Loading...
HomeMy WebLinkAbout5408_DeepRunTS_ResponseComments_20221003DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B SMITH GARDNER ENGINEERS October 3, 2022 Ms. Sherri Stanley Permitting Branch Head NC DEQ Division of Waste Management 217 W. Jones Street Raleigh, NC 27603 sherri.stanley(ancdenr.gov ABBRESS TEL WEB 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 www.smithgardnerinc.com RE: Deep Run Transfer Station (Permit No. 54-08T) Transfer Station Assessment Response to Review Comments Dear Ms. Stanley: On behalf of GFL Environmental Inc., Smith Gardner, Inc. (S+G) is pleased to provide this response to comments received from Ms. Donna Wilson via email correspondence dated July 8, 2022. The comments received are repeated below in italics followed by S+G's response in bold. 1. Please submit a revised operations plan as well as a closure plan with closure cost estimates to include all information now required by 15A NCAC 13B .0404, .0405, and .014106. Enclosed is an updated Operations Manual for the Deep Run Transfer Station Facility. Revisions required to address the referenced rules along with other general plan updates are summarized in the table below. Section Revision Section 1.2 Updated GFL and DEQ contact information. (Contact Information) Section 1.8 Revised to address new requirements. (Litter Control) Section 1.12 Added item for Transfer Station Cleaning (Record Keeping Program) and Maintenance Records. Section 2.3.1 Revised to include new waste screening (Waste Receiving and Inspection) requirements. Section 2.5.3 Revised to include use of leak -resistant (Container Loading and Transport) trailers to address new requirements. Section 2.8 Section added to address new (Operational. Contingency Plan) requirements. Section 3.3 Revised section to follow similar plan at (Leachate Management) other GFL facilities. Section 3.7 Section added to address new (Site Cleaning and Maintenance) requirements. DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B Ms. Sherri Stanley October 3, 2022 Page 2of2 Section Revision Section 4.0 Section added to address new (Transfer Station Closure Plan) requirements. Figure 1 (Site Plan) Revised to include general facility updates. Appendix F Appendix added to address new (Transfer Station Closure Cost requirements. Estimate) Please contact us at your earliest convenience should you have any questions, comments or require further clarification.CAR 'k4*�sti r+it++r Sincerely, *`'ESSO�{�i*+�•• SMITH GARONER, INC. # SEAL-101112022 EDocuSignedd,1by: DocuSigned by: ! 028426 ; b 4FFAB9B6926A4DE... 358C21E64007440... •rj • •+x 'q � L 8� 4*y Lou J. Krasuski W. Michael Brinchek, P.E. Staff Engineer Senior Project Manager lou(asmithaardnerinc.com mike(asmithaardnerinc.com Attachment: DEQ Email with Comments (July 8, 2022) Enclosure: Revised Operations Manual CC: Donna Wilson, DWM Liz Patterson, DWM Sarah Moutos, DWM Tyler Pate, GFL Environmental Inc. John Pfleger, GFL Environmental Inc. Crystal Slone, GFL Environmental Inc. DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B ROY COOPER Governor ELIZABETH S. BISER Secretary MICHAEL SCOTT NORTH CAROLINA Director Environmental Quality July 8, 2022 Sent via email: travis.pope@gflenv.com Mr. Travis Pope, Operations Supervisor Deep Run Transfer Station 2287 Leslie R. Stroud Road Kinston, North Carolina 28504 SUBJECT: Transfer Station Assessment Report, Revised Operating Plan, Closure Plan, and Closure Cost Estimates Deep Run Transfer Station, Permit 5408-TRANSFER-2014, Lenoir County Al Hill Properties, LLC /Waste Industries, LLC, subsidiary of GFL Dear Mr. Pope, The State of North Carolina, Division of Waste Management Solid Waste Section (Section) has completed the review of the Transfer Station Assessment Report (report) for the above referenced facility. The Report was submitted by Smith Gardner Engineers on June 18, 2021, in accordance with 15A North Carolina Administrative Code 13B .0401(b). The intent of the report was to self -assess and demonstrate compliance with the rules in 15A NCAC 13B .0400, readopted effective January 1, 2021, with a primary focus of vital infrastructure at the facility as part of transitioning under the new rules and other life of site permit requirements. In summary, the report recommended that: (1) a steel plate over the push wall north pit edge is damaged and should be repaired, and (2) the facility should monitor and repair as needed the minor wear or damage present on the concrete pad, tipping floor, push wall, and lower area walls and foundation. The Section agrees with the recommendation. Please proceed with the implementation of the recommendations in the report. Per 15A NCAC 13B .0401(b)(3), the facility has until July 8, 2025, to repair the push wall plate. Also, per the report recommendations, please submit a revised Operations Plan, Closure Plan, and closure cost estimates to include all information now required by 15A NCAC 13B .0404, .0405 and .0406. These plans and cost estimates should be submitted to the Section within 90 days of receipt of this letter. D E Q�� North Carolina Department of Environmental Quality I Division of Waste Management 217 West Jones Street 1 1646 Mail Service Center I Raleigh, North Carolina 27699-1646 NORTH CAROLINA - gepartmem of EnvimnmeM l quay /`� 919.707.8200 DocuSign Envelope ID: A3105CD3-D1BC-4A7C-8AA3-19004C59CC7B The Section has established an electronic form for the submittal of Transfer Station closure cost estimates and requests you submit the cost estimates in this manner using the following link: https://edocs.deg.nc.gov/Forms/TransferStation FA. The .0401 to .0406 Transfer Station Rules can be viewed at the link below, beginning on pdf page 17: http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental/`2OgualitV/chapter%2013%20- %20solid%20waste%20management/subchapter%20b/subchapter%20b/o20rules.pdf If you have any questions, please contact me at 919-707-8255 or donna.wilson@ncdenr.gov. Sincerely, Donna J. Wilson Environmental Engineer Solid Waste Section Email copy: Tyler Pate, GFL Crystal Slone, GFL Lou J. Krasuski, Smith Gardner Michael Brinchek, Smith Gardner Liz Patterson, SWS Sarah Moutos - SWS-ARO