HomeMy WebLinkAbout9102_VanceTS_RevOpsPlan_20220922DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
OPERATIONS MANUAL
Vance County Transfer Station
Henderson, North Carolina
NC Solid Waste Permit No. 91-02T
Prepared for:
1
GFC
e n v i r o n m e n t a l
Vance County Transfer Station
Henderson, North Carolina
September2022
Prepared by:
SMITH GARDNER
14 N. Boylan Avenue, Raleigh NC 27603 1 919.828.0577
(L S� PRINTED ON 100% RECYCLED PAPER
O 2022 Smith Gardner, Inc.
This document is intended for the sole use of the client for which it was prepared and
for the purpose agreed on by the client and Smith Gardner, Inc.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Operations Plan
Vance County Transfer Station
NC Solid Waste Permit No. 91-02T
Henderson, North Carolina
Prepared For:
GF
e n v i r o n m e n t a l
Vance County Transfer Station
Henderson, North Carolina
S+G Project No. GFLTRANSFER 22-1
DocuSigned by:
4FFAB9B6926A4DE...
Lou J. Krasuski
Staff Engineer
DocuSigned by:
i�1. tLad UviwGlu,� SEAL 9/2z7t2o22
358C21 E64007440... `. 028426
W. Michael Brinchek, P.E. , '`?�!rr c'.•`•
Senior Project Manager r'*r. `� L 5�%% •`}4
rr'r�logo soIs1ti1*t1
September 2022
NC LIC. NO. C-0828 (ENGINEERING)
SMITH GARDNER
14 N. Boylan Avenue, Raleigh NC 27603 1 919.828.0577
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD 1 028F-FEAC-4D47-BEO8-2F52CEC791 OE
Vance County Transfer Station
Henderson, North Carolina
Operations Manual
Table of Contents
Page
1.0 GENERAL FACILITY OPERATIONS.............................................................................. 1
1.1
OVERVIEW................................................................................................................1
1.2
CONTACT INFORMATION.........................................................................................1
1.2.1 GFL Environmental Inc. (Operator)............................................................. 1
1.2.2 GFL Environmental Inc............................................................................... 2
1.2.3 North Carolina Department of Environmental Quality ............................... 2
1.3
FACILITY OPERATIONS............................................................................................3
1.3.1 Facility Operating Hours............................................................................. 3
1.3.2 Service Area................................................................................................ 3
1.3.3 Personnel Requirements............................................................................ 3
1.3.4 Equipment Requirements........................................................................... 4
1.4
ACCESS CONTROL...................................................................................................4
1.4.1 Physical Restraints..................................................................................... 5
1.4.2 Security.......................................................................................................5
1.5
SIGNAGE..................................................................................................................5
1.6
COMMUNICATIONS..................................................................................................5
1.7
FIRE CONTROL........................................................................................................5
1.7.1 Fire Tetrahedron..........................................................................................6
1.7.2 Equipment....................................................................................................6
1.7.3 General Fire Management Strategies.........................................................6
1.7.4 Fires within the Transfer Station or in Transfer Trailers ............................7
1.7.5 Notification...................................................................................................7
1.7.6 Coordination With Local Fire Department...................................................7
1.8
LITTER CONTROL....................................................................................................7
1.9
SEVERE WEATHER CONDITIONS.............................................................................8
1.9.1 Ice Storms................................................................................................... 8
1.9.2 Heavy Rains................................................................................................. 8
1.9.3 Electrical Storms........................................................................................ 8
1.9.4 Windy Conditions......................................................................................... 8
1.9.5 Violent Storms............................................................................................. 8
1.10
HEALTH AND SAFETY..............................................................................................9
1.10.1 Personal Hygiene........................................................................................ 9
1.10.2 Personal Protection Equipment.................................................................. 9
1.10.3 Mechanical Equipment Hazard Prevention...............................................10
1.10.4 Employee Health and Safety......................................................................10
1.10.5 Physical Exposure......................................................................................10
1.10.6 Safety Data Sheets.....................................................................................10
Vance County Transfer Station Operations Manual
July 2022 Table of Contents Page i
DocuSign Envelope ID: ODD 1 028F-FEAC-4D47-BEO8-2F52CEC791 OE
1.11
UTILITIES...............................................................................................................11
1.12
RECORD KEEPING PROGRAM...............................................................................11
2.0 WASTE HANDLING OPERATIONS.............................................................................
13
2.1
OVERVIEW..............................................................................................................13
2.2
ACCEPTABLE WASTES..........................................................................................13
2.3
WASTE DEFINITIONS.............................................................................................14
2.4
WASTE SCREENING PROGRAMS...........................................................................16
2.4.1 Waste Receiving and Inspection................................................................16
2.4.2 Hazardous Waste Contingency Plan..........................................................17
2.5
FACILITY OPERATIONS..........................................................................................17
2.5.1 Operating Capacity.....................................................................................17
2.5.2 Disposal Facility.........................................................................................18
2.5.3 Access........................................................................................................18
2.5.4 General Procedures...................................................................................18
2.5.5 Recycling and Recovery.............................................................................19
2.5.6 Special Waste Management.......................................................................19
2.5.6.1 Asbestos Management................................................................19
2.6
MARKETS...............................................................................................................19
2.7
RECORDKEEPING..................................................................................................19
2.8
Operational Contingency Plan...............................................................................19
2.8.1 Loss of Power............................................................................................19
2.8.2 Loss of Communication.............................................................................20
2.8.3 Storm Surges.............................................................................................20
2.8.4 Scale and Scale Software Malfunction......................................................20
2.8.5 Equipment..................................................................................................20
3.0 ENVIRONMENTAL MANAGEMENT...........................................................................
21
3.1
OVERVIEW..............................................................................................................21
3.2
SURFACE WATER RUNOFF CONTROL..................................................................21
3.3
LEACHATE MANAGEMENT....................................................................................21
3.3.1 Leachate Collection...................................................................................21
3.3.2 Operation and Maintenance of Leachate Pump and Storage Tank ...........
22
3.4
VECTOR CONTROL.................................................................................................22
3.5
ODOR CONTROL.....................................................................................................22
3.5.1 MSW Materials...........................................................................................22
3.5.2 C&D Materials............................................................................................22
3.6
Dust Control...........................................................................................................22
3.7
Site Cleaning and Maintenance.............................................................................22
4.0 CLOSURE
PLAN.......................................................................................................
25
4.1
Closure Schedule...................................................................................................25
4.2
Closure Activities...................................................................................................25
4.3
Closure Costs and Financial Assurance................................................................26
Vance County Transfer Station Operations Manual
July 2022 Table of Contents Page ii
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
FIGURES
Figure 1 Site Location Map
Figure 2 General Site Arrangement
TABLES
Table 1
Personnel Requirements
Table 2
Equipment Requirements
Table 3
Acceptable Waste Summary
APPENDICES
Appendix A Fire Occurrence Notification Form
Appendix B Waste Screening Form
Appendix C Paint Filter Test
Appendix D Closure Cost Estimate
Vance County Transfer Station Operations Manual
July 2022 Table of Contents Page //
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
Vance County Transfer Station Operations Manual
July 2022 Table of Contents Page iv
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
1.0 GENERAL FACILITY OPERATIONS
1.1 OVERVIEW
This Operations Manual was prepared for the Vance County Transfer Station facility
(Permit No. 91-02T) located at 3453 NC Highway 39 North in Henderson, North Carolina
as shown in Figure 1. This document discusses the operation of the transfer station and
other on -site solid waste management activities.
Refer to Figure 2 for the general layout of the facility.
The information contained herein was prepared to provide personnel with an
understanding of how the Design Engineer envisioned facility operations. While
deviations from the operations outlined here may be acceptable, they should be
reviewed and approved by the Design Engineer. Please refer to the appropriate permit
application for a detailed discussion and calculations for the individual components of
the operation and process unit.
All personnel involved with the management or supervision of the facility shall review
the documents and periodically update as needed. A copy of this Operations Manual will
be kept at the facility and will be available for use at all times.
1.2 CONTACT INFORMATION
All correspondence and questions concerning the operation of the Vance County
Transfer Station facility should be directed to the appropriate company and regulatory
personnel listed below. For fire or police emergencies, dial 911.
1.2.1 GFL Environmental Inc. (Operator
Address: GFL Environmental Inc.
241 Vanco Mill Road
Henderson, North Carolina 27536
Phone: (252) 438-5333
Site Manager: Patrick Moseley
Email: patrick.moseley(agflenv.com
Vance County Transfer Station Operations Plan
September 2022 Page 1
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
1.2.2 GFL Environmental Inc. (Owner
Address: 3301 Benson Drive, Suite 601
Raleigh, North Carolina 27609
Manager: John Pfleger
Email: 0ohn.pfleger(agflenv.com
Phone: (919) 877-7523
1.2.3 North Carolina Unartment of Environmental Oual
North Carolina DEQ - Raleiah Central Office (RCO
Address: 217 West Jones Street
1646 Mail Service Center
Raleigh, North Carolina 27699-1646
Phone: (919) 707-8200
Fax: (919) 707-8200
North Carolina DEQ — Raleiah Reaional Office
Address: 3800 Barrett Drive
Raleigh, North Carolina 27609
Phone: (919) 791-4200
Fax: (919) 571-4718
Division of Waste Management (DWM) - Solid Waste Section:
Field Operations Branch Head: Jason Watkins (WSRO)
Email: lason.watkins(ancdenr.gov
Eastern Environmental Supervisor: Drew Hammonds (FRO)
Email: andrew.hammonds(ancdenr.gov
Environmental Senior Specialist: Tim Davis (RRO)
Email: timothy.davis(ancdenr.gov
Division of Ene
Address:
Mineral and Land Resources- Land Qualitv Section
Phone:
Regional Engineer:
Email:
Environmental Engineer:
Email:
North Carolina DEQ
Raleigh Regional Office
3800 Barrett Drive
Raleigh, North Carolina 27609
(919) 791-4200
Bill Denton, P.E. (RRO)
bill.denton(ancdenr.aov
Ivana Barham (RRO)
ivana.barham(ancdenr.gov
Vance County Transfer Station Operations Plan
September 2022 Page 2
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
1.3 FACILITY OPERATIONS
1.3.1 Facility Operating Hours
Waste will be received between 5:30 A.M. to 7:00 A.M. privately and 7:30 A.M. to
4:30 P.M. from the public, Monday through Friday and 7:30 A.M. to 12:00 P.M on
Saturday for both public and private. The facility will be closed on Sunday and on
holidays as designated by the Operator. The Operator may elect to modify these
hours from time to time.
Operating hours provided herein are defined as the gate hours, when the facility
is open to the public. The Operator may elect to modify these hours periodically
or may need additional time during the work day to accommodate other
activities. As such, the following activities may occur outside of operating hours:
Facility maintenance and cleanup;
Receipt of waste controlled by the facility Owner (i.e. commercial collection
routes); and
Transfer of loaded trailers and staging of empty trailers.
When work occurs outside of operating hours, the Operator is responsible for
providing the appropriate resources including equipment and personnel as
defined in Section 1.3.3 and Section 1.3.4.
1.3.2 Service Area
The Vance County Transfer Station facility is permitted to receive Municipal Solid
Waste (MSW) and Construction and Demolition (C&D) materials and not subject
to service area restrictions, provided the receiving permitted disposal site is
approved by franchise or local government approval to accept MSW or C&D from
the geographical area(s) of the waste origin.
1.3.3 Personnel Requirements
At least one member of the supervisory staff will be certified as a Transfer
Station Operations Specialist by the Solid Waste Association of North America
(SWANA). Each transfer station employee will go through an annual training
course (led by supervisory staff). As part of this training, personnel will learn to
recognize loads which may contain prohibited wastes.
The anticipated personnel requirements for operation and maintenance of the
site are listed in the following Table 1. The number of site personnel can be
adjusted based upon volume of waste received for recovery and transfer.
Vance County Transfer Station Operations Plan
September 2022 Page 3
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Table 1: Personnel Requirements
Description
Primary Function (Allocation)
Site Manager
Overall management of the facility.
Scale House Attendant
Receiving and weighing for incoming and
outgoing loads.
Operators (as needed)
Management of tipping floor, equipment
operations, and general facility operations.
Commercial Drivers (as needed)
Transfer of C&D and MSW waste.
Labor (as needed)
General labor.
1.3.4 Equipment Requirements
The Owner/Operator will maintain on -site equipment required to perform the
necessary transfer and recycling activities. Periodic maintenance of all
equipment and minor repair work will be performed in designated maintenance
zones.
The anticipated equipment requirements for operation and maintenance of the
facility are listed in Table 2. These may vary based on the volume coming into
the facility for recovery and transfer.
Table 2: Equipment Requirements
Description
Primary Function (Allocation)
1) Front End Loader (1)*
Loading, site cleanup, and transfer
operations.
2) Transfer Trucks (4-6)*
Collection and transfer of C&D and MSW
waste.
3) Other Equipment*
As needed.
* Number and types of vehicles and equipment will be based on actual volume of
waste received.
1.4 ACCESS CONTROL
Limiting access to the solid waste management facility is important for the following
reasons:
• Unauthorized and illegal dumping of waste materials is prevented.
• Trespassing, and injury resulting therefrom, is discouraged.
Vance County Transfer Station Operations Plan
September 2022 Page 4
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
• The risk of vandalism is greatly reduced.
Access to active areas of the transfer station will be controlled by a combination of
fences and natural barriers, and strictly enforced operating hours. An attendant will be
on duty at all times when the facility is open for public use to enforce access restrictions.
1.4.1 Physical Restraints
The site will be accessed by an entrance on NC Highway 39 North as shown on
Figure 2. Scales, scale house and offices are provided near the entrance. All
waste will have been weighed prior to being processed on site. The entrance will
have a gate which will be securely locked during non -operating hours.
1.4.2 Security
The Vance County Transfer Station facility is secured by fencing, locked gates,
and natural buffers. Frequent inspections of the gates and fences will be
performed by the facility personnel. Evidence of trespassing, vandalism, or
illegal operation will be reported to the Owner in order to coordinate the repair
or replacement of the damaged property and to ensure the integrity of the
facility's security.
1.5 SIGNAGE
A prominent sign(s) containing information required by the DWM will be placed at the
main facility entrance. This sign(s) will provide information on the operating hours,
operating procedures, and acceptable wastes. Additional signage will be provided as
necessary within the facility to distinctly identify the roadway to the transfer station
tipping floor and trailer loading area. Service and maintenance roads for use by
operations personnel will be clearly marked and barriers (e.g., traffic cones, barrels,
etc.) will be provided as required.
1.6 COMMUNICATIONS
The scale house/office has telephones in case of emergency and to conduct day-to-day
business. Emergency telephone numbers are displayed in the scale house office.
l.� FIRE CONTROL
Although no open burning of waste is allowed at the facility, the possibility of fire within
the processing and storage areas, or with a piece of equipment must be anticipated in
the daily operation of the facility. The operator will provide fire suppression equipment
to control accidental fires and arrangements will be made with the local fire protection
agency. The transfer station facility will be equipped with hose bibs or portable fire
extinguishers located on each wall of the facility. A combination of factory installed fire
Vance County Transfer Station Operations Plan
September 2022 Page 5
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
suppression systems and/or portable fire extinguishers will be operational on all heavy
pieces of equipment at all times. For larger and more serious outbreaks, the local fire
department will respond.
1.?.l Fire Tetrahedron'
To better understand the properties of fire we can
examine the fundamental methods to extinguish it.
The fire "tetrahedron" illustrates the rule that in
order to ignite and burn, each component
represents a property of flaming fire; fuel, oxygen,
heat, and chemical chain reaction. A fire is
prevented or extinguished by removing any one of
them. A fire naturally occurs when the elements
are combined in the right mixture (e.g., more heat needed for igniting some
fuels, unless there is concentrated oxygen). The fire tetrahedron is a more
modern adaptation of the traditional fire "triangle" recognizing the chemical
reactions that may occur as a component - "the uninhibited chain reaction". This
chain reaction is the feedback of heat to the fuel to produce the gaseous fuel
used in the flame. In other words, the chain reaction provides the heat necessary
to maintain the fire. These principles are integral in the prevention and
management of potential fire situations. Please note this information is
considered as a basis of understanding and may be superseded by the direction
and skill of the local Fire Marshall.
1.?.2 Equipment
Potential fire hazards are created from the build-up of fine, dry dust particles on
and around operational motors and control panels. The presence of these build-
ups can cause overheating and potential fire if periodic equipment cleaning and
maintenance are not practiced. A combination of factory installed fire
suppression systems and/or portable fire extinguishers will be operational on all
pieces of heavy equipment at all times. Portable fire extinguishers should be
maintained in a state of readiness on each piece of moving equipment and
equipment should be cleaned periodically.
1.?.3 General Fire Management Strategies
Each fire situation is site specific; however, general strategies for active fire
management include the following (in no particular order):
• Accelerated high temperature combustion (displacing fuel);
• Covering of the burn area with foams (reduce oxygen);
1 National Fire Protection Association (www.nfpa.org)
Vance County Transfer Station Operations Plan
September 2022 Page 6
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Flooding the burn area with water (reduce heat);
Injecting an inert gas such as CO2 (reduce oxygen); and
Applying extinguishing agents that will interfere with and inhibit the
combustion process at the molecular level (breaking the chemical
reaction).
1.?.4 Fires within the Transfer Station or in Transfer Trailers
Fires within the transfer station or in transfer trailers will be limited by the
control of "hot" loads entering the facility. Facility personnel at the scale house
will turn away all vehicles containing waste that is suspected to be hot. If
smoldering or burning waste is discovered on the tipping floor, then the waste
will be segregated, spread as thin as possible, and the fire will be extinguished.
No "hot" material will be loaded onto transfer trailers.
Transfer trailer fires are uncommon, but may occur when open trailers are
loosely loaded with combustible waste materials. If smoke or fire is observed in
a loaded waste transfer trailer, the fire must be immediately reported to the
Solid Waste Operations Manager. If possible, the load should be immediately
doused with water from the tipping floor. If possible, the transfer trailer should
be slowly moved from the loading bay to at least 100 feet away from the building,
and disconnected from the truck cab. The General Manager will evaluate the
situation and response, and, if necessary, call 911.
1.?.5 Notification
The Owner will verbally notify the DWM (see Section 1.2.3) within 24 hours of
discovery of a fire. In addition, written documentation describing the fire, the
actions carried out to extinguish the fire, and a strategy for preventing future
occurrences will be provided to the DWM within 15 days following any such
occurrence on the Fire Occurrence Notification Form included in Appendix A.
1.?.6 Coordination With Local Fire Department
A copy of this Operations Manual will be filed with the local fire department
including all contact information for the facility.
1.8 LITTER CONTROL
Customers are encouraged to contain and cover all waste within their vehicles/trailers
prior to entering the facility in an effort to reduce litter. Any load that is not secured in a
manner that would prevent material from leaving the vehicle while it is in motion is
subject to an additional fee. Trailers are encouraged to be covered by heavy tarp lids to
minimize litter and reduce the potential for the entrance of vectors into the disposal
operations.
Vance County Transfer Station Operations Plan
September 2022 Page 7
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
The vegetative trees/bushes act as a barrier to keep litter contained within the site
boundaries. Staff and operators pick up litter in and around the site on a daily basis and
respond to weather and heavy wind conditions that may compromise the appearance of
the property. Windblown litter from site operations discovered during the daily
inspections or observed on adjacent properties shall be picked up and containerized for
disposal at the end of each operating day, unless the landowner of the adjacent property
denies access to site staff.
1.9 SEVERE WEATHER CONDITIONS
Unusual weather conditions can directly affect the operations of the facility. Some of
these weather conditions and recommended operational responses are as follows.
1.9.1 Ice Storms
An ice storm can make access to the facility dangerous, prevent movement and
thus, may require closure of the facility until the ice is removed or has melted.
The determination to discontinue activities due to inclement weather conditions
will be made by the Transfer Station Manager.
1.9.2 Heavy Rains
Exposed soil surfaces can create a muddy situation in some portions of the
facility during rainy periods. The control of drainage and use of crushed stone on
unpaved roads should provide all-weather access for the site and promote
drainage away from critical areas. In areas where the aggregate surface is
washed away or otherwise damaged, new aggregate should be used for repair.
1.9.3 Electrical Storms
The open areas of the facility are susceptible to the hazards of an electrical
storm. If necessary, activities will be temporary suspended during such an
event. Refuge will be taken in the on -site building or in rubber -tired vehicles.
1.9.4 Windy Conditions
Facility operations will be adjusted as necessary to account for windy conditions.
1.9.5 Violent Storms
In the event of hurricane, tornado, or severe winter storm warning issued by the
National Weather Service, facility operations may be temporarily suspended until
the warning is lifted. Buildings and equipment will be properly secured.
Vance County Transfer Station Operations Plan
September 2022 Page 8
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
1.10 HEALTH AND SAFETY
All aspects of the facility operations were developed with the health and safety of the
operating staff, customers, and neighbors in mind. Prior to commencement of
operations at the facility, a member of the operating staff will be designated the site's
safety officer. This individual, together with the facility's management will modify the
site's safety and emergency response program to ensure consistency with the
Occupational Safety and Health Administration (OSHA) guidance.
Safety equipment provided includes equipment rollover protection cabs, seat belts,
audible reverse warning devices, Personal Protection Equipment (PPE), and first aid
kits. Facility personnel will be encouraged to complete the American Red Cross Basic
First Aid Course. Other safety requirements as designated by the Owner will also be
implemented.
Facility employees will be routinely trained in health and safety by supervisory staff. All
training will be documented. The following are some general recommendations for the
health and safety of workers at the Vance County Transfer Station facility.
1.10.1 Personal Hygiene
The following items are recommended as a minimum of practice:
• Wash hands before eating drinking, or smoking.
• Wear personal protective equipment as described in Section 1.10.2.
• Wash, disinfect, and bandage ANY cut, no matter how small it is. Any
breaks in the skin can become a source of infection.
• Keep fingernails closely trimmed and clean (dirty nails can harbor
pathogens).
1.10.2 Personal Protection Eauioment
PPE must be evaluated as to the level of protection necessary for particular
operating conditions and then made available to facility employees. The list
below includes the PPE typically used and/or required in a solid waste
management facility workplace.
• Safety shoes with steel toes.
• Noise reduction protection should be used in areas where extended
exposure to continuous high decibels levels is expected.
• Disposable rubber latex or chemical resistant gloves for handling and/or
sampling of waste materials.
• Dust filter masks.
• Hard hats (in designated areas).
• Portable eyewash.
Vance County Transfer Station Operations Plan
September 2022 Page 9
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
• Safety goggles.
• Safety vests.
Following use, PPE's should be disposed of or adequately cleaned, dried, or
readied for reuse.
1.10.3 Mechanical Equipment Hazard Prevention
All equipment should be operated with care and caution. All safety equipment
such as horns, backup alarms, and lights should be functional. A Lockout-
Tagout program will be used to identify equipment in need or under repair and
ensure that operation is "off-limits" prior to maintenance or repair. All
operators will be trained in the proper operation of equipment.
1.10.4 Employee Health and Safety
Some general safety rules are:
• Consider safety first when planning and conducting activities.
• Review the equipment 0&M manual(s) prior to attempting
repairs/changes.
• Remember the buddy system for repair of mechanical equipment
• Post emergency contact phone numbers.
• Provide easy and visible access to the Right to Know materials.
• Provide easy and visible access to the first aid kits and fire extinguishers.
1.10.5 Physical Exposure
Facility personnel may come in contact with the fluids, solids, and airborne
constituents found at the transfer station. Routine training should be conducted
regarding individual and collective materials and their associated hazards.
Training concerning safe workplace practices around these potential exposures
should instruct employees on the proper use of equipment and proper disposal
procedures.
1.10.6 Safety Data Sheets
Safety Data Sheets (SDS) will be collected on every waste (if available) that enters
the facility. Information will also be made available for all chemicals stored on
site for use by the facility. SIDS sheets will be stored in a location with all other
Right to Know information for the site.
Vance County Transfer Station Operations Plan
September 2022 Page to
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
1.11 UTILITIES
Electrical power, water and telephone will be provided at the scale house/office.
Restrooms will be provided at the site.
1.12 RECORD KEEPING PROGRAM
The Vance County Transfer Station facility will maintain the following records in the
operation record at the scale house:
A. Current permit(s) (Permit to Construct, Permit to Operate, etc.);
B. Current operations manual/plan(s) and engineering plan;
C. Inspection reports;
D. Audit and compliance records;
E. Annual facility reports;
F. Cleaning and maintenance records;
G. Waste inspection records (see Section 2.4);
H. Daily tonnage records - including source of generation, scale certifications,
I. Waste determination records;
J. List of generators and haulers that have attempted to dispose of restricted
wastes;
K. Employee training procedures and records of training completed;
L. Cost estimates or financial assurance documentation;
M. OSHA 300 logs; and
N. Screening logs.
The operating records will be kept up to date by the Owner or his designee. It will be
presented upon request to the DWM for inspection. Additionally, the Owner or his
designee shall submit to the DWM upon written request any information or records
required to be kept under the conditions of the permit or the rules.
Vance County Transfer Station Operations Plan
September 2022 Page 11
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
Vance County Transfer Station Operations Plan
September 2022 Page 12
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
2.0 WASTE HANDLING OPERATIONS
2.1 OVERVIEW
This section describes the required waste handling operations for the Vance County
Transfer Station facility. In addition to the MSW waste, the facility will also process
recyclables, (such as new construction waste including lumber, ferrous and non-ferrous
metals, etc.). These materials will be stored at the facility in durable, rust -resistant,
watertight, rodent proof, and cleanable containers, in accordance with Rule 15A NCAC
1313 .0104 as further described within, until there are sufficient quantities for pick up by
various recycling contractors.
2.2 ACCEPTABLE WASTES
The Vance County Transfer Station facility will only accept waste that is consistent with
the North Carolina solid waste regulations and the general conditions established in the
operating permit. The acceptance of waste materials must satisfy the following
definitions: The acceptance of materials is summarized in Table 3 below for each
designated area shown in Figure 2.
Table 3. Acceptable Waste SummaryM
Waste Type
MSW
Coo
Recycling
Municipal Solid Waste
✓
Prohibited
Construction & Demolition Debris
✓
✓
New Construction Debris
✓
✓
✓
Inert Debris
✓
✓
✓
Land Clearing Debris
✓
Asphalt
✓
✓
✓
Cardboard, Newsprint, Paper,
Magazines
✓
Glass, Plastic
✓
CCA/Creosote Treated woods
,i
Not accepted if separate
from C&D waste
Metals, Steel, Aluminum (cans
included)
Aluminum Cans Prohibited
✓
Pallets, Tires, White Goods
Not Accepted
Used Oil/Motor Vehicle Oil Filters
Lead Acid Batteries
Yard Waste, Oyster Shells
Computer equipment and TVs
Antifreeze (ethylene glycol)
Vance County Transfer Station Operations Plan
September 2022 Page 13
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Waste Type
MSW
Coo
Recycling
Certain Recyclable Rigid plastic
containers
Not Accepted
Containers (w/liquids)
Asbestos
Medical
Wastewater Treatment/Domestic
Not Accepted
Prohibited
Sludge
Hazardous Waste, Radioactive
Waste
Polychlorinated biphenyls (PCB)
wastes
Prohibited
Bulk or non -containerized liquid
wastes
Lamps or bulbs, ballasts or
fixtures
Not accepted if separate
from C&D waste
Thermostats and light switches
Lead pipes, lead roof flashing
Transformers / Capacitors
Notes:
1.) Waste banned by G.S. 130A-309.10 and waste banned by local law or ordinance at the disposal
destination are not accepted by the transfer station.
2.3 WASTE DEFINITIONS
The following definitions are associated with the waste acceptance outlined in
Section 2.2 (above):
Municipal solid waste as defined by the North Carolina General Statutes
130A-290(a)(18a) means any solid waste resulting from the operation of
residential, commercial, industrial, governmental, or institutional
establishments that would normally be collected, processed, and disposed of
through a public or private solid waste management service. Municipal solid
waste does not include hazardous waste, sludge, industrial waste managed
in a solid waste management facility owned and operated by the generator of
the industrial waste for management of that waste, or solid waste from
mining or agricultural operations.
Solid waste as defined by the North Carolina General Statutes 130A-
290(a)(35) means any hazardous or nonhazardous garbage, refuse or sludge
from a waste treatment plant, water supply treatment plant or air pollution
control facility, domestic sewage and sludges generated by the treatment
thereof in sanitary sewage collection, treatment and disposal systems, and
other material that is either discarded or is being accumulated, stored or
treated prior to being discarded, or has served its original intended use and is
generally discarded, including solid, liquid, semisolid or contained gaseous
material resulting from industrial, institutional, commercial and agricultural
operations, and from community activities.
Vance County Transfer Station Operations Plan
September 2022 Page 14
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
• Construction and Demolition Debris Waste: as defined in G.S. 130A-290 (a)(4)
means solid waste resulting solely from construction, remodeling, repair or
demolition operations on pavement, buildings, or other structures, but does
not include inert debris, land -clearing debris or yard waste.
• Inert Debris Waste: as defined in G.S. 130A-290 (a)(14) means solid waste that
consists solely of materials such as concrete, brick, concrete block,
uncontaminated soil, rock, and gravel.
• Land Clearing and Inert Debris Waste: as defined in G.S. 130A-290 (a)(15)
means solid waste that is generated solely from land -clearing activities, such
as stumps and tree trunks.
• Asphalt: in accordance with NCGS 130A-294(m).
• Other Wastes as Approved by the Solid Waste Section of the Division of Waste
Management.
• Hazardous waste as defined by NC General Statute 130A-290 (a) (8), including
hazardous waste from conditionally exempt small quantity generators.
• Polychlorinated biphenyls (PCB) wastes as defined in 40 CFR 761 with the
exception of trace amounts found in materials such as consumer electronics.
• Bulk or non -containerized liquid wastes unless the waste is household waste
other than septic waste, waste oil, or the waste is a leachate or gas
condensate derived from the MSW landfill unit. A liquid determination will
be performed by the paint filter test (see Appendix B for apparatus and
procedures).
• Containers holding liquid wastes unless the waste is household waste.
• Wastewater treatment sludge. Wastewater treatment sludge may be
accepted, with the approval of the DWM, for utilization as a soil conditioner
and incorporated into or applied onto the vegetative soil layer component of
the final cover system. In this case, the sludge will be applied at no greater
than agronomic rates and to a maximum depth of six inches.
• Containers such as tubes, drums, barrels, tanks, cans, and bottles unless
they are empty and perforated to ensure that no liquid, hazardous, or
municipal solid waste is contained therein;
• Garbage as defined in G.S. 130A-290(a)(7);
• Hazardous waste as defined in G.S. 130A-290(a)(8), to also include hazardous
waste from conditionally exempt small quantity generators;
• Industrial solid waste unless a demonstration has been made and approved
by the DWM that the landfill meets the requirements of Rule .0503(2)(d)(ii)(A);
• Medical waste as defined in G.S. 130A-290(a)(18);
• Municipal solid waste as defined in G.S. 130A-290(a)(18a);
• Polychlorinated biphenyls (PCB) wastes as defined in 40 CFR 761;
• Radioactive waste as defined in G.S. 104E-5(14);
• Septag_e as defined in G.S. 130A-290(a)(32);
• Sludge as defined in G.S. 130A-290(a)(34);
• Special wastes as defined in G.S. 130A-290(a)(40);
• White goods as defined in G.S. 130A-290(a)(44); and
• Yard trash as defined in G.S. 130A-290(a)(45).
Vance County Transfer Station Operations Plan
September 2022 Page 15
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
2.4 WASTE SCREENING PROGRAMS
To assure prohibited wastes are not entering the facility, screening programs have been
implemented. Waste received at the scale house entrance and waste taken to the
tipping area or the storage container area is inspected by trained personnel. These
individuals have been trained to spot indications of suspicious wastes, including:
hazardous placarding or markings, liquids, powders or dusts, sludges, bright or unusual
colors, drums or commercial size containers, and "chemical" odors. Screening
programs for visual and olfactory characteristics of prohibited wastes are an ongoing
part of the facility operation.
2.4.1 Waste Receivino and Inspection
All vehicles must stop at the scale house located near the entrance of the facility
and visitors are required to sign -in. All waste transportation vehicles are
weighed and the content of the load assessed. The scale attendant(s) requests
from the driver of the vehicle a description of the waste it is carrying to ensure
that unacceptable waste is not allowed into the facility. The attendant(s) then
visually checks the vehicle as it crosses the scale. Signs informing users of the
acceptable and unacceptable types of waste are posted at the scale house or in
the vicinity of the entrance to the site. Once passing the scales, the vehicles are
routed to the appropriate tipping floor or recovery area.
Vehicles are randomly selected for screening on a regular basis, depending on
personnel availability. Site personnel will ensure that each waste stream
received at the site is equitably inspected. At least one vehicle per week, but not
less than 5% of the average daily waste tonnage reported in the site's annual
report for the previous year, will be randomly selected by inspection personnel.
However, if something looks suspicious is spotted in any waste load, the load is
inspected further. Selected vehicles are directed to an area of the tipping floor
where the vehicle is unloaded. Waste is carefully spread using suitable
equipment. An attendant trained to identify wastes that are unacceptable for
processing inspects the waste discharged at the screening area. If unacceptable
waste is found, the load will be isolated, reloaded, and the generator/hauler will
be logged and escorted out of the facility.
For unacceptable wastes that are non -hazardous, the Owner will record in
writing and keep records for no less than five (5) years (see Section 1.12).
Records shall be made available to the division during a site inspection or upon
request. The hauler is responsible for removing unacceptable waste from the
facility's property.
For unacceptable wastes that are hazardous, the Hazardous Waste Contingency
Plan outlined in Section 2.4.2 will be followed. To determine the liquid content of
the waste, a liquid determination will be performed by the paint filter test (see
Vance County Transfer Station Operations Plan
September 2022 Page 16
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Appendix C for apparatus and procedures). The hauler is responsible for
removing unacceptable waste from the facility's property. If no unacceptable
waste is found, the load will be processed for recoverable items. All random
waste inspections will be documented by facility staff using the waste screening
form provided in Appendix B. In accordance with Rule 15A NCAC 13B.
0405(a)(8)(A), waste screening logs generated from waste inspections shall be
kept in the operating record for a minimum of five (5) years.
Records of information gathered as part of the waste screening programs will be
maintained at the site during its active life and as long as required by Vance
County Transfer Station and DWM, or for a minimum of five (5) years.
2.4.2 Hazardous Waste Contingency Plan
In the event that identifiable hazardous waste or waste of questionable character
is detected at the facility, appropriate equipment, protective equipment,
personnel, and materials as necessary will be employed to isolate the wastes.
DWM will be notified immediately (see Section 1.2.3) that an attempt was made
to dispose of hazardous waste at the facility. If the vehicle attempting disposal of
such waste is known, all attempts will be made to prevent that vehicle from
leaving the site or, if the vehicle has left the site, immediate notice will be served
on the vehicle owner that hazardous waste, for which they have responsibility,
has been delivered to the facility.
The facility will assist DWM as necessary and appropriate in the removal and
disposition of the hazardous waste and in the prosecution of responsible parties.
If needed, the hazardous waste will be covered with tarp material until such time
when an appropriate method can be implemented to properly handle the waste.
The cost of the removal and disposing of the hazardous waste will be charged to
the owner of the vehicle involved. Any vehicle owner or operator who knowingly
delivers hazardous waste to the facility may be barred from using the facility.
Should an incident where hazardous waste is found at the facility occur, the event
will be documented by staff using the waste screening form provided in Appendix
B.
2.5 FACILITY OPERATIONS
2.5.1 Operating Capacity
Waste may be stored onsite in leak -resistant transfer trailers with watertight
covers, for up to 24-hours except when the facility is closed during a weekend or
a holiday.
Vance County Transfer Station Operations Plan
September 2022 Pagel?
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
2.5.2 Disposal Facility
The anticipated disposal facilities for the transfer station (subject to change)
include any facility in the State of North Carolina or the Commonwealth of
Virginia that holds a solid waste permit for the specific waste disposed, and
whose service area includes the origin of the waste.
2.5.3 Access
Traffic will be clearly directed to the appropriate tipping floor or recovery area.
The traffic speed on the site should be less than 10 MPH. Rutting of gravel
roadway surfaces must be repaired by the placement of additional gravel on the
roadway and not solely by grading the rut. This will maintain the separator
geotextile placed below most gravel roadway surfaces. Paved portions of access
roads will also be monitored, maintained, and repaired as needed. Any record of
maintenance or repairs will be kept along with other records as mentioned in
Section 1.12.
2.5.4 General Procedures
The transfer operations will be conducted in accordance with the approved
Operation Plan and conditions of the Solid Waste Permit issued by the DWM.
Facility operations are anticipated as follows:
1. Collection vehicles delivering waste to the facility will enter through the main
entrance;
2. Collection vehicles will pass by and over the scales for weighing;
3. Collection vehicles will continue along the access road until reaching the
transfer station tipping area(s).
4. The tipping area has "push" walls running along the interior of the building
that direct the waste to an open "hopper", where waste will be loaded into the
transfer trailers and/or equipment on the lower level of the building.
5. An attendant will direct vehicles, waiting to unload, to back into the facility
through the entrance. Adequate area is available in front of the transfer area
for drivers to queue their vehicles into a backing maneuver. Operating
personnel will be on the station floor to direct and guide the vehicles.
6. The vehicles will back onto the tipping floor to an area designated by the
attendant.
7. Once the vehicle is in position, the waste load will be discharged directly onto
the tipping floor.
8. The discharged waste load will be inspected before it is mixed with other
waste on the tipping floor and loaded into the open top transfer trailers
Located in the lower level of the transfer station. All MSW waste will stay in
the covered area of the transfer station.
Vance County Transfer Station Operations Plan
September 2022 Page 18
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
2.5.5 Recycling and Recovery
Recyclables arrive and remain segregated from MSW and are loaded into open
top trailers.
2.5.6 Saecial Waste Management
2.5.6.1 Asbestos Management
The Vance County Transfer Station facility does not process any known or
recognized asbestos containing materials. For unacceptable waste that
is discovered, the Hazardous Waste Contingency Plan outlined in Section
2.4.2 will be followed.
2.6 MARKETS
The final destination of the recyclable materials separated from the waste may vary
depending on market prices for such materials.
2.? RECOROKEEPING
The facility will maintain accurate records of daily waste activities. Daily records will
document the weight of waste received and the origins of the loads. Additionally, the
operator will maintain monthly records of the amount of waste transported for disposal.
On or before August 1 annually, the operator will submit a facility report to the DWM and
to each county from which waste was received. Minimally, the facility report will
document the tons of waste received on a monthly basis, the origin of the waste, the type
of waste received, the tons diverted, and the tons disposed.
2.8 Operational Contingency Plan
Periodically, the site may experience events that may restrict or prevent the facility from
operating normally. The following contingency plan has been prepared in accordance
with 15A NCAC 13B.0404(i)(10) to identify operational procedures that will be employed
in the event these conditions arise. The contingency plan will be kept on -site, including
emergency procedures and contact information in case of emergencies. Emergency
contact numbers provided in Section 1.2 will also be posted at the site scale house.
2.8.1 Loss of Power
In the event of a power outage, the site will accept waste based on volume and
load counts until power can be restored. The scale house computer has battery
Vance County Transfer Station Operations Plan
September 2022 Page 19
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
back-up and a back-up hard drive to maintain records in the event of a power
and/or network outage.
2.8.2 Loss of Communication
Multiple communication devices are employed at the site to avoid loss of
communications. Two-way radios or cell phones are maintained between the
site manager, operators and scale house for day-to-day communications. The
scale house has telephones in case of emergency and to conduct day-to-day
business. Cellular phones are available for key operating staff (i.e. managers,
operators).
2.8.3 Storm Surges
The site does not serve as a disposal site. In the event of a storm surge,
materials exceeding the sites operational limits would be diverted to another
permitted solid waste facility capable of handling the storm surge.
2.8.4 Scale and Scale Software Malfunction
In the event the scale and/or scale software malfunctions, the site will accept
waste based on volume and load counts until the scale and/or scale software can
be repaired. The scale house computer has battery back-up and a back-up hard
drive to maintain records in the event of a power and/or network outage.
2.8.5 Equipment
As provided in Section 1.3.4 the site equipment is of sufficient type and quantity to
be able to operate, in the event of equipment malfunction. Should a disruption in
the waste screening equipment occur or should material quantities exceed the
equipment operating capacity, the facility may temporarily close and divert
materials to another permitted solid waste facility until repairs can be made that
would allow the site to return to normal operating conditions.
Vance County Transfer Station Operations Plan
September 2022 Page 20
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
3.0 ENVIRONMENTAL MANAGEMENT
3.1 OVERVIEW
This section reviews the overall environmental management tasks required for the
successful operation of the processing and recovery facility.
3.2 SURFACE WATER RUNOFF CONTROL
Waste and recyclable materials will be unloaded within the covered areas of the transfer
station building or directly into storage containers during periods of inclement weather.
Waste will not be unloaded or stored in standing water.
The site will be maintained in a fashion to divert surface water away from the
transferring and storage areas. Proper control of surface water at the transfer or
recycling areas will accomplish the following goals:
• Prevent the run-on of surface water into waste handling area(s);
• Prevent the run-off of surface water that has come into contact with the waste
(i.e., leachate);
• Limit the erosion caused by surface waters; and
• Limit sediments carried off -site by surface waters.
3.3 LEACHATE MANAGEMENT
The leachate management system for the MSW transfer station consists of concrete
tipping floor, collection trenches and leachate transmission piping, pumps, and an
underground storage tank. The transfer station tipping floor and loading areas are
designed to contain and direct leachate to the collection system.
3.3.1 Leachate Collection
All wash -down water which comes into contact with the waste, tipping floor,
loading bay floor, or waste handling equipment will be treated as leachate.
Leachate from the transfer station floor flows through the hopper and into the
lower level of the building or into a concrete curb and trough at the front edge of
the tipping floor. Leachate is collected in floor drains and gravity flows into the
underground storage tank where it is monitored weekly and removed via "pump
and haul" to an authorized waste water treatment facility. If there is evidence
that the drain is not working properly, staff will initiate the necessary
maintenance activities.
It is not anticipated that any leachate will get outside of the collection area as the
site is paved with drains flowing to the leachate collection system. However, in
the event a leachate release makes contact with soil, the spill will be contained
Vance County Transfer Station Operations Plan
September 2022 Page 21
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
as much as practical by staff (using excavation, soil berms, or other means) and
the DWM will be notified verbally or in writing within 24 hours from the time
when a leachate release is observed.
3.3.2 Operation and Maintenance of Leachate Pumo and Storage Tank
Operation and maintenance of leachate pumps and the grit storage tanks shall
be in accordance with the appropriate manufacturer's recommendations. The
pumps and storage tanks will be inspected weekly, at a minimum. The
underground storage tank shall be pumped before reaching its maximum
capacity of 18" from the top of the tank. If there is evidence that they are not
functioning properly, staff will initiate the necessary maintenance actions. The
Owner or his designee will be responsible for following and documenting, as
required, these activities.
3.4 VECTOR CONTROL
The tipping floor and recovery areas will be maintained in a clean, orderly, and sanitary
condition to effectively control vectors. The transfer areas will be cleaned and swept
daily and washed down weekly, at a minimum. If vector control becomes a problem,
additional measures will be taken to ensure the protection of human health.
3.5 ODOR CONTROL
3.5.1 MSW Materials
Odorous or potentially odorous MSW materials will be loaded into trailers as
soon as possible to avoid odor problems.
3.5.2 CCD Materials
Due to the nature of the type of C&D waste materials reclaimed, transferred, and
stored at this facility, odor is not expected to be of concern.
3.6 Dust Control
Dust generated by the processing activities will be limited by misting the materials, as
needed. The access roads to the tipping floor and the travel lanes from the trailer
loading areas are paved which will minimize dust generation.
3.? Site Cleanin and Maintenance
All waste shall be removed from the tipping floor, truck loading bays, and from behind
push walls at the end of each working day. The tipping floor, truck loading bays, and
Vance County Transfer Station Operations Plan
September 2022 Page 22
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
push walls shall be cleaned with a pressure washer no less than once per month.
Remaining areas of the building including but not limited to, side walls and any material
storage areas outside of the building shall be cleaned with a pressure washer no less
than twice per year. Any wash water generated from these activities shall be contained,
collected, and treated as leachate. Cleaning and maintenance records shall be
maintained and made available to DWM as mentioned in Section 1.12.
Vance County Transfer Station Operations Plan
September 2022 Page 23
DocuSign Envelope ID: ODD 1 028F-FEAC-4D47-BEO8-2F52CEC791 OE
This page intentionally left blank.
Vance County Transfer Station Operations Plan
September 2022 Page 24
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
4.0 CLOSURE PLAN
4.1 Closure Schedule
Closure activities will begin on the following schedule:
• No less than 90 days prior to the proposed date of cessation of waste acceptance
at the site, written notification of closure will be submitted to the Division.
• No later than 30 days after receipt of waste at the site, closure activities shall
begin.
• Closure activities shall be complete within 180 days of beginning.
• The Division shall be notified in writing that the requirements of Rule 15A NCAC
13B .0406(b) have been met.
• The Division shall conduct a final inspection to verify the conditions of closure
have been met.
4.2 Closure Activities
The owner or operator shall complete the closure activities stated in Rule 15A NCAC 13B
.0406(b).
The owner or operator shall post a minimum of one sign at the entrance of the facility
notifying all who utilize the facility of the date of closing and the prohibition against
further receipt of waste materials after the stated date. Suitable barriers shall be
installed at all gates or access points. As the facility is contained by perimeter fencing, a
lock on the main gate and other access gates is suitable.
The facility includes a bi-level prefabricated metal building, a scale house with scales, a
leachate collection system. At the time of closure, the owner or operator will remove all
waste, waste residue, and any recovered materials from the site and dispose at a facility
listed in Section 2.5.2 Disposal Facility. The tipping floor, loading pit, walls and ceiling
of the transfer station, and any other part of the processing areas will be washed down
and disinfected. The leachate collection system will be washed down and disinfected
and will be abandoned in place. The grit separator and pumpstation will be emptied,
washed down and disinfected. The stormwater drainage features on site will remain in
working order.
If required by the Division, a corrective action program will be conducted following the
closure of the site.
Vance County Transfer Station Operations Plan
September 2022 Page 25
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
4.3 Closure Costs and Financial Assurance
A closure cost estimate has been prepared in accordance to Rules 15A NCAC 13B
.1801(e) and .1802(a)(1). The site shall also annually adjust the closure cost estimate
and the financial assurance for inflation according to Rule 15A NCAC .1802(b). A closure
cost estimate is attached as Appendix D.
Vance County Transfer Station Operations Plan
September 2022 Page 26
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Figures
Operations Manual
Vance County Transfer Station
NC Solid Waste Permit 91-02T
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
0 1AD 2,000 3,000 4,000
Feet
SITE LOCATION
REFERENCE
1. BASEMAP FROM USGS 7.5-MINUTE QUADRANGLE
"HEN DERSON, NC", DATED 2017,
VANCECOUNTY TRANSFER STATION SMITH+GARONER
HENDERSON, NORTH CAROLINA
SITE LOCATION MAP ENGINEERS
ekNny12nArenu&�Id&h,NC2a603 I K '' F137r, l'. '.-FRIN6}
DRAWN: APPROVED SCALE: OATE: PROJECT NO.: IFIGUREND.:
JDM I LJK 1:24,000 1 Aug.2022 I GFLTRANSFER-22-1 1
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This Page Intentionally Left Blank
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Appendix A
Fire Occurrence Notification Form
Operations Manual
Vance County Transfer Station
NC Solid Waste Permit 91-02T
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD 1 028F-FEAC-4D47-BE08-2F52CEC791 OE
SOLID WASTE MANAGEMENT FACILITY
FIRE OCCURRENCE NOTIFICATION
NCDEQ Division of Waste Management
Waste Management Solid Waste Section
ENVIRONMENTAL QUALITY
Notify the Section verbally within 24 hours and submit written notification within 15 days of the occurrence.
(If additional space is needed, use back of this form)
NAME OF FACILITY:
DATE AND TIME OF FIRE:
HOW WAS THE FIRE REPORTED AND BY WHOM:
LIST ACTIONS TAKEN:
WHAT WAS THE CAUSE OF THE FIRE:
0
DESCRIBE AREA, TYPE, AND AMOUNT OF WASTE INVOLVED:
WHAT COULD HAVE BEEN DONE TO PREVENT THIS FIRE:
DESCRIBE PLAN OF ACTIONS TO PREVENT FUTURE INCIDENTS:
PERMIT #
NAME: TITLE: DATE:
***********************************************************************************************************
THIS SECTION TO BE COMPLETED BY SOLID WASTE SECTION REGIONAL STAFF
DATE RECEIVED
List any factors not listed that might have contributed to the fire or that might prevent occurrence of future fires:
FOLLOW-UP REQUIRED:
❑ NO ❑ PHONE CALL ❑ SUBMITTAL ❑ MEETING ❑ RETURN VISIT BY: (DATE)
ACTIONS TAKEN OR REQUIRED:
Revised 611512016
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Appendix
Waste Screening Form
Operations Manual
Vance County Transfer Station
NC Solid Waste Permit 91-02T
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
GFL Environmental Inc.
Vance County Transfer Station
Permit No. 91-02T
WASTE SCREENING FORM
Day / Date: Time Weighed in:
Truck Owner: Driver Name:
Truck Type: Vehicle ID / Tag No:
Weight: Tare:
Waste Generator / Source:
Reason Load Inspected
Inspection Location:
Random Inspection
Detained at Scales
Detained by Operating Staff
Approved Waste Determination Form Present? Yes
Description of Load:
Load Accepted (signature)
Load Not Accepted (signature)
Reason Load Not Accepted (complete only if load not accepted)
Description of Suspicious Contents:
Color:
Texture:
Drums Present:
Est. Cubic Yards in Load:
Est. Tons in Load:
No
Staff Initials
Staff Initials
Staff Initials
Date
Date
Hazardous Waste Markings:
Smell:
Waste Industries, LLC. Emergency Management Contacted? Yes
Company or Authority Contacted?
Hazardous Materials Present:
Hauler Notified (if waste not accepted) Phone:
Other Observations:
Final Disposition
Signed:
Waste Screening Inspector or Solid Waste Manager
Attach related correspondence to this form.
File completed form in Operating Record.
Date
IM 1
No
Time Contacted:
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD 1 028F-FEAC-4D47-BE08-2F52CEC791 OE
Appendix
Paint Filter Liquids Test
EPA Methods 9095
Operations Manual
Vance County Transfer Station
NC Solid Waste Permit 91-02T
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
METHOD 9095
PAINT FILTER LIQUIDS TEST
From EPA SW-846
1.0 SCOPE AND APPLICATION
1.1 This method is used to determine the presence of free liquids in a representative sample
of waste.
1.2 The method is used to determine compliance with 40 CFR 264.314 and 265.314.
2.0 SUMMARY OF METHOD
2.1 A predetermined amount of material is placed in a paint filter. If any portion of the
material passes through and
drops from the filter within the
5-minute test period, the
material is deemed to contain
free liquids. PAINT FILTER�LIQUIDS TEST
3.0 INTERFERENCES
3.1 Filter media were
observed to separate from the
filter cone on exposure to
alkaline materials. This
development causes no
problem if the sample is not
disturbed.
4.0 APPARATUS AND
111FAIl;II!1p
4.1 Conical paint filter:
Mesh number 60 (fine meshed
size). Available at local paint
stores such as Sherwin-
Williams and Glidden for an
approximate cost of $0.07 each.
%95-9
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
4.2 Glass funnel: If the paint filter, with the waste, cannot sustain its weight on the ring
stand, then a fluted glass funnel or glass funnel with a mouth large enough to allow at least 1
inch of the filter mesh to protrude should be used to support the filter. The funnel is to be fluted
or have a large open mouth in order to support the paint filter yet not interfere with the
movement, to the graduated cylinder, of the liquid that passes through the filter mesh.
4.3 Ring stand and ring or tripod.
4.4 Graduated cylinder or beaker: 100-mL.
5.0 REAGENTS
5.1 None.
6.0 SAMPLE COLLECTION, PRESERVATION, AND HANDLING
6.1 All samples must be collected according to the directions in Chapter Nine of EPA SW-
846.
6.2 A 100 mL or 100 g representative sample is required for the test
obtain a sample of 100 mL or 100 g that
is sufficiently representative of the
waste, the analyst may use larger size
samples in multiples of 100 mL or 100 g,
i.e., 200, 300, 400 mL or g. However,
when larger samples are used, analysts
shall divide the sample into 100-mL or
100-g portions and test each portion
separately. If any portion contains free
liquids, the entire sample is considered
to have free liquids.
7.o PROCEDURE
7.1 Assemble test apparatus as
shown in Figure 1.
7.2 Place sample in the filter. A
funnel may be used to provide support
for the paint filter.
7.3 Allow sample to drain for 5
minutes into the graduated cylinder.
RING STAND
If it is not possible to
FIGURE 1. PAINT FILTER TEST APPARATUS.
7.4 If any portion of the test material
collects in the graduated cylinder in the 9Q95-3
PAINT FILTER
-R
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
5-min. period, then the material is deemed to contain free liquids for purposes of 40 CFR
264.314 and 265.314.
8.0 QUALITY CONTROL
8.1 Duplicate samples should be analyzed on a routine basis.
9.0 METHOD PERFORMANCE
9.1 No data provided.
10.0 REFERENCES
10.1 None required.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
Appendix
Closure Cost Estimate
Operations Manual
Vance County Transfer Station
NC Solid Waste Permit 91-02T
DocuSign Envelope ID: ODD1028F-FEAC-4D47-BE08-2F52CEC7910E
This page intentionally left blank.
DocuSign Envelope ID: ODD 1 028F-FEAC-4D47-BEO8-2F52CEC791 OE
SMITH GARDNER
Vance County Transfer Station (NC Solid Waste Permit No.91-02T)
Engineer's Closure Construction Cost Estimate
DATE 15-Sep-22
BY LJK
Item
No.
Item
Uescription Unit
Contractor
Comments
Quantity
Unit Price
Total Price
1.o
Facility Area (Horizontal Plan) ---- > AC 5
Pre -Remedial Response
Subtotal
$2,500.00
1.1
Coordination, Contracts, and Management
AC
5
$500.00
$2,500.00
2.0
lRemedial Response Activities
$47,062.00
2.1
ISurveys and Layout
AC
5
$350.00
$1,750.00
S+G Estimate
2.2
Mobilization, Demobilization, and Project Closeout
AC
5
$500.00
$2,500.00
S+G Estimate
2.3
Wash Down & Cleanup of the Recovery Area & Leachate Collection System
DY
2
$1,800.00
$3,600.00
Assume single work crew per day.
2.4
Fencing G Concrete Barrier Protection
LS
1
$5,000.00
$5,000.00
Assume close process area and place concrete barriers
across access road.
2.5
Excess Disposal
TN
400
$46.00
$18,400.00
Assumes a waste volume fortwo (2) days at 200
tons/day of MSW and disposal at the Sampson County
Landfill.
2.8
Excess Recycling 6 Processing Material
TN
�2
$46.00
$3,312.00
Assumes maximum storage volume of recyclables
materials for three (3)trailers and disposal at Sampson
County Landfill.
2.7
Erosion G Sediment Control(grading, silt fence, maintenance, etc.)
AC
5
$750.00
$3,750.00
S+G Estimate
2.8
Reve etation
AC
5
$1,750.00
$8,750.00
S+G Estimate
3.0
Quality Assurance, Certification, & Deed Notation
$4,500.00
3.1
Engineering and Reporting
LS
1
$3,000.00
$3,000.00
S+G Estimate
3.2
ISurveyingand Deed Notation
LS
1
$1,500.00
$L500.00
S+G Estimate
Remedial Response Estimate -----> $54,062 (2022$)
10%Contingency ----- > $5,406 (2022$)
Total Estimate ----> $59,468 (2022$) (See Notes 19 2)
Notes:
1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDENR Division of Waste Management per http://Porta[.ncdenr.org/web/wm/sw/financialassurance
if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor and is considered acceptable
within a+/- 10%of the Total Estimate value.
_ Denotes values calculated in spreadsheet.