Plate 1: Installation of vapor barrier on retaining wall. December 5, 2022.
Plate 2: Retaining wall with drainage matting installed over vapor barrier. December 12, 2022
Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina
Project Number 221862.30
Photos Taken: December 2022 - January 2023
2748 Interstate Street, Suite A • Charlotte, North Carolina 28208
o: 704.837.7174 • www.geohydro.com
Plate 3: View of the elevator pit vapor barrier installation in progress. December 12, 2022.
Plate 4: View of the elevator pit with poured concrete. December 13, 2022.
Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina
Project Number 221862.30
Photos Taken: December 2022 - January 2023
2748 Interstate Street, Suite A • Charlotte, North Carolina 28208
o: 704.837.7174 • www.geohydro.com
Plate 5: View of the lower level vapor collection piping and exhaust vent stubs. January 17,
2023.
Plate 6: View of the lower level vapor collection piping and exhaust vent stubs. January 17,
2023.
Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina
Project Number 221862.30
Photos Taken: December 2022 - January 2023
2748 Interstate Street, Suite A • Charlotte, North Carolina 28208
o: 704.837.7174 • www.geohydro.com
Plate 7: View of the lower level vapor barrier installation January 20, 2023.
Plate 8: View of the lower level vapor barrier installation January 20, 2023.
Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina
Project Number 221862.30
Photos Taken: December 2022 - January 2023
2748 Interstate Street, Suite A • Charlotte, North Carolina 28208
o: 704.837.7174 • www.geohydro.com
Plate 9: View lower level smoke testing. January 21, 2023.
Plate 10: View of the lower level prior to concrete slab pouring. January 23, 2023.
Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina
Project Number 221862.30
Photos Taken: December 2022 - January 2023
2748 Interstate Street, Suite A • Charlotte, North Carolina 28208
o: 704.837.7174 • www.geohydro.com
Plate 11: View of the lower level concrete slab pouring. January 23, 2023.
Plate 12: View of the lower level poured slab. January 23, 2023.