Loading...
HomeMy WebLinkAbout91_N1090_INSP_20230130NORTH CARnLINAD_E Q�� o.n.mm.m m c.wm..rem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID X YW Transfer Compost SLAS COUNTY: VANCE MSWLF PERMIT NO.: N1090 Closed HHW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: January 30, 2023 FACILITY NAME AND ADDRESS: Tungsten Mine Stump Dump 4174 Tungsten Mine Rd. Oxford, NC 27507 GPS COORDINATES: Lat.: 36.504940' Date of Last Inspection: June 28, 2022 Long.:-78.476717' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Alan and Melissa Faulkner, Faulkner Grading and Landscaping Inc. Telephone: (252) 430-9525 (Landowner); (252) 492-7703 (Faulkner Grading) Email address: faulknergrading@yahoo.com FACILITY CONTACT ADDRESS: Alan and Melissa Faulkner Faulkner Grading and Landscaping, Inc. PO Box 2258 Henderson, NC 27536 PARTICIPANTS: Amanda Thompson — NCDEQ, Solid Waste Section STATUS OF PERMIT: Notified LCID approved March 24, 2017. Recorded in Vance County Register of Deeds: Book 1323 — Page 483. Based on rule 15A NCAC 13B .0563 (6), within 5 years of the effective date, notified LCID landfills will need to be properly closed or obtain a permit from the Division of Waste Management. The facility is in the process of obtaining a Permit from the Section. PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: None. Page 1 of 3 NORTH CARnLINAD_E Q�� OepaNnent W Environnnnbl puel� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1. The access road is of all-weather construction and appears to be properly maintained. 2. The gate was locked at the time of this inspection. 3. The site has adequate signage posted adjacent to the gate and visible from the road. 4. Permanent edge of waste markers were observed during this inspection. 5. The waste stream observed appeared to be clean. No unacceptable wastes were observed within the waste stream. Any identified unacceptable wastes are removed for proper disposal. 6. The working face was approaching the one -acre size limit. Ensure that the LCID is covered with six inches of soil monthly or when the working face reaches one acre in size, whichever occurs first. 7. Some standing water was observed in equipment tracks on top of the LCID from recent rains. No large areas of standing water were observed on top of the LCID. Continue to ensure that the LCID is graded to shed water from the top of the LCID. 8. Grasses were beginning to grow along the side slopes. 9. An access roadway was present around the entire landfill. 10. A lean-to had been constructed for the attendant. 11. Digital pictures were taken during the inspection. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by Amanda Amanda Thompson Thompson Date: 2023.02.0308:21:41 05'00' Phone: 910-433-3352 Amanda Thompson Environmental Senior Specialist Regional Representative Sent on: February 2, 2023 X Email Hand delivery US Mail Certified No. Ll Copies: Drew Hammonds, Eastern District Supervisor — Solid Waste Section Page 2 of 3 NORTH CARnLINAD_E Q�� o.n.mm.m m c.w.mmen.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Di*ital,hotos taken by Amanda Thompson on January 30 View of the southeastern side slope. 2023. PWW. View of the signage at the entrance gate. Page 3 of 3