HomeMy WebLinkAboutN1083_INSP_20230224FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID X YW Transfer Compost SLAS COUNTY: Ashe Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: N1083 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: February 24, 2023 Date of Last Inspection: March 23, 2022 FACILITY NAME AND ADDRESS: Brinegar Waste Site 1800 Hudler Town Road Crumpler, North Carolina 28617 GPS COORDINATES (decimal degrees): Lat.: 36.48860 Long.: -81.36186 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Anthony Brinegar, Operator Telephone: (336) 977-6348 Email address: brinegar887@gmail.com FACILITY CONTACT ADDRESS: 1041 Hudler Town Road Crumpler, North Carolina 28617 PARTICIPANTS: Charles Gerstell, NCDEQ – Solid Waste Section STATUS OF PERMIT: A Land Clearing and Inert Debris Notification was received by the Solid Waste Section on June 9, 2016. The Notification was filed for recordation with the Ashe County Register of Deeds on June 8, 2018. PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: Corrective Actions in Progress - 15A North Carolina Administrative Code 13B .0566(10)(a) states: “Open burning of solid waste is prohibited, unless approval has been obtained from the Division, the local government, and the Division of Air Quality in accordance with 15A NCAC 02D .1900 prior to any burning activity. During an inspection on August 25, 2021, waste within the landfill was on fire. Therefore, Mr. Brinegar was found in violation of 15A NCAC 13B .0566(10)(a). In order to achieve compliance, Mr. Brinegar was required to ensure actions continued to ensure that the fire was completely extinguished, immediately discontinue acceptance of waste until the fire had been completely extinguished, and notify the Division once the fire has been extinguished and it has been deemed safe to work within the landfill area. Within 30-days from the aforementioned notification, the entire waste area must be covered with a minimum of 6- inches of earthen material as required by 15A NCAC 13B 0566(4). FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 Inspection of the site on September 29, 2021 found heavy smoke still coming from the waste area, but no open flames were observed. Severe settling was observed at the top of the landfill in the center of the waste area. During a phone conversation on September 28, 2021 Mr. Brinegar stated that it was not recommended that equipment be moved onto the site as the fire was not completely extinguished and due to settling. Inspection of the site on December 7, 2021 found heavy smoke coming from the waste area. An area of open flame was observed at the southeast corner of the site during the inspection and emergency services were contacted. Emergency responders arrived on site and extinguished the flames. Mr. Brinegar was also contacted and arrived on site. Additional settling was observed at the top of the landfill in the center of the waste area. Inspection of the site on March 23, 2022 found no open flames on site. Some smoke was observed emanating near the crest of the slope on the far southwest side of the site. No open fames were observed. Waste on top of the landfill had been covered with soil. Exposed waste was observed at the toe of the slope. Mr. Brinegar stated he had placed soil on the top of the landfill but had not been able to provide additional soil to the slope due to safety concerns. Mr. Brinegar stated the landfill has continued to settle. Inspection of the site on February 24, 2023 found no open flames on site. Heavy smoke was observed emanating from an area of settling located near the crest of the fill slope at the southeast corner. No open flames were observed. The top of landfill was still covered with soil, but some settling at the crest of the fill slope was observed resulting in cracks forming across the crest of the fill slope. Some exposed waste was still observed at the toe of the slope which was previously segregated from the landfill when the fire originally started in August of 2021. OBSERVED VIOLATIONS: No new violations ADDITIONAL COMMENTS 1. The facility is located on a 48.96-acre parcel of land located off Hudler Town Road and is owned by Keith A. and Tammy L. Huffman. 2. No waste activities have taken place on site since the last inspection. 3. A cable attached to wooden fence posts had been installed across the entrance to the facility to prevent access to the site. As noted on the previous inspection report, please ensure the cable is extended to the remaining posts along Hudler Town Road to prevent access to the site from vehicular traffic. 4. The waste area appeared to be less than two acres in size. 5. Mr. Brinegar was contacted by phone during the inspection. Mr. Brinegar confirmed his intent to close the facility. However, Mr. Brinegar stated the site has continued to settle indicating it was not safe to access the site with heavy equipment to start closure activities. Mr. Brinegar stated he understood the requirements for closure and planned to begin the process once it was safe to work on the waste area. 6. As noted on the previous inspection report, as soon as conditions are safe to access the site with heavy equipment, final procedures must commence in accordance with 15A NCAC 13B .0567: (1)(A) The disposal area must be covered with no less than one foot of soil cover sloped to direct flow of surface water from the landfill. (1)(B) Soil cover must be stabilized with vegetative ground cover or other stabilizing material. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 (2) The owner or operator of a site shall complete the closure activities within 120 days after beginning the closure activities as specified in Subparagraph (1) of this Paragraph. (3) Within 30 days of completion of the closure of the site, the owner or operator shall submit to the Division a certification verifying that closure has been completed in accordance with this Rule. 7. Landfill slopes must be graded not to exceed a ratio of three horizontal to one vertical. 8. Until closure activities can commence, the landfill must be monitored regularly to evaluate the condition of the site and monitor it for safety concerns such as fire. 9. As noted in the previous inspection report, two loads of fence posts including wire fencing previously brough to the site must be removed to a solid waste facility permitted by the Division. Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: (704) 235-2144 Charles T. Gerstell Environmental Senior Specialist Regional Representative Sent on: 3/7/23 X Email Hand delivery X US Mail Certified No. [ _] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Digitally signed by Charles T. Gerstell DN: cn=Charles T. Gerstell, o=Division of Waste Management, ou=Solid Waste Section, email=charles.gerstell@ncdenr.gov, c=US Date: 2023.03.07 09:41:04 -05'00'