Loading...
HomeMy WebLinkAbout1812_DukeMarshall_ILF_GW_Elev_Locs_FID1772621_20211014r ■ ■ [r ■ •v r CLF21-10 GWA-4S/D r •44. vv 66 �. H Low I c�� r ■ s I I `� tvya 0 ..ice y 't l Rimr! ,� CLF-301 � �'�►.- , • : � �, ® ®FUTURE K • PHASE 3 : _ CLF-403 CLF-402 � CLF-302 � �• CLF-404 LEGEND LONG-TERM PIEZOMETERAND/OR GROUNDWATER MONITORING WELL TEMPORARY PIEZOMETER ASH BASIN WASTE BOUNDARY GEOGRAPHIC LIMITATION LANDFILL BOUNDARY s� � DUKE GRAPHIC SCALE 200 0 200 400 4ENERGY® CAROLINAS (IN FEET) DRAWN BY: R. KIEKHAEFER DATE: 07/27/2021 REVISED BY.' WTT DATE: 08/23/2021 CHECKED BY:: T. COLTON DATE: 08/23/2021 APPROVED BY: B. WILKER DATE: 08/23/2021 synTerra PROJECT MANAGER: B. WILKER www.synterracorp.com LANDFILL COMPLIANCE BOUNDARY LEACHATE BASIN STRUCTURAL FILL BOUNDARY — - - DUKE ENERGY CAROLINAS PROPERTY LINE STREAM (MCKIM & CREED) WETLAND (MCKIM & CREED) NOTES: 1. ALL BOUNDARIES ARE APPROXIMATE. 2. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS APPROVED BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 (SAW-2015-01412). WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015. 3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. 4. MAXAR IMAGERY OBTAINED FROM ESRI ONLINE, COLLECTED OCTOBER 3, 2020. 5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). FIGURE 6 GROUNDWATER ELEVATION MONITORING LOCATIONS PERMIT TO CONSTRUCT MODIFICATION REQUEST GROUNDWATER CONDITIONS EVALUATION AND MONITORING MARSHALL STEAM STATION TERRELL, NORTH CAROLINA