HomeMy WebLinkAboutWS-4084_13568_G_O_20150522_UST-10B
Page 1 of 11 5/22/2015 10:15 AM
North Carolina Department of Environment and Natural Resources
Underground Storage Tank NC
Printed: 5/22/2015 10:14 AM
Inspection Result: Failed Inspection Date: 5/7/2015
Partial Inspection: No Arrive and Depart Times: 8:55 AM-9:40 AM
Facility ID: 0-0-0000018476 Inspector Rose Pruitt
Facility Name SPRAY EXXON Insp. Type Compliance
Facility Address 103 BOONE RD
EDEN, NC 27288-4948
Rockingham County
Located facility, USTs onsite
Reason(s) Routine Compliance
Location 36.50413, -79.75893
Permit Exp. 3/31/2016
Facility Phone
CONTACTS
Contact Type Contact Information
Owner
since 3/10/2009
EDEN OIL CO INC , PO BOX 1375 REIDSVILLE, NC 27323-1375, Phone: (336) 349-
8228
Primary Operator
since 2/27/2003
REID TEAGUE, 103 BOONE RD EDEN, NC 27288-4948, Phone: (336) 623-6951
Trained: Yes (Pending CA), 10/19/2012, Training Type:Inspection
OWNERSHIP CHANGE
New Owner Change Date Basis Transfer of Ownership Form (UST-15) Submitted
EMERGENCY RESPONSE
Emergency Response Operator log (UST-26) onsite and completed with names of trained employees?
OTHER PARTICIPANTS
Name Organization
INSPECTOR COMMENTS
Type Date Comment
Corr. Prot. 5/7/2015 READING 0 AMPS AT INSPECTION, BREAKER TRIPPED. NO 60
DAY READINGS.
TANKS AND PIPING INFORMATION
Tanks Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
Tank ID 1 2 3 4A 5
TIMS Tank ID 1 2 3 4A 5
Facility ID: 0-0-0000018476
Page 2 of 11 5/22/2015 10:15 AM
Tanks Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
Is tank registered? Yes Yes Yes Yes Yes
Date tank installed 4/30/1985 4/30/1985 4/30/1985 7/30/1990 4/30/1985
Capacity of Tank in Gallons 8000 8000 8000 3000 1000
Tank / Product use Motor Fuel Motor Fuel Motor Fuel Motor Fuel Motor Fuel
Product stored in Tank Gasoline, Gas Mix Gasoline, Gas Mix Gasoline, Gas Mix Diesel Kerosene, Kero Mix
if gasoline, Detail Regular Mid-Grade Premium
If hazardous substance,
CAS# or description
If other, description
Tank Status Current Current Current Current Current
Tank closure report
submitted
Date tank last operated
Inches of product in Tank
Manifolded Tank No No No No No
Manifolded with tanks
New Tank System installed
in accordance with NC or
MI
Tank Construction Material
(DW required after 11/1/07)
Single Wall Steel Single Wall Steel Single Wall Steel Single Wall Steel Single Wall Steel
If other, description
Tank Manufacturer/Model BLANK BLANK BLANK BLANK BLANK
If other, describe
Tank material verified by UST-7A/B UST-7A/B UST-7A/B UST-7A/B UST-7A/B
Date Pipe Installed
Was UST Piping Installed
on or after 11/1/2007?
No No No No No
Piping Construction
Material (DW required after
11/1/07)
Single Wall FRP Single Wall FRP Single Wall FRP Single Wall Steel Single Wall Steel
If other, description
Pipe Manufacturer/Model BLANK BLANK BLANK BLANK BLANK
If other, describe
Pipe material verified by Petroleum Equip
Contractor
Petroleum Equip
Contractor
Petroleum Equip
Contractor
UST-7A/B UST-7A/B
If E-blend > 10% or
Biodiesel Blend > 20%;
Was UST-20 completed
and approved?
N/A N/A N/A N/A N/A
Facility ID: 0-0-0000018476
Page 3 of 11 5/22/2015 10:15 AM
CORROSION PROTECTION
Tank Corrosion Protection Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
DWM notified of current CP method Yes Yes Yes Yes Yes
Integrity assessment performed after 3/1/06 No No No No No
CP Method 1 Impressed Current Impressed Current Impressed Current Impressed Current Impressed Current
if other, Description
CP Installation Date 2/28/1998 2/28/1998 2/28/1998 2/28/1998 2/28/1998
CP Method 2
if other, Description
CP Installation Date
Flex Connector , Piping Extensions, and/or other
metal fittings Present
Elbow, Other Metal Elbow, Other Metal Elbow, Other Metal Unknown Unknown
Flex connector isolated from ground N/A N/A N/A N/A N/A
Source of verification of CP for Flex Connectors,
piping extensions and/or other metal fittings
Visual Visual Visual CP Test Results CP Test Results
if other, Description
Submersible pump (STP) is isolated from ground Yes Yes Yes N/A N/A
Piping extensions and/or other metal fittings are
isolated from ground
Yes Yes Yes Unknown Unknown
Flex connector, STP and/or other metal fittings
protected from corrosion
Yes Yes Yes Yes Yes
Corrosion protection method Impressed Current Impressed Current Impressed Current Impressed Current Impressed Current
Flex connector , Piping extensions, and/or other
metal fittings CP Installation Date
Dielectric Coating Installed (If tank installed after
12/22/88
N/A N/A N/A N/A N/A
Pipe Corrosion Protection Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
DWM notified of current CP method Yes Yes Yes Yes Yes
CP method FRP Piping FRP Piping FRP Piping Impressed Current Impressed Current
if other, Description
CP Installation Date 6/30/1990 6/30/1990 6/30/1990 6/30/1990 6/30/1990
Dielectric Coating Installed (If piping installed after 12/22/88 N/A N/A N/A N/A N/A
Dispenser Corrosion
Protection
Dispenser #1(1) Dispenser #2(2) Dispenser #3(3) Dispenser #4(4) Dispenser #5(5)
Flex Connector , Piping
Extensions, and/or other
metal fittings Present
Elbow, Flex Connector,
Other Metal
Elbow, Flex Connector,
Other Metal
Other Metal Elbow, Flex Connector,
Other Metal
Other Metal
Flex connector isolated from
ground
Yes Yes N/A Yes N/A
Source of verification of CP Visual Visual Visual Visual CP Test Results
Facility ID: 0-0-0000018476
Page 4 of 11 5/22/2015 10:15 AM
Dispenser Corrosion
Protection
Dispenser #1(1) Dispenser #2(2) Dispenser #3(3) Dispenser #4(4) Dispenser #5(5)
for Flex Connectors, piping
extensions and/or other
metal fittings
if other, Description
Piping extensions and/or
other metal fittings are
isolated from ground
Yes Yes Yes Yes No
Flex Connectors, Piping
extensions and/or other
metal fittings protected from
corrosion
N/A N/A Yes N/A Yes
Corrosion protection method Isolated Isolated Booted Isolated Impressed Current
Flex connector, Piping
extensions, and/or other
metal fittings CP Installation
Date
Source of Information for
verification of corrosion
protection for Riser pipe and
other metal piping
Visual Visual Visual Visual CP Test Results
if other, Description
CP Conclusions
CP Requirements Met? No
Issues Have CP system repaired & tested by CP Expert (MT1F/H & CL1 if TOS)
Impressed Current Systems System # 1
Applies to Tanks #1(1), #2(2), #3(3), #4(4A), #5(5)
Current voltage
Current Amperage 0.0000
Last three 60-day readings available No
System operating properly No
If no, select all that apply 0 volts and/or 0 amps, System disabled or not operational
If other, describe
Hour meter reading?
Hour meter installed No
CP Tests Test #1
Applies to Tanks #5(5), #4(4A), #3(3), #2(2), #1(1)
Facility ID: 0-0-0000018476
Page 5 of 11 5/22/2015 10:15 AM
CP Tests Test #1
Portion of System Tested Flex connectors, Piping, Tanks
Date of last Corrosion Protection Test 2/1/2013
As Left Voltage 44.8000
As Left Current 4.3000
CP Test Result Pass
Was CP Test done in accordance with National Standard? Yes
CP Tester Name ROBERT S HOWIE
Certificate Number 2702
Certifying Organization NACE
CP Testing Company Name ENVIRO CONSULTING
CP Testing Company Phone (704) 721-0101
UST7 form for last CP test submitted to DWM Yes
SPILL PREVENTION
Has DWM been notified of spill methods? Yes
Spill/Overfill Details Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
Is a drop tube present? Yes Yes Yes Yes Yes
Type of Stage I vapor recovery? Dual Point Dual Point Dual Point Not Required Not Required
Local Fill Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
Does Tank have a Remote Fill? No No No No No
Spill Protection Catchment Basin Catchment Basin Catchment Basin Catchment Basin Catchment Basin
Is spill prevention equipment provided and verified? Yes Yes Yes Yes Yes
Manufacturer/Model
If other, describe
Spill bucket is double-walled? (If installed after 11/1/07) N/A N/A N/A N/A N/A
Spill bucket is isolated or made of non-corroding materials?
(If installed after 11/1/07)
N/A N/A N/A N/A N/A
Date spill prevention provided 6/30/1990 6/30/1990 6/30/1990 6/30/1990 6/30/1990
Is spill prevention operating properly? Yes Yes Yes Yes Yes
If No, select all that apply
If other, describe
OVERFILL PREVENTION
Has DWM been notified of overfill methods? Yes
Overfill Control Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
Is overfill prevention
equipment provided and
verified?
Yes Yes Yes Yes Yes
Facility ID: 0-0-0000018476
Page 6 of 11 5/22/2015 10:15 AM
Overfill Control Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
Date overfill control
provided
6/30/1990 6/30/1990 6/30/1990 6/30/1990 6/30/1990
Type of overfill equipment Ball Float Valve Ball Float Valve Ball Float Valve Auto Shutoff Device Auto Shutoff Device
Source of information for
overfill control verification
Installer certification letter Installer certification letter Installer certification letter Visual observation Visual observation
If other, describe
Is overfill control operating
properly?
Yes Yes Yes Yes Yes
If No, select all that apply
If other, describe
Annual overfill check
date(If installed after
11/1/07) (UST-22A)
Annual overfill check
results(UST-22A)
Dispenser Sumps Dispenser #1(1) Dispenser #2(2) Dispenser #3(3) Dispenser #4(4) Dispenser #5(5)
Are containment sumps present? Yes Yes No Yes No
Installation Date
Sump Manufacturer
If Other (Specify)
Sump Construction Type
Sump Construction Material
If Other (Specify)
Are containment sumps monitored? No No No
Is monitoring required per 2N .0900? No No No No No
Piping components and/or STP were installed/replaced on or
after 11/1/07?
No No No No No
Are spills or small weeps evident in sumps? No No No No No
Are single wall piping components located in containment sump?
(If installed after 11/1/07)
Other Sumps Sump#1(1) Sump#2(2) Sump#3(3)
Are containment sumps present? No No No
Installation Date
Sump Manufacturer
If Other (Specify)
Sump Construction Type
Sump Construction Material
If Other (Specify)
Are containment sumps monitored?
Facility ID: 0-0-0000018476
Page 7 of 11 5/22/2015 10:15 AM
Other Sumps Sump#1(1) Sump#2(2) Sump#3(3)
Is monitoring required per 2N .0900? No No No
Piping components and/or STP were installed/replaced on or after 11/1/07? No No No
Are spills or small weeps evident in sumps? No No No
Are single wall piping components located in containment sump? (If installed after 11/1/07)
SITING AND SECONDARY CONTAINMENT
Siting And Sec.Containment-General Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
UST system upgraded with corrosion protection, spill and overfill before 1/1/91? No No No No No
UST system and/or piping are located within siting and secondary containment areas? No No No No No
LEAK DETECTION
General Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
DWM notified of leak
detection method?
Yes Yes Yes Yes Yes
Piping type Pressurized System Pressurized System Pressurized System European Suction European Suction
Suction Check Type Dispenser Dispenser
Type LLD present. MLLD MLLD MLLD Not Required Not Required
Tank – Primary leak
detection method
Automatic Tank Gauging Automatic Tank Gauging Automatic Tank Gauging Automatic Tank Gauging Automatic Tank Gauging
Tank - if other, specify
Tank - Primary LD install
date
Tank – Secondary leak
detection method
Tank - if other, specify
Piping - Primary leak
detection method
Line Tightness Testing
(LTT)
Line Tightness Testing
(LTT)
Line Tightness Testing
(LTT)
Exempt (European
Style)
Exempt (European
Style)
Piping - if other, specify
Piping - Primary LD
install date
Piping - Secondary leak
detection method
Piping - if other, specify
PIPING LEAK DETECTION
Pressurized Piping Tank #1(1) Tank #2(2) Tank #3(3)
Last MLLD/ELLD Test Date 4/29/2015 4/29/2015 4/29/2015
MLLD/ELLD Test Result Pass Pass Pass
Facility ID: 0-0-0000018476
Page 8 of 11 5/22/2015 10:15 AM
Pressurized Piping Tank #1(1) Tank #2(2) Tank #3(3)
Last LTT Test Date 4/29/2015 4/29/2015 4/29/2015
LTT Test Result Pass Pass Pass
Does test result indicatesuspected release? No No No
Number of MLLD/ELLD Types 1 1 1
MLLD/ELLD Equipment Tank #1(1) LLD #1 Tank #2(2) LLD #1 Tank #3(3) LLD #1
MLLD/ELLD Manufacturer/Model Red Jacket: FX1V Red Jacket: FX1V Red Jacket: FX1V
If other, describe
MLLD/ELLD Third Party Certified? Yes Yes Yes
MLLD/ELLD Testers MLLD/ELLD Tester #1
MLLD/ELLD Tester Name BOBBY DUNCAN
MLLD/ELLD Testing Company Name PTS
MLLD/ELLD Testing Company Phone Number (704) 892-8600
Pressurized Piping LTT LTT #1
LTT Manufacturer/Method Hasstech: AcuRite
If other, describe
LTT Third Party Certified? Yes
Pressurized Piping LTT Tester LTT Tester #1
LTT Tester Name BOBBY DUNCAN
LTT Testing Company Name PTS
LTT Testing Company Phone Number
European Suction Tank #4(4A) Tank #5(5)
Requirements for European suction piping verified? Yes Yes
Source of information for European Suction verification. Installer Certification Letter Installer Certification Letter
If other, specify
AUTOMATIC TANK GAUGE
ATG Systems ATG #1
ATG Manufacturer/Model V-R: TLS-350 CSLD
If other, describe
ATG Third Party Certified? Yes
Facility ID: 0-0-0000018476
Page 9 of 11 5/22/2015 10:15 AM
ATG Systems ATG #1
Is ATG console operational? Yes
Tanks #1(1), #2(2), #3(3), #4(4A), #5(5)
ATG Monthly LD Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
2015 May Pass Pass Pass Pass Pass
2015 Apr Pass Pass Pass Pass Pass
2015 Mar Pass Pass Pass Pass Pass
2015 Feb Pass Pass Pass Pass Pass
2015 Jan Pass Pass Pass Pass Pass
2014 Dec Pass Pass Pass Pass Pass
2014 Nov Pass Pass Pass Pass Pass
2014 Oct Pass Pass Pass Pass Pass
2014 Sep Pass Pass Pass Pass Pass
2014 Aug Pass Pass Pass Pass Pass
2014 Jul Pass Pass Pass Pass Pass
2014 Jun Pass Pass Pass Pass Pass
ATG Conclusions
Leak Detection Requirements Met? Yes
Do the results indicate a suspected release?
Issues
TRANSPORTER/FUEL DELIVERY INFORMATION
Delivery Information Tank #1(1) Tank #2(2) Tank #3(3) Tank #4(4A) Tank #5(5)
All deliveries made to permitted tanks Yes Yes Yes Yes Yes
Facility ID: 0-0-0000018476
Page 10 of 11 5/22/2015 10:15 AM
SITE DIAGRAM
Facility ID: 0-0-0000018476
Page 11 of 11 5/22/2015 10:15 AM