloves and washing of hands and face prior to consumption of fluids. The SHSO will monitor the partial decontamination and fluid consumption process to ensure that ingestion of site contaminants does not occur. B. Work in pairs.whenever conducting Level B activity or permit required CSE activity. C. Provide cooling devices. Ice vests or on-site showers can be provided to reduce BT and/or cool protective clothing. nid-app.97 nuoa DANIIL GT1 ~ The amount and type of undergarments worn will be left to the preference of each Individual unless prone to heat stress, especially heat rash. In this case, the worker can wear "long john" cotton type underwear to keep skin off chemical resistant clothing. D. Adjustment of the work schedule. When practicable, the most labor-intensive tasks should be carried out during the coolest part of the day. E. Shaded or cooled rest areas. Shaded or cooled rest areas will be provided when site environmental and/or workers physiological responses warrant. 1.1.3 Heat Stress Monitoring Physiological monitoring of personnel wearing an Impermeable protective ensemble will be conducted at regular intervals at the beginning and conclusion of the work period. HR must be periodically measured for all site personnel when heat stress conditions (climate or wearing impermeable clothing). Additional physiological monitoring such as BT and body water temperature (BWT) monitoring can be measured for extreme temperatures and when impermeable clothing Is worn. A. HR must be measured by the radial pulse for 30 seconds as early as posstble in the resting period and repeated approximately 3 minutes Into rest period. The HR at the beginning of the rest period should not exceed 110 beats per minute. The HR also should not exceed 90 beats per minute after approximately 3 minutes of rest. If the HR does exceed the criteria, the next work period will be shortened by 33 percent. while the length of the rest period will remain the same. If the HR still exceeds the criteria at the beginning of the next rest period, the following work period will be shortened by 33 percent B. BT can be measured orally with a clinical or disposable thermometer, In accordance with manufacturer's instructions, as early as possible in the rest period (before drinking liquid). Oral or ear temperature at the beginning of the rest period should not exceed 99.S"F. lflt does, the next work period will be shortened by 33 percent while the length of the rest period will remain the same. However, _if the OT exceeds 99.S"F at the beginning of the next rest period, the following work period will be shortened by another 33 percent A worker will not be permitted to wear a semi- permeable or impermeable protective ensemble when his/her BT exceed 99.5 • F. nid--app.97 n.uoa DANm en ~ I •. g g I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I C. Body water loss (BWL) due to per.ipiraUon can be measured by having the worker weigh him/her self at the beginning and end of each work day. Similar clothing should be worn at both weighing. BWL should not exceed 1.5 percent total body weight in a work day. Sunnested Freouency of Physioloalcal Monltorina for Flt and Acclimated Worbrs 2 3 Adlusted Tem...,rature' Nonn■I Work Ensemble' lm=rmeable Ensemble' . 90°F 132.2°C\ or above After each 45 minutes of work After each 15 minutes of work B7.5°-90°F t3o.s·-32.2·ci After each 60 minutes of work After each 30 minutes of work s2.5· -87 .5°F c2s.1 ·-3o.s·ci After each 90 minutes of work After each 60 minutes of work 77.5·-s2.5·F 125_3•.2s.1·c1 After each 120 minutes of work After each 90 minutes of work 72.5°-77.5°F (22.5°-25.3°C) After each 150 minutes of work After each 120 minutes of work For work levels of 250 kilocalories per hour. Calculate the adjusted air temperature (T ~ using the following equation: T ,..J (0 F) = T ,..J (0 F) + (13 x percent sunshine) Measure the air temperature (T .,J using a standard mercury-in-9lass thermometer with the bulb shielded from radiant heal. A normal work ensemble consists of cotton overalls with long sleeves and pants. An impermeable work ensemble consists of impermeable coveralls with long sleeves and pants. 1.1.4 Recognition and Treatment Any personnel who observes any of the following forms of heat stress either in themselves or in another worker, will report this information to his or her immediate supervisor or the SSHO. A. Heat Rash (or prickly heat) Cause: Continuous exposure to hot and humid air, aggravated by chafing clothing. Symptoms: Eruption of red pimples around sweat ducts accompanied by intense itching and tingling. Treatment: Remove sources of irritation and cool the skin with water or wet cloths. B. Heat Cramps or Heat Prostration Cause: Profuse perspiration accompanied by inadequate replenishment of body water and electrolytes. Symptoms: Sudden development of pain and/or muscle spasms in the abdominal region. Treatment: Remove the worker to the CRZ. Remove protective clothing. Decrease BT and allow a period of rest in a cool location. C. Heat Exhaustion -SERIOUS nid-app.97 RUOll DAN■L en ~ Cause: Overexertion In a hot environment and profuse perspiration accompanied by Inadequate replenishment of body water and electrolytes. Symptoms: Muscular weakness, staggering gatt, nausea, dizziness, shallow breathing. Treatment: Perform the following while simultaneously making arrangements for transport lo a medical facilfy. Remove the worker to the CRZ. Remove protective clothing. Lie the worker down on his or her back in a cool place, and raise the feet 6 to 12 inches. Keep warm, but loosen all clothing. If conscious, provide sips of a salt water solution consistency of one teaspoon salt in 12 ounces water. Transport the worker to a medical facilfy. D. Heat Stroke -EXTREMELY SERIOUS Cause: Same as heat exhaustion. Symptoms: No perspiration, dry mouth, pain in the head, dizziness, nausea. Treatment: Perform the following while making arrangements for transport to a medical facilfy. Remove the worker to the CRZ. Remove protective clothing. Lie the worker down in a cool place and raise the head and shoulder slightly. Cool _without chilling. Apply ice bags or cold wet cloth to the head. Sponge bare skin with cool water or rubbing alcohol. If possible, place the worker in a tub of cool water. Do not give stimulants. Transport to a medical facility. nicl-app.97 nuoa DAN■L «n1 ~ \ D D I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I HEAT STRESS MONITORING FORM Project Name: ______________________________ _ Project Number:. _____________________________ _ SHSO: _____________________________ _ Wort/ Body Ambient Rest Employee/ Pulse Body Water Date rrtte Temo WBGT Realmen Location Rate Temo Loss Comments nid-app.97 fUIOR DANDL OTI ~ ' I 2.0 COLO STRESS If work on this project begins in the winter months, thermal injury due to cold exposure can become a. problem for field personnel. Systemic cold exposure is referred to as hypothermia. Localized cold exposure is generally labeled frostbite. A. Hypothermia: hypothermia is defined as a decrease in the patient core temperature below 96°F. The BT is normally maintained by a combination of central (brain and spinal cord) and peripheral (skin and muscle) activity. Interferences with any of these mechanisms can result in hypothermia, even in the absence of what normally is considered a "cold" ambient temperature. Symptoms of hypothermia include: shivering, apathy, listlessness, sleepiness, and unconsciousness. B .. Frostbite: frostbite is both a general and medical term given to areas of local cold injury. Unlike systemic hypothermia, frostbite rarely occurs unless the ambient temperatures are less than freezing and usually less than 2 • F. Symptoms of frostbite are: a sudden blanching or whitening of the skin; the skin has a Warf or white appearance and is firm to the touch; tissues are cold, pale, and solid. Prevention of cold related illness can be aided by educating workers on recognizing the symptoms of frostbite and hypothermia and by identifying and limiting known risk factors. The workers should be provided with enclosed, heated environments on or adjacent to the site, dry changes of clothing, and warm drinks. To monitor the worker for cold related illnesses, start (oral) temperature recording at the job site: ■ M. the field team leader's discretion when suspicion is based on changes in a worker's performance or mental status. • At a worker's request. ■ As screening measure, two times per shift, under unusually hazardous conditions (e.g., wind- chill less than 20°F. or wind-chill less than 30°F with precipitation). ■ As a screening measure whenever any one worker on the site develops hypothermia. Workers developing moderate hypothermia (a core temperature of 92°F) should not return to work for at least 48 hours. nid-app.97 nuoa DAN■L on ~ I I I I I I I I I I I I I I I I I I I I I I I g u I I I I I I I I I I I I I Table 3. Progressive Clinical Symptoms of Hvoothennia Core Temperature l"Fl Svmotoms 99.6 Normal core bodv temoerature 96.8 Metabolic rate increases 95.0 Maximum shiverino 93.2 Victim conscious and resoonsive 91.4 Severe hvoothermia 89.6 -87.8 Consciousness clouded, blood pressure difficult to obtain, pupils dilated but react to light, shivering ceases 86.0 -84.2 Progressive loss of consciousness, muscular rigidity increases, pulse and blood oressure difficult to get, respiratory rate decreases 78.8 Victim seldom conscious 64.4 Lowest accidental hypothermia victim to recover In order to minimize the risk of the hazards of working in cold environments, workers will be trained and periodically reinforced in the recognition of the physiologic responses of the body to cold stress. In addition, the use of insulated work clothing, warm shelters and work/warming regimens may be used to minimize the potential hazards of cold stress. Also. special attention will be paid to equipment warm-up time and freeze protection for vessels, piping, equipment, tools, and walking/working surfaces. The current ACGIH Tl Vs for cold stress found in this appendix will be used as a guideline. nid-app.97 fLUOR DAN■L ttTI ~ nid-app.97 APPENDIXJ JSA ' ' RIIO■ DAN■L RI ~ I I I I 0 m I I II I I I I I I I I I I I I I I I I I I I I H 0 u I I I I I ( JOB SAFETY ANALYSIS GAUGE & BAIL WELLS TASK· JOB STEPS JOB HAZARDS Gauge & bail water from monijoring wells 1. metal burr on well cap 2. toxic vapors 3. explosive vapors 4. static electricity 5. muscle strain-back 6. muscle strain-shoulder 7. splashing liquid-eyes 8. splashing liquid-skin 9. contamination ni<Hpp.97 nuoa DAN■L cnl ~ 1. we;; 2. US€- 3. us~ 4. US':" 5. pre exF be·'. 6. u<:; ar.: bes 7. w-:-: 8. wee: 9. pre JOB SAFETY ANALYSIS OPERATIONS & MAINTENANCE JOB STEPS JOB HAZARDS Inspect Recovery Equipment 1. a. Splashing/1..iquicl Eyes (SPH = Separate Phase Hydrocarbons) Recovery Pump Removal and Maintenance b. Dermal Contact C. Toxic Vapors d. Explosion Vapors e. Static Electricity f. Muscle Strain/Back/Shoulders 2. Electrical/Pneumatic GSl-l&S oPSM..Ut.Js.A 1. a. b. C. d. e. 2. a. SAFEGUA I I I WearPPE I Wear PPE - Mon~or w/PII Ventilate/\.Jsl Grounding/ technique f 2nd person I means LockouVTa g n D D D D m I \ • .. I nicl-app.97 FLUOR DAN■L 4tTI ~ I I I I I m D APPENDIXK D SITE MAPS I I I r I I I I I I I I ~ .. I nid--app.97 nuoa DAN■L en ~ ~ .> I 1 a ~ Durham Wildlifr CIM~ U •Durham W1ldhle CILb Lak.e Dam " ss11\ "' % ;;\ " c .,, 99, DcLormc ,, I I I I I m 0 D m I = •· I ~, !£1 ~ e I I I (1 I I I I I I I ' I I I I n D g I I I I I I I I I I .. - I I I " ) I 0 0 "' ... i -,,._, i._ ,, I> ., . . MAP TO REX HOSPITAL /J ,. .. J .,. ""· ,.,., ff Koppen su, 1fwaid 111,e l'n,fod N....._, -7 I , I ' I I m APPENDIX L FLUOR DANIEL GTI FIELD INSPECTION FORM m D D D D m I I I I I I \.. .. I nid-app.97 n.uoa DAN■L en ~ I • I I I I I I I I I I I I I I I I I \\_ I INSPECTION AND MAINTENANCE CHECKLIST GROUNDWATER REMEDIATION SYSTEM KOPPERS COMPANY SUPERFUND SITE MORRISVILLE, NORTH CAROLINA INSPECTION DATE:. _________ _ PERFORMED BY:. __ ,;__ _______ _ WELL VAULT RECORD Flow Totaliur FQ-102 Pressure CHECK Pump P-101 Running (Observe FQ-102) Liquid Alarm (YA-101) Switch BS-101 (Stop/Start Pump) Pipe Leaks ____ gal ____ psi Yes Yes Yes Yes No No No No Comments: __________________________ _ Maintenance Performed: ______________________ _ TREATMENT BUILDING RECORD THE FOLLOWING Liquid Level in Sump Pressure PI-102 PI-103 Pump P-301 Running Pump P-302 Running Pl-301 PI-302 Filter Differential Pressure in. _psi _psi Yes No Yes No _psi _psi _psi Pl-303 Pl-304 1st Carbon Differential Pressure Pl-305 2nd Carbon Differential Pressure Liquid Level EQ Tank Fl-301 Flow FI-101/FQ-101 FI-301/FQ-301 FQ-302 CHECK TITT FOLLOWING Panel Power Switch: Turn switch and observe Off: Power Off On: PowerOn Sump Pump P-203: Tum switch and observe Hand: Pump On Off: Pump Off' Set to Auto Trans Pump P-301: Tum switch and observe Hand: Pump On Off: Pump Off' Set to Auto I I Checklist Shut 2 I _psi I _psi _psi I _psi _psi I _gal I _gpm rate total I rate total I __ gal I I Yes No Yes No I Yes No I _Yes No I Yes No I _Yes No I I \ I I I I I I I I I I I I I I I I I I I I ,,. I nid-app.97 APPENDIXM DAILY TAILGATE SAFETY MEETING FORM rwoa DANIIL tnt ~ FLUOR DANIEL GTI DAILY TAILGATE SAFETY MEETING Project/Site: _________________________ _ Date: ____________________________ _ Presented by: ______________ Title: ________ _ Topic(s)/lnformation Reviewed: __________________ _ Comments/Follow-up Actions: Sign in: NAME SIGNATURE COMPANY Instructions: ■ Conduct a Daily Tailgat~ Safety Meeting prior to beginning each day's site activities. ■ Complete form and file with Site HASP. • Follow-up on any noted items and document resolution of any action items. nid-app.97 n.llOR DANIIL ctn ~ I I I I I I I I I I I I I I I I I I I