Loading...
HomeMy WebLinkAboutSLAS2719_APPLICATION_MODIFY_2022APPLICATION FOR A PERMIT TO OPERATE A SEPTAGE LAND APPLICATION SITE North Carolina Department of Environmental Quality Division of Waste Management — Solid Waste Section 1646 Mail Service Center, Raleigh, NC 27699-1646 Site and Operator information 1. Applicant Atlantic OBX, Inc. Address PO Box 2560 Kitty Hawk, NC 27949 Phone 252-255-2030 2. Contact person for site operation (if different from applicant): Stephen Cummings Title or position Site Manager Phone 252-255-2030 Address PO Box 2560 Kitty Hawk, NC 27949 3. Landowner Same as Applicant Address 4. Site Location: County Currituck State Road Number 1146 Directions to site: U.S. Hwy 158 East to SR1146. Road dead ends into the farm. 5. Indicate whether request is: new renewal..-- X modification x For a permit renewal or modification, provide the following information: Existing site permit number: SLAS-27-19 permit expiration date: 411119 6. Number of acres meeting the requirements of the N.C. Septage Management Rules: 19.2 acres. 7. Substances other than septage or grease trap pumpings previously disposed of on the site: (a) None x , or (b) Attach a list indicating other substances, the amounts discharged, and the dates of discharge. 8. Attach written, notarized landowner authorization to operate a septage disposal site signed by the landowner (if the permit applicant does not own the property). If a corporation owns the land use a corporate landowner authorization form. if Limited Liability Company owns the land, use a limited liability company landowner authorization form. 9. Attach site evaluation report, including aerial photograph and soil analysis with metals results, unless the Division prepared the report. 10. Attach a vicinity map (county road map showing site location). (aver) il. Site Management Information: 1. The following information shall be included with the application form: (a) Nutrient Management Plan (b) Soil Erosion and Runoff Control Plan 2. Alternative plan for disposal (detention facility permit number or wastewater treatment plant authorization): SQTF-27-19, SDTF-27-22, or Elizabeth City WWTP 3. Types of septage proposed to be discharged at the site (check all that apply): (a) Domestic septage pumped from septic tanks x (b) Grease trap pumpings x (c) Portable toilet waste x (d) Commercial 1 Industrial septage x 4. Proposed treatment method of each type of septage to be land applied (use additional paper to explain If necessary): All septage, grease, and toilet waste will be stabilized with lime prior to land application so that the pH will be >12.0 for at least 30 minutes for domestic septage and at least 2 hours for grease or grease/septage mixture. 5. Proposed method of applying septage to land, including septage distribution plan if required * {use additional paper to explain if necessary): By driving a pumper truck equipped with spreader plates, air activated valves through the field while evenly spreading material without creating pools at the end of rows; also by use of hose reel continuously moving spray irrigation gun. 6. Demonstration from the appropriate state or federal government agency that the land application site complies with the Endangered Species Law ** or if any part of the site specified is not agricultural land (use additional paper to explain if necessary): since the site is agricultural, the Endangered Species Law does not apply. III. Certification I hereby certify that: 1. The information provided on this application is true, complete, and correct to the best of my knowledge. 2. 1 have read and understand the N.C. Septage Management Rules, and 3. 1 am aware of the otential consequences, including penalties and permit revocation, for failing to ow all app bl le and the conditions of a Septage Land Application Site permit. Sig not (" natuwe of company official required) Date Bryan Lincoln Print name President Title Nate: This application will not be reviewed until all parts of the application are complete. * Refer to Section .0837(e) of the N.C. Septage Management Rules. '* Refer to Section .0837(g) of the N.C. Septage Management Rules. 8:Solid WasteWalseptagelformslSLAS-Application & Authorizatio n\S LAS Permit Application -.Ian 2016.doex Rev 01-07-16 ATLANTIC OBX, INC. NUTRIENT MANAGEMENT PLAN FOR SLAS 27-19 SEPTAGE APPLICATIONS TO COASTAL BERMUDAGRASS AND RYE A. General Information: 1. The septage disposal site is located off of SR1146 (Swains Lane) in Barco, NC 2. The 19.2-acre site has been combined into 1 field. Field 1 contains approximately 19.2 acres. The attached copy of the aerial photograph for the site shows field boundaries and identifications. 3. The dominant soil series on the site is Conetoe (CnA). 4. Septage will not be applied where the site is untrafficable (untrafficable is defined as soil that will allow a loaded truck to leave a depression in sod greater than 3 inches in depth). 5. All nitrogen recommendations for forages will be 75% of the realistic yield expectation nitrogen rate should the forage be grazed. 6. Septage storage shall be provided to account for the average volume of septage pumped per week, or an alternative plan, such as disposal at a waste treatment plant, should be in place. B. Crops Being Grown and Approximate Planting Times: 1. The fields has been established in Coastal Bermudagrass. As a winter crop, the field will be overseeded annually with annual ryegrass or a small grain such as cereal rye or wheat. The annual ryegrass will be seeded at a rate of 40 pounds per acre if broadcasted or 30 pounds per acre if drilled. The small grain will be seeded 120 pounds per acre if broadcasted or 100 pound per acre if drilled. The overseeding will take place during the months of September or October depending on weather conditions of the given year. 2. If there is not an agronomically acceptable stand of bermudagrass (i.e., ground covered with bermudagrass stolons) on at least 85% of the surface area of the site, then bermudagrass will be sown in those areas in the following spring unless the determination of poor stands is made prior to or at the time of planting for bermudagrass of the current year. The bare areas should be lightly till and reseeded at the rate of 6-8 pounds per acre of Cheyenne or Wrangler bermudagrass seed (i.e., 0.2 pounds of seed per 1,000 square feet). C. Nitrogen (N) Needs for Crops Grown: Crop (Harvested for Hay) R.Y.E.' Nitrogen Application Ratez Lbs. N/Acre/Year Hybrid Bermudagrass overseeded with 5'4 49 lbs./Dry Ton 264 Tons/Acre Rescue ass 1. R.Y.E. = Realistic Yield Expectation. (Note: Although Annual Ryegrass is being used at this site with Hybrid Bermudagrass, rather than Rescuegrass, this is the most similar R.Y.E. for the site) 2. Nitrogen Application Rate = Suggested nitrogen rate based on R.Y.E. The amount of nitrogen to be supplied is estimated at 2.6 lbs./1,000 Gallons. D. Annual Application Rate MONTH RATE (GALLONS/ACRE) TOTAL GALLONS January 5,000 96,000 February 5,000 96,000 March 10,000 192,000 April 10,000 192,000 May 10,000 192,000 June 10,000 192,000 July 10,000 192,000 August 10,000 192,000 September 10,000 192,000 October 10,000 192,000 November 5,000 96,000 December 5,000 96,000 100,000 1,920,000 NOTE: Cumulative application rate is not to exceed 100,000 Gallons/Acre/Year E. Application Method The preceding information is based on septage being evenly applied over the entire site by a pumper truck with a splash pan or a hose reel equipped with a spray irrigation gun. F. Additional Fertility Requirements For optimum nitrogen uptake, the concentrations of other nutrients such as phosphorus, potassium, magnesium, and manganese must be sufficient as to not limit crop growth. Septage does not contain an adequate supply of all necessary nutrients for crop growth. Therefore, supplemental addition of nutrients such as phosphorus, potassium, magnesium, and manganese may be required. These additions should be based on soil test analyses. The soil samples should be taken in late Fall or early Winter, so that the supplements can be added prior to the bermudagrass breaking dormancy, or the small grain being planted. Do not follow the nitrogen recommendation from the soil test report. Use the nitrogen amounts given in this nutrient management plan. A separate soil sample should be collected for the buffer areas. Commercial fertilizer applications to the buffers are to be based on the soil sample results. G. Harvest of the Crops and Their Use 1. The bermudagrass will be cut for hay and baled whenever it reaches approximately 12 inches in height. The bermudagrass should be cut and baled approximately 3 times throughout the growing season. The annual ryegrass or small grain will be cut for hay and baled in April. 2. The winter overseed and bermudagrass will be harvested as hay and removed from site. If used for animal feed or bedding, no septage applications can be made within 30 days of harvest. A 30-day waiting period must be observed between the last application of septage and harvest for all material that is to be used as livestock feed or bedding. H. Soil Erosion and Runoff Control Plan Given that slopes on this site do not exceed five percent, a 50-foot buffer should suffice to prevent septage waste from migrating off of the fields. More severe site conditions could require that soil erosion structures be installed before septage can be applied. Submitted by: _�---A 22 Sit per r or Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2019 4 27-19 Permitted Rate: 10,000 2 Acres: 9.3 04/05/2019 8-4 12,000 4,000 16,000 >12 Current Hydraulic Rate 1,720 Sum 12,000 4,000 16,000 Monday, October 28, 2019 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2019 6 27-19 Permitted Rate: 30,000 1 Acres: 9.9 06/27/2019 7-5 72,000 24,000 96,000 >12 O6/29/2019 7-5 72,000 24,000 96,000 >12 Current Hydraulic Rate 19,394 Sum 144,000 48,000 192,000 Permitted Rate: 30,000 2 Acres: 9.3 06/22/2019 7-5 72,000 24,000 96,000 >12 06/25/2019 7-5 72,000 24,000 96,000 >12 Current Hydraulic Rate 20,645 Sum 144,000 48,000 192,000 Monday, October 28, 2019 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2019 8 27-19 Permitted Rate: 20,000 1 Acres: 9.9 08/06/2019 8-6 60,000 20,000 80,000 >12 08/12/2019 8-12 22,500 7,500 30,000 >12 08/31/2019 8-6 60,000 20,000 80,000 >12 WARNING Current Hydraulic Rate 19,192 Sum 140,000 50,000 190,000 Permitted Rate: 20,000 2 Acres: 9.3 08/14/2019 8-10 11,250 3,750 15,000 >12 08/28/2019 8-6 60,000 20,000 80,000 >12 08/30/2019 8-6 60,000 20,000 80,000 >12 WARNING Current Hydraulic Rate 18,817 Sum 130,000 45,000 175,000 Monday, October 28, 2019 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2019 9 27-19 Permitted Rate: 20,000 1 Acres: 9.9 09/23/2019 8-12 18,000 6,000 24,000 >12 09/24/2019 8-6 54,000 18,000 72,000 >12 Current Hydraulic Rate 9,697 Sum 64,000 32,000 96,000 Permitted Rate: 20,000 2 Acres: 9.3 09/26/2019 8-12 27,000 9,000 36,000 >12 09/27/2019 8-6 54,000 18,000 72,000 >12 Current Hydraulic Rate 11,613 Sum 72,000 36,000 108,000 Monday, October 28, 2019 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2020 4 27-19 Permitted Rate:10,000 1 Acres: 9.9 04/01 /2020 8-4 15,000 5,000 20,000 >12 04/02/2020 8-5 18,000 6,000 24,000 >12 04/08/2020 8-2 12,000 4,000 16,000 >12 04/09/2020 7-3 15,000 5,000 20,000 >12 Current Hydraulic Rate 8,081 Sum 60,000 20,000 80,000 Permitted Rate:10,000 2 Acres: 9.3 04/03/2020 8-5 18,000 6,000 24,000 >12 04/04/2020 8-5 18,000 6,000 24,000 >12 04/06/2020 8-3 15,000 5,000 20,000 >12 04/10/2020 8-2 12,000 4,000 16,000 >12 Current Hydraulic Rate 9,032 Sum 63,000 21,000 84,000 Thursday, December 31, 2020 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2020 6 27-19 Permitted Rate: 30,000 1 Acres: 9.9 06/12/2020 8-6 54,000 06/17/2020 8-6 54,000 06/26/2020 8-6 54,000 Current Hydraulic Rate 21,818 Sum 162,000 Permitted Rate: 30,000 2 Acres: 9.3 06/15/2020 8-6 54,000 06/20/2020 8-4 36,000 06/23/2020 8-6 54,000 Current Hydraulic Rate 20,645 Sum 144,000 18,000 72,000 > 12 18,000 72,000 > 12 18,000 72,000 > 12 54,000 216,000 18,000 72,000 > 12 12,000 48,000 > 12 18,000 72,000 > 12 48,000 192,000 Thursday, December 31, 2020 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2020 8 27-19 Permitted Rate: 20,000 1 Acres: 9.9 08/04/2020 8-5 54,000 18,000 72,000 >12 08/14/2020 8-4 36,000 12,000 48,000 >12 08/19/2020 8-5 54,000 18,000 72,000 >12 WARNING Current Hydraulic Rate 19,394 Sum 144,000 48,000 192,000 Permitted Rate: 20,000 2 Acres: 9.3 08/10/2020 8-3 24,000 8,000 32,000 >12 08/25/2020 8-5 54,000 18,000 72,000 >12 08/28/2020 8-5 54,000 18,000 72,000 >12 WARNING Current Hydraulic Rate 18,925 Sum 132,000 44,000 176,000 Thursday, December 31, 2020 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2020 9 27-19 Permitted Rate: 20,000 1 Acres: 9.9 09/23/2020 8-2 18,000 6,000 24,000 >12 09/28/2020 8-5 54,000 18,000 72,000 >12 Current Hydraulic Rate 9,697 Sum 72,000 24,000 96,000 Permitted Rate: 20,000 2 Acres: 9.3 09/24/2020 8-4 36,000 12,000 48,000 >12 09/30/2020 8-5 54,000 18,000 72,000 >12 Current Hydraulic Rate 12,903 Sum 90,000 30,000 120,000 Thursday, December 31, 2020 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2020 11 27-19 Permitted Rate:10,000 1 Acres: 9.9 11/02/2020 8-4 36,000 12,000 48,000 >12 11/05/2020 8-4 36,000 12,000 48,000 >12 WARNING Current Hydraulic Rate 9,697 Sum 72,000 24,000 96,000 Permitted Rate:10,000 2 Acres: 9.3 11/03/2020 8-4 36,000 12,000 48,000 >12 11/09/2020 8-4 30,000 10,000 40,000 >12 WARNING Current Hydraulic Rate 9,462 Sum 66,000 22,000 88,000 Thursday, December 31, 2020 Page 1 of 1 Year Month Permit # Field Date Time Septage Amount Grease Amount Volume Applied pH 2020 12 27-19 Permitted Rate:10,000 1 Acres: 9.9 12/07/2020 8-5 36,000 12,000 48,000 >12 12/10/2020 8-5 36,000 12,000 48,000 >12 WARNING Current Hydraulic Rate 9,697 Sum 72,000 24,000 96,000 Permitted Rate:10,000 2 Acres: 9.3 12/11/2020 8-5 36,000 12,000 48,000 >12 12/18/2020 8-5 30,000 10,000 40,000 >12 WARNING Current Hydraulic Rate 9,462 Sum 66,000 22,000 88,000 Thursday, December 31, 2020 Page 1 of 1 Permit # 27-19 MONTHLY SLAS REPORT BY PERMIT Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 4 1 04/02/21 7-4 10000 2000 12000 >12 04/07/21 7-4 18000 6000 24000 >12 Permitted Rate: 1000( 04/15/21 7-4 12000 4000 16000 >12 Acres:9.9 04/19/21 7-4 16000 4000 20000 >12 04/28/21 7-4 6000 2000 8000 >12 04/29/21 7-4 3000 1000 4000 >12 04/30/21 7-4 11000 3000 14000 >12 Current Hydraulic Rate 9899 SUM 76000 22000 98000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 6 1 06/01/21 7-5 15000 5000 20000 >12 06/02/21 7-5 20000 5000 25000 >12 06/03/21 7-5 18000 6000 24000 >12 06/07/21 7-5 20000 0 20000 >12 06/22/21 7-5 15000 3000 18000 >12 Permitted Rate: 30000 06/23/21 7-5 15000 5000 20000 >12 Acres:9.9 06/24/21 7-5 20000 0 20000 >12 06/25/21 7-5 27000 9000 36000 >12 06/28/21 7-5 24000 8000 32000 >12 06/29/21 7-5 30000 10000 40000 >12 06/30/21 7-5 30000 10000 40000 >12 Current Hydraulic Rate SUM 234000 61000 295000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 8 1 08/03/21 7-5 6000 2000 8000 >12 08/05/21 7-5 18000 6000 24000 >12 08/09/21 7-5 18000 6000 24000 >12 Permitted Rate: 08/11/21 7-5 9000 3000 12000 >12 Acres:9.9 08/12/21 7-5 12000 4000 16000 >12 08/17/21 7-5 18000 6000 24000 >12 08/18/21 7-5 21000 7000 28000 >12 08/20/21 7-5 3000 1000 4000 >12 08/24/21 7-5 21000 7000 28000 >12 08/25/21 7-5 9000 3000 12000 >12 08/27/21 7-5 12000 4000 16000 >12 Current Hydraulic Rate 19798 SUM 147000 49000 196000 Permit # 27-19 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 9 1 09/01/21 7-5 12000 3000 15000 >12 09/02/21 7-5 12000 3000 15000 >12 09/03/21 7-5 10000 2000 12000 >12 Permitted Rate: 20000 09/07/21 7-5 13000 2000 15000 >12 Acres:9.9 09/08/21 7-5 12000 0 12000 >12 09/10/21 7-5 16000 4000 20000 >12 09/16/21 7-5 12000 3000 15000 >12 09/21/21 7-5 21000 7000 28000 >12 09/27/21 7-5 18000 6000 24000 >12 09/29/21 7-5 15000 5000 20000 >12 09/30/21 7-5 15000 5000 20000 >12 Current Hydraulic Rate 19798 SUM 156000 40000 196000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 11 1 11/01/21 7-4 14000 2000 8000 >12 11/02/21 7-4 4000 0 4000 >12 11/05/21 7-4 7000 1000 4000 >12 Permitted Rate: 10000 11/08/21 7-4 7000 1000 4000 >12 Acres:9.9 11/15/21 7-4 8000 0 8000 >12 11/17/21 7-4 10000 2000 12000 >12 11/26/21 7-4 15000 5000 20000 >12 11/30/21 7-4 15000 5000 20000 >12 Current Hydraulic Rate 10000 SUM 80000 16000 96000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 12 1 12/01/21 7-4 6000 2000 8000 >12 12/03/21 7-4 6000 2000 8000 >12 12/07/21 7-4 12000 4000 16000 >12 Permitted Rate: 10000 12/09/21 7-4 8000 0 8000 >12 Acres:9.9 12/13/21 7-4 9000 3000 12000 >12 12/16/21 7-4 6000 2000 8000 >12 12/20/21 7-4 12000 4000 16000 >12 12/21/21 7-4 3000 1000 4000 >12 12/29/21 7-4 3000 1000 4000 >12 12/30/21 7-4 9000 3000 12000 >12 Current Hydraulic Rate 9697 SUM 74000 22000 96000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 4 2 04/02/21 7-4 8000 0 8000 >12 Permit # 27-19 Permitted Rate: 10000 Acres:9.3 Current Hydraulic Rate 10000 04/07/21 04/15/21 04/19/21 04/27/21 04/28/21 04/29/21 04/30/21 7-4 7-4 7-4 7-4 7-4 7-4 7-4 SUM 18000 8000 12000 9000 7000 7000 10000 79000 6000 0 4000 3000 0 0 1000 14000 24000 8000 16000 12000 7000 7000 14000 93000 >12 >12 >12 >12 >12 >12 >12 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 6 2 06/01/21 7-5 12000 4000 16000 >12 06/02/21 7-5 12000 4000 16000 >12 06/03/21 7-5 15000 5000 20000 >12 06/07/21 7-5 21000 7000 28000 >12 06/08/21 7-5 12000 0 12000 >12 06/22/21 7-5 15000 5000 20000 >12 Permitted Rate: 30000 06/23/21 7-5 24000 0 24000 >12 Acres:9.3 06/24/21 7-5 12000 0 12000 >12 06/25/21 7-5 28000 4000 32000 >12 06/28/21 7-5 27000 9000 36000 >12 06/29/21 7-5 24000 0 24000 >12 06/30/21 7-5 24000 8000 32000 >12 Current Hydraulic Rate 29247 SUM 226000 46000 272000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 8 2 08/05/21 7-5 6000 2000 8000 >12 08/09/21 7-5 18000 6000 24000 >12 08/11/21 7-5 9000 3000 12000 >12 Permitted Rate: 20000 08/12/21 7-5 3000 1000 4000 >12 Acres:9.3 08/17/21 7-5 21000 7000 28000 >12 08/18/21 7-5 27000 9000 36000 >12 08/23/21 7-5 15000 5000 20000 >12 08/24/21 7-5 15000 5000 20000 >12 08/25/21 7-5 18000 6000 24000 >12 08/27/21 7-5 6000 2000 8000 >12 Current Hydraulic Rate 19785 SUM 138000 46000 184000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 9 2 09/01/21 7-5 12000 0 12000 >12 09/02/21 7-5 12000 0 12000 >12 09/03/21 7-5 12000 3000 15000 >12 Permit # 27-19 09/06/21 7-5 13000 3000 16000 >12 Permitted Rate: 20000 09/07/21 7-5 17000 3000 20000 >12 Acres:9.3 09/08/21 7-5 8000 0 8000 >12 09/13/21 7-5 15000 5000 20000 >12 09/17/21 7-5 21000 7000 28000 >12 09/21/21 7-5 16000 4000 20000 >12 09/27/21 7-5 12000 0 12000 >12 09/29/21 7-5 16000 4000 20000 >12 Current Hydraulic Rate 19677 SUM 154000 29000 183000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 11 2 11/01/21 7-4 8000 0 8000 >12 11/02/21 7-4 9000 3000 12000 >12 11/03/21 7-4 12000 4000 16000 >12 Permitted Rate: 10000 11/05/21 7-4 4000 0 4000 >12 Acres:9.3 11/08/21 7-4 4000 0 4000 >12 11/10/21 7-4 9000 3000 12000 >12 11/15/21 7-4 6000 2000 8000 >12 11/16/21 7-4 8000 0 8000 >12 11/30/21 7-4 15000 5000 20000 >12 Current Hydraulic Rate 9893 SUM 75000 17000 92000 Year Month Field Date Time Septage Amount Grease Amount Volume Applied pH 2021 12 2 12/01/21 7-4 6000 2000 8000 >12 12/02/21 7-4 3000 1000 4000 >12 12/06/21 7-4 9000 3000 12000 >12 Permitted Rate:10000 12/07/21 7-4 9000 3000 12000 >12 Acres:9.3 12/09/21 7-4 8000 0 8000 >12 12/13/21 7-4 9000 3000 12000 >12 12/16/21 7-4 6000 2000 8000 >12 12/20/21 7-4 9000 3000 12000 >12 12/29/21 7-4 6000 2000 8000 >12 12/30/21 7-4 6000 2000 8000 >12 Current Hydraulic Rate 9893 SUM 71000 21000 92000 27-19 Loading Records Field 1 Acres 9.9 Permitted Rate: 10,000 Current Hydraulic Loading Rate 9696.97 Date Time e Amount Grease Amount Volume Applied Wednesday, April 6, 2022 7-4 24000 0 24000 >12 Friday, April 8, 2022 7-4 12000 4000 16000 >12 Monday, April 11, 2022 7-4 12000 0 12000 >12 Tuesday, April 12, 2022 7-4 18000 6000 24000 >12 Friday, April 15, 2022 7-4 15000 5000 20000 >12 Septagi 81000 Grease Monthly Total 15000 96000 Permitted Total • • 111 Wednesday, June 1, 2022 7-5 8000 0 8000 >12 180000 44000 224000 297,000 Thursday, June 2, 2022 7-5 9000 3000 12000 >12 Friday, June 3, 2022 7-5 16000 4000 20000 >12 Permitted Rate: 30,000 Tuesday, June 7, 2022 7-5 10000 2000 12000 >12 Wednesday, June 8, 2022 7-5 16000 4000 20000 >12 Current Hydraulic Loading Rate Friday, June 10, 2022 7-5 12000 0 12000 >12 22626.26 Tuesday, June 14, 2022 7-5 18000 6000 24000 >12 Wednesday, June 15, 2022 7-5 8000 0 8000 >12 Thursday, June 16, 2022 7-5 12000 4000 16000 >12 Friday, June 17, 2022 7-5 6000 2000 8000 >12 Tuesday, June 21, 2022 7-5 27000 9000 36000 >12 Thursday, June 23, 2022 7-5 12000 4000 16000 >12 Monday, June 27, 2022 7-5 19000 5000 24000 >12 Wednesday, June 29, 2022 7-5 7000 1000 8000 >12 Monday, August 1, 2022 7-5 12000 4000 16000 >12 149000 47000 196000 198,000 Wednesday, August 3, 2022 7-5 10000 2000 12000 >12 Thursday, August 4, 2022 7-5 12000 4000 16000 >12 Monday, August 8, 2022 7-5 6000 2000 8000 >12 Tuesday, August 9, 2022 7-5 12000 4000 16000 >12 Permitted Rate: 20,000 Wednesday, August 10, 2022 7-5 9000 3000 12000 >12 Friday, August 12, 2022 7-5 15000 5000 20000 >12 Current Hydraulic Loading Rate Tuesday, August 16, 2022 7-5 12000 4000 16000 >12 19797.98 Wednesday, August 17, 2022 7-5 9000 3000 12000 >12 Friday, August 19, 2022 7-5 9000 3000 12000 >12 Monday, August 22, 2022 7-5 6000 2000 8000 >12 Tuesday, August 23, 2022 7-5 6000 2000 8000 >12 Wednesday, August 24, 2022 7-5 4000 0 4000 >12 Thursday, August 25, 2022 7-5 9000 3000 12000 >12 Monday, August 29, 2022 7-5 3000 1000 4000 >12 Tuesday, August 30, 2022 7-5 6000 2000 8000 >12 Wednesday, August 31, 2022 7-5 9000 3000 12000 >12 Thursday, September 1, 2022 7-5 18000 6000 24000 >12 102000 26000 128000 198,000 Friday, September 2, 2022 7-5 6000 2000 8000 >12 Wednesday, September 7, 2022 7-5 6000 2000 8000 >12 Monday, September 12, 2022 7-5 6000 2000 8000 >12 Permitted Rate: 20,000 Tuesday, September 13, 2022 7-5 4000 0 4000 >12 Thursday, September 15, 2022 7-5 6000 2000 8000 >12 Current Hydraulic Loading Rate Friday, September 16, 2022 7-5 8000 0 8000 >12 12929.29 Monday, September 19, 2022 7-5 6000 2000 8000 >12 Wednesday, September 21, 2022 7-5 12000 0 12000 >12 Friday, September 23, 2022 7-5 9000 3000 12000 >12 Monday, September 26, 2022 7-5 9000 3000 12000 >12 Wednesday, September 28, 2022 7-5 3000 1000 4000 >12 Thursday, September 29, 2022 7-5 9000 3000 12000 >12 Tuesday, November 1, 2022 7-4 9000 3000 12000 >12 73000 23000 96000 99,000 Wednesday, November 2, 2022 7-4 12000 4000 16000 >12 Permitted Rate: 10,000 Monday, November 7, 2022 7-4 6000 2000 8000 >12 Wednesday, November 9, 2022 7-4 6000 2000 8000 >12 Current Hydraulic Loading Rate Friday, November 11, 2022 7-4 9000 3000 12000 >12 9696.97 Thursday, November 17, 2022 7-4 9000 3000 12000 >12 Friday, November 18, 2022 7-4 13000 3000 16000 >12 Monday, November 28, 2022 7-4 3000 1000 4000 >12 Tuesday, November 29, 2022 7-4 6000 2000 8000 >12 Monday, December 5, 2022 7-4 15000 5000 20000 >12 75000 21000 96000 99,000 Wednesday, December 7, 2022 7-4 12000 4000 16000 >12 Permitted Rate: 10,000 Thursday, December 8, 2022 7-4 9000 3000 12000 >12 Tuesday, December 13, 2022 7-4 9000 3000 12000 >12 Current Hydraulic Loading Rate Tuesday, December 20, 2022 7-4 4000 0 4000 >12 9696.97 Thursday, December 22, 2022 7-4 6000 2000 8000 >12 Tuesday, December 27, 2022 7-4 8000 0 8000 >12 Wednesday, December 28, 2022 7-4 6000 2000 8000 >12 Friday, December 30, 2022 7-4 6000 2000 8000 >12 Septage Grease Total Yearly Totals: 660000 176000 836000 Permitted Total 990,000 Field Acres Date Time Septage Amount Grease Amount Volume Applied pH Septage Grease Monthly Total Permitted Total 2 9.3 Tuesday, April 5, 2022 7-4 24000 0 24000 >12 78000 14000 92000 93,000 Thursday, April 7, 2022 7-4 9000 3000 12000 >12 Permitted Rate: 10,000 Monday, April 11, 2022 7-4 12000 0 12000 >12 Wednesday, April 13, 2022 7-4 21000 7000 28000 >12 Current Hydraulic Loading Rate Friday, April 15, 2022 7-4 12000 4000 16000 >12 9892.47 Wednesday, June 1, 2022 7-5 8000 0 8000 >12 145000 31000 176000 279,000 Thursday, June 2, 2022 7-5 6000 2000 8000 >12 Monday, June 6, 2022 7-5 10000 2000 12000 >12 Permitted Rate: 30,000 Tuesday, June 7, 2022 7-5 7000 1000 8000 >12 Thursday, June 9, 2022 7-5 27000 9000 36000 >12 Current Hydraulic Loading Rate Monday, June 13, 2022 7-5 4000 0 4000 >12 18924.73 Tuesday, June 14, 2022 7-5 12000 4000 16000 >12 Wednesday, June 15, 2022 7-5 8000 0 8000 >12 Friday, June 17, 2022 7-5 16000 0 16000 >12 Tuesday, June 21, 2022 7-5 9000 3000 12000 >12 Thursday, June 23, 2022 7-5 9000 3000 12000 >12 Monday, June 27, 2022 7-5 19000 5000 24000 >12 Wednesday, June 29, 2022 7-5 10000 2000 12000 >12 Monday, August 1, 2022 7-5 12000 4000 16000 >12 138000 46000 184000 186,000 Wednesday, August 3, 2022 7-5 24000 8000 32000 >12 Permitted Rate: 20,000 Monday, August 8, 2022 7-5 18000 6000 24000 >12 Thursday, August 11, 2022 7-5 9000 3000 12000 >12 Current Hydraulic Loading Rate Friday, August 12, 2022 7-5 6000 2000 8000 >12 19784.95 Tuesday, August 16, 2022 7-5 12000 4000 16000 >12 Wednesday, August 17, 2022 7-5 9000 3000 12000 >12 Friday, August 19, 2022 7-5 9000 3000 12000 >12 Monday, August 22, 2022 7-5 6000 2000 8000 >12 Tuesday, August 23, 2022 7-5 9000 3000 12000 >12 Thursday, August 25, 2022 7-5 12000 4000 16000 >12 Friday, August 26, 2022 7-5 6000 2000 8000 >12 Monday, August 29, 2022 7-5 6000 2000 8000 >12 Thursday, September 1, 2022 7-5 9000 3000 12000 >12 107000 25000 132000 186,000 Friday, September 2, 2022 7-5 6000 2000 8000 >12 Wednesday, September 7, 2022 7-5 8000 0 8000 >12 Monday, September 12, 2022 7-5 3000 1000 4000 >12 Permitted Rate: 20,000 Tuesday, September 13, 2022 7-5 10000 2000 12000 >12 Thursday, September 15, 2022 7-5 6000 2000 8000 >12 Current Hydraulic Loading Rate Friday, September 16, 2022 7-5 4000 0 4000 >12 14193.55 Monday, September 19, 2022 7-5 9000 3000 12000 >12 Wednesday, September 21, 2022 7-5 12000 0 12000 >12 Friday, September 23, 2022 7-5 9000 3000 12000 >12 Monday, September 26, 2022 7-5 9000 3000 12000 >12 Thursday, September 29, 2022 7-5 9000 3000 12000 >12 Friday, September 30, 2022 7-5 13000 3000 16000 >12 Tuesday, November 1, 2022 7-4 6000 2000 8000 >12 70000 22000 92000 93,000 Wednesday, November 2, 2022 7-4 9000 3000 12000 >12 Permitted Rate: 10,000 Monday, November 7, 2022 7-4 9000 3000 12000 >12 Wednesday, November 9, 2022 7-4 6000 2000 8000 >12 Current Hydraulic Loading Rate Friday, November 11, 2022 7-4 9000 3000 12000 >12 9892.47 Thursday, November 17, 2022 7-4 10000 2000 12000 >12 Friday, November 18, 2022 7-4 12000 4000 16000 >12 Monday, November 28, 2022 7-4 3000 1000 4000 >12 Tuesday, November 29, 2022 7-4 6000 2000 8000 >12 Monday, December 5, 2022 7-4 15000 5000 20000 >12 76000 16000 92000 93,000 Permitted Rate: 10,000 Current Hydraulic Loading Rate 9892.47 Wednesday, December 7, 2022 7-4 12000 4000 16000 >12 Thursday, December 8, 2022 7-4 9000 3000 12000 >12 Thursday, December 15, 2022 7-4 4000 0 4000 >12 Tuesday, December 20, 2022 7-4 4000 0 4000 >12 Thursday, December 22, 2022 7-4 6000 2000 8000 >12 Tuesday, December 27, 2022 7-4 12000 0 12000 >12 Wednesday, December 28, 2022 7-4 4000 0 4000 >12 Thursday, December 29, 2022 7-4 6000 2000 8000 >12 Friday, December 30, 2022 7-4 4000 0 4000 >12 Septage Yearly Totals: 614000 Permitted Total Grease Total 154000 768000 930,000 SLAS-27-19 19.2 acres @ 100,000 gal/ac/yr 1 1 1,920,000 gal/yr Field 1 Field 2 Field Field 4 Field 5 Field 6 Site ACRES 9.9 9.3 Max. Amount 990,000 930,000 Monthly Rate None 0 Low 10,000 Medium 20,000 High 30,0001 19.2 0 0 0 0 1,920,000 SITE SUMMARY YEAR Applied Amount Permit Amount Over / Under 2015 1,800,000 1,920,000 -120,000 2016 1,248,000 1,920,000 -672,000 2017 1,052,000 1,920,000 -868,000 2018 1,268,000 1,920,000 -652,000 2019 969,000 1,920,000 -951,000 2020 1,524,000 1,920,000 -396,000 2021 1,893,000 1,920,000 -27,000 2022 1,604,000 1,920,000 -316,000 Year: 2015 Septage Grease PTW January 0 0 0 February 0 0 0 March 0 0 0 April 132,000 44,000 0 May 0 0 0 June 417,000 139,000 0 July 0 0 0 August 276,000 92,000 0 September 252,000 84,000 0 October 0 0 0 November 135,000 45,000 0 December 138,000 46,000 0 Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) 0 - 0 0 - 0 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 - 0 0 - 0 - #DIV/0! 96,000 L 9,697 80,000 L 81602 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 280,000 H 28,283 276,000 H 29,677 H #DIV/0! 0 - 0 0 - 0 - #DIV/0! 192,000 M 19,394 176,000 M 18,925 M #DIV/0! 168,000 M 16,970 168,000 M 18,065 M #DIV/0! 0 - 0 0 - 0 - #DIV/0! 96,000 L 9,697 84,000 L 9,032 - #DIV/0! 96,000 L 9,697 88,000 L 9,462 L #DIV/0! TOTAL 1,350,000 450,000 0 928,000 872,000 PUMPED: 1,800,000 1 APPLIED: 1,800,0001 990,000 930,000 0 0 Year: 2016 Septage Grease PTW January 0 0 0 February 0 0 0 March 0 0 0 April 120,000 40,000 0 May 0 0 0 June 36,000 12,000 0 July 0 0 0 August 270,000 90,000 0 September 243,000 81,000 0 October 0 0 0 November 135,000 45,000 0 December 132,000 44,000 0 Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) 0 - 0 0 - 0 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 - 0 0 - 0 - #DIV/0! 80,000 L 8,081 80,000 L 81602 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 48,000 H 4,848 0 H 0 H #DIV/0! 0 - 0 0 - 0 - #DIV/0! 180,000 M 18,182 180,000 M 19,355 M #DIV/0! 180,000 M 18,182 144,000 M 15,484 M #DIV/0! 0 - 0 0 - 0 - #DIV/0! 96,000 L 9,697 84,000 L 9,032 - #DIV/0! 96,000 L 9,697 80,000 L 8,602 L #DIV/0! TOTAL 936,000 312,000 0 680,000 568,000 0 PUMPED: 1,248,000 1 APPLIED: 1,248,0001 990,000 930,000 0 Year: 2017 Septage Grease PTW January 0 0 0 February 0 0 0 March 0 0 0 April 108,000 36,000 0 May 0 0 0 June 0 0 0 July 0 0 0 August 270,000 90,000 0 September 270,000 90,000 0 October 0 0 0 November 0 0 0 December 141,000 47,000 0 Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) 0 - 0 0 - 0 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 - 0 0 - 0 - #DIV/0! 96,000 L 9,697 48,000 L 51161 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 H 0 0 H 0 H #DIV/0! 0 - 0 0 - 0 - #DIV/0! 192,000 M 19,394 168,000 M 18,065 M #DIV/0! 192,000 M 19,394 168,000 M 18,065 M #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 L 0 0 L 0 - #DIV/0! 96,000 L 9,697 92,000 L 9,892 L #DIV/0! TOTAL 789,000 263,000 0 576,000 476,000 PUMPED: 1,052,000 1 APPLIED: 1,052,0001 990,000 930,000 0 0 Year: 2018 Septage Grease PTW January 0 0 0 February 0 0 0 March 0 0 0 April 132,000 44,000 0 May 0 0 0 June 414,000 138,000 0 July 0 0 0 August 72,000 24,000 0 September 72,000 24,000 0 October 0 0 0 November 126,000 42,000 0 December 135,000 45,000 0 Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) 0 - 0 0 - 0 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 - 0 0 - 0 - #DIV/0! 96,000 L 9,697 80,000 L 8,602 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 288,000 H 29,091 264,000 H 28,387 H #DIV/0! 0 - 0 0 - 0 - #DIV/0! 48,000 M 4,848 48,000 M 5,161 M #DIV/0! 48,000 M 4,848 48,000 M 5,161 M #DIV/0! 0 - 0 0 - 0 - #DIV/0! 84,000 L 8,485 84,000 L 9,032 - #DIV/0! 96,000 L 9,697 84,000 L 9,032 L #DIV/0! TOTAL 951,000 317,000 0 660,000 608,000 0 PUMPED: 1,268,000 1 APPLIED: 1,268,000 990,000 930,000 0 Year: 2019 Septage Grease PTW January 0 0 0 February 0 0 0 March 0 0 0 April 12,000 4,000 0 May June 288,000 96,000 July August 273,750 91,250 September 153,000 51,000 October November December Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) 0 - 0 0 - 0 L #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 - 0 0 - 0 - #DIV/0! 0 L 0 16,000 L 1,720 L #DIV/0! - 0 - 0 - #DIV/0! 192,000 H 19,394 192,000 H 2O,645 H #DIV/0! - 0 - 0 - #DIV/0! 190,000 M 19,192 175,000 M 18,817 M #DIV/0! 96,000 M 9,697 108,000 M 11,613 M #DIV/0! - 0 - 0 - #DIV/0! L 0 L 0 - #DIV/0! L 0 L 0 L #DIV/0! TOTAL 726,750 242,250 0 478,000 491,000 0 PUMPED: 969,000 APPLIED: 969,000 990,000 930,000 0 Year: 2020 Septage Grease PTW January February March April May June July August September October November December Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) - 0 - 0 L #DIV/01. - 0 - 0 - #DIV/0! - 0 - 0 - #DIV/0! 80,000 L 8,081 84,000 L 91032 L #DIV/0! - 0 - 0 - #DIV/0! 216,000 H 21,818 192,000 H 2O,645 H #DIV/0! - 0 - 0 - #DIV/0! 192,000 M 19,394 176,000 M 18,925 M #DIV/0! 96,000 M 9,697 120,000 M 12,903 M #DIV/0! - 0 - 0 - #DIV/0! 96,000 L 9,697 88,000 L 9,462 - #DIV/0! 96,000 L 9,697 88,000 L 91462 L #DIV/0! TOTAL 0 0 0 776,000 PUMPED: 0 APPLIED: 1,524,0001 990,000 Septage Grease PTW January February March April May June July August September October November December Year: 2021 748,000 0 930,000 0 Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) - 0 - 0 L #DIV/0! - 0 - 0 - #DIV/0! - 0 - 0 - #DIV/0! 98,000 L 9,899 93,000 L 10,000 L #DIV/0! - 0 - 0 - #DIV/0! 295,000 H 29,798 272,000 H 29,247 H #DIV/0! - 0 - 0 - #DIV/0! 196,000 M 19,798 184,000 M 19,785 M #DIV/0! 196,000 M 19,798 183,000 M 19,677 M #DIV/0! - 0 - 0 - #DIV/0! 96,000 L 9,697 92,000 L 9,892 - #DIV/0! 96,000 L 9,697 92,000 L 9,892 L #DIV/0! TOTAL 0 0 0 977,000 PUMPED: 0 APPLIED: 1,893,0001 990,000 916,000 0 930,000 0 Year: 2022 Septage Grease PTW January February March April 159,000 29,000 May June 325,000 75,000 July August 287,000 93,000 September 209,000 51,000 October November 143,000 45,000 December 151,000 37,000 Field 1 Field 2 Field Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) Applied Rate Applied Rate (gal/ac) - 0 - 0 L #DIV/0! - 0 - 0 - #DIV/0! - 0 - 0 - #DIV/0! 96,000 L 9,697 92,000 L 91892 L #DIV/0! - 0 - 0 - #DIV/0! 224,000 H 22,626 176,000 H 18,925 H #DIV/0! - 0 - 0 - #DIV/0! 196,000 M 19,798 184,000 M 19,785 M #DIV/0! 128,000 M 12,929 132,000 M 14,194 M #DIV/0! - 0 - 0 - #DIV/0! 96,000 L 9,697 92,000 L 9,892 - #DIV/0! 96,000 L 9,697 92,000 L 91892 L #DIV/0! TOTAL 1,274,000 330,000 0 836,000 768,000 PUMPED: 1,604,000 1 APPLIED: 1,604,000 990,000 930,000 0 0 Applied Amount Permit Amount Over / (Under) Permit Amount Field 1 Field 2 Field Field 4 Field 5 Field 1 Field 2 Field Field 4 Field 5 Field 1 Field 2 Field Field 4 Field 5 Acres 9.9 9.3 0 0 0 9.9 9.3 0 0 0 9.9 9.3 0 0 0 2015 928,000 872,000 - - 990,000 930,000 - (62,000) (58,000) - 2016 680,000 568,000 990,000 930,000 (310,000) (362,000) 2017 576,000 476,000 990,000 930,000 (414,000) (454,000) 2018 660,000 608,000 990,000 930,000 (330,000) (322,000) 2019 478,000 491,000 990,000 930,000 (512,000) (439,000) 2020 776,000 748,000 990,000 930,000 (214,000) (182,000) 2021 977,000 916,000 990,000 930,000 (13,000) (14,000) 2022 836,000 768,000 990,000 930,000 (154,000) (162,000) Total 4,098,000 3,763,000 5,940,000 5,580,000 (2,009,000) (1,993,000) ATLANTIC OBX, INC. NUTRIENT MANAGEMENT PLAN FOR SLAS 27-19 SEPTAGE APPLICATIONS TO COASTAL BERMUDAGRASS AND RYE A. General Information: I. The septage disposal site is located off of SR1146 (Swains Lane) in Barco, NC 2. The 19.2-acre site is divided into 2 fields. Field 1 contains approximately 9.9 acres. Field 2 contains approximately 9.3 acres. The attached copy of the aerial photograph for the site shows field boundaries and identifications. 3. The dominant soil series on the site is Conetoe (CrA). 4. Septage will not be applied where the site is untrafficable (untrafficable is defined as soil that will allow a loaded truck to leave a depression in sod greater than 3 inches in depth). 5. All nitrogen recommendations for forages will be 75% of the realistic }field expectation nitrogen rate should the forage be grazed. 6. Septage storage shall be provided to account for the average volume of septage pumped per week, or an alternative plan, such as disposal at a waste treatment plant, should be in place. B. Crops Being Grown and Approximate Planting Times: 1. The 2 fields have been established in Coastal Bermudagrass. As a winter crop, the field will be overseeded annually with annual ryegrass or a small grain such as cereal rye or wheat. The annual ryegrass will be seeded at a rate of 40 pounds per acre if broadcasted or 30 pounds per acre if drilled. The small grain will be seeded 120 pounds per acre if broadcasted or 100 pound per acre if drilled. The overseeding will take place during the months of September or October depending on weather conditions of the given year. 2. If there is not an agronomically acceptable stand of bermudagrass (i.e., ground covered with bermudagrass stolons) on at least 85% of the surface area of the site, then bermudagrass will be sown in those areas in the following spring unless the determination of poor stands is made prior to or at the time of planting for bermudagrass of the current year. The bare areas should be lightly till and reseeded at the rate of 6-8 pounds per acre of Cheyenne or Wrangler bermudagrass seed (i.e., 0.2 pounds of seed per 1,000 square feet). C. Nitrogen (N) Needs for Crops Grown: Crop Harvested for Ha R.Y.E? Nitro en Application Rate2 Lbs. N/Acre/Year Hybrid Bermudagrass 1 overseeded with 5.4 Tons/Acre 49 lbs./Dry Ton 2G4 Rescue rass 1. R.Y.E. = Realistic Yield Expectation. (Note: Although Annual Ryegrass is being used at this site with Hybrid Bermudagrass, rather than Rescuegrass, this is the most similar R.Y.E. for the site) 2. Nitrogen Application Rate = Suggested nitrogen rate based on R.Y.E. The amount of nitrogen to be supplied is estimated at 2.6 lbs./1,000 Gallons. D. Annual Application Rate MONTH HATE(GALLONS/ACRE) TOTAL GALLONS January 5,000 96,000 February 5,000 96,000 March 10,000 192,000 April 10,000 192,000 May 10,000 192,000 June 10,000 192,000 July 10,000 192,000 August 10,000 192,000 September 10,000 192,000 October 10,000 192,000 November 5,000 96,000 December 5,000 96,000 100,000 1,920,000 NOTE: Cumulative application rate is not to exceed 100,000 Gallons/Acre/Year E. Application Method The preceding information is based on septage being evenly applied ovcr the entire site by a pumper truck with a splash pan or a hose reel equipped with a spray irrigation gun. F. Additional Fertility Requirements For optimum nitrogen uptake, the concentrations of other nutrients such as phosphorus, potassium, magnesium, and manganese must be sufficient as to not limit crop growth. Septage does not contain an adequate supply of all necessary nutrients for crop growth. Therefore, supplemental addition of nutrients such as phosphorus, potassium, magnesium, and manganese may be required. These additions should be based on soil test analyses. The soil samples should be taken in late Fall or early Winter, so that the supplements can be added prior to the bermudagrass breaking dormancy, or the small grain being planted. Do not follow the nitrogen recommendation from the soil test report. Use the nitrogen amounts given in this nutrient management plan. A separate soil sample should be collected for the buffer areas. Commercial fertilizer applications to the buffers are to be based on the soil sample results. G. Harvest of the Crops and Their Use 1. The bermudagrass will be cut for hay and baled whenever it reaches approximately 12 inches in height. The bermudagrass should be cut and baled approximately 3 times throughout the growing season. The annual ryegrass or small grain will be cut for hay and baled in April. 2. The winter overseed and bermudagrass will be harvested as hay and removed from site. If used for animal feed or bedding, no septage applications can be made within 30 days of harvest. A 30-day waiting period must be observed between the last application of septage and harvest for all material that is to be used as livestock feed or bedding. H. Soil Erosion and Runoff Control Plan Given that slopes on this site do not exceed five percent, a 50-foot buffer should suffice to prevent septage waste from migrating off of the fields. More severe site conditions could require that soil erosion structures be installed before septage can be applied. SubmittedYDate: b3-� G e 0 exator