Loading...
HomeMy WebLinkAboutFA-92649_96748_CA_O_20220707Date of Incident: Thursday July 7, 2022, 5:08 PM CST PES Incident #: 22-094-07126 State: North Carolina County: Hoke State Report # 20220707-13 NRC Report #: 1340875 1. Who? a. Location: 3511 Ashemont Rd Raeford, NC 28376 b. Generator: Estes Express Lines 2. When? a. Reported to PES at: Thursday July 7, 2022, 5:08 PM CST b. Discovered: Thursday July 7, 2022, 5:08 PM CST, Duration of Release is Undetermined c. PES dispatched: First Call Environmental d. NC DOE incident: 20220707-13, NRC Incident: 1340875 3. Location? a. Location: 3511 Ashemont Rd b. City: Raeford, County: Hoke, Township: c. GPS Coordinates: 35.048443° N X -79.404348° W 4. Product Released? a. Product released: Diesel fuel from saddle tanks b. Amount Released: 40-gallons 5. Environmental Impact? a. (Land, Air, Water) Land b. length of area of the navigable waterway affected: N/A c. (Impact area size) 25’ X 70’ of soil d. Identify damage to wildlife and/or vegetation: Undetermined e. Identify impact to human health and safety: Undetermined f. Identify medical advice provided for exposed individuals and or local medical personnel: Undetermined 6. Monitoring and Detection? a. Monitored: N/A b. Airborne: N/A c. Public Warned: Undetermined 7. Mitigation, Containment Action? a. How much product or waste was recovered or neutralized: No waste was generated due to being in pending excavation b. (Estimated amount of waste). No waste was generated due to being in pending excavation 8. Prevention Measures? a. Undetermined 9. Health Risks? a. Undetermined 10. Permit Numbers? a. Undetermined 11. Chronology? Date of Incident: Thursday July 7, 2022, 5:08 PM CST PES Incident #: 22-094-07126 State: North Carolina County: Hoke State Report # 20220707-13 NRC Report #: 1340875 On Thursday July 7, 2022, at 5:08 pm CST, I received a report from Estes Express Lines that a tractor trailer roll-over causing the release of possible diesel fuel from the saddle tanks located at 3511 Ashemont Rd in Raeford, NC 28376. It was reported undetermined as not really for sure if there was a release or not at this point in time. I identified First Call Environmental as a tier 1 contractor in the geographical area to respond to the incident at 5:17 pm. At 6:04 pm I notified the National Response Center of the incident due to a major artery being blocked by this roll-over and was issued a report number of 1340875. At 6:21 pm, I notified the North Carolina Department of the Environment of the possible release and was issued a report number of 20220707-13. At 7:06 pm, the contractor notified me he arrived on-site and began his assessment. He advised the towing vender has up righted the tractor and diesel fuel had released onto the soil. The contractor stated that approximately the size of the impact was the size of 25’ X 70’. They began to deploy absorbent boom to contain the released fuel. The contractor estimated 40-gallons of diesel fuel had released when the tractor was up righted. This project is in pending excavation pending the contractor’s cost estimate for a future excavation. PES will examine the cost estimate and if it lines out with the scope of work, the excavation will be schedule at a pending date. 12. Documentation? a. PES is preparing the Final report, containing the waste manifest 13. Causes? Roll-over.