HomeMy WebLinkAboutSLAS2719_APPLICATION_MODIFY_2022APPLICATION FOR A PERMIT TO OPERATE A SEPTAGE LAND APPLICATION SITE
North Carolina Department of Environmental Quality
Division of Waste Management — Solid Waste Section
1646 Mail Service Center, Raleigh, NC 27699-1646
Site and Operator information
1. Applicant Atlantic OBX, Inc.
Address PO Box 2560
Kitty Hawk, NC 27949
Phone 252-255-2030
2. Contact person for site operation (if different from applicant): Stephen Cummings
Title or position
Site Manager Phone 252-255-2030
Address
PO Box 2560
Kitty Hawk, NC 27949
3. Landowner
Same as Applicant
Address
4. Site Location:
County Currituck State Road Number 1146
Directions to site: U.S. Hwy 158 East to SR1146. Road dead ends into the farm.
5. Indicate whether request is: new renewal..-- X modification x
For a permit renewal or modification, provide the following information:
Existing site permit number: SLAS-27-19 permit expiration date: 411119
6. Number of acres meeting the requirements of the N.C. Septage Management Rules: 19.2 acres.
7. Substances other than septage or grease trap pumpings previously disposed of on the site:
(a) None x , or (b) Attach a list indicating other substances, the amounts discharged,
and the dates of discharge.
8. Attach written, notarized landowner authorization to operate a septage disposal site signed by the
landowner (if the permit applicant does not own the property). If a corporation owns the land
use a corporate landowner authorization form. if Limited Liability Company owns the land,
use a limited liability company landowner authorization form.
9. Attach site evaluation report, including aerial photograph and soil analysis with metals results,
unless the Division prepared the report.
10. Attach a vicinity map (county road map showing site location).
(aver)
il. Site Management Information:
1. The following information shall be included with the application form:
(a) Nutrient Management Plan
(b) Soil Erosion and Runoff Control Plan
2. Alternative plan for disposal (detention facility permit number or wastewater treatment plant
authorization): SQTF-27-19, SDTF-27-22, or Elizabeth City WWTP
3. Types of septage proposed to be discharged at the site (check all that apply):
(a) Domestic septage pumped from septic tanks x
(b) Grease trap pumpings x
(c) Portable toilet waste x
(d) Commercial 1 Industrial septage x
4. Proposed treatment method of each type of septage to be land applied (use additional paper to
explain If necessary): All septage, grease, and toilet waste will be stabilized with lime prior to
land application so that the pH will be >12.0 for at least 30 minutes for domestic septage and at least
2 hours for grease or grease/septage mixture.
5. Proposed method of applying septage to land, including septage distribution plan if required * {use
additional paper to explain if necessary): By driving a pumper truck equipped with spreader plates,
air activated valves through the field while evenly spreading material without creating pools at the end of
rows; also by use of hose reel continuously moving spray irrigation gun.
6. Demonstration from the appropriate state or federal government agency that the land application
site complies with the Endangered Species Law ** or if any part of the site specified is not
agricultural land (use additional paper to explain if necessary): since the site is agricultural, the
Endangered Species Law does not apply.
III. Certification
I hereby certify that:
1. The information provided on this application is true, complete, and correct to the best of my
knowledge.
2. 1 have read and understand the N.C. Septage Management Rules, and
3. 1 am aware of the otential consequences, including penalties and permit revocation, for failing
to ow all app bl le and the conditions of a Septage Land Application Site permit.
Sig not (" natuwe of company official required) Date
Bryan Lincoln
Print name
President
Title
Nate: This application will not be reviewed until all parts of the application are complete.
* Refer to Section .0837(e) of the N.C. Septage Management Rules.
'* Refer to Section .0837(g) of the N.C. Septage Management Rules.
8:Solid WasteWalseptagelformslSLAS-Application & Authorizatio n\S LAS Permit Application -.Ian 2016.doex
Rev 01-07-16
ATLANTIC OBX, INC.
NUTRIENT MANAGEMENT PLAN FOR SLAS 27-19
SEPTAGE APPLICATIONS TO COASTAL BERMUDAGRASS AND RYE
A. General Information:
1. The septage disposal site is located off of SR1146 (Swains Lane) in Barco, NC
2. The 19.2-acre site has been combined into 1 field. Field 1 contains approximately 19.2 acres. The attached copy of
the aerial photograph for the site shows field boundaries and identifications.
3. The dominant soil series on the site is Conetoe (CnA).
4. Septage will not be applied where the site is untrafficable (untrafficable is defined as soil that will allow a loaded
truck to leave a depression in sod greater than 3 inches in depth).
5. All nitrogen recommendations for forages will be 75% of the realistic yield expectation nitrogen rate should the
forage be grazed.
6. Septage storage shall be provided to account for the average volume of septage pumped per week, or an alternative
plan, such as disposal at a waste treatment plant, should be in place.
B. Crops Being Grown and Approximate Planting Times:
1. The fields has been established in Coastal Bermudagrass.
As a winter crop, the field will be overseeded annually with annual ryegrass or a small grain such as cereal rye or
wheat. The annual ryegrass will be seeded at a rate of 40 pounds per acre if broadcasted or 30 pounds per acre if
drilled. The small grain will be seeded 120 pounds per acre if broadcasted or 100 pound per acre if drilled. The
overseeding will take place during the months of September or October depending on weather conditions of the
given year.
2. If there is not an agronomically acceptable stand of bermudagrass (i.e., ground covered with bermudagrass stolons)
on at least 85% of the surface area of the site, then bermudagrass will be sown in those areas in the following spring
unless the determination of poor stands is made prior to or at the time of planting for bermudagrass of the current
year. The bare areas should be lightly till and reseeded at the rate of 6-8 pounds per acre of Cheyenne or Wrangler
bermudagrass seed (i.e., 0.2 pounds of seed per 1,000 square feet).
C. Nitrogen (N) Needs for Crops Grown:
Crop (Harvested for Hay)
R.Y.E.'
Nitrogen Application Ratez
Lbs. N/Acre/Year
Hybrid Bermudagrass
overseeded with
5'4
49 lbs./Dry Ton
264
Tons/Acre
Rescue ass
1. R.Y.E. = Realistic Yield Expectation. (Note: Although Annual Ryegrass is being used at this site with Hybrid
Bermudagrass, rather than Rescuegrass, this is the most similar R.Y.E. for the site)
2. Nitrogen Application Rate = Suggested nitrogen rate based on R.Y.E. The amount of nitrogen to be supplied is
estimated at 2.6 lbs./1,000 Gallons.
D. Annual Application Rate
MONTH
RATE (GALLONS/ACRE)
TOTAL GALLONS
January
5,000
96,000
February
5,000
96,000
March
10,000
192,000
April
10,000
192,000
May
10,000
192,000
June
10,000
192,000
July
10,000
192,000
August
10,000
192,000
September
10,000
192,000
October
10,000
192,000
November
5,000
96,000
December
5,000
96,000
100,000
1,920,000
NOTE: Cumulative application rate is not to exceed 100,000 Gallons/Acre/Year
E. Application Method
The preceding information is based on septage being evenly applied over the entire site by a pumper truck with a splash
pan or a hose reel equipped with a spray irrigation gun.
F. Additional Fertility Requirements
For optimum nitrogen uptake, the concentrations of other nutrients such as phosphorus, potassium, magnesium, and
manganese must be sufficient as to not limit crop growth. Septage does not contain an adequate supply of all necessary
nutrients for crop growth. Therefore, supplemental addition of nutrients such as phosphorus, potassium, magnesium,
and manganese may be required. These additions should be based on soil test analyses. The soil samples should be taken
in late Fall or early Winter, so that the supplements can be added prior to the bermudagrass breaking dormancy, or the
small grain being planted. Do not follow the nitrogen recommendation from the soil test report. Use the nitrogen
amounts given in this nutrient management plan.
A separate soil sample should be collected for the buffer areas. Commercial fertilizer applications to the buffers are to be
based on the soil sample results.
G. Harvest of the Crops and Their Use
1. The bermudagrass will be cut for hay and baled whenever it reaches approximately 12 inches in height. The
bermudagrass should be cut and baled approximately 3 times throughout the growing season. The annual ryegrass or
small grain will be cut for hay and baled in April.
2. The winter overseed and bermudagrass will be harvested as hay and removed from site. If used for animal feed or
bedding, no septage applications can be made within 30 days of harvest. A 30-day waiting period must be observed
between the last application of septage and harvest for all material that is to be used as livestock feed or bedding.
H. Soil Erosion and Runoff Control Plan
Given that slopes on this site do not exceed five percent, a 50-foot buffer should suffice to prevent septage waste
from migrating off of the fields. More severe site conditions could require that soil erosion structures be installed
before septage can be applied.
Submitted by: _�---A 22
Sit per r
or
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 4 27-19
Permitted Rate: 10,000 2
Acres: 9.3
04/05/2019
8-4
12,000
4,000
16,000 >12
Current Hydraulic Rate 1,720
Sum
12,000
4,000
16,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 6 27-19
Permitted Rate: 30,000 1
Acres: 9.9
06/27/2019
7-5
72,000
24,000
96,000 >12
O6/29/2019
7-5
72,000
24,000
96,000 >12
Current Hydraulic Rate 19,394
Sum
144,000
48,000
192,000
Permitted Rate: 30,000 2
Acres: 9.3
06/22/2019
7-5
72,000
24,000
96,000 >12
06/25/2019
7-5
72,000
24,000
96,000 >12
Current Hydraulic Rate 20,645
Sum
144,000
48,000
192,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field
Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2019 8 27-19
Permitted Rate: 20,000 1
Acres: 9.9
08/06/2019
8-6
60,000
20,000
80,000
>12
08/12/2019
8-12
22,500
7,500
30,000
>12
08/31/2019
8-6
60,000
20,000
80,000
>12
WARNING Current Hydraulic Rate 19,192
Sum
140,000
50,000
190,000
Permitted Rate: 20,000 2
Acres: 9.3
08/14/2019
8-10
11,250
3,750
15,000
>12
08/28/2019
8-6
60,000
20,000
80,000
>12
08/30/2019
8-6
60,000
20,000
80,000
>12
WARNING Current Hydraulic Rate 18,817
Sum
130,000
45,000
175,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2019 9 27-19
Permitted Rate: 20,000 1
Acres: 9.9
09/23/2019
8-12
18,000
6,000
24,000 >12
09/24/2019
8-6
54,000
18,000
72,000 >12
Current Hydraulic Rate 9,697
Sum
64,000
32,000
96,000
Permitted Rate: 20,000 2
Acres: 9.3
09/26/2019
8-12
27,000
9,000
36,000 >12
09/27/2019
8-6
54,000
18,000
72,000 >12
Current Hydraulic Rate 11,613
Sum
72,000
36,000
108,000
Monday, October 28, 2019 Page 1 of 1
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2020 4 27-19
Permitted Rate:10,000 1
Acres: 9.9
04/01 /2020
8-4
15,000
5,000
20,000 >12
04/02/2020
8-5
18,000
6,000
24,000 >12
04/08/2020
8-2
12,000
4,000
16,000 >12
04/09/2020
7-3
15,000
5,000
20,000 >12
Current Hydraulic Rate 8,081
Sum
60,000
20,000
80,000
Permitted Rate:10,000 2
Acres: 9.3
04/03/2020
8-5
18,000
6,000
24,000 >12
04/04/2020
8-5
18,000
6,000
24,000 >12
04/06/2020
8-3
15,000
5,000
20,000 >12
04/10/2020
8-2
12,000
4,000
16,000 >12
Current Hydraulic Rate 9,032
Sum
63,000
21,000
84,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH
2020 6 27-19
Permitted Rate: 30,000 1
Acres: 9.9
06/12/2020 8-6 54,000
06/17/2020 8-6 54,000
06/26/2020 8-6 54,000
Current Hydraulic Rate 21,818 Sum 162,000
Permitted Rate: 30,000 2
Acres: 9.3
06/15/2020 8-6 54,000
06/20/2020 8-4 36,000
06/23/2020 8-6 54,000
Current Hydraulic Rate 20,645 Sum 144,000
18,000
72,000 > 12
18,000
72,000 > 12
18,000
72,000 > 12
54,000
216,000
18,000
72,000 > 12
12,000
48,000 > 12
18,000
72,000 > 12
48,000
192,000
Thursday, December 31, 2020
Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 8 27-19
Permitted Rate: 20,000 1
Acres: 9.9
08/04/2020
8-5
54,000
18,000
72,000
>12
08/14/2020
8-4
36,000
12,000
48,000
>12
08/19/2020
8-5
54,000
18,000
72,000
>12
WARNING Current Hydraulic Rate 19,394
Sum
144,000
48,000
192,000
Permitted Rate: 20,000 2
Acres: 9.3
08/10/2020
8-3
24,000
8,000
32,000
>12
08/25/2020
8-5
54,000
18,000
72,000
>12
08/28/2020
8-5
54,000
18,000
72,000
>12
WARNING Current Hydraulic Rate 18,925
Sum
132,000
44,000
176,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 9 27-19
Permitted Rate: 20,000 1
Acres: 9.9
09/23/2020
8-2
18,000
6,000
24,000
>12
09/28/2020
8-5
54,000
18,000
72,000
>12
Current Hydraulic Rate 9,697
Sum
72,000
24,000
96,000
Permitted Rate: 20,000 2
Acres: 9.3
09/24/2020
8-4
36,000
12,000
48,000
>12
09/30/2020
8-5
54,000
18,000
72,000
>12
Current Hydraulic Rate 12,903
Sum
90,000
30,000
120,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 11 27-19
Permitted Rate:10,000 1
Acres: 9.9
11/02/2020
8-4
36,000
12,000
48,000
>12
11/05/2020
8-4
36,000
12,000
48,000
>12
WARNING Current Hydraulic Rate 9,697
Sum
72,000
24,000
96,000
Permitted Rate:10,000 2
Acres: 9.3
11/03/2020
8-4
36,000
12,000
48,000
>12
11/09/2020
8-4
30,000
10,000
40,000
>12
WARNING Current Hydraulic Rate 9,462
Sum
66,000
22,000
88,000
Thursday, December 31, 2020 Page 1 of 1
Year Month Permit # Field Date
Time
Septage Amount
Grease Amount Volume Applied
pH
2020 12 27-19
Permitted Rate:10,000 1
Acres: 9.9
12/07/2020
8-5
36,000
12,000
48,000
>12
12/10/2020
8-5
36,000
12,000
48,000
>12
WARNING Current Hydraulic Rate 9,697
Sum
72,000
24,000
96,000
Permitted Rate:10,000 2
Acres: 9.3
12/11/2020
8-5
36,000
12,000
48,000
>12
12/18/2020
8-5
30,000
10,000
40,000
>12
WARNING Current Hydraulic Rate 9,462
Sum
66,000
22,000
88,000
Thursday, December 31, 2020 Page 1 of 1
Permit # 27-19
MONTHLY SLAS REPORT BY PERMIT
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 4
1
04/02/21
7-4
10000
2000
12000
>12
04/07/21
7-4
18000
6000
24000
>12
Permitted Rate: 1000(
04/15/21
7-4
12000
4000
16000
>12
Acres:9.9
04/19/21
7-4
16000
4000
20000
>12
04/28/21
7-4
6000
2000
8000
>12
04/29/21
7-4
3000
1000
4000
>12
04/30/21
7-4
11000
3000
14000
>12
Current Hydraulic Rate
9899
SUM
76000
22000
98000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 6
1
06/01/21
7-5
15000
5000
20000
>12
06/02/21
7-5
20000
5000
25000
>12
06/03/21
7-5
18000
6000
24000
>12
06/07/21
7-5
20000
0
20000
>12
06/22/21
7-5
15000
3000
18000
>12
Permitted Rate: 30000
06/23/21
7-5
15000
5000
20000
>12
Acres:9.9
06/24/21
7-5
20000
0
20000
>12
06/25/21
7-5
27000
9000
36000
>12
06/28/21
7-5
24000
8000
32000
>12
06/29/21
7-5
30000
10000
40000
>12
06/30/21
7-5
30000
10000
40000
>12
Current Hydraulic Rate
SUM
234000
61000
295000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 8
1
08/03/21
7-5
6000
2000
8000
>12
08/05/21
7-5
18000
6000
24000
>12
08/09/21
7-5
18000
6000
24000
>12
Permitted Rate:
08/11/21
7-5
9000
3000
12000
>12
Acres:9.9
08/12/21
7-5
12000
4000
16000
>12
08/17/21
7-5
18000
6000
24000
>12
08/18/21
7-5
21000
7000
28000
>12
08/20/21
7-5
3000
1000
4000
>12
08/24/21
7-5
21000
7000
28000
>12
08/25/21
7-5
9000
3000
12000
>12
08/27/21
7-5
12000
4000
16000
>12
Current Hydraulic Rate
19798
SUM
147000
49000
196000
Permit # 27-19
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 9
1
09/01/21
7-5
12000
3000
15000
>12
09/02/21
7-5
12000
3000
15000
>12
09/03/21
7-5
10000
2000
12000
>12
Permitted Rate: 20000
09/07/21
7-5
13000
2000
15000
>12
Acres:9.9
09/08/21
7-5
12000
0
12000
>12
09/10/21
7-5
16000
4000
20000
>12
09/16/21
7-5
12000
3000
15000
>12
09/21/21
7-5
21000
7000
28000
>12
09/27/21
7-5
18000
6000
24000
>12
09/29/21
7-5
15000
5000
20000
>12
09/30/21
7-5
15000
5000
20000
>12
Current Hydraulic Rate
19798
SUM
156000
40000
196000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 11
1
11/01/21
7-4
14000
2000
8000
>12
11/02/21
7-4
4000
0
4000
>12
11/05/21
7-4
7000
1000
4000
>12
Permitted Rate: 10000
11/08/21
7-4
7000
1000
4000
>12
Acres:9.9
11/15/21
7-4
8000
0
8000
>12
11/17/21
7-4
10000
2000
12000
>12
11/26/21
7-4
15000
5000
20000
>12
11/30/21
7-4
15000
5000
20000
>12
Current Hydraulic Rate
10000
SUM
80000
16000
96000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 12
1
12/01/21
7-4
6000
2000
8000
>12
12/03/21
7-4
6000
2000
8000
>12
12/07/21
7-4
12000
4000
16000
>12
Permitted Rate: 10000
12/09/21
7-4
8000
0
8000
>12
Acres:9.9
12/13/21
7-4
9000
3000
12000
>12
12/16/21
7-4
6000
2000
8000
>12
12/20/21
7-4
12000
4000
16000
>12
12/21/21
7-4
3000
1000
4000
>12
12/29/21
7-4
3000
1000
4000
>12
12/30/21
7-4
9000
3000
12000
>12
Current Hydraulic Rate
9697
SUM
74000
22000
96000
Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH
2021 4 2 04/02/21 7-4 8000 0 8000 >12
Permit # 27-19
Permitted Rate: 10000
Acres:9.3
Current Hydraulic Rate
10000
04/07/21
04/15/21
04/19/21
04/27/21
04/28/21
04/29/21
04/30/21
7-4
7-4
7-4
7-4
7-4
7-4
7-4
SUM
18000
8000
12000
9000
7000
7000
10000
79000
6000
0
4000
3000
0
0
1000
14000
24000
8000
16000
12000
7000
7000
14000
93000
>12
>12
>12
>12
>12
>12
>12
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 6
2
06/01/21
7-5
12000
4000
16000
>12
06/02/21
7-5
12000
4000
16000
>12
06/03/21
7-5
15000
5000
20000
>12
06/07/21
7-5
21000
7000
28000
>12
06/08/21
7-5
12000
0
12000
>12
06/22/21
7-5
15000
5000
20000
>12
Permitted Rate: 30000
06/23/21
7-5
24000
0
24000
>12
Acres:9.3
06/24/21
7-5
12000
0
12000
>12
06/25/21
7-5
28000
4000
32000
>12
06/28/21
7-5
27000
9000
36000
>12
06/29/21
7-5
24000
0
24000
>12
06/30/21
7-5
24000
8000
32000
>12
Current Hydraulic Rate
29247
SUM
226000
46000
272000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 8
2
08/05/21
7-5
6000
2000
8000
>12
08/09/21
7-5
18000
6000
24000
>12
08/11/21
7-5
9000
3000
12000
>12
Permitted Rate: 20000
08/12/21
7-5
3000
1000
4000
>12
Acres:9.3
08/17/21
7-5
21000
7000
28000
>12
08/18/21
7-5
27000
9000
36000
>12
08/23/21
7-5
15000
5000
20000
>12
08/24/21
7-5
15000
5000
20000
>12
08/25/21
7-5
18000
6000
24000
>12
08/27/21
7-5
6000
2000
8000
>12
Current Hydraulic Rate
19785
SUM
138000
46000
184000
Year Month Field Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 9 2 09/01/21
7-5
12000
0
12000
>12
09/02/21
7-5
12000
0
12000
>12
09/03/21
7-5
12000
3000
15000
>12
Permit # 27-19
09/06/21
7-5
13000
3000
16000
>12
Permitted Rate: 20000 09/07/21
7-5
17000
3000
20000
>12
Acres:9.3 09/08/21
7-5
8000
0
8000
>12
09/13/21
7-5
15000
5000
20000
>12
09/17/21
7-5
21000
7000
28000
>12
09/21/21
7-5
16000
4000
20000
>12
09/27/21
7-5
12000
0
12000
>12
09/29/21
7-5
16000
4000
20000
>12
Current Hydraulic Rate 19677
SUM
154000
29000
183000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 11
2
11/01/21
7-4
8000
0
8000
>12
11/02/21
7-4
9000
3000
12000
>12
11/03/21
7-4
12000
4000
16000
>12
Permitted Rate: 10000
11/05/21
7-4
4000
0
4000
>12
Acres:9.3
11/08/21
7-4
4000
0
4000
>12
11/10/21
7-4
9000
3000
12000
>12
11/15/21
7-4
6000
2000
8000
>12
11/16/21
7-4
8000
0
8000
>12
11/30/21
7-4
15000
5000
20000
>12
Current Hydraulic Rate
9893
SUM
75000
17000
92000
Year Month
Field
Date
Time
Septage Amount
Grease Amount
Volume Applied
pH
2021 12
2
12/01/21
7-4
6000
2000
8000
>12
12/02/21
7-4
3000
1000
4000
>12
12/06/21
7-4
9000
3000
12000
>12
Permitted Rate:10000
12/07/21
7-4
9000
3000
12000
>12
Acres:9.3
12/09/21
7-4
8000
0
8000
>12
12/13/21
7-4
9000
3000
12000
>12
12/16/21
7-4
6000
2000
8000
>12
12/20/21
7-4
9000
3000
12000
>12
12/29/21
7-4
6000
2000
8000
>12
12/30/21
7-4
6000
2000
8000
>12
Current Hydraulic Rate
9893
SUM
71000
21000
92000
27-19
Loading Records
Field
1
Acres
9.9
Permitted Rate: 10,000
Current Hydraulic Loading Rate
9696.97
Date
Time
e Amount Grease Amount Volume Applied
Wednesday, April 6, 2022
7-4
24000
0
24000
>12
Friday, April 8, 2022
7-4
12000
4000
16000
>12
Monday, April 11, 2022
7-4
12000
0
12000
>12
Tuesday, April 12, 2022
7-4
18000
6000
24000
>12
Friday, April 15, 2022
7-4
15000
5000
20000
>12
Septagi
81000
Grease Monthly Total
15000 96000
Permitted Total
• • 111
Wednesday, June 1, 2022
7-5
8000
0
8000
>12
180000 44000 224000 297,000
Thursday, June 2, 2022
7-5
9000
3000
12000
>12
Friday, June 3, 2022
7-5
16000
4000
20000
>12
Permitted Rate: 30,000
Tuesday, June 7, 2022
7-5
10000
2000
12000
>12
Wednesday, June 8, 2022
7-5
16000
4000
20000
>12
Current Hydraulic Loading Rate
Friday, June 10, 2022
7-5
12000
0
12000
>12
22626.26
Tuesday, June 14, 2022
7-5
18000
6000
24000
>12
Wednesday, June 15, 2022
7-5
8000
0
8000
>12
Thursday, June 16, 2022
7-5
12000
4000
16000
>12
Friday, June 17, 2022
7-5
6000
2000
8000
>12
Tuesday, June 21, 2022
7-5
27000
9000
36000
>12
Thursday, June 23, 2022
7-5
12000
4000
16000
>12
Monday, June 27, 2022
7-5
19000
5000
24000
>12
Wednesday, June 29, 2022
7-5
7000
1000
8000
>12
Monday, August 1, 2022
7-5
12000
4000
16000
>12
149000 47000 196000 198,000
Wednesday, August 3, 2022
7-5
10000
2000
12000
>12
Thursday, August 4, 2022
7-5
12000
4000
16000
>12
Monday, August 8, 2022
7-5
6000
2000
8000
>12
Tuesday, August 9, 2022
7-5
12000
4000
16000
>12
Permitted Rate: 20,000
Wednesday, August 10, 2022
7-5
9000
3000
12000
>12
Friday, August 12, 2022
7-5
15000
5000
20000
>12
Current Hydraulic Loading Rate
Tuesday, August 16, 2022
7-5
12000
4000
16000
>12
19797.98
Wednesday, August 17, 2022
7-5
9000
3000
12000
>12
Friday, August 19, 2022
7-5
9000
3000
12000
>12
Monday, August 22, 2022
7-5
6000
2000
8000
>12
Tuesday, August 23, 2022
7-5
6000
2000
8000
>12
Wednesday, August 24, 2022
7-5
4000
0
4000
>12
Thursday, August 25, 2022
7-5
9000
3000
12000
>12
Monday, August 29, 2022
7-5
3000
1000
4000
>12
Tuesday, August 30, 2022
7-5
6000
2000
8000
>12
Wednesday, August 31, 2022
7-5
9000
3000
12000
>12
Thursday, September 1, 2022
7-5
18000
6000
24000
>12
102000 26000 128000 198,000
Friday, September 2, 2022
7-5
6000
2000
8000
>12
Wednesday, September 7, 2022
7-5
6000
2000
8000
>12
Monday, September 12, 2022
7-5
6000
2000
8000
>12
Permitted Rate: 20,000
Tuesday, September 13, 2022
7-5
4000
0
4000
>12
Thursday, September 15, 2022
7-5
6000
2000
8000
>12
Current Hydraulic Loading Rate
Friday, September 16, 2022
7-5
8000
0
8000
>12
12929.29
Monday, September 19, 2022
7-5
6000
2000
8000
>12
Wednesday, September 21, 2022
7-5
12000
0
12000
>12
Friday, September 23, 2022
7-5
9000
3000
12000
>12
Monday, September 26, 2022
7-5
9000
3000
12000
>12
Wednesday, September 28, 2022
7-5
3000
1000
4000
>12
Thursday, September 29, 2022
7-5
9000
3000
12000
>12
Tuesday, November 1, 2022
7-4
9000
3000
12000
>12
73000 23000 96000 99,000
Wednesday, November 2, 2022
7-4
12000
4000
16000
>12
Permitted Rate: 10,000
Monday, November 7, 2022
7-4
6000
2000
8000
>12
Wednesday, November 9, 2022
7-4
6000
2000
8000
>12
Current Hydraulic Loading Rate
Friday, November 11, 2022
7-4
9000
3000
12000
>12
9696.97
Thursday, November 17, 2022
7-4
9000
3000
12000
>12
Friday, November 18, 2022
7-4
13000
3000
16000
>12
Monday, November 28, 2022
7-4
3000
1000
4000
>12
Tuesday, November 29, 2022
7-4
6000
2000
8000
>12
Monday, December 5, 2022
7-4
15000
5000
20000
>12 75000 21000 96000 99,000
Wednesday, December 7, 2022
7-4
12000
4000
16000
>12
Permitted Rate: 10,000
Thursday, December 8, 2022
7-4
9000
3000
12000
>12
Tuesday, December 13, 2022
7-4
9000
3000
12000
>12
Current Hydraulic Loading Rate
Tuesday, December 20, 2022
7-4
4000
0
4000
>12
9696.97
Thursday, December 22, 2022
7-4
6000
2000
8000
>12
Tuesday, December 27, 2022
7-4
8000
0
8000
>12
Wednesday, December 28, 2022
7-4
6000
2000
8000
>12
Friday, December 30, 2022
7-4
6000
2000
8000
>12
Septage Grease Total
Yearly Totals: 660000 176000 836000
Permitted Total 990,000
Field Acres Date Time Septage Amount Grease Amount Volume Applied pH Septage Grease Monthly Total Permitted Total
2 9.3
Tuesday, April 5, 2022
7-4
24000
0
24000
>12
78000 14000 92000 93,000
Thursday, April 7, 2022
7-4
9000
3000
12000
>12
Permitted Rate: 10,000
Monday, April 11, 2022
7-4
12000
0
12000
>12
Wednesday, April 13, 2022
7-4
21000
7000
28000
>12
Current Hydraulic Loading Rate
Friday, April 15, 2022
7-4
12000
4000
16000
>12
9892.47
Wednesday, June 1, 2022
7-5
8000
0
8000
>12
145000 31000 176000 279,000
Thursday, June 2, 2022
7-5
6000
2000
8000
>12
Monday, June 6, 2022
7-5
10000
2000
12000
>12
Permitted Rate: 30,000
Tuesday, June 7, 2022
7-5
7000
1000
8000
>12
Thursday, June 9, 2022
7-5
27000
9000
36000
>12
Current Hydraulic Loading Rate
Monday, June 13, 2022
7-5
4000
0
4000
>12
18924.73
Tuesday, June 14, 2022
7-5
12000
4000
16000
>12
Wednesday, June 15, 2022
7-5
8000
0
8000
>12
Friday, June 17, 2022
7-5
16000
0
16000
>12
Tuesday, June 21, 2022
7-5
9000
3000
12000
>12
Thursday, June 23, 2022
7-5
9000
3000
12000
>12
Monday, June 27, 2022
7-5
19000
5000
24000
>12
Wednesday, June 29, 2022
7-5
10000
2000
12000
>12
Monday, August 1, 2022
7-5
12000
4000
16000
>12
138000 46000 184000 186,000
Wednesday, August 3, 2022
7-5
24000
8000
32000
>12
Permitted Rate: 20,000
Monday, August 8, 2022
7-5
18000
6000
24000
>12
Thursday, August 11, 2022
7-5
9000
3000
12000
>12
Current Hydraulic Loading Rate
Friday, August 12, 2022
7-5
6000
2000
8000
>12
19784.95
Tuesday, August 16, 2022
7-5
12000
4000
16000
>12
Wednesday, August 17, 2022
7-5
9000
3000
12000
>12
Friday, August 19, 2022
7-5
9000
3000
12000
>12
Monday, August 22, 2022
7-5
6000
2000
8000
>12
Tuesday, August 23, 2022
7-5
9000
3000
12000
>12
Thursday, August 25, 2022
7-5
12000
4000
16000
>12
Friday, August 26, 2022
7-5
6000
2000
8000
>12
Monday, August 29, 2022
7-5
6000
2000
8000
>12
Thursday, September 1, 2022
7-5
9000
3000
12000
>12
107000 25000 132000 186,000
Friday, September 2, 2022
7-5
6000
2000
8000
>12
Wednesday, September 7, 2022
7-5
8000
0
8000
>12
Monday, September 12, 2022
7-5
3000
1000
4000
>12
Permitted Rate: 20,000
Tuesday, September 13, 2022
7-5
10000
2000
12000
>12
Thursday, September 15, 2022
7-5
6000
2000
8000
>12
Current Hydraulic Loading Rate
Friday, September 16, 2022
7-5
4000
0
4000
>12
14193.55
Monday, September 19, 2022
7-5
9000
3000
12000
>12
Wednesday, September 21, 2022
7-5
12000
0
12000
>12
Friday, September 23, 2022
7-5
9000
3000
12000
>12
Monday, September 26, 2022
7-5
9000
3000
12000
>12
Thursday, September 29, 2022
7-5
9000
3000
12000
>12
Friday, September 30, 2022
7-5
13000
3000
16000
>12
Tuesday, November 1, 2022
7-4
6000
2000
8000
>12
70000 22000 92000 93,000
Wednesday, November 2, 2022
7-4
9000
3000
12000
>12
Permitted Rate: 10,000
Monday, November 7, 2022
7-4
9000
3000
12000
>12
Wednesday, November 9, 2022
7-4
6000
2000
8000
>12
Current Hydraulic Loading Rate
Friday, November 11, 2022
7-4
9000
3000
12000
>12
9892.47
Thursday, November 17, 2022
7-4
10000
2000
12000
>12
Friday, November 18, 2022
7-4
12000
4000
16000
>12
Monday, November 28, 2022
7-4
3000
1000
4000
>12
Tuesday, November 29, 2022
7-4
6000
2000
8000
>12
Monday, December 5, 2022
7-4
15000
5000
20000
>12
76000 16000 92000 93,000
Permitted Rate: 10,000
Current Hydraulic Loading Rate
9892.47
Wednesday, December 7, 2022
7-4
12000
4000
16000
>12
Thursday, December 8, 2022
7-4
9000
3000
12000
>12
Thursday, December 15, 2022
7-4
4000
0
4000
>12
Tuesday, December 20, 2022
7-4
4000
0
4000
>12
Thursday, December 22, 2022
7-4
6000
2000
8000
>12
Tuesday, December 27, 2022
7-4
12000
0
12000
>12
Wednesday, December 28, 2022
7-4
4000
0
4000
>12
Thursday, December 29, 2022
7-4
6000
2000
8000
>12
Friday, December 30, 2022
7-4
4000
0
4000
>12
Septage
Yearly Totals: 614000
Permitted Total
Grease Total
154000 768000
930,000
SLAS-27-19
19.2 acres @ 100,000 gal/ac/yr 1 1 1,920,000 gal/yr
Field 1 Field 2 Field Field 4 Field 5 Field 6 Site
ACRES 9.9 9.3
Max. Amount 990,000 930,000
Monthly Rate
None 0
Low 10,000
Medium 20,000
High 30,0001
19.2
0
0
0
0
1,920,000
SITE
SUMMARY
YEAR
Applied Amount
Permit Amount
Over / Under
2015
1,800,000
1,920,000
-120,000
2016
1,248,000
1,920,000
-672,000
2017
1,052,000
1,920,000
-868,000
2018
1,268,000
1,920,000
-652,000
2019
969,000
1,920,000
-951,000
2020
1,524,000
1,920,000
-396,000
2021
1,893,000
1,920,000
-27,000
2022
1,604,000
1,920,000
-316,000
Year: 2015
Septage Grease PTW
January
0
0 0
February
0
0 0
March
0
0 0
April
132,000
44,000 0
May
0
0 0
June
417,000
139,000 0
July
0
0 0
August
276,000
92,000 0
September
252,000
84,000 0
October
0
0 0
November
135,000
45,000 0
December
138,000
46,000 0
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
0
-
0
0
-
0
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
96,000
L
9,697
80,000
L
81602
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
280,000
H
28,283
276,000
H
29,677
H
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
192,000
M
19,394
176,000
M
18,925
M
#DIV/0!
168,000
M
16,970
168,000
M
18,065
M
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
96,000
L
9,697
84,000
L
9,032
-
#DIV/0!
96,000
L
9,697
88,000
L
9,462
L
#DIV/0!
TOTAL 1,350,000 450,000 0 928,000 872,000
PUMPED: 1,800,000 1 APPLIED: 1,800,0001 990,000 930,000
0
0
Year: 2016
Septage Grease PTW
January
0
0 0
February
0
0 0
March
0
0 0
April
120,000
40,000 0
May
0
0 0
June
36,000
12,000 0
July
0
0 0
August
270,000
90,000 0
September
243,000
81,000 0
October
0
0 0
November
135,000
45,000 0
December
132,000
44,000 0
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
0
-
0
0
-
0
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
80,000
L
8,081
80,000
L
81602
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
48,000
H
4,848
0
H
0
H
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
180,000
M
18,182
180,000
M
19,355
M
#DIV/0!
180,000
M
18,182
144,000
M
15,484
M
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
96,000
L
9,697
84,000
L
9,032
-
#DIV/0!
96,000
L
9,697
80,000
L
8,602
L
#DIV/0!
TOTAL 936,000 312,000 0 680,000 568,000 0
PUMPED: 1,248,000 1 APPLIED: 1,248,0001 990,000 930,000 0
Year: 2017
Septage Grease PTW
January
0
0 0
February
0
0 0
March
0
0 0
April
108,000
36,000 0
May
0
0 0
June
0
0 0
July
0
0 0
August
270,000
90,000 0
September
270,000
90,000 0
October
0
0 0
November
0
0 0
December
141,000
47,000 0
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
0
-
0
0
-
0
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
96,000
L
9,697
48,000
L
51161
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
H
0
0
H
0
H
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
192,000
M
19,394
168,000
M
18,065
M
#DIV/0!
192,000
M
19,394
168,000
M
18,065
M
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
L
0
0
L
0
-
#DIV/0!
96,000
L
9,697
92,000
L
9,892
L
#DIV/0!
TOTAL 789,000 263,000 0 576,000 476,000
PUMPED: 1,052,000 1 APPLIED: 1,052,0001 990,000 930,000
0
0
Year: 2018
Septage Grease PTW
January
0
0 0
February
0
0 0
March
0
0 0
April
132,000
44,000 0
May
0
0 0
June
414,000
138,000 0
July
0
0 0
August
72,000
24,000 0
September
72,000
24,000 0
October
0
0 0
November
126,000
42,000 0
December
135,000
45,000 0
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
0
-
0
0
-
0
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
96,000
L
9,697
80,000
L
8,602
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
288,000
H
29,091
264,000
H
28,387
H
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
48,000
M
4,848
48,000
M
5,161
M
#DIV/0!
48,000
M
4,848
48,000
M
5,161
M
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
84,000
L
8,485
84,000
L
9,032
-
#DIV/0!
96,000
L
9,697
84,000
L
9,032
L
#DIV/0!
TOTAL 951,000 317,000 0 660,000 608,000 0
PUMPED: 1,268,000 1 APPLIED: 1,268,000 990,000 930,000 0
Year: 2019
Septage Grease PTW
January
0
0 0
February
0
0 0
March
0
0 0
April
12,000
4,000 0
May
June
288,000
96,000
July
August
273,750
91,250
September
153,000
51,000
October
November
December
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
0
-
0
0
-
0
L
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
-
0
0
-
0
-
#DIV/0!
0
L
0
16,000
L
1,720
L
#DIV/0!
-
0
-
0
-
#DIV/0!
192,000
H
19,394
192,000
H
2O,645
H
#DIV/0!
-
0
-
0
-
#DIV/0!
190,000
M
19,192
175,000
M
18,817
M
#DIV/0!
96,000
M
9,697
108,000
M
11,613
M
#DIV/0!
-
0
-
0
-
#DIV/0!
L
0
L
0
-
#DIV/0!
L
0
L
0
L
#DIV/0!
TOTAL 726,750 242,250 0 478,000 491,000 0
PUMPED: 969,000 APPLIED: 969,000 990,000 930,000 0
Year:
2020
Septage Grease PTW
January
February
March
April
May
June
July
August
September
October
November
December
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
-
0
-
0
L
#DIV/01.
-
0
-
0
-
#DIV/0!
-
0
-
0
-
#DIV/0!
80,000
L
8,081
84,000
L
91032
L
#DIV/0!
-
0
-
0
-
#DIV/0!
216,000
H
21,818
192,000
H
2O,645
H
#DIV/0!
-
0
-
0
-
#DIV/0!
192,000
M
19,394
176,000
M
18,925
M
#DIV/0!
96,000
M
9,697
120,000
M
12,903
M
#DIV/0!
-
0
-
0
-
#DIV/0!
96,000
L
9,697
88,000
L
9,462
-
#DIV/0!
96,000
L
9,697
88,000
L
91462
L
#DIV/0!
TOTAL 0 0 0 776,000
PUMPED: 0 APPLIED: 1,524,0001 990,000
Septage Grease PTW
January
February
March
April
May
June
July
August
September
October
November
December
Year: 2021
748,000 0
930,000 0
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
-
0
-
0
L
#DIV/0!
-
0
-
0
-
#DIV/0!
-
0
-
0
-
#DIV/0!
98,000
L
9,899
93,000
L
10,000
L
#DIV/0!
-
0
-
0
-
#DIV/0!
295,000
H
29,798
272,000
H
29,247
H
#DIV/0!
-
0
-
0
-
#DIV/0!
196,000
M
19,798
184,000
M
19,785
M
#DIV/0!
196,000
M
19,798
183,000
M
19,677
M
#DIV/0!
-
0
-
0
-
#DIV/0!
96,000
L
9,697
92,000
L
9,892
-
#DIV/0!
96,000
L
9,697
92,000
L
9,892
L
#DIV/0!
TOTAL 0 0 0 977,000
PUMPED: 0 APPLIED: 1,893,0001 990,000
916,000 0
930,000 0
Year: 2022
Septage Grease PTW
January
February
March
April
159,000
29,000
May
June
325,000
75,000
July
August
287,000
93,000
September
209,000
51,000
October
November
143,000
45,000
December
151,000
37,000
Field 1
Field 2
Field
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
Applied
Rate
Applied Rate
(gal/ac)
-
0
-
0
L
#DIV/0!
-
0
-
0
-
#DIV/0!
-
0
-
0
-
#DIV/0!
96,000
L
9,697
92,000
L
91892
L
#DIV/0!
-
0
-
0
-
#DIV/0!
224,000
H
22,626
176,000
H
18,925
H
#DIV/0!
-
0
-
0
-
#DIV/0!
196,000
M
19,798
184,000
M
19,785
M
#DIV/0!
128,000
M
12,929
132,000
M
14,194
M
#DIV/0!
-
0
-
0
-
#DIV/0!
96,000
L
9,697
92,000
L
9,892
-
#DIV/0!
96,000
L
9,697
92,000
L
91892
L
#DIV/0!
TOTAL 1,274,000 330,000 0 836,000 768,000
PUMPED: 1,604,000 1 APPLIED: 1,604,000 990,000 930,000
0
0
Applied Amount
Permit Amount
Over / (Under) Permit Amount
Field 1
Field 2 Field Field 4 Field 5
Field 1
Field 2 Field Field 4 Field 5
Field 1
Field 2 Field Field 4 Field 5
Acres
9.9
9.3 0 0 0
9.9
9.3 0 0 0
9.9
9.3 0 0 0
2015
928,000
872,000 - -
990,000
930,000 -
(62,000)
(58,000) -
2016
680,000
568,000
990,000
930,000
(310,000)
(362,000)
2017
576,000
476,000
990,000
930,000
(414,000)
(454,000)
2018
660,000
608,000
990,000
930,000
(330,000)
(322,000)
2019
478,000
491,000
990,000
930,000
(512,000)
(439,000)
2020
776,000
748,000
990,000
930,000
(214,000)
(182,000)
2021
977,000
916,000
990,000
930,000
(13,000)
(14,000)
2022
836,000
768,000
990,000
930,000
(154,000)
(162,000)
Total
4,098,000
3,763,000
5,940,000
5,580,000
(2,009,000)
(1,993,000)
ATLANTIC OBX, INC.
NUTRIENT MANAGEMENT PLAN FOR SLAS 27-19
SEPTAGE APPLICATIONS TO COASTAL BERMUDAGRASS AND RYE
A. General Information:
I. The septage disposal site is located off of SR1146 (Swains Lane) in Barco, NC
2. The 19.2-acre site is divided into 2 fields. Field 1 contains approximately 9.9 acres. Field 2 contains approximately
9.3 acres. The attached copy of the aerial photograph for the site shows field boundaries and identifications.
3. The dominant soil series on the site is Conetoe (CrA).
4. Septage will not be applied where the site is untrafficable (untrafficable is defined as soil that will allow a loaded
truck to leave a depression in sod greater than 3 inches in depth).
5. All nitrogen recommendations for forages will be 75% of the realistic }field expectation nitrogen rate should the
forage be grazed.
6. Septage storage shall be provided to account for the average volume of septage pumped per week, or an alternative
plan, such as disposal at a waste treatment plant, should be in place.
B. Crops Being Grown and Approximate Planting Times:
1. The 2 fields have been established in Coastal Bermudagrass.
As a winter crop, the field will be overseeded annually with annual ryegrass or a small grain such as cereal rye or
wheat. The annual ryegrass will be seeded at a rate of 40 pounds per acre if broadcasted or 30 pounds per acre if
drilled. The small grain will be seeded 120 pounds per acre if broadcasted or 100 pound per acre if drilled. The
overseeding will take place during the months of September or October depending on weather conditions of the
given year.
2. If there is not an agronomically acceptable stand of bermudagrass (i.e., ground covered with bermudagrass stolons)
on at least 85% of the surface area of the site, then bermudagrass will be sown in those areas in the following spring
unless the determination of poor stands is made prior to or at the time of planting for bermudagrass of the current
year. The bare areas should be lightly till and reseeded at the rate of 6-8 pounds per acre of Cheyenne or Wrangler
bermudagrass seed (i.e., 0.2 pounds of seed per 1,000 square feet).
C. Nitrogen (N) Needs for Crops Grown:
Crop Harvested for Ha
R.Y.E?
Nitro en Application Rate2
Lbs. N/Acre/Year
Hybrid Bermudagrass
1
overseeded with
5.4
Tons/Acre
49 lbs./Dry Ton
2G4
Rescue rass
1. R.Y.E. = Realistic Yield Expectation. (Note: Although Annual Ryegrass is being used at this site with Hybrid
Bermudagrass, rather than Rescuegrass, this is the most similar R.Y.E. for the site)
2. Nitrogen Application Rate = Suggested nitrogen rate based on R.Y.E. The amount of nitrogen to be supplied is
estimated at 2.6 lbs./1,000 Gallons.
D. Annual Application Rate
MONTH
HATE(GALLONS/ACRE)
TOTAL GALLONS
January
5,000
96,000
February
5,000
96,000
March
10,000
192,000
April
10,000
192,000
May
10,000
192,000
June
10,000
192,000
July
10,000
192,000
August
10,000
192,000
September
10,000
192,000
October
10,000
192,000
November
5,000
96,000
December
5,000
96,000
100,000
1,920,000
NOTE: Cumulative application rate is not to exceed 100,000 Gallons/Acre/Year
E. Application Method
The preceding information is based on septage being evenly applied ovcr the entire site by a pumper truck with a splash
pan or a hose reel equipped with a spray irrigation gun.
F. Additional Fertility Requirements
For optimum nitrogen uptake, the concentrations of other nutrients such as phosphorus, potassium, magnesium, and
manganese must be sufficient as to not limit crop growth. Septage does not contain an adequate supply of all necessary
nutrients for crop growth. Therefore, supplemental addition of nutrients such as phosphorus, potassium, magnesium,
and manganese may be required. These additions should be based on soil test analyses. The soil samples should be taken
in late Fall or early Winter, so that the supplements can be added prior to the bermudagrass breaking dormancy, or the
small grain being planted. Do not follow the nitrogen recommendation from the soil test report. Use the nitrogen
amounts given in this nutrient management plan.
A separate soil sample should be collected for the buffer areas. Commercial fertilizer applications to the buffers are to be
based on the soil sample results.
G. Harvest of the Crops and Their Use
1. The bermudagrass will be cut for hay and baled whenever it reaches approximately 12 inches in height. The
bermudagrass should be cut and baled approximately 3 times throughout the growing season. The annual ryegrass or
small grain will be cut for hay and baled in April.
2. The winter overseed and bermudagrass will be harvested as hay and removed from site. If used for animal feed or
bedding, no septage applications can be made within 30 days of harvest. A 30-day waiting period must be observed
between the last application of septage and harvest for all material that is to be used as livestock feed or bedding.
H. Soil Erosion and Runoff Control Plan
Given that slopes on this site do not exceed five percent, a 50-foot buffer should suffice to prevent septage waste
from migrating off of the fields. More severe site conditions could require that soil erosion structures be installed
before septage can be applied.
SubmittedYDate: b3-�
G
e 0 exator