HomeMy WebLinkAboutSLAS2720_APPLICATION_MODIFY_2022APPLICATION FOR A PERMIT TO OPERATE A SEPTAGE LAND APPLICATION SITE
North Carolina Department of Environmental Quality
Division of Waste Management — Solid Waste Section
1646 Mail Service Center, Raleigh, NC 27699-1646
Site and Operator Information
1. Applicant Atlantic ❑BX, Inc
Address
PO Box 2560
Kitty Hawk, NC 27949
Phone
252-255-2030
2. Contact person
for site operation (if different from applicant): Stephen Cummings
Title or position
Site Manager phone 252-255-2030
Address
PO Box 2560
Kitty Hawk, NC 27949
3. Landowner
Same as Applicant
Address
4. Site Location.
County Currituck State Road Number 1146
Directions to site: U.S. Hwy 158 East to SR1146. Road dead ends into fhe farm.
5. Indicate whether request is: new renewal x modification x
For a permit renewal or modification, provide the following information:
Existing site permit number: SLAS-27-20 permit expiration date:4i1i19
6. Number of acres meeting the requirements of the N.C. Septage Management Rules: 22.1 acres.
7. Substances other than septage or grease trap pumpings previously disposed of on the site:
(a) None x , or (b) Attach a list indicating other substances, the amounts discharged,
and the dates of discharge.
S. Attach written, notarized landowner authorization to operate a septage disposal site signed by the
landowner (if the permit applicant does not own the property). if a corporation owns the land
use a corporate landowner authorization form. if Limited Liability Company owns the land,
use a limited liability company landowner authorization form.
9. Attach site evaluation report, including aerial photograph and soil analysis with metals results,
unless the Division prepared the report.
16. Attach a vicinity map (county road map showing site location).
(over)
II. Site Management Information:
The following information shall be included with the application form:
(a) Nutrient Management Plan
(b) Soil Erosion and Runoff Control Plan
2. Alternative plan for disposal (detention facility permit number or wastewater treatment plant
authorization): St7TF-27-19, SQTF-27-22, or Elizabeth City WWTP
3. Types of septage proposed to be discharged at the site {check all that apply):
(a) Domestic septage pumped from septic tanks x
(b) Grease trap pumpings x
(c) Portable toilet waste x
(d) Commercial I Industrial septage x
4. Proposed treatment method of each type of septage to be land applied (use additional paper to
explain If necessary): All septage, grease, and to if et waste will be stabilized with lime prior to
land application so that the pH will be >12.0 for at least 30 minutes for domestic septage and at least
2 hours for grease or grease/septage mixture.
5. Proposed method of applying septage to land, including septage distribution plan if required' (use
additional paper to explain if necessary): By driving a pumper truck equipped with spreader plates,
air activated valves through the field while evenly spreading material without creating pools at the end of
C1
rows; also by use of hose reel continuously moving spray irrigation gun.
Demonstration from the appropriate state or federal government agency that the land application
site complies with the Endangered Species Law ' or if any part of the site specified is not
agricultural land (use additional paper to explain if necessary): since the site is agricultural, the
Endangered Species Law does not apply.
III. Certification
hereby certify that:
1. The information provided on this application is true, complete, and correct to the best of my
knowledge.
2. 1 have read and understand the N.C. Septage Management Rules, and
3. 1 am aware of the otenti consequences, including penalties and permit revocation, for failing
to w all appl' le le and the conditions of a Septage Land Application Site permit.
Sig na u r Sig fore of company official required) Date
Bryan Lincoln
Print name
President
Title
Note: This application will not be reviewed until all parts of the application are complete.
* Refer to Section .0837(ey of the N.C. Septage Management Rules.
** Refer to Section .0837(g) of the H.C. Septage Management Rules.
S:Solid—WastelcWseptagelformslS L.AS-Application & Authorizatio nlS LAS Perm i t App lication -Jan 2016.docx
Rev 0 1-07-16
ATLANTIC OBX, INC.
NUTRIENT MANAGEMENT PLAN FOR SLAS 27-20
SEPTAGE APPLICATIONS TO COASTAL BERMUDAGRASS AND RYE
A. General Information:
1. The septage disposal site is located off of SR1146 (Swains Lane) in Barco, NC
2. The 22.1-acre site is divided into 3 fields. Field 1 contains approximately 4.3 acres. Field 2 contains approximately
4.3 acres. Field 3 contains approximately 13.5 acres. The attached copy of the aerial photograph for the site shows
field boundaries and identifications.
3. The dominant soil series on the site is Bojac (BoA) in Field 1, Altavista (AaA) in Field 2 and Dragston (Ds) in Field
3.
4. Septage will not be applied where the site is untrafficable (untrafficable is defined as soil that will allow a loaded
truck to leave a depression in sod greater than 3 inches in depth).
5. All nitrogen recommendations for forages will be 75% of the realistic yield expectation nitrogen rate should the
forage be grazed.
6. Septage storage shall be provided to account for the average volume of septage pumped per week, or an alternative
plan, such as disposal at a waste treatment plant, should be in place.
B. Crops Being Grown and Approximate Planting Times:
1. All 3 fields have been established in Coastal Bermudagrass.
As a winter crop, the field will be overseeded annually with annual ryegrass or a small grain such as cereal rye or
wheat. The annual ryegrass will be seeded at a rate of 40 pounds per acre if broadcasted or 30 pounds per acre if
drilled. The small grain will be seeded 120 pounds per acre if broadcasted or 100 pound per acre if drilled. The
overseeding will take place during the months of September or October depending on weather conditions of the
given year.
2. If there is not an agronomically acceptable stand of bermudagrass (i.e., ground covered with Bermudagrass stolons)
on at least 85% of the surface area of the site, then bermudagrass will be sown in those areas in the following spring
unless the determination of poor stands is made prior to or at the time of planting for bermudagrass of the current
year. The bare areas should be lightly till and reseeded at the rate of 6-8 pounds per acre of Cheyenne or Wrangler
bermudagrass seed (i.e., 0.2 pounds of seed per 1,000 square feet).
C. Nitrogen (N) Needs for Crops Grown:
Crop (Harvested for Hay)
R.Y.E.'
Nitrogen Application Ratez
Lbs. N/Acre/Year
Hybrid Bermudagrass
overseeded with
5'4
49 lbs./Dry Ton
264
Tons/Acre
Rescuegrass
1. R.Y.E. = Realistic Yield Expectation. (Note: Although Annual Ryegrass is being used at this site with Hybrid
Bermudagrass, rather than Rescuegrass, this is the most similar R.Y.E. for the site)
2. Nitrogen Application Rate = Suggested nitrogen rate based on R.Y.E. The amount of nitrogen to be supplied is
estimated at 2.6 lbs./1,000 Gallons.
D. Annual Application Rate
MONTH
RATE GALLONS/ACRE
TOTAL GALLONS
January
5,000
110,500
February
5,000
110,500
March
10,000
221,000
April
10,000
221,000
May
10,000
221,000
June
10,000
221,000
July
10,000
221,000
August
10,000
221,000
September
10,000
221,000
October
10,000
221,000
November
5,000
110,500
December
5,000
110,500
100,000
2,210,000
NOTE: Cumulative application rate is not to exceed 100,000 Gallons/Acre/Year
E. Application Method
The preceding information is based on septage being evenly applied over the entire site by a pumper truck with a splash
pan or a hose reel equipped with a spray irrigation gun.
F. Additional Fertility Requirements
For optimum nitrogen uptake, the concentrations of other nutrients such as phosphorus, potassium, magnesium, and
manganese must be sufficient as to not limit crop growth. Septage does not contain an adequate supply of all necessary
nutrients for crop growth. Therefore, supplemental addition of nutrients such as phosphorus, potassium, magnesium,
and manganese may be required. These additions should be based on soil test analyses. The soil samples should be taken
in late Fall or early Winter, so that the supplements can be added prior to the bermudagrass breaking dormancy, or the
small grain being planted. Do not follow the nitrogen recommendation from the soil test report. Use the nitrogen
amounts given in this nutrient management plan.
A separate soil sample should be collected for the buffer areas. Commercial fertilizer applications to the buffers are to be
based on the soil sample results.
G. Harvest of the Crops and Their Use
1. The bermudagrass will be cut for hay and baled whenever it reaches approximately 12 inches in height. The
bermudagrass should be cut and baled approximately 3 times throughout the growing season. The annual ryegrass or
small grain will be cut for hay and baled in April.
2. The winter overseed and bermudagrass will be harvested as hay and removed from site. If used for animal feed or
bedding, no septage applications can be made within 30 days of harvest. A 30-day waiting period must be observed
between the last application of septage and harvest for all material that is to be used as livestock feed or bedding.
H. Soil Erosion and Runoff Control Plan
Given that slopes on this site do not exceed five percent, a 50-foot buffer should suffice to prevent septage waste
from migrating off of the fields. More severe site conditions could require that soil erosion structures be installed
before septage can be applied.
Submitted by: _�---A 22
Sit per r
or
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 1 27-20
Permitted Rate: 10,000 1
Acres: 4.3
01 / 11 /2019
8-2 9,000
01/14/2019
8-2 9,000
01 / 15/2019
8-2 9,000
Current Hydraulic Rate 8,372
Sum 27,000
Permitted Rate: 10,000 2
Acres: 4.3
3,000
12,000 >12
3,000
12,000 >12
3,000
12,000 >12
9,000
36,000
01 / 17/2019
8-2 9,000
3,000
12,000 >12
01 / 18/2019
8-2 9,000
3,000
12,000 >12
01 /21 /2019
8-2 9,000
3,000
12,000 >12
Current Hydraulic Rate 8,372
Sum 27,000
9,000
36,000
Permitted Rate: 10,000 3
Acres: 7.1
01 /23/2019
8-2
9,000
3,000
12,000
>12
01 /24/2019
8-2
9,000
3,000
12,000
>12
01/25/2019
8-2
9,000
3,000
12,000
>12
01/28/2019
8-2
9,000
3,000
12,000
>12
01/29/2019
8-2
9,000
3,000
12,000
>12
Current Hydraulic Rate 8,451
Sum
45,000
15,000
60,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2019 3 27-20
Permitted Rate: 10,000 4
Acres: 6.4
03/18/2019
8-2
9,000
3,000
12,000
>12
03/21/2019
8-2
9,000
3,000
12,000
>12
03/22/2019
8-2
9,000
3,000
12,000
>12
03/25/2019
8-2
9,000
3,000
12,000
>12
03/27/2019
8-2
9,000
3,000
12,000
>12
WARNING Current Hydraulic Rate 9,375
Sum
45,000
15,000
60,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2019 4 27-20
Permitted Rate: 10,000 1
Acres: 4.3
04/01/2019
8-2
9,000
3,000
12,000
>12
04/30/2019
8-2
9,000
3,000
12,000
>12
04/30/2019
8-2
9,000
3,000
12,000
>12
Current Hydraulic Rate 8,372
Sum
27,000
9,000
36,000
Permitted Rate: 10,000 2
Acres: 4.3
04/22/2019
8-2
9,000
3,000
12,000
>12
04/22/2019
8-2
9,000
3,000
12,000
>12
04/23/2019
8-2
9,000
3,000
12,000
>12
Current Hydraulic Rate 8,372
Sum
27,000
9,000
36,000
Permitted Rate: 10,000 3
Acres: 7.1
04/14/2019
8-4
12,000
4,000
16,000
>12
04/ 15/2019
8-4
12,000
4,000
16,000
>12
04/15/2019
8-4
12,000
4,000
16,000
>12
04/16/2019
8-4
12,000
4,000
16,000
>12
Current Hydraulic Rate 9,014
Sum
48,000
16,000
64,000
Permitted Rate: 10,000 4
Acres: 6.4
04/09/2019
8-3
9,000
3,000
12,000
>12
04/09/2019
8-3
9,000
3,000
12,000
>12
04/10/2019
8-3
9,000
3,000
12,000
>12
04/ 10/2019
8-3
9,000
3,000
12,000
>12
Current Hydraulic Rate 7,500
Sum
36,000
12,000
48,000
Monday, October 28, 2019
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 6 27-20
Permitted Rate: 30,000 1
Acres: 4.3
06/15/2019
7-5
72,000
24,000
96,000 >12
Current Hydraulic Rate 22,326
Sum
72,000
24,000
96,000
Permitted Rate: 30,000 2
Acres: 4.3
06/18/2019
7-5
72,000
24,000
96,000 >12
Current Hydraulic Rate 22,326
Sum
72,000
24,000
96,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 7 27-20
Permitted Rate: 30,000 4
Acres: 6.4
WARNING
07/08/2019
7-5
18,000
6,000
24,000
>12
07/09/2019
7-5
18,000
6,000
24,000
>12
07/25/2019
7-5
18,000
6,000
24,000
>12
07/26/2019
7-5
18,000
6,000
24,000
>12
07/27/2019
7-5
18,000
6,000
24,000
>12
07/29/2019
7-5
18,000
6,000
24,000
>12
07/30/2019
7-5
18,000
6,000
24,000
>12
07/31/2019
7-5
18,000
6,000
24,000
>12
Current Hydraulic Rate 30,000
Sum
144,000
48,000
192,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 8 27-20
Permitted Rate: 20,000 1
Acres: 4.3
08/01/2019 8-6 36,000 12,000 48,000 >12
08/02/2019 8-2 24,000 8,000 32,000 >12
WARNING Current Hydraulic Rate 18,605 Sum 60,000 20,000 80,000
Permitted Rate: 20,000 2
Acres: 4.3
08/03/2019
8-6
36,000
12,000
48,000 >12
08/05/2019
8-2
24,000
8,000
32,000 >12
WARNING Current Hydraulic Rate 18,605
Sum
60,000
20,000
80,000
Permitted Rate: 20,000 3
Acres: 7.1
08/21/2019
8-4
45,000
15,000
60,000 >12
08/23/2019
8-6
54,000
18,000
72,000 >12
WARNING Current Hydraulic Rate 18,592
Sum
99,000
33,000
132,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2019 9 27-20
Permitted Rate: 20,000 1
Acres: 4.3
09/04/2019
8-4
60,000
20,000
80,000
>12
WARNING Current Hydraulic Rate 18,605
Sum
55,000
25,000
80,000
Permitted Rate: 20,000 2
Acres: 4.3
09/05/2019
8-6
60,000
20,000
80,000
>12
WARNING Current Hydraulic Rate 18,605
Sum
55,000
25,000
80,000
Permitted Rate: 10,000 4
Acres: 6.4
09/03/2019
8-4
45,000
15,000
60,000
>12
WARNING Current Hydraulic Rate 9,375
Sum
40,000
20,000
60,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 1 27-20
Permitted Rate: 10,000 1
Acres: 4.3
01/15/2020
8-4
12,000
4,000
16,000
>12
01/16/2020
8-2
9,000
3,000
12,000
>12
01/17/2020
8-2
9,000
3,000
12,000
>12
WARNING Current Hydraulic Rate 9,302
Sum
30,000
10,000
40,000
Permitted Rate: 10,000 2
Acres: 4.3
01/28/2020
8-2
9,000
3,000
12,000
>12
01/29/2020
8-4
12,000
4,000
16,000
>12
01/30/2020
8-2
9,000
3,000
12,000
>12
WARNING Current Hydraulic Rate 9,302
Sum
30,000
10,000
40,000
Permitted Rate: 10,000 3
Acres: 7.1
01 /20/2020
8-4
12,000
4,000
16,000
>12
01 /21 /2020
8-2
9,000
3,000
12,000
>12
01/22/2020
8-2
9,000
3,000
12,000
>12
01/23/2020
8-2
9,000
3,000
12,000
>12
01/27/2020
8-4
12,000
4,000
16,000
>12
WARNING Current Hydraulic Rate 9,577
Sum
51,000
17,000
68,000
Thursday, December 31, 2020 11 - 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 4 27-20
Permitted Rate: 10,000 1
Acres: 4.3
04/28/2020
8-4
12,000
4,000
16,000
>12
04/29/2020
8-3
9,000
3,000
12,000
>12
04/30/2020
8-2
9,000
3,000
12,000
>12
WARNING Current Hydraulic Rate 9,302
Sum
30,000
10,000
40,000
Permitted Rate: 10,000 2
Acres: 4.3
04/28/2020
8-4
9,000
3,000
12,000
>12
04/29/2020
8-3
12,000
4,000
16,000
>12
04/30/2020
8-2
9,000
3,000
12,000
>12
WARNING Current Hydraulic Rate 9,302
Sum
30,000
10,000
40,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 6 27-20
Permitted Rate: 30,000 1
Acres: 4.3
06/02/2020
8-6
36,000
12,000
48,000
>12
06/04/2020
8-6
36,000
12,000
48,000
>12
Current Hydraulic Rate 22,326
Sum
72,000
24,000
96,000
Permitted Rate: 30,000 2
Acres: 4.3
06/08/2020
8-6
36,000
12,000
48,000
>12
06/10/2020
8-6
36,000
12,000
48,000
>12
Current Hydraulic Rate 22,326
Sum
72,000
24,000
96,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 8 27-20
Permitted Rate: 20,000 1
Acres: 4.3
08/01/2020
8-5
36,000
12,000
48,000
>12
08/03/2020
8-4
27,000
9,000
36,000
>12
WARNING Current Hydraulic Rate 19,535
Sum
63,000
21,000
84,000
Permitted Rate: 20,000 2
Acres: 4.3
08/05/2020
8-5
36,000
12,000
48,000
>12
08/07/2020
8-3
24,000
8,000
32,000
>12
WARNING Current Hydraulic Rate 18,605
Sum
60,000
20,000
80,000
Permitted Rate: 20,000 3
Acres: 7.1
08/24/2020
8-5
48,000
16,000
64,000
>12
08/27/2020
8-5
54,000
18,000
72,000
>12
WARNING Current Hydraulic Rate 19,155
Sum
102,000
34,000
136,000
Thursday, December 31, 2020
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 9 27-20
Permitted Rate: 20,000 1
Acres: 4.3
09/21/2020
8-5
60,000
20,000
80,000
>12
WARNING Current Hydraulic Rate 18,605
Sum
60,000
20,000
80,000
Permitted Rate: 20,000 2
Acres: 4.3
09/26/2020
8-5
54,000
18,000
72,000
>12
Current Hydraulic Rate 16,744
Sum
54,000
18,000
72,000
Permitted Rate: 10,000 4
Acres: 6.4
09/30/2020
8-4
48,000
16,000
64,000
>12
WARNING Current Hydraulic Rate 10,000
Sum
48,000
16,000
64,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 12 27-20
Permitted Rate: 10,000 1
Acres: 4.3
12/15/2020
8-4
30,000
10,000
40,000
>12
WARNING Current Hydraulic Rate 9,302
Sum
30,000
10,000
40,000
Permitted Rate: 10,000 2
Acres: 4.3
12/21/2020
8-4
30,000
10,000
40,000
>12
WARNING Current Hydraulic Rate 9,302
Sum
30,000
10,000
40,000
Permitted Rate: 10,000 3
Acres: 7.1
12/23/2020
8-4
45,000
15,000
60,000
>12
Current Hydraulic Rate 8,451
Sum
45,000
15,000
60,000
Permitted Rate: 10,000 4
Acres: 6.4
12/28/2020
8-4
45,000
15,000
60,000
>12
WARNING Current Hydraulic Rate 9,375
Sum
45,000
15,000
60,000
Thursday, December 31, 2020
Permit # 27-20
MONTHLY SLAS REPORT BY PERMIT
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 1
1
01/05/21
7-4
6000
2000
8000
>12
01/06/21
7-4
3000
0
3000
>12
Permitted Rate: 1000(
01/11/21
7-4
9000
3000
12000
>12
Acres:4.3
01/14/21
7-4
7000
0
7000
>12
01/15/21
7-4
9000
3000
12000
>12
Current Hydraulic Rate
SUM
34000
8000
42000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 4
1
04/01/21
7-4
6000
2000
8000
>12
04/02/21
7-4
3000
1000
4000
>12
Permitted Rate: 1
04/09/21
7-4
6000
2000
8000
>12
Acres:4.3
04/12/21
7-4
6000
2000
8000
>12
04/15/21
7-4
9000
3000
12000
>12
Current Hydraulic Rate
SUM
30000
10000
40000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 6
1
06/01/21
7-5
18000
6000
24000
>12
06/03/21
7-5
12000
4000
16000
>12
06/04/21
7-5
7000
0
7000
>12
Permitted Rate: 300n
06/07/21
7-5
9000
3000
12000
>12
Acres:4.3
06/11/21
7-5
16000
0
16000
>12
06/14/21
7-5
18000
6000
24000
>12
06/29/21
7-5
30000
0
30000
>12
Current Hydraulic Rate
SUM
110000
19000
129000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 8
1
08/05/21
7-5
6000
2000
8000
>12
08/06/21
7-5
3000
1000
4000
>12
08/10/21
7-5
12000
4000
16000
>12
Permitted Rate: 20000
08/13/21
7-5
6000
2000
8000
>12
Acres:4.3
08/16/21
7-5
12000
4000
16000
>12
08/19/21
7-5
12000
4000
16000
>12
08/24/21
7-5
6000
2000
8000
>12
08/27/21
7-5
6000
2000
8000
>12
Current Hydraulic Rate
SUM
63000
21000
84000
Permit # 27-20
Year Month
Field Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 9
1 09/02/21
7-5
11000
1000
12000
>12
09/03/21
7-5
8000
0
8000
>12
Permitted Rate: 20000
09/06/21
7-5
9000
3000
12000
>12
Acres:4.3
09/09/21
7-5
12000
0
12000
>12
09/17/21
7-5
12000
4000
16000
>12
09/23/21
7-5
11000
1000
12000
>12
09/28/21
7-5
9000
3000
12000
>12
Current Hydraulic Rate
19535
SUM
72000
12000
84000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 12
1
12/01/21
7-4
3000
1000
4000
>12
12/02/21
7-4
3000
1000
4000
>12
Permitted Rate: 10000
12/03/21
7-4
6000
2000
8000
>12
Acres:4.3
12/09/21
7-4
3000
1000
4000
>12
12/14/21
7-4
6000
2000
8000
>12
12/15/21
7-4
6000
2000
8000
>12
12/17/21
7-4
3000
1000
4000
>12
Current Hydraulic Rate
9302
SUM
30000
10000
40000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 1
2
01/05/21
7-4
3000
1000
4000
>12
01/06/21
7-4
4000
0
4000
>12
Permitted Rate: 10000
01/14/21
7-4
12000
3000
15000
>12
Acres:4.3
01/25/21
7-4
6000
2000
8000
>12
01/26/21
7-4
8000
2000
10000
>12
Current Hydraulic Rate
9535
SUM
33000
8000
41000
Year Month
Field Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 4
2 04/01/21
7-4
6000
2000
8000
>12
04/02/21
7-4
12000
4000
16000
>12
Permitted Rate: 10000
04/09/21
7-4
3000
1000
4000
>12
Acres:4.3
04/12/21
7-4
10000
2000
12000
>12
04/27/21
7-4
3000
0
3000
>12
Current Hydraulic Rate
10000
SUM
34000
9000
43000
Year Month Field
Date
2021 6 2
06/01/21
06/02/21
06/03/21
Permitted Rate: 30000
06/04/21
Acres: 4.3
06/11/21
06/14/21
06/30/21
Current Hydraulic Rate
Year Month
Field Date
2021 8
2 08/02/21
08/03/21
08/04/21
08/06/21
08/10/21
08/13/21
Permitted Rate:
08/16/21
Acres: 4.3
08/19/21
08/23/21
08/25/21
08/27/21
Current Hydraulic Rate
19535
Year Month Field
Date
2021 9 2
09/02/21
09/06/21
09/08/21
Permitted Rate: 2000(
09/17/21
Acres: 4.3
09/20/21
09/23/21
Current Hydraulic Rate
Permit # 27-20
Time
Septage Amount
Grease Amount
Volume Applied
pH
7-5
6000
2000
8000
>12
7-5
18000
6000
24000
>12
7-5
9000
3000
12000
>12
7-5
24000
6000
30000
>12
7-5
12000
4000
16000
>12
7-5
9000
3000
12000
>12
7-5
24000
0
24000
>12
SUM
102000
24000
126000
Time
Septage Amount
Grease Amount
Volume Applied
pH
7-5
6000
2000
8000
>12
7-5
20000
0
20000
>12
7-5
12000
4000
16000
>12
7-5
6000
2000
8000
>12
7-5
15000
5000
20000
>12
7-5
6000
2000
8000
>12
7-5
12000
4000
16000
>12
7-5
6000
2000
8000
>12
7-5
3000
1000
4000
>12
7-5
9000
3000
12000
>12
7-5
6000
2000
8000
>12
SUM
101000
27000
128000
Time
Septage Amount
Grease Amount
Volume Applied
pH
7-5
4000
0
4000
>12
7-5
12000
4000
16000
>12
7-5
13000
3000
16000
>12
7-5
12000
3000
15000
>12
7-5
12000
0
12000
>12
7-5
16000
4000
20000
>12
SUM
69000
14000
83000
Year Month Field
Date
Time
2021 12 2
12/02/21
7-4
12/07/21
7-4
Permitted Rate: IOOOL
12/09/21
7-4
Acres: 4.3
12/14/21
7-4
12/15/21
7-4
Current Hydraulic Rate 9302
SUM
Septage Amount Grease Amount Volume Applied pH
9000
3000
12000
>12
6000
2000
8000
>12
3000
1000
4000
>12
6000
2000
8000
>12
6000
2000
8000
>12
30000
10000
40000
Permit # 27-20
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 1
3
01/05/21
7-4
7000
2000
9000
>12
01/06/21
7-4
3000
1000
4000
>12
Permitted Rate: 10000
01/11/21
7-4
7000
1000
8000
>12
Acres:7.1
01/15/21
7-4
10000
2000
12000
>12
01/25/21
7-4
9000
3000
12000
>12
01/26/21
7-4
7000
1000
8000
>12
01/29/21
7-4
12000
3000
15000
>12
Current Hydraulic Rate
9578
SUM
55000
13000
68000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 4
3
04/01/21
7-4
7000
1000
8000
>12
04/09/21
7-4
12000
4000
16000
>12
Permitted Rate: 10000
04/12/21
7-4
10000
2000
12000
>12
Acres:7.1
04/15/21
7-4
3000
1000
4000
>12
04/19/21
7-4
12000
4000
16000
>12
04/22/21
7-4
12000
2000
14000
>12
Current Hydraulic Rate
9859
SUM
56000
14000
70000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 6
3
06/01/21
7-5
16000
0
16000
>12
06/02/21
7-5
16000
0
16000
>12
06/03/21
7-5
12000
4000
16000
>12
Permitted Rate: 30000
06/04/21
7-5
16000
4000
20000
>12
Acres:7.1
06/11/21
7-5
12000
4000
16000
>12
06/14/21
7-5
12000
4000
16000
>12
06/16/21
7-5
24000
8000
32000
>12
06/24/21
7-5
18000
6000
24000
>12
06/29/21
7-5
26000
6000
32000
>12
06/30/21
7-5
20000
0
20000
>12
Current Hydraulic Rate
29296
SUM
172000
36000
208000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 8
3
08/06/21
7-5
9000
3000
12000
>12
08/10/21
7-5
9000
3000
12000
>12
08/13/21
7-5
3000
1000
4000
>12
Permitted Rate: 20000
08/16/21
7-5
12000
4000
16000
>12
Acres:7.1
08/19/21
7-5
15000
5000
20000
>12
08/23/21
7-5
9000
3000
12000
>12
— 0
b
x
Current Hydraulic Rate 19718
08/24/21
08/26/21
08/30/21
08/31/21
7-5
7-5
7-5
7-5
SUM
3000
18000
21000
6000
105000
1000
6000
7000
2000
35000
Permit # 27-20
4000 >12
24000 >12
28000 >12
8000 >12
140000
Year Month Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 9 3
09/01/21
7-5
15000
5000
20000
>12
09/02/21
7-5
12000
0
12000
>12
09/07/21
7-5
9000
3000
12000
>12
Permitted Rate: 20000
09/09/21
7-5
9000
3000
12000
>12
Acres:7.1
09/13/21
7-5
8000
0
8000
>12
09/16/21
7-5
21000
7000
28000
>12
09/20/21
7-5
12000
4000
16000
>12
09/27/21
7-5
12000
4000
16000
>12
09/30/21
7-5
12000
4000
16000
>12
Current Hydraulic Rate 19718
SUM
110000
30000
140000
Year Month Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 12 3
12/02/21
7-4
3000
1000
4000
>12
12/03/21
7-4
3000
1000
4000
>12
12/08/21
7-4
6000
2000
8000
>12
Permitted Rate: 10000
12/14/21
7-4
6000
2000
8000
>12
Acres:7.1
12/17/21
7-4
9000
3000
12000
>12
12/22/21
7-4
9000
3000
12000
>12
12/23/21
7-4
3000
1000
4000
>12
12/27/21
7-4
6000
2000
8000
>12
12/29/21
7-4
7000
2000
9000
>12
Current Hydraulic Rate 9718
SUM
52000
17000
69000
Year Month
Field Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 3
4 03/01/21
7-4
15000
5000
20000
>12
03/03/21
7-4
4000
0
4000
>12
Permitted Rate: 10000
03/05/21
7-4
21000
7000
28000
>12
Acres:6.4
03/26/21
7-4
10000
2000
12000
>12
Current Hydraulic Rate
10000
SUM
50000
14000
64000
Permit # 27-20
Year Month Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 4 4
04/01/21
7-4
11000
3000
14000
>12
04/09/21
7-4
9000
3000
12000
>12
Permitted Rate: 10000
04/12/21
7-4
12000
4000
16000
>12
Acres:6.4
04/15/21
7-4
3000
1000
4000
>12
04/19/21
7-4
3000
1000
4000
>12
04/22/21
7-4
9000
3000
12000
>12
Current Hydraulic Rate 9688
SUM
47000
15000
62000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 6
4
06/01/21
7-5
20000
0
20000
>12
06/02/21
7-5
20000
0
20000
>12
06/04/21
7-5
24000
0
24000
>12
06/11/21
7-5
12000
4000
16000
>12
Permitted Rate: 30000
06/14/21
7-5
16000
4000
20000
>12
Acres:6.4
06/24/21
7-5
9000
3000
12000
>12
06/28/21
7-5
24000
0
24000
>12
06/29/21
7-5
36000
12000
48000
>12
Current Hydraulic Rate
28750
SUM
161000
23000
184000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 7
4
07/01/21
7-5
18000
6000
24000
>12
07/02/21
7-5
12000
0
12000
>12
Permitted Rate: 30000
07/06/21
7-5
18000
6000
24000
>12
Acres:6.4
07/12/21
7-5
18000
6000
24000
>12
07/26/21
7-5
24000
8000
32000
>12
07/28/21
7-5
20000
0
20000
>12
07/29/21
7-5
20000
0
20000
>12
07/30/21
7-5
20000
0
20000
>12
Current Hydraulic Rate
27500
SUM
150000
26000
176000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 9
4
09/01/21
7-5
12000
0
12000
>12
Permitted Rate: 10000
09/03/21
7-5
9000
3000
12000
>12
Acres:6.4
09/27/21
7-5
21000
7000
28000
>12
09/29/21
7-5
8000
0
8000
>12
Current Hydraulic Rate
9375
SUM
50000
10000
60000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
— 0
b
x
Permit # 27-20
2021 12 4
12/01/21
7-4
6000
2000
8000
>12
12/03/21
7-4
9000
3000
12000
>12
12/08/21
7-4
6000
2000
8000
>12
Permitted Rate: 10000
12/09/21
7-4
3000
1000
4000
>12
Acres:6.4
12/14/21
7-4
6000
2000
8000
>12
12/16/21
7-4
6000
2000
8000
>12
12/22/21
7-4
3000
1000
4000
>12
12/27/21
7-4
3000
1000
4000
>12
12/28/21
7-4
6000
2000
8000
>12
Current Hydraulic Rate
SUM
48000
16000
64000
27_20
Loading Records
Field Acres Date Time Septage Amount Grease Amount Volume Applied pH Septage Grease Monthly Total Permitted Total
1
4.3
Permitted Rate: 10,000
Current Hydraulic Loading Rate
10000.00
Permitted Rate:
Current Hydraulic Loading Rate
M1111111KIII7
Thursday, January 6, 2022
7-4
6000
2000
8000
>12
Friday, January 7, 2022
7-4
12000
4000
16000
>12
Thursday, January 13, 2022
7-4
3000
1000
4000
>12
Thursday, January 20, 2022
7-4
6000
2000
8000
>12
Wednesday, January 26, 2022
7-4
6000
1000
7000
>12
Thursday, April 14, 2022
7-4
9000
3000
12000
>12
Tuesday, April 19, 2022
7-4
9000
3000
12000
>12
Wednesday, April 20, 2022
7-4
6000
1000
7000
>12
Thursday, April 21, 2022
7-4
12000
0
12000
>12
33000 10000 43000 43,000
36000 7000 43000 43,000
Wednesday, June 1, 2022
7-5
12000
4000
16000
>12 97000 27000 124000
129,000
Friday, June 3, 2022
7-5
12000
4000
16000
>12
Tuesday, June 7, 2022
7-5
4000
0
4000
>12
Permitted Rate: 30,000
Thursday, June 9, 2022
7-5
6000
2000
8000
>12
Monday, June 13, 2022
7-5
11000
1000
12000
>12
Current Hydraulic Loading Rate
Wednesday, June 15, 2022
7-5
9000
3000
12000
>12
28837.21
Thursday, June 16, 2022
7-5
9000
3000
12000
>12
Monday, June 20, 2022
7-5
6000
2000
8000
>12
Tuesday, June 21, 2022
7-5
3000
1000
4000
>12
Thursday, June 23, 2022
7-5
9000
3000
12000
>12
Tuesday, June 28, 2022
7-5
4000
0
4000
>12
Thursday, June 30, 2022
7-5
12000
4000
16000
>12
Monday, August 1, 2022
7-5
6000
2000
8000
>12 65000 21000 86000
86,000
Tuesday, August 2, 2022
7-5
6000
2000
8000
>12
Friday, August 5, 2022
7-5
11000
3000
14000
>12
Tuesday, August 9, 2022
7-5
9000
3000
12000
>12
Permitted Rate: 20,000
Wednesday, August 10, 2022
7-5
6000
2000
8000
>12
Thursday, August 11, 2022
7-5
3000
1000
4000
>12
Current Hydraulic Loading Rate
Monday, August 15, 2022
7-5
6000
2000
8000
>12
20000.00
Thursday, August 18, 2022
7-5
3000
1000
4000
>12
Monday, August 22, 2022
7-5
3000
1000
4000
>12
Tuesday, August 23, 2022
7-5
3000
1000
4000
>12
Wednesday, August 24, 2022
7-5
3000
1000
4000
>12
Friday, August 26, 2022
7-5
3000
1000
4000
>12
Tuesday, August 30, 2022
7-5
3000
1000
4000
>12
Friday, September 2, 2022
7-5
6000
2000
8000
>12 61000 15000 76000
86,000
Thursday, September 8, 2022
7-5
7000
1000
8000
>12
Monday, September 12, 2022
7-5
3000
1000
4000
>12
Permitted Rate:
Wednesday, September 14, 2022
7-5
9000
3000
12000
>12
Monday, September 19, 2022
7-5
3000
1000
4000
>12
Current Hydraulic Loading Rate
Tuesday, September 20, 2022
7-5
6000
2000
8000
>12
17674.42
Wednesday, September 21, 2022
7-5
4000
0
4000
>12
Thursday, September 22, 2022
7-5
6000
2000
8000
>12
Monday, September 26, 2022
7-5
4000
0
4000
>12
Tuesday, September 27, 2022
7-5
3000
1000
4000
>12
Thursday, September 29, 2022
7-5
10000
2000
12000
>12
Friday, December 2, 2022
7-4
6000
2000
8000
>12 33000 7000 40000 43,000
Permitted Rate:10,000
Tuesday, December 6, 2022
7-4
6000
2000
8000
>12
Friday, December 9, 2022
7-4
6000
2000
8000
>12
Current Hydraulic Loading Rate
Monday, December 12, 2022
7-4
4000
0
4000
>12
9302.33
Wednesday, December 14, 2022
7-4
3000
1000
4000
>12
Tuesday, December 20, 2022
7-4
4000
0
4000
>12
Tuesday, December 27, 2022
7-4
4000
0
4000
>12
Septage Grease Total
Yearly Totals: 325000 87000 412000
Permitted Total 430,000
Field Acres Date Time Septage Amount Grease Amount Volume Applied pH Septage Grease Monthly Total Permitted Total
2
4.3
Permitted Rate: 10,000
Current Hydraulic Loading Rate
9767.44
Thursday, January 6, 2022
7-4
6000
2000
8000
>12
Wednesday, January 12, 2022
7-4
6000
2000
8000
>12
Wednesday, January 19, 2022
7-4
9000
3000
12000
>12
Thursday, January 20, 2022
7-4
3000
1000
4000
>12
Wednesday, January 26, 2022
7-4
8000
2000
10000
>12
32000 10000 42000 43,000
Thursday, April 7, 2022
7-4
8000
0
8000
>12 37000 6000 43000 43,000
Permitted Rate: 10,000
Thursday, April 14, 2022
7-4
9000
3000
12000
>12
Monday, April 18, 2022
7-4
3000
1000
4000
>12
Current Hydraulic Loading Rate
Wednesday, April 20, 2022
7-4
4000
0
4000
>12
10000.00
Friday, April 22, 2022
7-4
6000
2000
8000
>12
Tuesday, April 26, 2022
7-4
7000
0
7000
>12
Wednesday, June 1, 2022
7-5
3000
1000
4000
>12 94000 18000 112000 129,000
Thursday, June 2, 2022
7-5
4000
0
4000
>12
Monday, June 6, 2022
7-5
9000
3000
12000
>12
Permitted Rate: 30,000
Tuesday, June 7, 2022
7-5
8000
0
8000
>12
Wednesday, June 8, 2022
7-5
6000
2000
8000
>12
Current Hydraulic Loading Rate
Friday, June 10, 2022
7-5
8000
0
8000
>12
26046.51
Monday, June 13, 2022
7-5
7000
1000
8000
>12
Wednesday, June 15, 2022
7-5
12000
4000
16000
>12
Monday, June 20, 2022
7-5
6000
2000
8000
>12
Wednesday, June 22, 2022
7-5
7000
1000
8000
>12
Thursday, June 23, 2022
7-5
11000
1000
12000
>12
Tuesday, June 28, 2022
7-5
9000
3000
12000
>12
Thursday, June 30, 2022
7-5
4000
0
4000
>12
Tuesday, August 2, 2022
7-5
6000
2000
8000
>12 65000 21000 86000 86,000
Friday, August 5, 2022
7-5
6000
2000
8000
>12
Permitted Rate: 20,000
Tuesday, August 9, 2022
7-5
9000
3000
12000
>12
Wednesday, August 10, 2022
7-5
6000
2000
8000
>12
Current Hydraulic Loading Rate
Monday, August 15, 2022
7-5
8000
2000
10000
>12
20000.00
Thursday, August 18, 2022
7-5
9000
3000
12000
>12
Monday, August 22, 2022
7-5
6000
2000
8000
>12
Tuesday, August 23, 2022
7-5
6000
2000
8000
>12
Wednesday, August 24, 2022
7-5
3000
1000
4000
>12
Friday, August 26, 2022
7-5
3000
1000
4000
>12
Tuesday, August 30, 2022
7-5
3000
1000
4000
>12
Friday, September 2, 2022
7-5
6000
2000
8000
>12 63000 13000 76000 86,000
Tuesday, September 6, 2022
7-5
8000
0
8000
>12
Permitted Rate: 20,000
Thursday, September 8, 2022
7-5
8000
0
8000
>12
Wednesday, September 14, 2022
7-5
6000
2000
8000
>12
Current Hydraulic Loading Rate
Friday, September 16, 2022
7-5
3000
1000
4000
>12
17674.42
Tuesday, September 20, 2022
7-5
7000
1000
8000
>12
Thursday, September 22, 2022
7-5
3000
1000
4000
>12
Friday, September 23, 2022
7-5
6000
2000
8000
>12
Tuesday, September 27, 2022
7-5
4000
0
4000
>12
Wednesday, September 28, 2022
7-5
3000
1000
4000
>12
Friday, September 30, 2022
7-5
9000
3000
12000
>12
Friday, December 2, 2022
7-4
6000
2000
8000
>12 31000 9000 40000 43,000
Permitted Rate: 10,000
Friday, December 9, 2022
7-4
6000
2000
8000
>12
Wednesday, December 14, 2022
7-4
9000
3000
12000
>12
Current Hydraulic Loading Rate
Friday, December 16, 2022
7-4
6000
2000
8000
>12
9302.33
Tuesday, December 20, 2022
7-4
4000
0
4000
>12
Septage Grease Total
Yearly Totals: 322000 77000 399000
Permitted Total
Field Acres Date Time Septage Amount Grease Amount Volume Applied pH
3
7.1
Permitted Rate: 10,000
Current Hydraulic Loading Rate
9859.15
Thursday, January 6, 2022
7-4
6000
2000
8000
>12
Friday, January 7, 2022
7-4
9000
3000
12000
>12
Tuesday, January 18, 2022
7-4
9000
3000
12000
>12
Wednesday, January 19, 2022
7-4
12000
4000
16000
>12
Wednesday, January 26, 2022
7-4
17000
5000
22000
>12
Septage Grease Monthly Total Permitted Total
53000 17000 70000 71,000
Monday, April 11, 2022
7-4
12000
0
12000
>12 60000 11000
71000 71,000
Thursday, April 14, 2022
7-4
9000
3000
12000
>12
Permitted Rate: 10,000
Monday, April 18, 2022
7-4
4000
0
4000
>12
Wednesday, April 20, 2022
7-4
9000
3000
12000
>12
Current Hydraulic Loading Rate
Friday, April 22, 2022
7-4
3000
0
3000
>12
10000.00
Tuesday, April 26, 2022
7-4
8000
0
8000
>12
Wednesday, April 27, 2022
7-4
9000
3000
12000
>12
Thursday, April 28, 2022
7-4
6000
2000
8000
>12
Wednesday, June 1, 2022
7-5
6000
2000
8000
>12 113000 27000
140000 213,000
Thursday, June 2, 2022
7-5
7000
1000
8000
>12
Monday, June 6, 2022
7-5
12000
4000
16000
>12
Permitted Rate: 30,000
Wednesday, June 8, 2022
7-5
9000
3000
12000
>12
Friday, June 10, 2022
7-5
8000
0
8000
>12
Current Hydraulic Loading Rate
Tuesday, June 14, 2022
7-5
6000
2000
8000
>12
19718.31
Wednesday, June 15, 2022
7-5
12000
4000
16000
>12
Friday, June 17, 2022
7-5
4000
0
4000
>12
Monday, June 20, 2022
7-5
6000
2000
8000
>12
Tuesday, June 21, 2022
7-5
3000
1000
4000
>12
Thursday, June 23, 2022
7-5
12000
0
12000
>12
Monday, June 27, 2022
7-5
9000
3000
12000
>12
Tuesday, June 28, 2022
7-5
9000
3000
12000
>12
Thursday, June 30, 2022
7-5
10000
2000
12000
>12
Tuesday, August 2, 2022
7-5
6000
2000
8000
>12 107000 33000
140000 142,000
Friday, August 5, 2022
7-5
9000
3000
12000
>12
Tuesday, August 9, 2022
7-5
9000
3000
12000
>12
Permitted Rate: 20,000
Wednesday, August 10, 2022
7-5
6000
2000
8000
>12
Thursday, August 11, 2022
7-5
9000
3000
12000
>12
Current Hydraulic Loading Rate
Friday, August 12, 2022
7-5
8000
0
8000
>12
19718.31
Monday, August 15, 2022
7-5
6000
2000
8000
>12
Wednesday, August 17, 2022
7-5
6000
2000
8000
>12
Thursday, August 18, 2022
7-5
12000
4000
16000
>12
Monday, August 22, 2022
7-5
6000
2000
8000
>12
Wednesday, August 24, 2022
7-5
3000
1000
4000
>12
Thursday, August 25, 2022
7-5
6000
2000
8000
>12
Friday, August 26, 2022
7-5
6000
2000
8000
>12
Monday, August 29, 2022
7-5
9000
3000
12000
>12
Wednesday, August 31, 2022
7-5
6000
2000
8000
>12
Friday, September 2, 2022 99000 17000 116000 142,000
7-5
6000
2000
8000
>12
Monday, September 5, 2022
7-5
8000
0
8000
>12
Tuesday, September 6, 2022
7-5
4000
0
4000
>12
Wednesday, September 7, 2022
7-5
3000
1000
4000
>12
Friday, September 9, 2022
7-5
6000
2000
8000
>12
Permitted Rate: 20,000
Wednesday, September 14, 2022
7-5
4000
0
4000
>12
Thursday, September 15, 2022
7-5
9000
3000
12000
>12
Current Hydraulic Loading Rate
Friday, September 16, 2022
7-5
3000
1000
4000
>12
16338.03
Monday, September 19, 2022
7-5
7000
1000
8000
>12
Wednesday, September 21, 2022
7-5
6000
2000
8000
>12
Thursday, September 22, 2022
7-5
7000
1000
8000
>12
Friday, September 23, 2022
7-5
7000
1000
8000
>12
Tuesday, September 27, 2022
7-5
12000
0
12000
>12
Wednesday, September 28, 2022
7-5
6000
2000
8000
>12
Friday, September 30, 2022
7-5
11000
1000
12000
>12
Friday, December 2, 2022
7-4
6000
2000
8000
>12 53000 15000 68000
Permitted Rate: 10,000
Tuesday, December 6, 2022
7-4
6000
2000
8000
>12
Friday, December 9, 2022
7-4
10000
2000
12000
>12
Current Hydraulic Loading Rate
Wednesday, December 14, 2022
7-4
6000
2000
8000
>12
9577.46
Friday, December 16, 2022
7-4
12000
4000
16000
>12
Tuesday, December 20, 2022
7-4
6000
2000
8000
>12
Friday, December 23, 2022
7-4
4000
0
4000
>12
Wednesday, December 28, 2022
7-4
3000
1000
4000
>12
Septage Grease Total
Yearly Totals: 485000 120000 605000
Permitted Total 710,000
Field Acres
Date Time Septage Amount Grease Amount Volume Applied pH Septage Grease Monthly Total Permitted Total
4 6.4
Thursday, March 3, 2022
7-4
9000
3000
12000
>12
50000 14000 64000 64,000
Wednesday, March 9, 2022
7-4
8000
0
8000
>12
Permitted Rate:
Tuesday, March 15, 2022
7-4
18000
6000
24000
>12
Friday, March 18, 2022
7-4
6000
2000
8000
>12
Current Hydraulic Loading Rate
Monday, March 21, 2022
7-4
9000
3000
12000
>12
10000.00
Monday, April 4, 2022
7-4
8000
0
8000
>12
58000 6000 64000 64,000
Thursday, April 7, 2022
7-4
12000
0
12000
>12
Permitted Rate: 10,000
Tuesday, April 12, 2022
7-4
7000
1000
8000
>12
Thursday, April 14, 2022
7-4
6000
2000
8000
>12
Current Hydraulic Loading Rate
Tuesday, April 19, 2022
7-4
8000
0
8000
>12
10000.00
Friday, April 22, 2022
7-4
8000
0
8000
>12
Thursday, April 28, 2022
7-4
3000
1000
4000
>12
Friday, April 29, 2022
7-4
6000
2000
8000
>12
Wednesday, June 1, 2022
7-5
4000
0
4000
>12
129000 31000 160000 192,000
Thursday, June 2, 2022
7-5
7000
1000
8000
>12
Friday, June 3, 2022
7-5
4000
0
4000
>12
Tuesday, June 7, 2022
7-5
4000
0
4000
>12
Wednesday, June 8, 2022
7-5
21000
7000
28000
>12
Permitted Rate: 30,000
Friday, June 10, 2022
7-5
8000
0
8000
>12
Tuesday, June 14, 2022
7-5
12000
4000
16000
>12
Current Hydraulic Loading Rate
Thursday, June 16, 2022
7-5
7000
1000
8000
>12
25000.00
Friday, June 17, 2022
7-5
6000
2000
8000
>12
Tuesday, June 21, 2022
7-5
8000
0
8000
>12
Thursday, June 23, 2022
7-5
12000
4000
16000
>12
Tuesday, June 28, 2022
7-5
27000
9000
36000
>12
Thursday, June 30, 2022
7-5
9000
3000
12000
>12
Wednesday, July 6, 2022
7-5
24000
0
24000
>12
141000 31000 172000 192,000
Permitted Rate: 30,000
Thursday, July 7, 2022
7-5
8000
0
8000
>12
Monday, July 11, 2022
7-5
24000
8000
32000
>12
Current Hydraulic Loading Rate
Wednesday, July 13, 2022
7-5
24000
8000
32000
>12
26875.00
Monday, July 18, 2022
7-5
18000
6000
24000
>12
Tuesday, July 19, 2022
7-5
20000
4000
24000
>12
Thursday, July 21, 2022
7-5
8000
0
8000
>12
Monday, July 25, 2022
7-5
15000
5000
20000
>12
Friday, September 2, 2022
7-5
7000
1000
8000
>12
52000 12000 64000 64,000
Monday, September 5, 2022
7-5
8000
0
8000
>12
Wednesday, September 7, 2022
7-5
6000
2000
8000
>12
Permitted Rate: 10,000
Thursday, September 8, 2022
7-5
3000
1000
4000
>12
Tuesday, September 13, 2022
7-5
3000
1000
4000
>12
Current Hydraulic Loading Rate
Monday, September 19, 2022
7-5
3000
1000
4000
>12
10000.00
Wednesday, September 21, 2022
7-5
6000
2000
8000
>12
Friday, September 23, 2022
7-5
4000
0
4000
>12
Tuesday, September 27, 2022
7-5
3000
1000
4000
>12
Wednesday, September 28, 2022
7-5
3000
1000
4000
>12
Friday, September 30, 2022
7-5
6000
2000
8000
>12
Permitted Rate: 10,000
Current Hydraulic Loading Rate
10000.00
Friday, December 2, 2022
7-4
3000
1000
4000
>12 51000 13000
Tuesday, December 6, 2022
7-4
6000
2000
8000
>12
Friday, December 9, 2022
7-4
6000
2000
8000
>12
Monday, December 12, 2022
7-4
6000
2000
8000
>12
Wednesday, December 14, 2022
7-4
6000
2000
8000
>12
Friday, December 16, 2022
7-4
9000
3000
12000
>12
Wednesday, December 21, 2022
7-4
8000
0
8000
>12
Thursday, December 22, 2022
7-4
4000
0
4000
>12
Friday, December 30, 2022
7-4
3000
1000
4000
>12
64000 64,000
Septage Grease Total
Yearly Totals: 481000 107000 588000
Permitted Total 640,000
SLAS-27-20
22.1 acres @ 100,000 gal/ac/yr 1 2,210,000 gal/yr
Field 1 Field 2 Field 3 Field 4 Field 5 Field 6 Site
ACRES 4.3 4.3 7.1 6.4 22.1
Max. Amount 430,000 430,000 710,000 640,000 0 0 2,210,000
Monthly Rate
None 0
Low 10,000
Medium 20,000
High 30,000
Septage Grease PTW
January
February
March
April
May
June
July
August
September
October
November
December
Yea r:
SITE SUMMARY
YEAR
Applied Amount
Permit Amount
2016
1,328,000
2,210,000
2017
1,144, 000
2,210,000
2018
1,780,000
2,210,000
2019
1,272,000
2,210,000
2020
1,136,000
2,210,000
2021
2,185,000
2,210,000
2022
2,004,000
2,210,000
2016
Over / Under
-882,000
-1,066,000
-430,000
-938,000
-1,074,000
-25,000
-206,000
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
36,000
L
8,372
36,000
L
8,372
36,000
L
5,070
L
0
-
0
-
0
-
0
-
0
-
0
-
0
60,000
-
8,451
-
0
32,000
L
7,442
32,000
L
7,442
64,000
L
9,014
64,000
L
10,000
-
0
-
0
-
0
-
0
H
0
H
0
168,000
H
23,662
96,000
H
15,000
-
0
-
0
-
0
144,000
-
22,500
M
0
M
0
M
0
M
0
84,000
M
19,535
80,000
M
18,605
140,000
M
19,718
64,000
M
10,000
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
36,000
L
8,372
36,000
L
8,372
60,000
L
8,451
60,000
L
9,375
TOTAL 0 0 0 188,000
PUMPED: 0 APPLIED: 1,328,000 430,000
184,000
430,000
528,000
710,000
428,000
640,000
Yea r:
2017
Septage Grease PTW
January
February
March
April
May
June
July
August
September
October
November
December
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
36,000
L
8,372
36,000
L
8,372
60,000
L
8,451
L
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
64,000
-
10,000
32,000
L
7,442
32,000
L
7,442
64,000
L
9,014
64,000
L
10,000
-
0
-
0
-
0
-
0
H
0
H
0
H
0
H
0
-
0
-
0
-
0
-
0
72,000
M
16,744
72,000
M
16,744
120,000
M
16,901
M
0
72,000
M
16,744
72,000
M
16,744
120,000
M
16,901
60,000
M
9,375
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
40,000
L
9,302
40,000
L
9,302
40,000
L
5,634
48,000
L
7,500
TOTAL 0 0 0 252,000
PUMPED: 0 APPLIED: 1,144,000 430,000
Septage Grease PTW
January
February
March
April
May
June
July
August
September
October
November
December
Year: 2018
252,000
430,000
404,000
710,000
236,000
640,000
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
32,000
L
7,442
32,000
L
7,442
64,000
L
9,014
L
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
60,000
-
9,375
36,000
L
8,372
36,000
L
8,372
60,000
L
8,451
60,000
L
9,375
-
0
-
0
-
0
-
0
120,000
H
27,907
120,000
H
27,907
192,000
H
27,042
192,000
H
30,000
-
0
-
0
-
0
192,000
-
30,000
48,000
M
11,163
48,000
M
11,163
96,000
M
13,521
M
0
48,000
M
11,163
48,000
M
11,163
48,000
M
6,761
48,000
M
7,500
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
36,000
L
8,372
36,000
L
8,372
64,000
L
9,014
64,000
L
10,000
TOTAL 0 0 0 320,000
PUMPED: 0 APPLIED: 1,780,000 430,000
320,000
430,000
524,000
710,000
616,000
640,000
Yea r:
2019
Septage
Grease PTW
January
99,000
33,000
February
March
45,000
15,000
April
138,000
46,000
May
June
144,000
48,000
July
144,000
48,000
August
219,000
73,000
September
165,000
55,000
October
November
December
TOTAL
954,000
318,000 0
PUMPED:
1,272,000
1 APPLIED: 1,272,000
Year:
Septage
Grease PTW
January
111,000
37,000
February
March
April
60,000
20,000
May
June
144,000
48,000
July
August
225,000
75,000
September
162,000
54,000
October
November
December
150,000
50,000
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
36,000
L
8,372
36,000
L
8,372
60,000
L
8,451
L
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
60,000
-
9,375
36,000
L
8,372
36,000
L
8,372
64,000
L
9,014
48,000
L
7,500
-
0
-
0
-
0
-
0
96,000
H
22,326
96,000
H
22,326
H
0
H
0
-
0
-
0
-
0
192,000
-
30,000
80,000
M
18,605
80,000
M
18,605
132,000
M
18,592
M
0
80,000
M
18,605
80,000
M
18,605
M
0
60,000
M
9,375
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
L
0
L
0
L
0
L
0
328,000
430,000
2020
328,000
430,000
256,000
360,000
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
40,000
L
9,302
40,000
L
9,302
68,000
L
9,577
L
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
40,000
L
9,302
40,000
L
9,302
L
0
L
0
-
0
-
0
-
0
-
0
96,000
H
22,326
96,000
H
22,326
H
0
H
0
-
0
-
0
-
0
-
0
84,000
M
19,535
80,000
M
18,605
136,000
M
19,155
M
0
80,000
M
18,605
72,000
M
16,744
M
0
64,000
M
10,000
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
40,000
L
9,302
40,000
L
9,302
60,000
L
8,451
60,000
L
9,375
TOTAL 852,000 284,000 0 380,000
PUMPED: 1,136,000 1 APPLIED: 1,136,000 430,000
264,000
124,000
Year:
2021
Septage Grease PTW
January
February
March
April
May
June
July
August
September
October
November
December
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
42,000
L
9,767
41,000
L
9,535
68,000
L
9,577
L
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
64,000
-
10,000
40,000
L
9,302
43,000
L
10,000
70,000
L
9,859
62,000
L
9,688
-
0
-
0
-
0
-
0
129,000
H
30,000
126,000
H
29,302
208,000
H
29,296
184,000
H
28,750
-
0
-
0
-
0
176,000
-
27,500
84,000
M
19,535
128,000
M
29,767
140,000
M
191718
M
0
84,000
M
19,535
83,000
M
19,302
140,000
M
191718
60,000
M
9,375
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
40,000
L
9,302
40,000
L
9,302
69,000
L
9,718
64,000
L
10,000
TOTAL 0 0 0 419,000
PUMPED: 0 APPLIED: 2,185,000 430,000
Year:
Septage
Grease PTW
January
168,000
51,000
February
March
April
191,000
30,000
May
June
433,000
103,000
July
141,000
31,000
August
237,000
75,000
September
275,000
57,000
October
November
December
168,000
44,000
2022
461,000
430,000
695,000
710,000
610,000
640,000
Field 1
Field 2
Field 3
Field 4
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
43,000
L
10,000
42,000
L
9,767
70,000
L
9,859
64,000
L
10,000
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
43,000
L
10,000
43,000
L
10,000
71,000
L
10,000
64,000
L
10,000
-
0
-
0
-
0
-
0
124,000
H
28,837
112,000
H
26,047
140,000
H
19,718
160,000
H
25,000
-
0
-
0
-
0
172,000
-
26,875
86,000
M
20,000
86,000
M
20,000
140,000
M
19,718
M
0
76,000
M
17,674
76,000
M
17,674
116,000
M
16,338
64,000
M
10,000
-
0
-
0
-
0
-
0
-
0
-
0
-
0
-
0
40,000
L
9,302
40,000
L
9,302
68,000
L
9,577
64,000
L
10,000
TOTAL 1,613,000 391,000 0 412,000
PUMPED: 2,004,000 APPLIED: 2,004,000 430,000
399,000
430,000
605,000
710,000
588,000
640,000
Applied Amount
Field 1
Field 2
Field 3
Field 4
Acres
4.3
4.3
7.1
6.4
2016
188,000
184,000
528,000
428,000
2017
252,000
252,000
404,000
236,000
2018
320,000
320,000
524,000
616,000
2019
328,000
328,000
256,000
360,000
2020
380,000
368,000
264,000
124,000
2021
419,000
461,000
695,000
610,000
2022
412,000
399,000
605,000
588,000
Total
2,299,000
2,312,000
3,276,000
2,962,000
Permit Amount
Over / (Under) Permit Amount
Field 5 Field 1
Field 2
Field 3
Field 4
Field 5 Field 1
Field 2
Field 3
Field 4 Field 5
0 4.3
4.3
7.1
6.4
0 4.3
4.3
7.1
6.4 0
- 430,000
430,000
710,000
640,000
- (242,000)
(246,000)
(182,000)
(212,000) -
- 430,000
430,000
710,000
640,000
- ■ (178,000)
(178,000)
(306,000)
(404,000) -
- 430,000
430,000
710,000
640,000
- ■ (110,000)
(110,000)
(186,000)
(24,000) -
- 430,000
430,000
710,000
640,000
- (102,000)
(102,000)
(454,000)
(280,000) -
- 430,000
430,000
710,000
640,000
- (50,000)
(62,000)
(446,000)
(516,000) -
- 430,000
430,000
710,000
640,000
- (11,000)
31,000
(15,000)
(30,000) -
- 430,000
430,000
710,000
640,000
- (18,000)
(31,000)
(105,000)
(52,000) -
- 3,010,000
3,010,000
4,970,000
4,480,000
- (711,000)
(698,000)
(1,694,000)
(1,518,000) -
ATLANTIC OBX, INC.
NUTRIENT MANAGEMENT PLAN FOR SLAS 27-20
SEPTAGE APPLICATIONS TO COASTAL BERMUDAGRASS AND RYE
A. General Information:
I. The Septage disposal site is located off of SR1146 (Swains Lane) in Barco, NC
2. The 22.1-acre site is divided into 4 fields. Field 1 contains approximately 4.3 acres. Field 2 contains approximately
4.3 acres. Field 3 contains approximately 7.1 acres. Field 4 contains approximately 6.4 acres. The attached copy of
the aerial photograph for the site shows field boundaries and identifications.
3. The dominant soil series on the site is Bojac (BoA) in Field 1, Altavista (AaA) in Field 2, Dragston (Ds) in Field 3,
and Bojac (BoA) in Field 4.
4. Sept -age will not be applied where the site is untrafficable (untrafficable is defined as soil that will allow a loaded
truck to leave a depression in sod greater than 3 inches in depth).
5. All nitrogen recommendations for forages will be 75% of the realistic yield expectation nitrogen rate should the
forage be grazed.
6. Septage storage shall be provided to account for the average volume of septage pumped per week, or an alternative
Plan, such as disposal at a waste treatment plant, should be in place.
B. Crops Being Grown and Approximate Planting Times:
1. All 4 fields have been established in Coastal Bermudagrass.
As a winter crop, the field will be overseeded annually with annual ryegrass or a small grain such as cereal rye or
wheat. The annual ryegrass will be seeded at a rate of 40 pounds per acre if broadcasted or 30 pounds per acre if
drilled. The small grain will be seeded 120 pounds per acre if broadcasted or 100 pound per acre if drilled. The
overseeding will take place during the months of September or October depending on weather conditions of the
given year.
2. If there is not an agronomically acceptable stand of bermudagrass (.e., ground covered with bermudagrass stolons)
on at least 85% of the surface area of the site, then bermudagrass will be sown in those areas in the following spring
unless the determination of poor stands is made prior to or at the time of planting for bermudagrass of the current
year. The bare areas should be lightly till and reseeded at the rate of 6-8 pounds per acre of Cheyenne or Wrangler
bermudagrass seed (i.e., 0.2 pounds of seed per 1,000 square feet).
C. Nitrogen (N) Needs for Crops Grown:
Crop Harvested for Ha
R.Y.E.'
Nitrogen Application Ratez
Lbs. N/Acre/Year
Hybrid Bermudagrass
overseeded with
5.4
Tons/Acre
49 lbs./Dry Ton
264
Rescuegrass
1. R.Y.E. = Realistic Yield Expectation. (Note: Although Annual Regrass is being used at this site with Hybrid
Bermudagrass, rather than Rescuegrass, this is the most similar R.Y.E. for the site)
2. Nitrogen Application Rate = Suggested nitrogen rate based on R.Y.E. The amount of nitrogen to be supplied is
estimated at 2.6 lbs./1,000 Gallons.
D. Annual Application Rate
MONTH
RATE GALLONS/ACRE
TOTAL GALLONS
January
5,000
110,500
February
5,000
110,500
March
10,000
221,000
April
10,000
221,000
may
10,000
221,000
June
10,000
221,000
ul
10,000
221,000
August
10,000
221,000
September
10,000
221,000
October
10,000
221,000
November
5,000
110,500
December
5,000
110,500
100,000
2,210,000
NOTE: Cumulative application rate is not to exceed 100,000 Gallons/Acre/Year
E. Application Method
The preceding information is based on septage being evenly applied over the entire site by a pumper truck with a splash
pan or a hose reel equipped with a spray irrigation gun.
F. Additional Fertility Requirements
For optimum nitrogen uptake, the concentrations of other nutrients such as phosphorus, potassium, magnesium, and
manganese must be sufficient as to not limit crop growth. Septage does not contain an adequate supply of all necessary
nutrients for crop growth. Therefore, supplemental addition of nutrients such as phosphorus, potassium, magnesium,
and manganese may be required. These additions should be based on soil test analyses. The soil samples should be taken
in late Fall or early Winter, so that the supplements can be added prior to the bermudagrass breaking dormancy, or the
small grain being planted. Do not follow the nitrogen recommendation from the soil test report. Use the nitrogen
amounts given in this nutrient management plan.
A separate soil sample should be collected for the buffer areas. Commercial fertilizer applications to the buffers are to be
based on the soil sample results.
G. Harvest of the Crops and Their Use
1. The bermudagrass will be cut for hay and baled whenever it reaches approximately 12 inches in height. The
bermudagrass should be cut and baled approximately 3 times throughout the growing season. The annual ryegrass or
small grain will be cut for hay and baled in April.
2. The winter overseed and bermudagrass will be harvested as hay and removed from site. If used for animal feed or
bedding, no septage applications can be made within 30 days of harvest. A 30-day waiting period must be observed
between the last application of septage and harvest for all material that is to be used as livestock feed or bedding.
H. Soil Erosion and Runoff Control Plan
Given that slopes on this site do not exceed five percent, a 50-foot buffer should suffice to prevent septage waste
from migrating off of the fields. More severe site conditions could require that sod erosion structures be installed
before septage can be applied.
Submitted by-. Date. �,z
9pilrator