Loading...
HomeMy WebLinkAbout25071_Patterson Ave_VIMS Installation Draft Photos_20230402Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina Project Number 221862.30 Photos Taken: December 2022 - January 2023 2748 Interstate Street, Suite A • Charlotte, North Carolina 28208 o: 704.837.7174 • www.geohydro.com Plate 1: Installation of vapor barrier on retaining wall. December 5, 2022. Plate 2: Retaining wall with drainage matting installed over vapor barrier. December 12, 2022 Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina Project Number 221862.30 Photos Taken: December 2022 - January 2023 2748 Interstate Street, Suite A • Charlotte, North Carolina 28208 o: 704.837.7174 • www.geohydro.com Plate 3: View of the elevator pit vapor barrier installation in progress. December 12, 2022. Plate 4: View of the elevator pit with poured concrete. December 13, 2022. Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina Project Number 221862.30 Photos Taken: December 2022 - January 2023 2748 Interstate Street, Suite A • Charlotte, North Carolina 28208 o: 704.837.7174 • www.geohydro.com Plate 5: View of the lower level vapor collection piping and exhaust vent stubs. January 17, 2023. Plate 6: View of the lower level vapor collection piping and exhaust vent stubs. January 17, 2023. Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina Project Number 221862.30 Photos Taken: December 2022 - January 2023 2748 Interstate Street, Suite A • Charlotte, North Carolina 28208 o: 704.837.7174 • www.geohydro.com Plate 7: View of the lower level vapor barrier installation January 20, 2023. Plate 8: View of the lower level vapor barrier installation January 20, 2023. Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina Project Number 221862.30 Photos Taken: December 2022 - January 2023 2748 Interstate Street, Suite A • Charlotte, North Carolina 28208 o: 704.837.7174 • www.geohydro.com Plate 9: View lower level smoke testing. January 21, 2023. Plate 10: View of the lower level prior to concrete slab pouring. January 23, 2023. Patterson Ave/ Two Cities Church Brownfields Site Winston Salem, North Carolina Project Number 221862.30 Photos Taken: December 2022 - January 2023 2748 Interstate Street, Suite A • Charlotte, North Carolina 28208 o: 704.837.7174 • www.geohydro.com Plate 11: View of the lower level concrete slab pouring. January 23, 2023. Plate 12: View of the lower level poured slab. January 23, 2023.