October 3, 2022
Ms. Sherri Stanley
Permitting Branch Head
NC DEQ Division of Waste Management
217 W. Jones Street
Raleigh, NC 27603
sherri.stanley(ancdenr.gov
ABBRESS TEL WEB
14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 www.smithgardnerinc.com
RE: Deep Run Transfer Station (Permit No. 54-08T)
Transfer Station Assessment
Response to Review Comments
Dear Ms. Stanley:
On behalf of GFL Environmental Inc., Smith Gardner, Inc. (S+G) is pleased to provide this
response to comments received from Ms. Donna Wilson via email correspondence dated July 8,
2022. The comments received are repeated below in italics followed by S+G's response in bold.
1. Please submit a revised operations plan as well as a closure plan with closure cost
estimates to include all information now required by 15A NCAC 13B .0404, .0405, and
.014106.
Enclosed is an updated Operations Manual for the Deep Run Transfer Station
Facility. Revisions required to address the referenced rules along with other
general plan updates are summarized in the table below.
Section
Revision
Section 1.2
Updated GFL and DEQ contact information.
(Contact Information)
Section 1.8
Revised to address new requirements.
(Litter Control)
Section 1.12
Added item for Transfer Station Cleaning
(Record Keeping Program)
and Maintenance Records.
Section 2.3.1
Revised to include new waste screening
(Waste Receiving and Inspection)
requirements.
Section 2.5.3
Revised to include use of leak -resistant
(Container Loading and Transport)
trailers to address new requirements.
Section 2.8
Section added to address new
(Operational. Contingency Plan)
requirements.
Section 3.3
Revised section to follow similar plan at
(Leachate Management)
other GFL facilities.
Section 3.7
Section added to address new
(Site Cleaning and Maintenance)
requirements.
DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B
Ms. Sherri Stanley
October 3, 2022
Page 2of2
Section
Revision
Section 4.0
Section added to address new
(Transfer Station Closure Plan)
requirements.
Figure 1 (Site Plan)
Revised to include general facility updates.
Appendix F
Appendix added to address new
(Transfer Station Closure Cost
requirements.
Estimate)
Please contact us at your earliest convenience should you have any questions, comments or
require further clarification.CAR
'k4*�sti r+it++r
Sincerely, *`'ESSO�{�i*+�••
SMITH GARONER, INC. #
SEAL-101112022
EDocuSignedd,1by: DocuSigned by: ! 028426 ;
b
4FFAB9B6926A4DE... 358C21E64007440... •rj •
•+x 'q � L 8� 4*y
Lou J. Krasuski W. Michael Brinchek, P.E.
Staff Engineer Senior Project Manager
lou(asmithaardnerinc.com mike(asmithaardnerinc.com
Attachment: DEQ Email with Comments (July 8, 2022)
Enclosure: Revised Operations Manual
CC: Donna Wilson, DWM
Liz Patterson, DWM
Sarah Moutos, DWM
Tyler Pate, GFL Environmental Inc.
John Pfleger, GFL Environmental Inc.
Crystal Slone, GFL Environmental Inc.
DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
MICHAEL SCOTT NORTH CAROLINA
Director Environmental Quality
July 8, 2022
Sent via email: travis.pope@gflenv.com
Mr. Travis Pope, Operations Supervisor
Deep Run Transfer Station
2287 Leslie R. Stroud Road
Kinston, North Carolina 28504
SUBJECT: Transfer Station Assessment Report, Revised Operating Plan, Closure Plan, and
Closure Cost Estimates
Deep Run Transfer Station, Permit 5408-TRANSFER-2014, Lenoir County
Al Hill Properties, LLC /Waste Industries, LLC, subsidiary of GFL
Dear Mr. Pope,
The State of North Carolina, Division of Waste Management Solid Waste Section (Section) has
completed the review of the Transfer Station Assessment Report (report) for the above
referenced facility. The Report was submitted by Smith Gardner Engineers on June 18, 2021, in
accordance with 15A North Carolina Administrative Code 13B .0401(b).
The intent of the report was to self -assess and demonstrate compliance with the rules in 15A
NCAC 13B .0400, readopted effective January 1, 2021, with a primary focus of vital
infrastructure at the facility as part of transitioning under the new rules and other life of site
permit requirements.
In summary, the report recommended that: (1) a steel plate over the push wall north pit edge is
damaged and should be repaired, and (2) the facility should monitor and repair as needed the
minor wear or damage present on the concrete pad, tipping floor, push wall, and lower area
walls and foundation.
The Section agrees with the recommendation. Please proceed with the implementation of the
recommendations in the report. Per 15A NCAC 13B .0401(b)(3), the facility has until July 8,
2025, to repair the push wall plate.
Also, per the report recommendations, please submit a revised Operations Plan, Closure Plan,
and closure cost estimates to include all information now required by 15A NCAC
13B .0404, .0405 and .0406. These plans and cost estimates should be submitted to the
Section within 90 days of receipt of this letter.
D E Q�� North Carolina Department of Environmental Quality I Division of Waste Management
217 West Jones Street 1 1646 Mail Service Center I Raleigh, North Carolina 27699-1646
NORTH CAROLINA -
gepartmem of EnvimnmeM l quay /`� 919.707.8200
DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B
The Section has established an electronic form for the submittal of Transfer Station closure cost
estimates and requests you submit the cost estimates in this manner using the following link:
https://edocs.deg.nc.gov/Forms/TransferStation FA.
The .0401 to .0406 Transfer Station Rules can be viewed at the link below, beginning on pdf
page 17:
http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental/`2OgualitV/chapter%2013%20-
%20solid%20waste%20management/subchapter%20b/subchapter%20b/o20rules.pdf
If you have any questions, please contact me at 919-707-8255 or donna.wilson@ncdenr.gov.
Sincerely,
Donna J. Wilson
Environmental Engineer
Solid Waste Section
Email copy:
Tyler Pate, GFL
Crystal Slone, GFL
Lou J. Krasuski, Smith Gardner
Michael Brinchek, Smith Gardner
Liz Patterson, SWS
Sarah Moutos - SWS-ARO