Loading...
HomeMy WebLinkAboutNCD003446721_19850225_Celeanse Corporation - Shelby Fiber_FRBCERCLA RI_Groundwater Investigation-OCRC.F-..l-1; 1') E~£ .LS Fehr"'--"-"'-\ \ '\ 'l,S -• SHELBY PLANT -GROUNDWATER INVESTIGATION CHRONOLOGY 0 1970 -78 ACCUMULATION OF DRUMS OF CHEMICALS AND SOLVENTS IN FIELD NEAR w/w TREATMENT PONDS --SITE CLEANED UP BY 1978, 0 Nov 1980 SUBMITTED RCRA PART A APPLICATION FOR DRUM STORAGE FACILITY, ' 0 APRIL 1981 DECISION MADE TO CONDUCT HYDROGEOLOGICAL STUDY 0 OCT 1981 0 Nov 1981 OF PLANT --RETAINED SOIL & MATERIAL ENGINEERS (SMEl, TWENTY THREE (23) GROUNDWATER MONITORING WELLS INSTALLED BY SME, A -1 GROUNDWATER SAMPLING AND ANALYSIS PROGRAM BEGAN USING DAVIS & FLOYD LABORATORY, ' " • • SHELBY PLANT -GROUNDWATER INVESTIGATION MONITORING WELL SAMPLING & ANALYSIS PROGRAM 0 SAMPLE BACKGROUND AND WELLS OF POSSIBLE CONCERN ON AN APPROXIMATE QUARTERLY BASIS, 0 SAMPLE OTHER WELLS AT LEAST ANNUALLY, 0 ANALYTICAL PARAMETERS CHOSEN ON BASIS OF -INDICATORS OF POSSIBLE CONTAMINATION, To~ -MATERIALS USED IN PLANT, 0 LIST OF PARAMETERS PH CONDUCTIVITY TOTAL ORGANIC CARBON (TOC) TOTAL DISSOLVED SOLIDS (DISCONTINUED AFTER 1982) OIL & GREASE NITRATE ANT I MONY -c.J~~....l- CHROMIUM "'~,A -~., -.~4,-erv COPPER ZINC • • SHELBY PLANT -GROUNDWATER INVESTIGATION CHRONOLOGY (CONTINUED) 0 JUNE 1983 0 JULY 1983 ° FEB 1984 GC SCAN PERFORMED ON GROUNDWATER SAMPLE FROM MONITORING WELL 0-25, SUPERFUND NOTIFICATION MADE TO EPA AND N,C, GEOPHYSICAL SURVEY CONDUCTED BY SME TO DETERMINE IF ANY DRUMS WERE BURIED, TEST EXCAVATIONS MADE --NO BURIED DRUMMED CHEMICALS WERE FOUND, ~ ~,,.,,.:t,. "-" ~ "4uw.d ~ :;i:- 0 APRIL 1984 ADDITIONAL INFORMATION REQUESTED BY EPA INCLUDING ANALYTICAL DATA, HISTORY OF SITE, ETC, 0 JUNE 1984 0 AUG 1984 0 SEPT 1984 PHYSICAL INSPECTION OF PLANT BY EPA (ATLANTA) AND N,C, EPA REQUESTED COPY OF THE HYDROGEOLOGICAL REPORT, (A MITRE EVALUATION WAS MADE BY EPA USING THE DATA SUBMITTED), SME PROPOSED EXPANSION OF THE MONITORING WELL NETWORK, 9 wJla ?e,$ 50,000. EPA PLACED SHELBY PLANT ON PROPOSED EXPANSION OF NPL SITES, i~ ~ ~('., °( wi.,lc\--, c)~ ~ • • SHELBY PLANT -GROUNDWATER INVESTIGATION CHRONOLOGY (CONTINUED) 0 OCT 1984 MEETING WITH AND RI/FS, EPA (ATLANTA) ~ .Jo-. TO DISCUSS WORKPLAN ~ er,~ ~ o,J,,.;,_, , Oc k-..-, ~ 'P c,,P-,} ~ C/ ox:idj,,J C,J~ c.rJJ ci~,,.,.._,. -tk.-vr=rL ~ wd/.o 0 DEC 1984 SAMPLES TAKEN FROM WELLS D-3~, K-28, 0-25 AND 33~0l ° FEB 1985 T-17 FOR GC/MS ORGANIC CONSTITUENT ANALYSIS, (REPORT ISSUED FEB 1985), NINE (9) ADDITIONAL MONITORING WELLS INSTALLED BY SME, • • SHELBY PLANT -GROUNDWATER INVESTIGATION 1985 PLANS 0 INSTALL NINE (9) ADDITIONAL MONITORING WELLS (COMPLETE), 0 UPDATE HYDROGEOLOGICAL REPORT (SME), ° CONDUCT QUARTERLY SAMPLING AND ANALYSES ON SELECTED WELLS (INCLUDING NEW WELLS); ANNUAL SAMPLING AND ANALYSES ON BALANCE OF WELLS, ° CONDUCT ADDITIONAL ROUND OF CONSTITUENT ANALYSES (PRIORITY POLLUTANT PROTOCOLS) ON WELLS HAVING POSSIBLE SIGNIFICANT CONTAMINATION, (TARGET -2ND QUARTER), 0 DEVELOP WoRKPLAN (FOR RI/FS) FOR SUBMITTAL TO EPA (TARGET - EARLY 3RD QUARTER, SME), -1-o \,,____, ~~J:k_J, -lo £ f fl {o-.1~ JUArU,W-" i ' l ' • Compound Pri ority Pollutants Benzene Carbon Tetrachloride 1,1-Dichloroethane Chloroethane ✓ Chloroform 1,1-Dichloroethylene • Shel b* Pl ant Groundwaternalytical Data D-35 pg/1 (12-6-84) K-28 pg/1 (5-18-84) 29 K-28 )Jg/1 (12-6-84) 20 Trans-1,2-Dichloroethylene Ethyl Benzene Methylene Chloride 26 Trichlorofluoromethane 439 3921 Toluene 29 Trichloroethylene Vinyl Chloride 2-Chlorophenol Phenol 13 Bis(2-Ethylhexyl) Phthalate 51 Butyl Benzyl Phthalate 16 Di-n-butyl Phthalate 11 Diethyl Phthalate 170 Antimony NA Arsenic NA Nickel NA 20 Zinc 101 NA 27 NA -not analyzed for. 0-25 JJ9/l (6-27-83) 219 23 192 698 1432 166 1046 42 17090 4484 114 50 46 NA NA NA NA 0-25 T-19 JJ9/l µg/1 (12-6-84) (12-6-84) 117 12 1025 262 24 48 16 14 40 81 756 645 16 10 24 232 3 49 24 13 38 9 210 29 45 '. ' . I • • Other Organic Peaks (Semi-quantitative) (12/84 samples only) D-35 3-Methyl-Butanoic Acid Butanoic Acid 4-Methyl Pheno 1 Octadecanal Octanoic Acid Benzoic Acid 3,5-Dimethyl Benzoic Acid 7-Methyl-1-octene Ethyl Cyclohexene 1-Hexadecanol Tetrahydrofuran 2-Methyl-1,3-Dioxolane 1,1-0xybisbenzene Xylenes Furan compound -unidentified 3-Chlorophenol Tetradecanal 1,1-Biphenyl Hydrocarbons -unidentified 1500 f~ w-cJ1;- • K-28 0-25 T-17 1000 20000 2000 200 50 2000 2000 2000 500 200 100 200 100 200 500 200 50 100 50 200 ' 50 100 5000 5000 3000 ,, il 'I I, ,, li I i ' " I! I' ,j I· .... ---·---·-- • • ~ . -.. 1j . \:1'G11..'--/<...o.~~---.. _ .C~'-~E"'b~-·-'." _ ll! lti ___ .... --·--~· __ ····-·•····---· --·•---~-·--•-··----···•-····-··-· ..... ___ -iii () . . !1,·1. JA":"1.::5 .. C-.,~\I 1.. 1...-=-:-:J.. . . 'L.-,-,_,,,,.,_-r.,.r ... __ ..: I I , iii . ·. . . -·· . --~l-•#n; '..lo, ;)_S" · 1 q ~b :" ·· -·. J . --. . ---,----· . ---•--·-... ~ ·--~..J.•--c i-1-A-ri.L.Q'liU : ·:_:• ---. ··-----·---.. . --. --~~-\:r'.·:~: •.;. -,,.·,, -li~: ~))~--~-~~-~z»-;;~:-·~: _--~-~:-·_-:_:~~--~· :_ ! . . : :I, • ! I -. ---------------.. ----------------------....... ----------· .... --· ..... -..... ·-· .. ---·--. ......,_ ii J1~l jf,f(./c~: CEfL---T-••·-:----Gc,"'~(~:0,f 1 ·· ---• ....... i!i-~5!eH_: .. A:: [I;~~---~~--~:_f.c; ___ : __ .. _:_ .. :··: ______ . _____ (;,-1-1 ~i1.fl:~::_ , ;n ' 111 :--~---------:1i-;; 1,J i . I! r o . . /J . . -_:_·: . L_ _ -... -. :i1 ... '-~-i...'...f'-Y.l. L ___ '._{.)_0-,}_!-_J_ ______ .. r.: ____ . --_ -· ............... u.,..;_/;JIJ.L-0 !/.~--'-·· '._____ ij _J, _ _;t1, __ ;1Lo 1~rn4'J~ ____ CF o______ ___ __ ______________ ·--~-f!._~~~-Y -~--- ;_ -------·--.. Ii _c . .e t¼rnc/4h __ ------CP_() ------· .... --·--·-·. ---_Q_,{e!lv.. _· -,ti / - l:l i--------~-~~•~f ~:--~~~~----i~En}::~~~: •~~---_ --~ -~,~:~::_-~:~~ ; 'I . . .. , l . : -.----· .. ........ . ·;11 _____ ,,_ --·-··----'-" --------·-··-...... -__ .. ----·-·--·-·-----~ ! . ,i : !I . I ·'·' 1 ll · -------·--·--·-·--· ----·--· ---·-· · -· ·-·•· --·····•--·-··--------·---·· •---· · --·-··---··••--·-·~----·-----~:·· . ii I : " ... . . ,_ . ~ • ; I •-• ---• --•---'," ,-M•••---------- !' ,I -----------·--l1~=~------_ ----·-------·-· -------.1--. --------------·--. -----------· --·-··------·-----··---------. ··-· \.~".::---.-•••-•~-•~---••--~---•---•--h--• .. •--••-••••--••-•••--•••-••• -•-• --' ..... .d r ~-!H eELANESE F 18 ER S OPE R f\TI O 1,1 S CERT! FI ED MAIL February 19, 1985 JCP-85-20 • N. C. Dept. of Natural Resources & Community Development Division of Environmental Management, Groundwater Division P. 0. Box 370 Asheville, NC 28802 Attn: Kay Dechant Dear Ms. Dechant: Subject: Ground,1ater Monitoring Shelby Plant -Celanese Fibers Operations Cleveland County In response to your telephone request, I have enclosed a summary of available specific constituent analytical data for the Shelby plant background groundwater monitoring well (D-35) and three other downgradient monitoring wells (K-28, 0-25 and T-17). Samples were taken and analyzed in accordance with EPA protocols for priority pollutants. In addition, for the 12/6/84 sampling round, other major organic peaks on the GC scans were identified and an estimate of the concentrations for these compounds was made. If you have any questions on the data, please give me a call on 554-2975. Very truly yours, cc: E. A. Collins s. p. Engelman E. ,, '. Glover -SME ,l. A. Lerme v!. E. Ross vi. H. Town CEL.:..NESE FIBERS OPERATIONS· P.O. BOX 3241,: · CH."\RLOTTE. N.C. 28232 · 1ELEPHONE 704-554-2000 .--..... -:-...... c·. ..,. • • Shelby Plant Groundwater Analytical Data D-35 K-28 K-28 0-25 0-25 T-19 ug/1 ug/1 ug/7 ug/1 ug/1 ua/1 Compound (12-6-84) (5-18-84) (12-6-84) (6-27-83) (12-6-84) (12:6-84) Priority Pollutants Benzene 29 20 219 117 Carbon Tetrachloride 23 12 1,1-Dichloroethane 192 Chloroethane 698 1025 Chloroform 1432 262 1,1-Dichloroethylene 166 24 Trans-1,2-Dichloroethylene 48 16 Ethyl Benzene 14 Methylene Chloride 26 1046 40 81 Trichlorofluoromethane 439 3921 756 645 Toluene 29 42 16 Trichloroethylene 10 Vinyl Chloride 24 2-Chlorophenol 17090 Phenol 13 4484 232 3 Bis(2-Ethylhexyl) Phthalate 51 114 49 24 Butyl Benzyl Pht!ialate 16 13 Di-n-butyl Phthalate 11 50 Diethyl Phthalate 170 46 Antimony NA NA 38 Arsenic NA. NA 9 Nickel = NA 20 NA 210 Zinc 101 NA 27 ~A,=:--=-29-· '45--m:z;-.~ ::::.::::,::r::::c ::i::w....-::::.=.::ct:: NA -not analyzed for. • Other Organic Peaks (Semi-quantitative) (12/84 samples only) D-35 3-Methyl-Butanoic Acid Butanoic Acid 4-Methyl Phenol Octadecanal Octanoic Acid Benzoic Acid 3,5-Dimethyl Benzoic Acid 7-Methyl-1-octene Ethyl Cyclohexene 1-Hexadecanol Tetrahydrofuran 2-Methyl-1,3-Dioxolane 1,1-0xybisbenzene Xylenes Furan compound -unidentified 3-Chlorophenol Tetradecanal 1,1-Biphenyl Hydrocarbons -unidentified 1500 K-28 1000 20000 2000 2000 2000 2000 500 200 100 200 200 5000 • 0-25 200 100 500 50 100 200 50 100 5000 T -17 50 200 50 3000 Note: For Well 0-25, a specific constituent analysis in the 6/27/83 sample showed acetic acid 677,000 ug/1, Butyric acid 99,6000 ug/1. • .&ElANESE FIBERS OPERATIONS January. 15, 1985 JCP-85-04 . CERTIFIED MAIL • A'R QUALITY DIVISION! ASHE:V!!...!..E: O:"FJCE: North Carolina Dept. of Natural Resources & Community Development Division of Environmental Management, Groundwater Section P. 0. Box 370 Asheville, N. C. 28802 Attn: Kay Dechant .Subject: Groundwater Monitoring Dear Ms. Dechant: Shelby Plant -Celanese Fibers Operations Cleveland County In response to your letter of January 10th, .I have enclosed a printout of the Shelby plant groundwater monitoring data. A plant layout is also included which shows the location of the monitoring wells. If you have any questions on.the data, please give me a call on (704) 554-2975. JCP/lb cc: (w/o attach) E. A. Collins S. P. Engelman Very truly yours, ,~CEl:!.~QBE: OPERATIONS C. Pullen, Manager En ironmental.Affairs ====· --·J-;-A,-terme--===== ™~-\ W .-r:':""'RIYss"·-=Shelby W. H. Town CELANESE FIBERS OPERATIONS• P.O. BOX 32414 • CHARLOTTE. N.C. 28232 • TELEPHONE 704-554-2000 4 DIVISION OF CELANESE CORPORATION \__ )RTH CAROLINA DEPARTMENT OF NAT(,,.--..JL o<ESOURCES AND COMMUNITY DEVELOPM-.,T Date _.,...~.,.0;"'-'-~,(_3.,__ __ ::""'':~,~ Remarks: _____________________ _ ~ D Note and file O Note and re!urn to me D Note and see me about this D For your approval O Per our conversation O Per your request Return with more details ~ ACTION D Note, initial and forward O Your comments, please O For your information O Prepare reply for my signature D Prepare informatjon for me to reply 0 Please answer, with copy to me To be filed ·• • . ·l " BAC...'r<-. G eo,.1~1::s:> \: CELANESE FIBERS OPERATIONS .ll SHELBY PLANT, SHELBY,NC •' '' ., GROUNDWATER ANALYSES FROM MONITORING WELL C49 WATER SPECIFIC OIL & TOTAL ELEV. TEMP PH CONDUCT TOC TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L • MG/L MG/L MG/L MG/L ' 11/2"181 193.88 5.2 75 6 80 2.2 0, 1 i<o.01 ,!. <0.01 <0,01 0.043 03/04/82 197. 5'1 7. ll 85 1 ,, 136 BDL 0.27 •~O, 005 .l <0.02 <0,02 o. 127 06/09/82 197.81 7,2 70 12 62 BDL 0, 73 <;.O, 01 <0,02 0,0IJ 0, 101, 09/09/82 195.91 6. 7 65 7 74 BDL 0.33 <0,005 <0.02 <0.02 0.08 06/27/83 199.71 5.95 300 1. 7 09/01/83 196.61 6. 7 250 6.7 BDL 0.29 <0.002 <0.02 <0.02 0.039 11/11/83 19'1. 011 1 3 7. 112 811 2.0 02/ 16/81/ 197. 116 17 8.08 110 5.5 05/ 18/81/ 200. 11 15 7.69 20 3.6 • 08/17/84 200.31 19 6 30 7.8 <1.0 0.22 <0.005 '! <0.02 <0.02 0, 359 11/16/84 197.93 16 · 7. 2 19 1. 7 }' ~ I ' ;/ \3 ACK G~o lJl'-1'!:) GROUNDWATER ANALYSES FROM MONITORING WELL D35 \,ATER SPECIFIC OIL & TOTAL ELEV. TEMP PII CONDUCT TOC TDS GREASE NITHATE ANTIMONY CHROMIUM COPPEil ZINC DATE FEET C Ull I TS MMIIOS/CM MG/L MG/L MG/L MG/L l>J~/L MG/L MG/L MG/L 11/24/81 176.8 5.9 180 5 1611 2.6 0. 37 <0.01 <0.01 <0.01 0.068 03/0IJ/82 180. 06 5.6 100 7.5 '14 BDL IL 3 <0.005 <0.02 <0.02 0. 0911 06/09/82 180. 16 6.3 105 7.5 611 BDL 2. 7 <0.01 <0.02 <0.02 o. 125 09/09/82 179. 16 6.2 120 5.5 64 1.62 2.4 <0.005 <0.02 <0.02 0. 192 06/27/83 181. 1 5.75 95 1.5 09/01/83 178.96 6. 1 100 BDL 1 . 6 <0.002 <0.02 <0.02 0. 127 • 11/11/83 176. 89 16 7. 12 104 <LO 02/16/84 179.118 17 6.81 95 7.5 05/18/811 181.86 15 7. 15 70 4 . 2 08/17 /84 180.96 19 6.6 120 13.4 <1.0 1. 70 <0.005 <0.02 <0.02 o. 116 11/16/84 179. 07 16 5.9 129 1. 3 ; ',), . ~,- • • DATE 11/211/81, 03/011/82 06/09/82 09/09/82 09/01/83 08/17 /811 DATE 11/24/81 03/04/82 06/09/82 09/09/82 09/01/83 08/17/84 WATER ELEV. fEET 155.36 161. 56 159.99 158.09 156.99 159.69 WATER ELEV. FEET. 127.65 129.65 129.98 128.88 127.38 129.118 TEMP C 19 TEMP C 19 PII UNITS 5.6 6.2 6.9 6.8 6.112 5.9 PII UNITS 6.2 6.3 7. 1 6.8 6.86 7.6 CELANESE FIBERS OPERATIONS SHELBY PLANT, SHELBY,NC GROUNDWATER ANALYSES FROM MONITORING WELL A39 SPECIFIC Oil & ANTIMONY CONDUCT TOG TDS GREASE NITRATE MMIIOS/CM MG/L MG/L MG/l MG/L MG/L_ 90 4 92 I. 3 0.23 <0.01 70 9 92 BDL 1 . 7 <0.005 80 8.5 511 BDL 1. 2 <0.01 70 ., 114 BDL 1. 3 <0.005 60 1. 3 BDL 0.95 ~0.002 30 IL 7 <1.0 1. 211 <0.005 ' ~ GROUNDWATER ANALYSES FROM MONITORING WELL B34 .. 5 SPECIFIC Oil.& ' CONDUCT TOG TDS GREASE NITRATE ANTIMONY MMflOS/CM MG/l MG/L MG/L MG/l MG/l. 500 8.5 228 1. 7 0.33 <0.01 600 10.5 352 BDL 0. 91, <0.005 590 6.5 328 BDL ,, . 65 <D.01 550 6.5 350 BDL 1. 85 <O. 005 700 2 BOL 1. 1 <0.062 550 28.5 <1.0 1.0 <0.00~ •I . " TOTAL CHROMIUM r;t• ZINC MG/L MG/l <0.01 l<O. 01 0.023 <0.02 <0.02 0.037 <0.02 <0.02 0.06 <0.02 \1<o. 02 0.054 <0.02 f0.02 0.028 <0.02 f0.02 0.243 TOTAL CHROMIUM COPPER ZINC MG/L MG/L MG/L ~ <0.01 <0.01 0. 159 -10.02 <0.02 0. 102 <0.02 <0.02 0. 111 <0.02 <0.02 D. 14 :<0.02 <0.02 0.079 <0.02 <0.02 D. 111 ,i -:~-. • • DATE 11/24/81 03/04/82 06/09/82 09/09/82 09/01/83 08/17/84 DATE 11 /211/81 03/04/82 06/09/82 09/09/82 06/27/83 09/01/83 11/11/83 02/16/84 05/18/84 08/17/84 11/16/84 WATER ELEV. FEET 160.83 160.58 180.26 160.66 162.06 167.26 WATER ELEV. FEET 161. 113 1.61.85 162.28 163. 118 163. 51 163.08 162.35 162.85 164. 18 165.08 165.48 TEMP C 22 TEMP C 20 16 16 22 17 Pll UNITS 6.2 6.2 7. 1 6.9 6. 78 6.7 PII UNITS 6. 3 5.6 6.6 6. 7 6.95 6.28 6. 39 6.9 6.76 6.3 7.3 CELANESE FIBERS OPERATIONS SHELBY PLANT, SIIELBY,NC GROUNDWATER ANALYSES FROM MON I TOR I NG WELL F~5 SPECIFIC OIL & (· TOTAL CONDUCT TOG TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC MMHOS/CM MG/L MG/L MG/L MG/L MG/~ MG/L MG/L MG/L ' 195 5.5 . 220 BDL 0. 13 <0.01 . <0.01 <0.01 0.075 118 8 132 .BOL <O. 10 <O. 005 <0.02 <0.02 0.065 112 9.5 62 BDL 0.2· <0.01 <0.02 <0.02 0.0"6 85 4.5 52 BDL 0. 14 <0.005 <0.02 <0.02 0. 158 55 4 6.4 0.4 <0.002 <0.02 <0.02 0.044 40 13.4 15.6 0.21 ' <0.005 <0.02 <().,. 02 0.036 , .. I 1 GROUNDWATER ANALYSES FROM MONITORING WELL G50 SPECIFIC OIL & TOTAL CONDUCT TOG TDS GREASE NITRATE ANTIMONY yHROMIUM :o PER ZINC MMHOS/CM MG/L MG/L MG/L MG/L MG/L' MG/L 'MG/L MG/L 400 6.5 288 BDL 0.2 <O.01 <0.01 l<O.01 0.084 560 10.5 288 BDL 0.35 <0.005 <0.02 <0.02 0.079 600 12,5 328 BDL 0.69 <0.01 <0.02 ro. 02 0.05 550 8 310 BDL o. 73 <0:005 <0.02 <0.02 0.171 128 5 .\.<O. 002 1100 1. 5 BDL 0. 22 i <0.02 r0.02 0.124 350 3.0 350 17.0 ':'.~ 270 11 . 2 270 2.9 1. O <0.10 <0.005 <0,02 <0.02 0.114 273 3. 11 ,. ,., ~. ; '.{·~: CELANESE FIBERS OPERATIONS '· SHELBY PLANT, SHELBY,NC GROUNDWATER ANALYSES FROM MONITOR I NG WELL G88.5 WATER SPECIFIC OIL & -f"'" J, TOTAL ELEV. TEMP PH CONOUCT TOC TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L MG/L MG/L MG/L MG/L 11/211/81 161. 59 7.2 170 65 156 ADL 0. 11 <0.01 <0.01 0.01 0.025 03/011/82 161. 01 6.3 11,3 8 132 BOL 0.2 <0,005 <0.02 <0.02 0,027 06/09/82 162.36 7.5 155 10 100 BOL 0.23 <O. 01 · <0.02 <0.02 0. 1111 09/09/82 161. 86 6,9 132 10.5 114 BDL 0. 15 <0,005 <0.02 <0.02 0.075 06/27/83 163. 115 6.25 1150 2 09/01/83 164.06 7. 17 100 7.5 BDL 0. 15 <0.002 <0.02 <0.02 0.038 11/11/83 163. 18 19 6.86 130 1 .0 02/ 16/811 163. 311 20 7.7 95 ,,.o 05/18/811 163.86 16 7. 13 85 9. ,, ,l . • 08/ 17 /811 165.66 21 6,.7 70 6. 1 1. 2 o. 19 '.<0. 005 <0.02 <0.02 0.034 11/16/84 165.36 18 7.3 80 1. 7 -:;\ GROUNDWATER ANALYSES FROM MONITORING WELL 1179.;> WATER SPECIFIC OIL & ~ TOTAL ELEV. TEMP PH CONDUCT TOC TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L MG/L MG/L MG/L MG/L 11/211/81 · 152,82 6.2 135 4 84 BDL 0. 13 ·:-:o. 01_ · <0. 01 <0.01 0.06 03/011/82 153.09 6 96 7.5 96 BDL 0.38 ,;,~o. 005 <0.02 <0,02 0.047 06/09/82 7.2 90 7.5 54 BOL 0,43 ·<0:-0.1 <0.02 <0.02 0,072 09/09/82 1511. 51 7.7 74 6.5 56 11. 75 0,4. "<0.005 <0.02 <0.02 0.079 09/01/83 154.81 6.8 70 1 . 3 1. 1 0.65 <0.002 <0.02 <0.02 0.057 •• 08/17 /84 155.57 19 6. 1 60 2.0 1. 3 0.70 <0.005 <0.02 <0,02 0.059 . / j ?~ foN,J)i c., l-l R. o·fi' p._ ,1:.. R_ !i;.~V C 'TI D "'-l CELANESE FIBERS OPERATIONS SIIELBY PLANT, SIIELBY,NC GROUNDWATER ANALYSES FROM MON I TOR I NG WELL 157.5 WATER SPECIFIC OIL & TOTAL El.EV. TEMP PH CONDUCT TOG TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L MG/L MG/L MG/L MG/L 11/24/81 155, lj 9.6 165 11 128 1. 3 0. 15 <0.01 <0.01 0.01 0.007 03/011/82 136 .118 9.R 145 9 116 1. 5 0.33 <0.005 <0.02 <0.02 0.01 06/09/82 158, 18 10. 2 152 7.5 64 llDL 0.48 <0.01 <0.02 <0.02 0.013 09/09/82 157.78 8.7 85 11. 5 76 1. 1 0.25 <0.005· <0.02 <0.02 0.011 09/01/83 157.28 6.6 300 15.8 BDL 0.52 <0.002 <0.02 <0.02 0.028 08/ 17 /811 158. 118 20 7. 1 80 2.3 <1.0 0.40 <0.005 <0.02 <0.02 0.034 ., {1'. '· ,.,, ' • J . 1 ~- E 114 Y l "f.:.N C G/....Y C:Dl- GROUNDWATER ANALYSES FROM MON I TOR I NG WELJ-J28. 5 -~t . WATER SPEC/ FIG 01 l. & .,. TOTAL El.EV. TEMP PH CONDUCT TDC TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L ,;j:MG/L MG/L MG/L MG/L 11/211/81 151,. 1,9 6.3 9D0 10 6411 1. 4 2. 12 <0.01 <0.01 0.01 l). 11 03/04/82 158.59 6.6 1050 8.5 816 DOI. 3.9 ~0.005 <0.02 <0.02 (,I. 105 06/09/82 158.59 6.9 250 7.5 126 BDL <0.10 <0.01 <0.02 <0.02 0.075 09/09/82 157.89 6.8 1650 10.5 1116 5.05 63 <0.005 <0.02 0.03 0.233 06/27/83 159.92 6.65 1560 11 09/01/83 157.31 6.65 1550 11 ODL 22 <0.002 <0.02 <0.02 0.102 • 11/11/83 155.01 14 6.51 995 6.0 02/16/811 160.59 16 7.35 1200 130 05/18/811 161. 99 16 6. 511 11100 17 .0 08/17/811 160. 119 18 6.6 2000 6.7 1. 0 150 <O. 005 !· <0.02 <0.02 0.085 11/16/84 156. 71 16 7.7 2000 7.4 .. ial i .,. II ·····-#;/< . . ., ... ' . 'I tt , / !? Tl-I y L._ le.,_, E. G Ly C. DI-·r ! CELANESE FI BERS OPERATIONS ,I> • ! SHELBY PLANT, SHELBY,NC GROUNDWATER ANALYSES FROM !'ION I TOR I NG WELL J59·. 5 <, . . '-~;;~TOTAL WATER SPECIFIC Oil & ELEV. TEMP PH CONDUCT TOG TDS GREASE NITRATE ANTIMONY\ CHROMIUM CD,PP,ER ZINC DATE FEET ·c UNITS MMHOS/CM MG/L MG/l MG/L MG/l MG/l ; MG/L 1/t~ MG/L 11 /211/81 154.49 6'. 1 300 6.5 212 BDL <O. 10 0.017 ) <0.01 <:O-fb1 0.093 03/04/82 156,74 5.9 163 7.5 120 BDL <O. 10 <0.005 <0.02 <0.02 0.072 06/09/82 157.51 6.8 1660 15 1020 8DL 37 ' <0.01 <0.02 · ~o-ho2 o. 101 09/09/82 155.41 7. 1 225 4 108 BDL 0. 1 <0.0Q5 .. <0.02 <□ . p 2 o. 186 06/27/83 158.62 7.15 130 BDL I•"-•'·• R 09/01/83 156.29 6. 112 190 1. 5 BOL 0.07 <O. 002. ; <0.02 1.02 0.092 11/11/83 154.99 13 7. 18 135 1. 0 ' t 02/16/811 156.111 16 7. 75 165 6.8 .• I. 05/18/811 159. 11 16 7. 211 150 1 3. 5 .08/17/84 158.51 19 6. 7. 70 2.6 <1.0 <O. 10 <0.005 <0.02 <0.02 0.090 " 11/16/811 158.59 16 7.2 11/5 1. 5 .. "; I ~' " 4 I I .S: Pl.__..__ ·f'() ... '.:!:) \ GROUNDWATER ANALYSES FROM MON I TOR I NG WELL K28 WATER SPECIFIC Oil & • TOTAL ELEV. TEMP PH CONDUCT TDC TOS GREASE NITRATE ANTIMONY CHROMIUM COP,PER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/l MG/L MG/l MG/L -1 ("1G/l MG/L MG/l 11 11 /211/8 l 1lJ6. 17 6 175 6.5 1 41, 2. 1 0.1t2 <0.01 ' <0.01 <01.01 0.015 03/04/82 . 153.23 6. 3 970 320 704 BDL 3 <0.005 <0.02 <Di" 02 0.095 06/09/82 1117. 4 6.5 460 13 220 BDL 2.2 <D. 01, <0.02 <~-02 0.055 09/09/82 11,7. 8 6.5 450 26 264 BDL 2.2 <0.005 <0.02 < .02 o. 119 06/27 /83 1119. 86 5.65 7200 6667 • ·'l' ' 09/01/83 1 l16. Lt 5.87 5000 3130 1. i 3.5 <0.002 fl. 03 <0.02 o. 192 .11/11/83 145.57 17 6.23 1800 141,0 02/16/84 152.57 16 6.4 4500 2804 ,. ' 1 05/18/84 153. 1 16 6.48 6000 5400 ',i 08/17/84 148.35 18 5.6 5000 3350 <1.0 1. 10 ~<O. 005~j· .· <0·.02 <0.02 0. 177 11/1.6/84 ·147.28 16 6 3050 2054 ,,--!:~ f ,, ,, I", ·~£:-Ir ·' ,-, ~· :' '-· -~-f . ' l'f ' , CELANESE FIBERS OPERATIONS •', . "\ SHELBY PLANT, SHELBY,NC GROUNDWATER ANALYSES FROM MONITORING WELLJ;K58, WATER SPECIFIC OIL & '~ ' •TOTAL ELEV. TEMP PH CONDUCT TOC TDS GREASE NI THATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMllOS/CM MG/L MG/L MG/L MG/L MG/L 'MG/L MG/L MG/L 11/211/81. l l1lt. 9 7 . 160 6.5 1 IJO 2.7 0. 11 <0.01 1 <0.01 <0.01 0.027 03/011/82 151. 92 6,5 110 8 1()11 BDL <O. 10 <0.005 ' <0.02 <0.02 0.017 06/09/82 1117 .65 8. 1 152 9 82 BDL <0. 10 <0'.01 <0.02 <0.02 0,01 09/09/82 1 l16. 15 7. 1 110 11. 5 76 BDL 0. 11 <0.905 <0.02 <0.02 0.01 06/27/83 1118.83 6.6 460 BDL • 09/01/83 1115 .115 7.06 110 1. 5 BDL 0.05 <0.002 <0.02 <0.02 0.021 11/11/83 11JIL5 17 6.8 100 1.0 02/16/811 .151. 112 16 7. 111 105 8.5 05/18/811 151. 85 16 7.09 120 11. 2 ' ' • 08/1"1/84 11,9. 5 20 6.6 80 12.6 <1.0 o. 35 <0.005 , . '<0.02 <0.02 0.071 11/16/84 1118. 23 16 8.3 95 3.7 -z. ,. "¥ ' ' GROUNDWATER ANALYSES FROM MONITORING WELL M44 0'? WATER SPECI FIG OIL & ' TOTAL ELEV. TEMP Pll CONDUCT TOG TDS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L MG/L, MG/L MG/L MG/L 11/211/81 137.81 5.6 100 5.5 124 1. 5 <O. 10 <(J. 01 <0.01 <0.01 0.065 03/04/82 133.29 6 911 12.5 56 BOL <O. 10 <0.005 <0.02 .:(). 02 0.062 06/09/82 132.62 6.3 105 8 511 BDL <O. 10 <0.01 <0.02 -,-, i, .. ..;f.~ 0.095 09/09/82 133.92 6.8 95 6.5 88 BDL <O·. 10 <O·: 005 <0.02 <U!.ld2 0. 123 09/01/83 131. 62 6.29 70 1. 3 1. 7 <O. 10 <0.002 <0. 021 <Ci'fo2 0.062 08/17/84 133.92 20 5.8 85 8.3 <1.0 o. 12 <0.0!)'? <0.02 ,, <01.02 0. 101 • •· • DATE 11/211/81 03/04/82 06/09/82 09/09/82 09/01/83 08/17/84 DATE 11/211/81 03/011/82 06/09/82 09/09/82 09/01/83 08/17 /84 WATER ELEV. FEET 1112. 87 150.5 1115.05 11, l . 115 1111. 45 142.6 HATER ELEV. FEET 1Irn. 58 148.03 143.7 140.5 139.2 144. 15 1 TEMP C 19 TEMP C 17 PII UNITS 5.6 5.3 5.7 6 5.88 6. 1 PH UNITS 5.9 7. 1 8.2 9. 1 9.69 9.7 CELANESE FIBERS.OPERATIONS SIIELBY PLANT, SHELBY,NC GROUNDWATER ANALYSES FROM MONITORING WELL'N29 -. SPECIFIC OIL & .; CONDUCT TOC TOS -GREASE NITRATE ANTIMONY MMHOS/CM MG/L MG/L MG/L MG/L MG/L 110 5 104 2.5 0.55 <0.01 60 9 32 BOL 3. 1 <0,005 60 6.5 26 BOL 1. 2 <0.01 62 5.5 40 1. 28 1. 5 <O. 005 .. 70 BDL BDL 1. 1 <0.002 50 . 2.9 1. 5 0.90 <0.005 ' ,, f O'-\ 7\l 1"' c. -(?o~•-:!' GROUNDWATER ANALYSES FROM MONITORING WE~L N53.5 SPECIFIC OIL & CONDUCT TOC TDS GREASE NITRATE ANTIMONY MMHOS/CM MG/L MG/L MG/L MG/L; .~G/L < 155 4.5 184 -BDL 0. 11, <o;. o 1 117 11 76 BDL ·<O. 10 <0,005 135 11 80 BOL 0. 1 • <d.01 128 5.5 92 BOL <O. 10 • , <O. 005 110 2.3 BDL <O. 10 , <O. 002 J 75 2.6 <1.0 0. 19 <9.005: .. • TOTAL CHROMIUM COPPER ZINC MG/L MG/L MG/L <0.01 <0,01 0.09 <0.02 <0.02 0.07 <0,02 <0.02 0.099 <0,02 <0.02 0. 123 <0.02 <0.02 0.025 <0.02 <0.02 0.096 TOTAL CHROMIUM COPPER Z_INC MG/L MG/L MG/L <0.01 <0.01 0.088 <0.02 <0.02 0.037 <0.02 <0.02 0,076 <0.02 <0.02 0.0116 <0.02 <0.02 0.094 <0.02 <0.02 0.030 rt..\:"."~ ,, )1 •. . i;. ·.i( : , cf '. f'b \..1.S:WING i).,n,o. " ,. J:. ' ·_.:· !i ~ CELANESE FIBERS OPERATIONS SHELBY rLAN\, SHELBY,NC ,; \. GROUNOWA TER ANALYSES FROM MONITORING W~LL 025 WATER SPECIFIC OIL & TOTAL ELEV. TEMP PH CONDUCT TOG TOS GREASE NITRATE ANTIMONY CIIROMIUM COPPER ZINC DATE FEET C UNITS MMHOS/CM MG/L MG/L MG/L MG/L MG/~ MG/L MG/L MG/L 11/211/81 111.7. 09. --· -6 1600 270 1232 1 2.34 0.092 <0.01 <0.01 0.072 03/011/82 1118.67 6:4 3900 600 '231!0 -15. 2 · ~ 3 . ft· -0. 136 · ·<0.02 <0-.-02 0 .· 1-· · 06/09/82 1118. 3 7 6.3 1,000 930 2598 10.2 1. 8 0. 111 <0.02 <0.02 o. 14 09/09/82 1119. 67 6.2 1,500 865 3110 3.39 5 ,-t 0.4 <0.02 0.02 0.172 06/27/83 148.84 6.25 1,000 1028 09/01/83 1119.97 6.41 3000 306 4.6 2. 1 0.024 <0.02 <0.02 0. 128 11/11/83 1116. 59 18 6. 18 300 150 02/16/811 1118. 92 16 6.8 3000 196 05/ 18/84 149.67 16 6. 1 2000 1115 08/ 17 /84 148.77 20 6.2 2000 99.0 <1.0 1. 30 <0.005 <0.02 <0.02 o. 114 •• 11/16/811 148.27 16 .6. 3 2900 51. 6 ll "f;" i r {>\)\..\SI-\\ 1\1 (, flQ N ll GROUNDWATER ANALYSES FROM MON I TOR I NG WELL P31.5 WATER SPECIFIC OIL & ' !i TOTAL ' [LEV. TEMP PH CONDUCT TOC TDS GREASE NITRATE ANT l'MoN·y-CHROMIUM COPPER ZINC DATE FEET C UNITS MMIIOS/CM MG/L MG/L MG/L MG/L MGf MG/L MG/L MG/L 11/21i/81 123.53 5. 7 650 10.5 396 3.3 <O. 10 0.031 <0.01 0.01 0. 107 03/011/82 121. 86 6.2 790 l lL 5 412 BOL <O. 10 ~ <0.005 <0.02 <0.02 o. 118 06/09/82 121.66 6.7 775 15.5 424 BDL <O. 10 ' <O .01 <0.02 <0.02 0. 16 09/09/82 122.56 6.5 850 8 488 6.91 <O. 10 ••; <0.005 . <0.02 <0.02 o. 129 09/01/83 121 . 36 6.76 800 5 801. 0.04 <>-! <O 002 <0.02 <0.02 0. 129 #: 08/17/84 122.16 19 6.3 1000 11. 0 <1.0 <O. 10 f p:oo5 <0.02 <0.02 0.077 ~ • ,· ' ,, ., .. . , ,r_, j ,, ii ;:~ ·. .. ~. 1# DATE 11/24/81 03/04/82 06/09/82 09/09/82 09/01/83 08/ 17 /811 • DATE 11/24/81 03/011/82 06/09/82 09/09/82 06/27/83 09/01/83 .11/11/83 02/ 16/811 05/ 18/811 08/ 17 /811 11/16/84 -rmm:zr~uczrzgtxa El tfl! 571 CF'ftZYttiWtf&71 Z ·• · -"'"'fir" -ifo/1ttfWi$fWff W7wl@iriiW¥ii~ WATER ELEV. TEMP PH FEET C UNITS 119. 09 4.5 119. 26 5. 1 118. 29 5.4 118. 79 5.9 118. 59 5.58 ]20.29 19 5.8 WATER ELEV. TEMP PH FEET C UNITS 126.52 5 126:21 5. 1 123.47 5.6 12lL 37 5. 7 125.37 5.95 123.67 5.75 123.02 18 6,06 125-. 77 16 6.85 126.07 16 6.71 125.37 19 5.7 124.27 17 6 (° o\..1-S.r4l'N G CELANESE FIBERS OPERATIONS SHELBY PLANT, SHELSY,NC -f> o N :::z::. " ' I ' GROUNDWATER ANALYSES FROM MON [ TOR I NG WELL Q33 SPECIFIC Oil&: CONDUCT TOG ms GREASE NITRATE ANTIMONY MMHOS/CM MG/L MG/L MG/L MG/L MG/L 165 13. 5 124 1. 3 0. 13 o. of, 185 8 172 SOL <0.10 <0.005 260 10 192 SOL <O. 10 ~o. 01 · 300 6 142 SOL <O. 10 <0.005 350 3.2 2. 1 <O. 10 .<0:002 400 6.0 <1. 0 <O. 10 ~0.005 ., ., . ,. $1..U""l::,G c.-fa r-.i::D ?o k \ S: N I r--1 C. ·flON-:D GROUNDWATER ANALYSES FROM MONITORING WELL R17 SPF:CI FIG 01 L &: CONDUCT TOG ms GREASE NITRATE ANTIMONY MMHOS/CM MG/L MG/L i>!G/L MG/L' . MG/L 175 7.5 l BIJ 2.8 0. 11 <0.01 158 14 132 BDL <0. 10 <0.005 225 9 110 BDL <0. 10 <0.01 250 7.5 130 4. 32 <O, 10 <0.005 240 11.6 180 1. 8 SOL <0. 10 <0.002 155 1. 5 170 9.5 110 22. 1 1 140 3.5 <1.0 <O. 10 <0.005 140 4.9 TOTAL CHROMIUM COPPER ZINC MG/L MG/L MG/L <0.01 <0.01 o. 109 <0.02 <0.02 0.095 <0.02 <0.02 0. 149 <0.02 <0.02 0.222 <0.02 <0.02 0.135 <0.02 <0.02 o. 144 •' ' I - .: TOTAL l CHROMIUM COPiPER ZINC 1MG/L MGj~ MG/L <0.01 o .lo 1 0. 173 <0.02 <dJ.~{ 0.131 <0.02 <li'.O 0.04 <0.02 <o'to2 o. 128 <JI 02 <q.02 o. 15 Jl02 <0.02 o. 101 • • DATE 11 /211/8 l 03/011/82 06/09/82 09/09/82 09/01/83 08/17/84 DATE 11/211/81 03/011/82 06/09/82 09/09/82 09/01/83 08/ 17 /84 WATER ELEV. FEET 123.97 125.63 J 2ll. 1 123.9 123.3 124 WATER ELEV. FEET 153.29 156.37 153. 91, 154. 311 153. 911 155. 011 TEMP C 18 TEMP C ,. 19 PH UNITS 5.6 6. 1 6.2 6.2 6.31 6.3 Pll UNITS 10. 3 10. ,, 10,8 10.2 10.35 9.9 c -f o i'h. 1 :J:); . I.·\ f' DI.. I S..I,{ I"\ 0 . ~ l f~ f'(!) N l:) . , S kV :I::, G i.;: CELANESE FIBERS OPERATIONS SIIELBY PLANT, SHELBY.NC GROUNDWATER ANALYSES FROM MON I TOR I NG WELL SPECIFIC OIL&: CONDUCT roe TOS GREASE NITRATE MMIIOS/CM MG/L MG/L MG/L MG/I. 350 7.5 256 • ,1. 6 <O. 10 375 9.5 lBL• BDL <O. 10 375 8.5 226 BOL <0.10 375 5.5 250 9.53 <0, 10 400 3.2 4.4 <O. 10 310 4.7 ,. 9 <O. 10 0 I l-. GROUNDWATER ANALYSES FROM MON I TOR I NG WELL SPECIFIC OIL&: CONDUCT roe TOS GREASE NlrRATE ·MMHOS/CM MG/L MG/L MG/L MG/L IIQQ IL5 192 BDL 0. 18 1150 7 1118 ,. 5 0.33 i,oo 5.5 811 BDL 0,78 350 5 126 2.48 0.56 165 3.5 3 0.71 130 3.5 7.2 0.70 Ll R4?,5 ANTIMONY ~IG/L . <6-.-()J. <0.005 <0.01 <0.005 <0.002 <0.00~ ANTIMONY MG/LI'.> <0.01 <0.005 <0.01 <0.005 <0.002 <0.005 -,,,,}' ' . i\ •a ·•,TOTAL CHROMIUM COPPER ZINC ''tlCifL MG/L MG/L ;.: <b. 01 <0.01 D. 1 33 <D.02 <0.02 0.079 <0,02 <0.02 0.1117 <0.02 <0.02 D. 12 <0.02 <0.02 0. 121 : <0.02 <0.02 D. 120 TOTAL CHROMIUM COPPER ZINC 0MG/L MG/L. MG/L ~-•.o. 03 <0.01 0.01 <0.02 <0.02 0.018 <0.02 <0.02 0.009 ~0.02 <0.02 0. 116 <0.02 <0.02 0.017 <0.02 <0.02 0.024 ; -,-.. $1-..V~ Co ·c:;--po N:-!:) •· CELANESE FIBERS OPERATIONS SIIELBY PLANT, SflELBY,NC GROUNDWATER ANALYSES FROM MONITORING WELi, T17 WATER ELEV. TEMP DATE FEET C SPECIFIC OIL & TOTAL PU CONDUCT TOG TOS GREASE NITRATE ANTIMONY CHROMIUM COPPER ZINC UNITS MMMOS/CM MG/L MG/L MG/L MG/L MG/L MG/L MG/L MG/L 11 /211/81 120.22 03/011/82 121. 72 06/09/82 120.6 09/ll9/82 111. 3 09/01/83 120. 1 08/ 17 /811 1211. 8 20 li_ 9 350 14.5 196 1.8 0. lli 0.01 <0.01 <0.01 o. 105 5.2 193 12.5 200 BDL <O. 10 <0.005 <0.02 <0.02 0.075 5.11 325 13 166 BDL 0.2 t <0.01 <0.02 <0.02 0. 156 6.3 350 10.5 156 8.97 <O. 10 <0.005 <0.02 <0.02 0. 173 5.56 1100 8.5 1. 5 <0. 10 <O. 002 <0.02 <0.02 0.137 5.6 320 9.3 1. 4 <O. 10 <0.005 <0.02 <0.02 0. 120 • l • •· • • CELANESE FIBERS OPERATIONS -SIIELDY PLANT -SHELBY,NC 13:06 MONDAY, STATISTICAL ANO BDL VALUES EXCLUDED FROM STAT I,'•,,-;:, FRONT PART OF THIS"REPORT ' ~I~ DATA FOR EACH WELL < UNITS ARE THE SAME AS IN THE VARIABLE N MEAN STANDARD f MINIMUM 'MAXl~Ul DEVIATION VA~UE VALTIE -----------------------------------\IELL=A39 ------------·_ '. ___________ . ----. -i'-u LEVEL 6 158.613 2,2116 155.360 161.»60 TEMP 1 19.000 19.000 19.000 PH 6 6.303 0.507 5.600 6.~ob ~g~DUCT ~ 6g:~gl 2g:~~g 31:~gg 9g:ggg 0 IL GRS 1 1 . 300 1. 300 1 ./30,0 ~?~;ATE o6g4 8t ~g~ 26: ~~~ ~-56_:: g~g ! 11 ~ :log(.o ANTIMONY CHROME COPPER -ZINC 6 ·0.074 0.084 0.023 0:24 ----------------------------------WELL-BJlt.5 __________________ :_ .----------l-- LEVEL 6 128.837 1.088 127.380 129.980 TEMP 1 19.000 "19.000 19.000 PH 6 6.810 0.518 '6.200 7.600 CONDUCT 6 581. 667 67. 9116 500 ! 000 700. 000 TOG 6 10.417 9.297 2.000 28.500 OIL GRS 1 1.700 1 .700 1 .700 TDS-4 314.500 58.683 228.000 352 .. 000 NITRATE 6 1.645 1.550 0.330 4.1650 ANTIMONY O ,. -·j CHROME O · COPPER O . ZINC 6 0.117 0.028 0.079 0.,59 -----------------------------------\IELL=C49 ~~~~L 1J 1;~:~6~ ~:J~~ ji~:ggg I 2?i:~Jg PH 11 6.867 0.860 5.,200 8.(180 CONDUCT 11 94.364 93.189 19.000 · JOO.boo TOG 11 6.182 lt.0112 1.700 14.000 OIL GRS 1 2.200 2.200 2.~00 TDS-lj 88. 000 32. 863 62. 000 136. 000 NITRATE 6 0.323 0.214 • 0.100 0.?30 ANT I MONY O .lt CHROME O ~:o:~ COPPER 1 0. QIIO ZINC 6 0.125 o. 119 ., ~0:040 .. 0.039 ~-'i" 0.01,0 0.359 JANUARY 14, 1985 • • CELANESE FI BERS OPERATIONS -SIIELBY PLANT -SHELBY, NC 1 3: 06 MONDAY, JANUARY 14, 1985 2 STATISTICAL DATA FOR EACH WELL < AND BDL VALUES EXCLUDED FROM STATISTICS VARIABLE UN ITS ARE HIE SAME AS IN HIE FRONT PART OF TH IS REPORT N MEAN STANDARD DEVIATION . . ' ~ MINIMUM . VALUE1. : ! t : ·. MAXIMUM VALUE -----------------------------------WELL=D35 ----------,,----.~---.--------------- LEVEL 11 179. 500 1. 603 I 176. 800 TEMP 5 16.600 1. 517 15.000 Pfl 11 6.312 0.539 5.600 CONDUCT 11 110. 727 27.868 70.000 TOC 9 5. 933 3.679 1.300 OIL_GRS 3 1. 740 0.807 1. 000 TOS ,, 84.000 511. 160 •14. 000 NITRATE 6 2.178 1. 316 0.370 ANTIMONY 0 CIIROME 0 ,. COPPER 0 Jr •. ZINC 6 0. 120 0. 0112 i 0.068 -----------------------------------WELL=F55 LEVEL 6 165.275 7.771 160.580. TEMP 1 22.000 22.000 PII 6 6.647 0.371 · 6.200 CONDUCT 6 100.833 55.387 -40.000 TOC 6 7.483 3.586 4.000 OIL_GRS 2 11. 000 6.505 6.400 TOS ,, 116.500 77.638 52.000 NITRATE 5 0.216 o. 109 0. 130 ANTIMONY 0 CIIROME 0 . ! COPPER 0 ZINC 6 0.071 0.045 0.036 -----------------------------------WELL=G50 • I ---------------: LEVEL 11 163.234 1. 285 TEMP 5 18.200 2. 683 PH 11 6.553 0.452 CONDUCT 11 377.364 145.388 161.430 16.000 5.600 . ,128.000 1. 500 1. 000 288.000 0.200 TOG 11 ·1.409 4.895 OIL_GRS 1 1. 000 TDS 4 303.500 19. 3118 NITRATE 5 0.438 0.255 ANTIMONY 0 CIIROME 0 COPPER 0 ZINC 6 0.104 0.042 0.050 181.860 19.000 7. 150 180.000 13 .1100 2.600 1611. 000 4.300 0. 192 180.260 22.000 7 .100 195.000 13.400 15.600 220.000 0.400 0. 158 165.480 22.000 7.300 600.000 17.000 1. 000 32:.s. ()!'}() •., f Jo / < fij ~ og1;;1 ~ I I I Ii • • CELANESE FIBERS OPERATIONS -SHELBY PLANT• SIIELBY,NC 13:06 MONDAY, JANUARY 14, 1985 3 STATISTICAL DATA FOR EACH WELL < AND BDL VALUES EXCLUDED FROM STATISTICS VARIABLE LEVEL TEMP PII CONDUCT TOG OIL GRS TDS-. NITRATE ANTIMONY CHROME' COPPER -ZINC UN ITS ARE THE SAME AS IN THE FRONT PART OF TH IS REPORT N 1 1 5 11 11 11 1 4 6 0 0 1 6 MEAN 163.2118 18.800 7.001 1116. 3611 11.382 1. 200 125.500 0.172 0,010 0.057 STANDARD DEVIATION , MINIMUM · ~ VALLIE ,· MAXIMUM VALUE WELL -G88. 5 -------------------, • ------------- 1.lt78 1~1.0107: ~t 165.660 1.924 '16.000 21.000 0.1157 6;;_250,:, <' • 7. 700 105.878 70:000~ -.. 450.000 18.111 1:'1000"'(":t 65.000 24. 187 0.043 i'.'200 1.200 1 oo'. ooo 156. ooo •0:110 0.230 .. 0.010 0:025 0.010 o. 141 ----------------------------------WELL-H79. 5 ---------; ----,, ----; ~; ------------LEVE L 5 154. 160 1.170 152:•820 ;l/ 155.570 TEMP 1 19.000 19.000•/i." ·19.000 PH 6 6.667 0.686 6.000>',j 7.700 CONDUCT 6 87. 500 26. 756 60. 000 . 135. 000 TOG 6 4.800 2.764 1.300 7.500 OIL_GRS 3 2.383 2.052 '11,100 4.750 TDS 4 72. 500 20. 809 54·. 000 96. 000 NITRATE 6 0.448 0.206 -~a130 0.700 ANT I MONY O s \ · CHROME O · ' COPPER O \;~. \·_ ZINC 6 0.062 0.011 9;0117 !·/ 0.079 ----------------------------------WELL=l57.5 -----------.---------------------LEVEL 6 153.933 8.619 136.480 158. 1180 TEMP 1 20.000 20.000 -,! 20.000 PH 6 8.667 1.1199 6.600 , 1 o·. 200 CONDUCT 6 1511. 500 79.696 80.000 300.000 TDC 6 7. 183 4.875 2.300 15.800 OIL GRS 3 1.300 0.200 1. 100 1. 500 -TDS 4 ,96. 000 30. 811 611.000 128.000 NI THATE 6 0.355 o. 1110 • 0. 150 0.520 ANTIMONY 0 CHROME 0 COPPER 1 0.010 ~ Q.010 0.010 ZINC 6 0.017 o. 011 0.007 0.034 "' ';. ,;,.·. ' 'I# ... J ff ' -?., 'P' 1,, I I CELANESE FIBERS OPERATIONS -SHELBY PLANT -SHELBY,NC 13:06 f10NOAY, JANUARY 14, 1985 4 STATISTICAL DATA FOR EACH WELL < ANO BOL VALUES EXCLUDED FROM STATISUIJtS UNITS ARE THE SAME AS IN THE FRONT PART OF THIS REPORT HI VAR I ABLE N MEAN STANDARD MINIMUM MAXll,<UM DEVIATION VALUE VAL!UE ~;~;~-------------~i--------1~~:6~6WELL-J28,5~:~~~--------1~~:~6g ___ : ----11~:f!:gg PII 11 6.782 0.406 6.300 7.700 CONDUCT 11 1323.182 516.209 250.000 2000.000 roe · 11 19.236 36.912 · 4.ooo 130Jboo OIL GRS 3 2,483 2.232 1,000 5!b50 TDS-4 675.500 li15.019 126.000. i 1116{000 NITRATE 5 118.204 61.957 ,2.120 • 150/000 ANT I MONY O 1 • •• ,I/ CHROME· 0 1 COPPER 2 0.020 0,014 0.010 0!030 ZINC 6 0.118 0.058 0.075 0!~33 . . II ----------------------------------WELL=J59. 5 --------.-----.------------------~--- • ' LEVEL 11 156.970 1.610 •154,1190 159.1110 TEMP 5 16. 000 2. 121 13. 000 19 ,1000 PH 11 6.867 0.549 '5.900 7.750 CONDUCT 11 303.000 453.847 to.ooo 1660.000 TOG 1 O 5. 990 11. 960 1 . 000 15 .(boo 01 L_GRS O •• ,I TDS 4 365.000 439,131 ''108.000 1020.000 NITRATE 3 12,390 21,313 0.070 37,000 i,NTIMONY 1 0.017 ._0.0117 0.017 CHROME O I COPl>[R O l ZINC 6 0, 106 0.0111 0.072 • 0. 186 -----------------------------------WELL=K28 ----------------------------------- LEVEL 11 148.885 2.863 1Lt5.570 153.230 • TEMP 5 16.600 0.8911 16.000 18.000 PII 11 6. 139 0.335 ··5.600 6.500 CONDUCT 11 31'15. 909 2513. QJ15 175. 000 7200.000 TDC 11 2291. 8611 2260.696 6.500 6667,000 OIL_GRS 2 1. 600 0.707 1. 100 ' 2. 100 TDS 4 333.000 252.251 11111. 000 704.000 NITRATE 6 2.070 1.150 0.1120 3.500 ANTIMONY 0 {> ,:_-,, . CHROME 1 0.030 0.030 0.030 COPPER 0 oi.015 ZINC 6 0.109 0.069 0. 192 , . ) f , • • CELANESE FIBERS OPERATIONS -SIIELllY PLANT -SIIELBY,NC 13:06 MONDAY, JANUARY 14, 1985 5 STATISTICAL DATA FOR EACH WELL < ANO BOL VALUES EXCLUDED FROM STATISTICS VARIABLE UNITS AHE THE SAME AS IN THE FRONT PART OF'THIS !\EPORT N MEAN STANDARD DEVIATION MINIMUM VALUE MAXIMUM VALUE -----------------------------------WELL=K58 ----------------------------------- LEVEL TEMP Pl! CONDUCT TOC OIL GRS TOS- NITRATE ANTIMONY CHROME COPPER ZINC 11 5 11 1 1 10 1 4 ,, 0 0 0 6 148.218 17.000 7. 117 145.636 6.650 2. 700 100.500 o. 155 0.026 2. 762 1.732 0.583 106.838 3.925 28.9511 0.133 0.023 . o/ 111(1. 500 16.000• 6.500 80.000 1.000 2. 700, 76.ooo· 0:0501, 1 • ~. ~ ' t 0.010 l,t · , 151 .920 20.000 8. 300 460.000 12.600 2. 700 140.000 0. 350 0.071 ----------------------------------WELL -MIJ4. 5 ----------·_ -~· ·h .... '"' i, --------, ---- LEVEL TEMP Pl! CONDUCT TOC OIL CRS TOS- N I TRATE ANTIMONY CIIROME COPPER ZINC LEVEL 'TEMP Pl! CONDUCT TOG OIL GRS TOS- N I TRATE ANTIMONY CHROME COPPER ZINC 6 1 6 6 6 2 ,, 1 0 0 0 6 6 1 6 6 5 3 ,, 6 0 0 0 6 133.863' 20.000 6.132 91 . 500 7.017 1. 600 80.500 0. 120 0.085 143.987 19.000 5.763 68.667 5.780 1. 760 50.500 1.392 0.084 • . I WELL=N29 2. 121 o. 427 12.1,10 3.686 0. , ,, 1 32.919 0.026 3.452 0.293 21. 229 2.229 0.650 36. 125 0.895 0.033 I 13 i": 620· 20.000 5.600 70.000 1,300 1. 500 54.000 0. 120 0.062 137.810 20.000 6.800 105. ono 1 \': .11,~,g o. 123 / 1?:J~f , I II ~ /I ff 141.450 150.500 19.000 19.'06'0 '5. 300 6/110'0 50. ooo 110 !'oo·o 2;900 9)0(\0 1. 280 2 !,500 26. ooo 104 /j'oljo o.550 3,1go 1· I •p.025 a/)12,3 t ~ • • CELANESE FIBERS OPERATIONS -SHELBY PL/INT -SHELBY,NC STATISTICAL DATA FOR EACH WELL < AND BDL VALUES EXCLUDED FROM UN I TS ARE THE SAME AS IN. THE FRONT PART OF TII IS REPORT 13:06 MONDAY, JANUARY 14, 1985 ~TATISTICS VARIABLE N MEAN :a_!• STANDARD MINIMUM!., MAXIMUM DEV I AT I ON ~ VALUE , . VALUE WELL=N53.5 ----------·--Jt __ ·-. ------------ LEVEL TEMP PH CONDUCT TDC OIL GRS TDS- N I TRATE ANTIMONY CHROME COPPER ZINC 6 1 6 6 6 0 1, 3 0 0 0 6 142.693 17.000 8.282 120.000 6. 150 108.000 . 0. 143 0.062 3.259 1.532 27.011 . 3. 91,0 51.121 0.045 0.028 i~ 139'.200 ,17.000 C 5.900 . • 75. 000, ·, j· 2.300)' 76.000 0. 100 '-t ,_. {! t •i;rl 0';'030 ,'t· 148.030 17. 000 9.700 155.000 11. 000 184.000 0. 190 0.094 WELL=925 _____________________ t ___ ~--------- LEVEL ,, 148.621 1 . Ol11 11t6.590_' 11,9. 970 TEMP 5 17.200 1.789 16. 000 . 20.000 PH 1 1 6.285 0.209 6.000 6.800 CONDUCT 11 2836. 3611 1265. 917 300:000 lJ500.000 TOC 11 1121.873 365. 117 51. 600 1028.000 OIL_GRS 5 6.878 5. 71,9 1.000 l5. 200 TDS 4 2320.000 792.786 1232.000· 3110. 000 NITRATE 6 2.657 1 , 3ltlt 1 .·300 5.000 ANTIMONY 5 o. 153 0. 141! \.'. 0.02~ 0. 1,00 Cl/ROME 0 COPPER 1 0.020 ftg;g~g 0.020 ZINC 6 0. 121 0.034 0. 172 :-.· L ----------------------------------WELL-P31. 5 -----------. , • -~ --.------------- , ;_ ; LEVEL 6 122.188 0.776 121.360 TEMP 1 19.000 ,; .'•19.000 Pll 6 6,360 0,390 ~5.700, CONDUCT 6 810.833 .• 114.036 650.000. TOG 6 10.750 ,3,9311 ,~ 5.000 OIL GRS 2 5.105 2.553 ;,,: 3.300 T □ S-~ 430.000 40.332 396)000 NnRATE 1 0.040 .o,!040 ANTIMONY 1 0.031 ·o':'.031 CHROME O 'i\ . COPPER 1 0.010 0.0'10 1 J.' ZINC 6 0.120 0.028 0,077 123.530 19.000 ·6.760 1000.000 15.500 ·6.910 488,000 0:040 0.031 0.010 0. ]60 6 • • STATISTICAL VARIABLE LEVEL TEMP PH CONDUCT TDC OIL GRS ros- N I THATE ANTIMONY CHROME COPPER ZINC CELANESE FIBERS OPERATIONS -SHELBY PLANT -SHELBY,NC DATA FOR EACH WELL < AND BDL VALUES EXCLUDED FROM UN I TS ARE THE SAME AS IN THE FRONT PART OF TII IS REPORT N 6 1 6 6 6 2 4 1 1 0 0 6 MEAN 119.052 19.000 5.380 276.667 7. 783 1. 700 157.500 0. 130 0.011 0. 142 STANDARO DEVIATION WELL=Q33 0.699 0.518 91.960 3.606 0.566 30. 3118 .. 'Ml NIMUM VALUE 118.290 ,19.000 1 4.500 165.000.·, \ 3. 200 ··1. 300: 121,.000 0.130 0.011 0.095 13:06 MONDAY, STATISTICS MAX~MUM VAt.'UE II 120.~290 19. 00 5. 00 400.000 13.500 2. 100 192.000 0. 130 0.011 0.222 -----------------------------------WELL=Rl7 ----------------------------------- LEVEL 11 TEMP 5 PH 11 CONDUCT 11 roe 11 OIL_GRS 2 TDS 4 NITRATE 1 ANTIMONY 0 CHROME 0 COPPER 1 ZINC 6 124.925 17.200 5.856 176.636 7.809 3.560 139.000 a. 110 0.010 u. 120 1. 218 1 . 3011 0.567 lt4 .11211 6.002 1. 075 31. 602 ., 123.020 ;< 16.000 5.000 110.000 . 1. 500, . 2: 800~ 110.000 . O! 110 j . . . l .. ,. f. 0:010 0\040 126.520 19.000 6.850 250.000 22. 100 11. 320 184.000 0. 110 0.010 0. 173 ----------------------------------WELL=R42 5 ----------------------------------, . -1 LEVEL TEMP PH CONOUCT TDC OIL GRS rDs- NITRATE ANTIMONY CHROME COPPER ZINC 6 1 6 6 6 4 lj 0 0 0 0 6 1211.150 lB.000 6. 118 3611.167 6. 1183 4.357 229.000 0. 120 0. 779 f2 3. 300 t- 0.265 30.890 2.4111 3.670 32.680 0.023 18. 000 , 5:600 l~ .310.000 '3.200 1. 600 1811 :..ooo ., . 0.079 '125.630 18. 000 6.310 400.000 9.500 9.530 256.000 JANUARY 14, 1985 7 • • • STATISTICAL VARIABLE CELANESE FI BERS OPERATIONS -SHELBY PLANT -SHELBY, NC 13: 06 MONDAY, JANUARY 14, 1985 DATA FOR EACH WELL < AND BDL VALUES EXCLUDED FROM STATISTICS UNITS ARE THE SAME AS IN THE FRONT PART OF THIS REPORT N MEAN STANDARD DEVIATION MINIMUM VALUE MAXIMUM VALUE -----------------------------------WELL=S50 ----------------------------------- LEVEL 6 1511.487 1. 087 153.290 1~6.370 TEMP 1 19.000 · 19.000 l<}. 1::.;1c, PH 6 10.325 0.293 .. 9.900 r1ftlbo CONDUCT 6 315.833 1 31,. 626 130.000 45olto·oo TOG 6 4.833 1.329 ~3.500 I / ~'iqpo OIL_GRS 4 3. 545 2.515 \\1. 500 i~oo TDS 4 137.500 1,5. 000 84.000 192\0bO NITRATE 6 0.543 0.239 0.180 'I _, ANTIMONY 0 \. 9{ 1u30 CIIROME 1 0.030 . , "'" r, COPPER 0 . . , ·1 ZINC 6 0.032 0.041 0.00? 0.116 -----------------------------------W~LL=T17 11. 513--------111. 300 12\. joo LEVEL 6 119.790 TEMP 1 20.000 20.000 20. 00 PII 6 5.493 0.472 4.900 6.300 CONDUCT 6 323.000 69.714 193.000 40ii.poo ··me 6 11. 383 2.324 8.500 1;:.goo OIL_GRS 11 3.1117 3.706 1.400 . 70 TOS 11 179. 500 21.810 156.000 20fJ.OOO NITRATE 2 0. 170 0.042 0. 140 0.200 ANTIMONY 1 0.010 0.010 b.010 CIIROME 0 l: COPPER 0 o: 075 I ZINC 6 0. 128 0.035 . 173 I 8 WELL 0-O!...D LEGEND j :NSTi,.IOIIS BY SOIL 8 MATERIAL ENGl.n:RS I • WELL INSTALLATIONS ( 6"' CASED TO ROCt<l ' ,~ __ --... NOTE: THIS OR!i.wr,JG MOOIFEO LOCAT!CWS SHOwN ARE LOCAT/~ SHOWN. FOR AND FROM DAVIS a FUND DRAWING NO. APPROXIMATE BASED ON .THE P\.., EXACT s:>R!NG LDCATICWiS SEE (_ A,hT'2 -l -;;~_...; 7' I ;'1 C,A,:1~...) 1...J U .... 1.10~ ~ w "'-'-· 8 -3 ../ ._s-· y a HE D J-59.~ J-28.5 ·1' Sp.C;,:IJ, ..;. . T~c:.-· EO E • SP!Ll PONDS I AER AT1or•( BASIN ,, .. ,., D 3;1~1~5"'-. (='d Ei □EQ BASIN SLUDGE PO<D CJ EQ. BASIN MATERIAL ENGINEERS, INC PROJECT - N0.2 POUSHING FIBERS SHELBY, FIGURE -5 o.:..n: _I POND INDUSTRIES N. C. JOB NO ec • • \ eD CT-COOLING TOWER EP-EMEROENCY POND PP-POLISHING POND ~ CLLAf\E~E r -~ [ j I I i l PRODUCTION AREA • 0 • MONITOR LOCATIONS --RAILROAD .:L 5 T e..b r u-..~ ft. 10 I "\ 'l, .S Xt.-JZ. -10C.... s.,c,:;,,-' eB N □ □ •u~~ I AB I 0 f AB 0 SP 9 co ao3 </1/G 1~ / North Carolina Depart1T1ent of Natural Resources & Community Development Ja!:les G. 1·~artin, Governor S. Thomas Rhodes, Secretary DIVISION OF ENVIRONMENTAL 1'L.\.NAGENENT January 14, 1985 ~·fr. ~-."illia:n E. Ross Engi::eer".:.:-:g Superin::endent Ce.la:22s2 Fibers Oper2.tions ?. 0. Bos: 87 JAN 18 198 Shelby, ~ortt·carolina 28150 ----• Subject: Well Construction Pernit No. 22-0078-WN-0033 Celanese Fibers Operations (Formerly: Fiber Industries, Inc.) Cleveland County, .North Carolina Dear Mr. Ross: ~z-:. accordance with your application re,ceived January 11, 1985, we are forwerding herewith Well Construction Fermit No. 22-0078-WN-0033 · dated ja:-iuary 14, 1985, issued to Celanese Fibers Ope:rations £.or the c:or:struction of nine monitor wells at Celanese Fibers Operations in Clevelend County. If any parts, requirer.:ents, or limitations contained in this Permit are u::acceptable co you, you ha.ve the right to an adjudicatory hearing before 2 hearing officer upon written demand to the Director within 30 days following receipt of this Permit, identifying the specific issues to be-contended. Unless such demand is mad,e, this Permit shall be final ar:ci binding. This Per.nit will be effective from the date of its issuance until Jc:lv 10, 1985, and shall be subject to the conditions and limitations as speci:ied therein. ~1D/ar Enc le 3are. cc: ~~ee Crosby ~lr. Everett W. Glover, Jr. '-'~ Peyry Nelson Sincere!:,, ORIGINAL SlGNED BY ROY M. DAVI~ Roy M. Davis Regional Supervisor .>~.~.;: :1>? ::._:,; .1;."':;;i ci:ice !ni~rc:-,c1.-:i;:e =:u1!c1:-:i;. 59 '.'.'cc:::;;_n, ?:c::c-:. ;:= 0. 30A 370, As.1<:·::!I<;;:, i·! -.:. 29~C'.?·C27:0 T-e112::-:c:-1e rc,..:,'252-J'.3..:; .,:r. 5c:...·at :');:;;:,c:::_:,-;,:,,, .. \fi:': .-nc=1i~-e :.c::c:n 5.-r::;i.:;·e •• • • EXVIRON:!ENL\L ,fA?,AGEMENT COl'!c!IS S 10,l DEPARTI!ENT OF NATURAL RESOF:l.CES Al'.D COl-!HUclITY DEVELOP:!ENT ASHEVILLE, NORTd CAROLINA PERMIT FOR THE CONSTRUCTION OF A WELL OR WEIL SYSTEM In accordance ~ith the provisions of Article 7, Chapter 87, North Carolina General Statutes, and o_ther applicable Laws~ Rules and Regulations. PERMISSION IS HEREBY GR.-\.'iTED TO CELA.~ESE FIBERS OPERATIONS FOR THE CO:,STRl'CTIO'., OF A }!ONITOR WELL SYSTE.'1 located in the Blue Ridge-Inner Piedmont Hydrogeologic System at Celanese Fibers Operations in Cleveland County, in acco:--cia!lce with the application dated January 10, 1985, and :n confor.:iity with speci£i-:.:ations ar:.ci sup?orting data~ all of ;./hich are filed wi t'.1 the Department of Natural Resources and Commur.i::y Develop21er..t ar:.d are conside!~ed a part oi this Pernit. Tnis ?ernit is for well coestructio:-:. only, ·and does noc -;.;raive a:1.i: provisions or requirements of any other applicable la~s or regulations. Construction of a well under this Permit shall be in cospliance with the North Carolina_Well Construction Regulations and Standa:.-ds~ and any other State and local laws and regulations pertai:1ing to well construction. This Pernit Kill be effecti\·e fros :fie dace of i_ts issuance until July 10, 1985, and shall be subject to other specified conditions~ liDitations, or excepti?ns as follows: 1. Each well shall have permanently .affixed an identification plate constructed of durable mate.rial and shall contain the following information: drilli~g contractor's name and registration number;· date well completed; total depth c.f well; a warning that. the well is not for water supply and that the groundwater rr.a·,, contain hazardous materials; and dept~ to screens. P&ge 2 • • Well completion, well abandonment, and water quality reports are to be subrr.itted to the Division of Environmental :"la!lageraent' s Groundwater Section Central Office in Raleigh. 3. All wells shall be afforded reasonable protec~ion against d2~age during construction and use. ' When the 1,ell has served its purpose and is of no further use. it shall be permanently abandoned according to the requirerr.ents of Section . 0113 of· the Criteria On Standards Applicable To Water- Supply And Certain Other Type Wells (15 NCAC 2C . 0100). ?ermit issued this the 14th day of January, 1985. t:ORTR CAROLINA ENVIRONNENTAL K<\NAGENE!:T cm~!ISSIO:N ORIGINAL SIGNED BY ROY M. DAVIS Roy M. Davis, Regioe1al Supervisor Division of Environmental Hanagement By Authority of ·the Environmental c!anagement Commission PL<!-!IT :-;o. 22-0078-Wl1-0033 R'.:tf r:'Jl:SIMI 1 rr C • • SOIL & MATERIAL ENGINEERS INC. ::NGINEEcllNG TESTING-INSPECTION January 10, 1985 NC Department of Natural Resources and Community Development !nte~ change Building 59 Woodfin Place Asheville, North Carolina 28801 ATTENTION: Mr. Don Link SUBJECT: Monitoring Well Construction Celanese Fibers Co. Shelby, North Carolina S&ME Job No. 075-84-1050 Gentlemen: '.°:.--:-'.1:-d · .. 'J~te:-~-=cti::n . . :·.·,'.:::: ~:\~i,:,:-,ai Officf' Attached is a permit request,.typical well construction diagram and schedule of well depths for nine monitoring wells tc, be .constructed at the Celanese Fibers Operations facility in Shelby, North Carolina. We are planning to initiate field operations late the week of January 14 or early the week of January 21, ·1985.l Please review this application and let us know whether modifications need to be made in the proposed c·onstruction. Thank you for your prompt attention to this matter. Very truly yours, SOIL a. MATERIAL ENGINEERS, INC. -;" .ll-, ~ , · , , ·• · I I 1-1;: ' ·-. /; (,,,/..;_)(t.r..,,__ (.J_, • 1._,..,.mz.:.. ..... r-. . Everett W. Glover, Jr., P.E. Project Manager/Senior Project Engineer EWG/stw :~ ~~a ffl!!ffilffl'M1Xmeme1r:mrt2rit'rzrtlf!~~feXil,~f'2:?lfflfflWttf1 {~i. t _· •. •. l~ NORTH CAROLINA ~ ENVIRONMENTAL MANAGEMENT COMMISSION if. Dc:~ARTMEN_T .OF NATURAL /.,ND ECONOMIC RESOURCES APPLICATION FOR PERMIT TO CONSTRUCT A WELL NORT!f CAROLil;A ENVIRONMENTAL MANAGEH:D.-r COMMISSION Gentlemen: .J,q,v ID. , 19 8 5 In accordance with the provisions of Article 7, Chapter 87, General Statutes of North Carolina, and regulations pursuant thereto, application is hereby made by --'C.....,E:..u:!::::i,;:.N'::..::;G_,:S:e:C,:_...:~--=-.:z;:..::.'5=5::es=-'o=LB:..:¢i.c',e,,,==<.,;;J..rroy==~s _______ ...,:f or a permit to construct · (name of well owner) ..a--..ellSas descr~bed below and in the accompanying data subt:litted as a part of this applies tion. (a) Name of property owner __ _,{!==.5€a:,L.=;'/!.!N=O=E'--LN..::ZiS=~=·=5~-=o~:e=e:::efl=:..!r:rc,v-:a:..!=.:.S:.._ _______ _ (b) (c) (d) (e) (f) (g) {h) (i) Location of Property_~.:..f,/.'-:u,~vc:---'--/f"'-"'8-:---"'6;""-=,e"':. ;:-;;;L;;-,---:"e,""L=6-y-=<!!:::LA:::..:.;IJ/"'-"D"-"<!.o=>;.... =--· --'-N.:....,,C.,::;_ ___ _ (Road, 1Community, Subdivision, Lot No.) Tmm County Purpose of well ____ 9.,_,,.(!-.,U:.,E ...... u..:,,..:,;,_.1,½...a:e ........ ¢t<'f"-C;epq='-'tl"'lfZu.,;We;;l'?-=--•.1..rn.:::.i:e.s:::.....:A..;f~o"-A.."''.r=..cm.;.,oe..,-::-r:~N'-'C;,;l...------ Will proposed well replace an existing vell"-_-~Mi·~o=--·--------------- Total capacity of existing syste:n:_;,_ ____ ...:.,(Y_.,..,,_/4~·'------J>gallons per day Well No. Yield !Je11 No. Yield Proposed well: . j. w I 1;.eA-VC'-f);;c.li.. . . Construction type .5!..eeeNe 1/ · (open end, screened, gravel packed, etc.) 7 1 ( sec A-rrA-UeCJ s, J/60.:/l.e • • • 1. Estimated depth 35-1Q f-r · · .Estimated Yield ____ /V'.....,,_/fj ........ ______ _ Estimated date of construction: Begin I /z,( /& "5 Comple;e o? /B /85" I , • I Drilling Contractor:. __ _,.S,=~ri=L,__:E:-~ 1 ~H,'-'-''l't-'-'-r~e:~-~,e;:r;~-,;;"--"L'--~6~1U~~G;;,...,.rs....c;M~~~~~-~r.e~s~,~.:r.i=.:i1t~C.==--------- Location of Well: Provide a detailed map showing the location of the proposed well and sx.y wells in the existing syste:n to at le.ast two (2) nearby reference points such as roads, intersections, and streams. Identify roads with State Highway road ide::i.tification numbers •. · -Show-all existing water supply wells within a .radius--oL __ _ 1,000 feet of the proposed well. Well Construction Diagram: Provide specification. (See Form GW-22A) a diagram showing proposed construction The App1.iaant hereby p.grees the proposed .>eZZ. i.n.1.Z be construated in aacordance i.n.th approved specifications and conditions of the WeZ2 Construation Pemt. C et..ANcS ~ &.e,ces OPe~/'I r.rr,;v s /lo ,4;,:, '<' B7 ..:s,.;ey5 t , NC. ol 81 S-o 's'euvu.11-w. b/1r1,01 -~c Signature of Well · Ag (Mailing 1Address of Well D'.roer {Required) ~r1... I #1'9re£J.-,,,.<... Gv6-rA/1:c.cs . .rAJc.- .3;) c0 H 1'1-"'-.T;,; Al D,e,.. , A/€ /lru•uvrA. c;,.,. ;:,o 340 Mailii:;g Address of·Agent f?,e.r;.J73c.r /4/4-,vlffft&:- Title PERMIT NO. ____ issued. ____ --'19. __ _ • DHGIW1 OF PROPOSED CONSTRUCTION SPECIFICATIONS • Straigbt-Sc~eened or Gravel-Packed well (Constructed in unconsolidated formations) ,------------land surface Ooen-End Well (Constructed•in conoolid- ated formations) A) B) Casing: ,,;J 11 ..Sc1,1e:Du..'-IZ 10 1) Inner: ____ type ____ I. D ___ ft. (deptb) __ 2) Outer: ___ type ___ I. D ___ ft. (depth) Cement: . /of' l) Inner Casing: S-.11r-.; c..ess SreGt_ lbs./ft. ft. (into rock) . lbs./ft • .rre To o/l!::L!CIND -5< ,c. ft. 2). Outer Casing: Cl= /3E,vrcw ____ ft. to ____ .ft. to ft.,, ,, r ,,..,~ Rock C) Screen(a): .S~.LN,:.GS{ype ,;?" I. D. ~TEC-L,. ____ ft. to. __ ____ .ft •. to __ ft.J C.£6 · ft. 6c.h£D<.u .. <? to Z k A&>ve Sc..e =N·· D) Gravel: _____ :t. to __ _ ft. in. (size) use appropriate diagram ng, but not limited to, (Fill in each blank that applies and to sho~ proposed construction includ1 casing (outer and inner), sealing mat etc.}, packers, screens, gra~el, cbem erial (cement, clay, ical feed lities, etc.) .. - C"JKG if . - Location Diagram: (Previously prepared maps may be submitted provided they Con- tain• information required in item (g) of the application). rT,,, .. , .•. Rock Cl .L 0 !. J --- D[ litOllT ION . L &Klf LL AREA «. TOOl Ill £ COV £ !fr UillT Dnlll.lUIOM ITI.L S01 TOMS . ....... ,mv ·PROPOSED ADDITIONAL MONIT?~NG WI ELLS .- <D lMU• ClHCl VI..L """" ""·' •DL 1-.~f -· .... ...... Cl(NCl ..... 'l'OND POUSHf,10 .... Well to 15 ft water table below f bedrocR e Well to top' o EB ·th shallow and Well nesltl·sw~s described deep we above . ' &:ALE. l • ~o ' t.oo ""' 0.--,IDO,_ ,./ . E\c,7aiJ•WMJii, ' . • . . · FIGURE l IAl ENGINEERS,INC. -·· shelby Facility Jina ~~~~t-;;;;;--~ .... _J Shelby, North Caro -. • • · Well Designation 0-70 U-35 V-35 W-35 W-70 X-35 H-50 Y-35 Y-70 -mt rm rm: Trrr:&iltffsre; · 121ttn ifc&lt 5 't'.%'ttl7ttt"S1d9tf:twrmt WELL SCHEDULE S&ME Job No. 07.5-84-10.50 Total Depth Cit) 70 35 35 35 70 35 50 35 70 • Screen Depth (ft) 65-70 30-35 30-35 30-35 65-70 30-35 !f.5-.50 30-35 65-70 Note: All wells will be gravel packed to about 2 feet above the screen with the remainder of the annulus backfilled with bentonite or cement-bentonite grout.-· Protective Cap Bentonite Seal Sand Pack ·em:::maro· cz 1 r:rcnram·csswfzic-,, w·-rn-r1f'lli::::currllt:rn'ta'i::2M mrmait5:5ti':''ltie:ti1ttn :er"·M"tlr:i' Steel Security Casing with Lockable Cap. Cement-Bentonite Grout , . --~1, .. ---· ---..J.1 .. ,-_--_-_--_· ·_ No~i~~l 6-Inch Bore Hole ----·· ··-· ------------ • + -- TYPICAL MONITORING WELL SCHE11ATIC · • • i ~ A I jl : 1! : ! J : -,I I µJ I ' ' I ./1 <:P I WI I j i • • North Carolina Department of Natural Resources & Community Development James G. ~-Iartin., Governor S. Thomas Rhodes, Secretary DIVISION OF ENVIRONMENTAL 1-u\NAGEMENT Hr. William E. Ross Engineering Superintendent Celanese Fibers Operations P. 0. Box 87 Shelby, North Carolina 28150 Dear Mr. Ross: January 14, 1985 Subject: ... "" JAN 18198 Well Construction Permit No. 22-007 8-Wl-!-0033 Celanese Fibers Operations (Formerly: Fiber Industries, Inc.) Cleveland County, North Carolina In accordance with your application received January 11, 1985, we are forwarding herewith Well Construction Fermit No. 22-0078-WM-0033 dated January 14, 1985, issued to Celanese Fibers Operations for the construction Of nine monitor wells at Celanese Fibers Operations in Cleveland County. If any part_s, requirements, or limitations contained in this Permit are unacceptable to you, you have the right to an adjudicatory hearing before a hearing officer upon written demand to the Director within 30 days following receipt of this Permit, identifying the specific issues to be contended. Unless such demand is mad,a, this Permit shall be final and binding. This Pennit will be effective from the date of its issuance until July 10, 1985, and shall be subject to the conditions and limitations as specified therein. R:1D/ ar Enclosure cc: ~~ee Crosby Mr. Everett W. Glover, Jr. tlr. Perry Nelson ' ORIGINAL SIGNED BY ROY M. DAVI~ Roy M. Davis Regional Supervisor .A.s.-.eville Regional Otfice ln;ercr,ange Building. 59 1/1/ooCfin Place, P. 0. Sox 370, Asneville, N. C. 28802-0370 Telephone 70~/253-3341 An Ecual Ooponunitv Aifirmari•1e Action Employer • • NORTH CAROLINA ENVIRONl-!ENTAL HA."IAGEillNT COMHISSION DEPARTI1ENT OF NATURAL RESOURCES AND COMMUNITY DEVELOP}!ENT ASHEVILLE, NORTH CAROLINA PERMIT FOR THE CONSTRUCTION CF A WELL·OR WELL SYSTEM In acco.rdance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERHISSION IS HEREBY GRAl'ITED TO CELANESE FIBERS OPERATIONS FOR THE CONSTRUCTION OF A MONITOR WELL SYSTE:-1 located in the Blue Ridge-,Inner Piedmont Hydrogeologic System at Celanese Fibers Operations in Cleveland County, in accordance with the application date_d January 10, 1985, and in conformity with specifications and supporting data, all of which are filed with the Department of Natural Resources and Community Development and are considered a part of this Permit. This Permit is for well construction only, and does not ~aive any provisions or requirements of any other applicable laws or regul:::ttions. Construction of a well under this Permit shall be in compliance with the North Carolina Well Construction Regulations and Standards, and any other State and local laws and regulations pertaining to well construction. This Pennit will be effective .from the date of its issuance until July 10, 1985, and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Each well shall have permanently .affixed an identification plate constructed of durable material and shall contain the following information: drilling contractor's name and registration number; date well completed; total depth of well; a warning that the well is not for water supply and that ~he groundwater may contain hazardous materials; and deptp to screens. • • Page 2 2. Well completion, well abandonment, and water quality reports are to be submitted to the Division of Environmental Management's Groundwater Section Central Office in Raleigh. 3. All wells shall be afforded reasonable protection against damage during construction and use. 4. When the well has served its purpose and is of no further use, it shall be permanently abandoned according to the. requirements ·of Section . 0113 of· the Criteria On Standards Applicable To Water- Supply And Certain Other Type Wells (15 NCAC 2C .0100). Permit issued this the 14th day of January, 1985. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COl1MISSION ORIGINAL SIGNED BY ROY M. DAVIS Roy!-!. Davis, Regional Supervisor Division·of Environmental Management By Authority of the Environmental Management Commission PEJJ-!IT NO. 22-0078-Wl-l-0033 • • SOIL & MATERIAL ENGINEERS INC. ENGINE~RING-TESTING INSPECTION · 3300 Marjan Drive. N.E .. Atlanta, Georgia 30340 404/451-5772 January 10, 1985 NC Department of Natural Resources and Community Development Interchange Building 59 Woodfin Place Asheville, North Carolina 2880 l ATTENTION: Mr; Don Link SUBJECT: Monitoring Well Construction Celanese Fibers Co. Shelby, North Carolina S&ME Job No. 075~84-1050 Gentlemen: Grsur.d \A/cater Section / · '··e·.ri/!e Regionai Office Attached is a permit request, typical well construction diagram and schedule of well depths for nine monitoring wells tc, be _constructed at the Celanese Fibers Operations facility in Shelby, North Carolina. We are planning to initiate field operations late the week of January 14 or early the week of January 21, ·1985.( Please review this application and let us know whether modifications need to be made in the proposed construction. Thank you for your prompt attention to this matter. Very truly yours, · SOIL &: MA TERlAL ENGINEERS, INC. ~ {;Vtdt· (jj ~A.g_ Everett W. Glover, Jr., P.E. Project Manager/Senior Project Engineer EWG/stw • NORTH CAROLINA· /.' ENVIRONMENTAL MANAGEMENT COMMISSION DE PAR TMEN_T OF NATURAL AND ECONOMIC RESOURCES APPLICATION FOR PERMIT TO CONSTRUCT A WELL ,, Grour.d \Nater.Section ===================================:••=· ::-.:13.,z:r,.tE, · 8++ ,flal Of ;i; e TO: NORT!f CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -'="""-T.4'-'-'-'N"--'/'-'D""---'--' 19 8 5 Gentlemen: In accordance with the provisions of Article 7, Chapter 87, General Statutes of North Carolina, and·regulations pursuant thereto, application is hereby made by _ __,(!,..=E:..,u:!=~A/~€=-:::Sc:E:_..:.h-='-.:r,=i5~6-=6=-· __,.0::.,,e'-'~ .. 't'fic=c.iTR=.:.&'=S'--__ · _____ .for a permit to construct (name of well owner) data submitted as a part of this ..a--wellSas described below and in the accompanying application. (a) Name of property owner_· ---"{!"'-"'€'-'l,--""1=M:.:~:..<·e.e__,Nc..·-=:r.e=~==;;:5___,04;p::.e:=.e::!.n.:...!.r.ro,v.t.=:=5-,::_ _______ _ (b) (c) (d) Location of Property __ .!.H..:...::W,::_;,.Y_ . ...::l_,f..,8::_~CA...,;u,€.:.:::..;L=-..,....::e='.L=t:='-y>'..!<'!a:;L4=~,V~Q""--°"<!.o""-'.-~N:::...:,C:::_ ____ _ (Road, lc:ommuni ty, Subdi v!s ion, Lot No. ) Town County Purpose of well ___ _,9:._JW=cf:=<-<~"i:,_Lfr;,e..<a.._;q,~-ecg~i.JNO~~W.:ict:r.rc.c...S:~;e.=-A={o~A.Jo::;::r:=..!mJ.!&e.,,.:r.""N=C:Zz_ ____ _ Will proposed well replace an existing vell'----=~o~·-------------- (e) Total capacity of existing system: _____ ~!t..,:...r.,./4=·-----~gallons per day Well No. Yield (,ell No. Yield (f) (g) (h) (i) Proposed well: · j. w / (rb<rVCL. /JJ'IC!i.. Construction type ..5:!.e~Ne 1/ · (open end, screened, gravel packed, etc.) Estimated depth 35-10 /~ ( .Sec-J/..7.~efo/f.fff_°l.._e_. ·_-'-/V'.-'+"/4.,_ _____ _ Estimated date of construction: Begin 1/z; /e "5 Comple:e o? /~ /85' ( I I ' Drilling Contractor: S.rL E:-Hr,re,e.:rl'fc. 01~,z:Ne-e.,es.I,yc. · Location of Well: Provide a detailed map showing the location of the proposed well and any wells in the existing system to at least two (2) nearby reference points such as roads, intersections, and streams. Identify roads with State Highway road identification,·numbers. -Show-all existing water supply wells within-a -radius-of_ 1,000 feet of the proposed well. Well Construction Diagram: Provide specification. (See Form GW-22A) a diagram showing proposed construction The Applicant hereby p.gx•ees the proposed we ZZ. i.n. ZZ. be constructed in· accordance with approved specifications and conditions of the I/ell Constx-uction Permit. C GL9Ne"S <: &.ece5 OPe,e/9 r...ro,v s. ,Po 4>a,... 87 ,§HE<,&.; , /V'C.. ol 81 S-o s:e UVuif itJ. ~ ~ < Signature of Well ' . Ag (Mailing~dress of Well Owner (Required) ~r'-,f ;ll,1re~-,,,.'-Gv6Z-Ne.c.es,:Truc... .3;)c:J HflR...T;,,AJ D,e...., NE MT<..fiA/r4. G,t 50 340 Haili~ Address of·Agent Title GW-22 PERMIT NO. ____ issued _____ l_9 __ _ • DHGRAM OF PROPOSED CONSTRlJCTION SPECIFICATIONS • Straight-Screened • or Gravel-Packed well (Constructed in unconsolidated formations) Open-End 1rlell (Constructed·tn consolid- ated formations) ,------------land surface __________ - 1--1---.L-...J, 1) Inner:· ___ type ___ I. D. ___ lbs·./ft. ___ ft. (deptb) ___ .ft. (into rock) 2) Outer: type ___ !. D. . lbs./ft. ___ ft. (depth) B) Celllent: -r;;,P OF· f3e,vro,vrre To (;,'GOlJND .S ,e "°A-C6 1) Inner Casing: ____ ft. to .c._ ___ ft. 2). Outer Casing: -----'ft. to _____ ft.,, ', , I f 'f • ,c Rock c;i " __ I .. D • c) Screen( s): .5rPDvl£St:ype .:,'Tli=C ...... ____ ft. to ______ ft.Jse,r . ____ ft. to ft: Sc.hEDuLlii 'to zk,4ex,.,e Su:!.=N·· D) Gravel: ______ :t. to___ ft. ____ .cin. (size) (Fill in each blank. that applies and use appropriate diagram to obow proposed construction including, but not limited to, casing (outer and inner), sealing material (cement, clay, etc·.), packers, screens, grav_el, chemical feed line~, .. etc .. } Location Diagram~ (Pre\'iously prepared maps may be submitted provided they con- tain information required in item (g) of the application). .. • ,,, I., Rock J :!.. ..f.. 0 . \ \ ~u• [UtOLlTION . LAl()FI..L AREA • \ ~·IL.JI ·-"-• w . • ( 't:'.¾-"' l •- d] !. ·----·. . ' (ii. YCot,. MOOV[RY I.MIT DCSTIU.ATION ITa.L DOT TOMS. ~SPO>Al m•v ., MONITORING WELLS PROPOSED·ADDITIONAL • .- [MU• CU.tC'f Sll'ILL """' HO. Z POLtSlilfCG ,OHO POUSHIHG PONO I I . ~.\ . . I • mr---·· ..• ~ ·.-- CD Well to 15 ft water table below f bedrocl< e We 11 to top O C ·th shallow and We 11 nes, tl· w.~s described deep we s . above FIGURE 1 "' . _., • WELL SCHEDULE S&ME Job No. 075-8~10.50 • Well Designation Total Depth Screen Depth (ft) 0-70 U-35 V-35 W-35" W-70 X-35 H-50 Y-35 Y-70 Note:· {ft) 70 35 35 35 70 35 50 35 70 65-70 30-35 30-35 30-35 65-70 30-35 45-50 30-35 65-70 All wells will be gravel packed to about 2. feet above·the screen with the remainder of the. annulus backfilled with bentonite or cement-bentonite grout • ·• Protective Cap Steel Security-Casing with Lockable Cap. -------· 2-Inch l.D. Stainless Steel Jt..----s;:::S::ct::x:i-R::-1:c'.':J""--J~F..:.l~sh-Joint Casing Bentonite Seal Sand Pack Cement-Bentonite Grout TYPICAL MONITORING-WELL SCHEMATIC . • .. . :'} Mr. Jim Pullen • • North Carolina Department of Natural Resources & Community Development James G. Mci'rtin, Governor S. Thomas Rhodes, Secretary DIVISION OF ENVIRONMENTAL MAJlAGEl-!ENT GROUNDWATER SECTION January 10, 1985 Celanese Fiber Corp-orate Office P. O. Box 32414 Charlotte, North Carolina 28232· Dear 1!r. Pullen: Subject: Groundwater Nonitoring Celanese Fiber Operations Cleveland County, North Carolina As a result of the Division of Environmental Managem~nt's groundwater pollution source inventory, it is my understanding that Celanese Fiber Operations has been conducting groundwater monitoring at the subject site. It would be appreciated if we could obtain copies of any groundwater moni_toring data that you have available on the twent"y-four monitoring wells at the plant site in Cleveland County. If you have any questions concerning this request, contact Mr. Donald R. Link or myself at 704-253-3341. KD/ar cc: '.'7"'1' Nelson \)'t'e ~telstadt ~I,, 1 Sincerely, Kay Dechant Hydrology Technician J-..sneville Regioro.JI Ofiice lnterc:,2n9e Suilc1n£, 59 Woodiin Piece, P. 0. Bo.x 370, Asheville. N. C. 28802-0370 Teleohone 70,l/253-331.1 J.n Ecual Opoonuniry Affirrnati11e Acrion Employer DATE: TO: FROM: RE: • 10 January 1985 RCRA 3012 File Lee Crosby • 10 January 1985 Telephone Conversation with Don Link Fiber Industries, Shelby NC D003446721 NC NRCD DEM Regional Hydrologist, Don Link (704/253-3341) was contacted in response to his request for Celanese Fiber operations groundwater data. The RCRA 3012 (Superfund) program has received no groundwater monitoring data from Celanese. Mr. Link says that he has now checked with Celanese and he will be receiving the data directly from the company. Mr. Link has agreed to send the Celanese data to RCRA 3012. LC/lw • • North Carolina Department of Natural Resources & Community Development James G. Martin, Governor Thomas A. Rhodes, Secretary DIVISION OF ENVIRONMENTAI MANAGEMENT GROUNDWATER SECTION January 7, 1985 JAN 8 198 Mr. William L. Meyer N. C. Department of Human Resources Solid & Hazardous Waste Management Branch P. 0. Box 2091 Raleigh, North Carolina 27602 Dear Mr. Meyer: Subject: Groundwater Monitoring Celanese Fiber Operations Cleveland County, North Carolina We are currently involved in groundwater monitoring at Celanese Fiber Operations' sludge land application site in Cleveland County. As a result of our groundwater pollution source inventory, it is my understanding that your agency through the Super Fund Program has been receiving groundwater monitoring data at the subject site. It would be appreciated if we could obtain copies of groundwater monitoring data that you have received from Celanese Fiber Operations. If T can be of any assistance to you, please do not hesitate to contact me. DL/ar cc: Perry Nelson Sincerely, uµ Don Link Regional Hydrologist f.ttl!:, 1,..·,:,\·,"" ·. N~ :noo'3-44<c, 1.l...\ 'F I l!:,EJl. 1:.m> Ll!:>T~I ES, Asheville Regional Office Interchange Building, 59Woodfin Place, P. 0. Box 370, Asheville, N. C. 28802·0370 Telephone 704/253-3341 An Equal Opportunity Affirmative Action Employer