HomeMy WebLinkAboutRA-28474_47726_I_UST-10B_20210708Page 1 of 8 7/13/2021 7:46 AM
North Carolina
Department of Environmental Quality
Underground Storage Tank
UST-10BPrinted:7/13/2021 7:46 AM
Inspection Result:Failed Inspection Date:7/8/2021
Partial Inspection:No Arrive and Depart Times:11:45 AM-1:05 PM
Facility ID:00-0-0000030637 Inspector Charley Stangle
Facility Name BEARPOND FRESH MKT.,INC.Insp.Type Compliance
Facility Address 3963 RALEIGH ROAD
HENDERSON,NC 27537
Vance County
Located facility,USTs onsite
Reason(s)Routine Compliance
Location 36.277645,-78.405758
Permit Exp.9/30/2021
Facility Phone (252)438-6452
CONTACTS
Contact Type Contact Information
Owner
since 2/1/1996
BEARPOND FRESH MKT.,INC.,3963 RALEIGH ROAD HENDERSON,NC 27537,
Phone:(252)438-6452
Regulatory Operator
since 2/1/1996
BEARPOND FRESH MKT.,INC.,3963 RALEIGH ROAD HENDERSON,NC 27537,
Phone:(252)438-6452
Manager
since 12/16/2002
BILLY T STANTON,3963 RALEIGH ROAD HENDERSON,NC 27537,Phone:(252)
438-6452,Email:BTSTANTON55@GMAIL.COM
OWNERSHIP CHANGE
New Owner Change Date Basis Transfer of Ownership Form (UST-15)Submitted
Yes 5/26/2021 SALE TO NEW
OWNER
No
EMERGENCY RESPONSE
Emergency response placard with emergency response operator contact information is
posted in the dispensing areas if the dispensers are left on without an attendant present?
N/A
OTHER PARTICIPANTS
Name Organization
Billy Stanton Bearpond
AJ QAEMI BEARPOND
INSPECTOR COMMENTS
Type Date Comment
Facility 7/12/2021 New owner,AJ Qaemi's email address:jnhinvestment4@gmail.com.
ADDITIONAL INSPECTOR COMMENTS
TANKS AND PIPING INFORMATION
Tanks Tank #1(1-PREM)Tank #2(2-REG)
Tank ID 1-PREM 2-REG
TIMS Tank ID 1 2
Is tank registered?Yes Yes
Date tank installed 1/15/1993 1/15/1993
Capacity of Tank in Gallons 8000 10000
Is tank regulated Yes Yes
Diameter (Inches)96 96
Tank /Product use Motor Fuel Motor Fuel
Product stored in Tank Gasoline,Gas Mix Gasoline,Gas Mix
Product Detail Premium Regular
UST-10B Facility ID:00-0-0000030637
Page 2 of 8 7/13/2021 7:46 AM
Tanks Tank #1(1-PREM)Tank #2(2-REG)
If hazardous substance,CAS#or
description
If other,description
Tank status Current Current
Tank closure report submitted
Date tank last operated
Inches of product in Tank
Compartment tank No No
Other compartment(s)
Base compartment
Manifolded tank No No
Manifolded with tank(s)
Master manifold tank
New Tank System installed in
accordance with NC or MI
Yes Yes
Tank Construction Material (DW required
after 11/1/07)
Single Wall Steel Single Wall Steel
If other,description
Tank Manufacturer/Model Unknown Unknown
If other,describe
Tank material verified by UST-7A/B UST-7A/B
Date Pipe Installed 1/15/1993 1/15/1993
Was UST Piping Installed on or after
11/1/2007?
No No
Piping Construction Material (DW
required after 11/1/07)
Single Wall FRP Single Wall FRP
If other,description
Pipe Manufacturer/Model Smith Fibercast:Red Thread
IIA
Smith Fibercast:Red Thread
IIA
If other,describe
Pipe material verified by Visual Visual
If E-blend >10%or Biodiesel Blend >
20%;Was UST-20 completed and
approved?
N/A N/A
CORROSION PROTECTION
Tank Corrosion Protection Tank #1(1-PREM)Tank #2(2-REG)
DWM notified of current CP method Yes Yes
Integrity assessment performed after 3/1/06 No No
CP Method 1 Sacrificial Anodes Sacrificial Anodes
if other,Description
CP Installation Date 1/15/1993 1/15/1993
CP Method 2
if other,Description
CP Installation Date
Flex Connector ,Piping Extensions,and/or other metal fittings
Present
Other Metal,Flex
Connector,Elbow,
Ball Valve
Other Metal,Flex
Connector,Elbow,
Ball Valve
Flex connector isolated from ground Yes Yes
Source of verification of CP for Flex Connectors,piping
extensions and/or other metal fittings
Visual Visual
if other,Description
Submersible pump (STP)is isolated from ground Yes Yes
Piping extensions and/or other metal fittings are isolated from
ground
Yes Yes
Flex connector,STP and/or other metal fittings protected from
corrosion
N/A N/A
Corrosion protection method Booted Booted
UST-10B Facility ID:00-0-0000030637
Page 3 of 8 7/13/2021 7:46 AM
Tank Corrosion Protection Tank #1(1-PREM)Tank #2(2-REG)
Flex connector ,Piping extensions,and/or other metal fittings CP
Installation Date
Dielectric Coating Installed (If tank installed after 12/22/88 Unknown Unknown
Pipe Corrosion Protection Tank #1(1-PREM)Tank #2(2-REG)
DWM notified of current CP method Yes Yes
CP method FRP Piping FRP Piping
if other,Description
CP Installation Date 1/15/1993 1/15/1993
Dielectric Coating Installed (If piping installed after 12/22/88 N/A N/A
Dispenser Corrosion Protection Dispenser #1(1/2)Dispenser #2(3/4)
Flex Connector ,Piping Extensions,and/or other metal
fittings Present
Other Metal,Flex
Connector
Other Metal,Flex
Connector
Flex connector isolated from ground Yes Yes
Source of verification of CP for Flex Connectors,piping
extensions and/or other metal fittings
Visual Visual
if other,Description
Piping extensions and/or other metal fittings are isolated
from ground
Yes Yes
Flex Connectors,Piping extensions and/or other metal
fittings protected from corrosion
N/A N/A
Corrosion protection method Isolated Isolated
Flex connector,Piping extensions,and/or other metal
fittings CP Installation Date
Source of Information for verification of corrosion
protection for Riser pipe and other metal piping
Visual Visual
if other,Description
CP Conclusions
CP Requirements Met?Yes
Issues
CP Tests Test #1
Applies to Tanks #2(2-REG),#1(1-PREM)
Portion of System Tested Tanks
Date of last Corrosion Protection Test 4/18/2019
CP Test Result Pass
Was CP Test done in accordance with National Standard?Yes
CP Tester Name TED URCINOLA
Certificate Number 100929-201R
Certifying Organization SEE
CP Testing Company Name NTM
CP Testing Company Phone (800)643-8265
As Left Voltage
As Left Current
UST7 form for last CP test submitted to DWM Yes
SPILL PREVENTION
Has DWM been notified of spill methods?Yes
Spill/Overfill Details Tank #1(1-PREM)Tank #2(2-REG)
Is a drop tube present?Yes Yes
UST-10B Facility ID:00-0-0000030637
Page 4 of 8 7/13/2021 7:46 AM
Spill/Overfill Details Tank #1(1-PREM)Tank #2(2-REG)
Type of Stage I vapor recovery?Dual Point Dual Point
Local Fill Tank #1(1-PREM)Tank #2(2-REG)
Does Tank have a Second Fill?No No
Spill Protection Catchment Basin Catchment Basin
Is spill prevention equipment provided and verified?Yes Yes
Manufacturer/Model Universal Valve:
70C-XXXX-XX
Series (SW)
Universal Valve:
70C-XXXX-XX
Series (SW)
If other,describe
Spill bucket is double-walled?N/A N/A
Monitoring Type
(UST-6B)
Is spill bucket interstice monitored every 30 days?(If
installed before 11/1/07)
Spill bucket is isolated or made of non-corroding materials?
(If installed after 11/1/07)
N/A N/A
Date spill prevention provided 1/15/1993 1/15/1993
Last 12 monthly spill bucket checks completed and all
deficiencies corrected (UST-27)?
Yes Yes
Is spill prevention operating properly?Yes Yes
If No,select all that apply
If other,describe
O&M walkthrough inspection completed in accordance with
national standard (e.g.PEI RP 900)(UST-27)?
Yes Yes
3 Year Tightness Test Date
(UST-6D/23A)
Primary Tightness Test Result
(UST-6D/23A)
Secondary Tightness Test Result
(UST-6D/23A)
Tightness Testing done in accordance with a standard?
OVERFILL PREVENTION
Has DWM been notified of overfill methods?Yes
Overfill Control Tank #1(1-PREM)Tank #2(2-REG)
Is overfill prevention equipment provided and verified?Yes Yes
Date overfill control provided 8/16/2018 8/16/2018
Type of overfill equipment Auto Shutoff Device Auto Shutoff Device
Source of information for overfill control verification Visual observation Visual observation
If other,describe
Manufacturer/Model OPW:71SO-XXXX
Series (FV)
OPW:71SO-XXXX
Series (FV)
If other,describe
Is overfill control operating properly?Yes Yes
If No,select all that apply
If other,describe
Overfill check date (UST-22A)4/13/2021 4/13/2021
Overfill check result (UST-22A)Pass Pass
Capacity of Tank in Gallons 8000 10000
Diameter (Inches)96 96
Dispenser Sumps Dispenser #1(1/2)Dispenser #2(3/4)
Are containment sumps present?Yes Yes
Installation Date 1/15/1993 1/15/1993
UST-10B Facility ID:00-0-0000030637
Page 5 of 8 7/13/2021 7:46 AM
Dispenser Sumps Dispenser #1(1/2)Dispenser #2(3/4)
Sump Manufacturer Unknown Unknown
If Other (Specify)
Sump Construction Type Single Walled Single Walled
Sump Construction Material Plastic Plastic
If Other (Specify)
Are containment sumps monitored?No No
Is monitoring required per 2N .0900?No No
Piping components and/or STP were installed/replaced on or
after 11/1/07?
No No
Are spills or small weeps evident in sumps?No No
Are single wall piping components located in containment
sump?(If installed after 11/1/07)
UDC Visual Inspection Date
(annually)(UST-22C)
4/13/2021 4/13/2021
UDC Visual Inspection Results
(UST-22C)
Pass Pass
Annual containment sump check completed in accordance
with national standard (e.g.PEI RP 900)?
Yes Yes
Other Sumps Sump#1(PREM
STP)
Sump#2(REG STP)
Are containment sumps present?No No
Installation Date
Sump Manufacturer
If Other (Specify)
Sump Construction Type
Sump Construction Material
If Other (Specify)
Are containment sumps monitored?
Is monitoring required per 2N .0900?No No
Piping components and/or STP were installed/replaced on or
after 11/1/07?
No No
Are spills or small weeps evident in sumps?No No
Are single wall piping components located in containment
sump?(If installed after 11/1/07)
Sump Visual Inspection Date
(annually)(UST-22C)
4/13/2021 4/13/2021
Sump Visual Inspection Results
(UST-22C)
Pass Pass
Annual containment sump check completed in accordance
with national standard (e.g.PEI RP 900)?
Yes Yes
SITING AND SECONDARY CONTAINMENT
Siting And Sec.Containment-General Tank #1(1-PREM)Tank #2(2-REG)
UST system upgraded with corrosion protection,spill and
overfill before 1/1/91?
N/A N/A
UST system and/or piping are located within siting and
secondary containment areas?
No No
LEAK DETECTION
General Tank #1(1-PREM)Tank #2(2-REG)
DWM notified of leak detection method?Yes Yes
Piping Type
Piping type Pressurized System Pressurized System
UST-10B Facility ID:00-0-0000030637
Page 6 of 8 7/13/2021 7:46 AM
General Tank #1(1-PREM)Tank #2(2-REG)
if other,specify
Suction check type
Type LLD present.ELLD ELLD
Tank Release Detection
Primary leak detection method Automatic Tank
Gauging
Automatic Tank
Gauging
if other,specify
Primary LD install date 1/31/1993 1/31/1993
Secondary leak detection method
if other,specify
Piping Release Detection
Primary leak detection method Line Tightness
Testing (LTT)
Line Tightness
Testing (LTT)
if other,specify
Primary LD install date 1/31/1993 1/31/1993
Secondary leak detection method
if other,specify
Equipment Checks
Last 12 monthly RD equipment checks completed and all
deficiencies corrected (UST-27)?
Yes Yes
if no,select all that apply
Annual RD equipment operability check result (UST-22B)Pass Pass
if Fail,select all that apply
Annual RD equipment operability check date (UST-22B)4/13/2021 4/13/2021
RD equipment checks completed per national standard
(e.g.PEI RP 900/1200)(UST-22B/27)?
Yes Yes
PIPING LEAK DETECTION
Pressurized Piping Tank #1(1-PREM)Tank #2(2-REG)
Last MLLD/ELLD Test Date 5/3/2021 5/3/2021
MLLD/ELLD Test Result Pass Pass
Last LTT Test Date 5/3/2021 5/3/2021
LTT Test Result Pass Pass
Does test result indicate
suspected release?
No No
Number of MLLD/ELLD Types 1 1
MLLD/ELLD Equipment Tank #1(1-PREM)LLD #1 Tank #2(2-REG)LLD #1
MLLD/ELLD Manufacturer/Model V-R:PLLD Series 8484 (E)V-R:PLLD Series 8484 (E)
If other,describe
MLLD/ELLD Third Party Certified?Yes Yes
MLLD/ELLD Testers MLLD/ELLD Tester #1
MLLD/ELLD Tester Name TED URCINOLA
MLLD/ELLD Testing Company Name NTM
MLLD/ELLD Testing Company Phone Number (800)643-8265
Pressurized Piping LTT LTT #1
LTT Manufacturer/Method AcuRite:Training &Serv
If other,describe
LTT Third Party Certified?Yes
UST-10B Facility ID:00-0-0000030637
Page 7 of 8 7/13/2021 7:46 AM
Pressurized Piping LTT Tester LTT Tester #1
LTT Tester Name TED URCINOLA
LTT Testing Company Name NTM
LTT Testing Company Phone Number (800)643-8265
AUTOMATIC TANK GAUGE
ATG Systems ATG #1
ATG Manufacturer/Model V-R:TLS-350 CSLD
If other,describe
ATG Third Party Certified?Yes
Is ATG console operational?Yes
Tanks #1(1-PREM),#2(2-REG)
ATG Monthly LD Tank #1(1-PREM)Tank #2(2-REG)
2021 Jul Pass Pass
2021 Jun Pass Pass
2021 May Pass Pass
2021 Apr Pass Pass
2021 Mar Pass Pass
2021 Feb Pass Pass
2021 Jan Pass Pass
2020 Dec Pass Pass
2020 Nov Pass Pass
2020 Oct Pass Pass
2020 Sep Pass Pass
2020 Aug Pass Pass
ATG Conclusions
Leak Detection Requirements Met?Yes
Do the results indicate a suspected
release?
Issues
REPAIRS
Repairs
Any Repair Issues?No
Issues
Delivery Information Tank #1(1-PREM)Tank #2(2-REG)
All deliveries made to permitted tanks Yes Yes
UST-10B Facility ID:00-0-0000030637
Page 8 of 8 7/13/2021 7:46 AM
SITE DIAGRAM 1