Loading...
HomeMy WebLinkAbout1812_DukeMarshall_2022Q4_GWCR_FID1771734_20230201(� DUKE ENERGY February 1, 2023 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Groundwater Condition Quarterly Report — October 2022 through December 2022 Industrial Landfill No.1 Permit No.: 1812-INDUS-2008 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Moutos: 526 South Church St. Charlotte, NC 28202 Mailing Address P.O. Box 1006 Mail Code EC 13K. Charlotte, NC 28201-1006 In accordance with the NCDEQ DWM September 17, 2021, Phase 2 Permit Modification Approval letter, Duke Energy is providing the quarterly report describing groundwater conditions in the area of the Marshall Steam Station Industrial Landfill No.1 (ILF, 1812-INDUS-2008) Phases 2, 3, and 4. The report is for the quarterly period of October 2022 through December 2022 (Q4 2022). The quarterly report includes an analysis of groundwater levels and dewatering pump flowrates within Phases 2, 3 and 4, with updated water level maps, hydrographs, pump flowrate plots, and well construction and water level data tables. An evaluation of groundwater levels and pump flowrates compared to model predictions is included. All groundwater transducer data, groundwater model trend data, and dewatering pump data are provided in an excel file format as the report Appendices. Groundwater conditions in the vicinity of Marshall Steam Station's Industrial Landfill No.1 continue to be monitored and evaluated. The next quarterly report (Q1 2023) will be submitted by May 1, 2023. If you need additional information regarding this submittal do not hesitate to email or call me at Ashley. Healy(cDduke-energv.com or (717) 982-0986. Respectfully submitted, j4VAi Ashley Healy, P.G. Environmental Services Attachments: Industrial Landfill No.1 (1812-INDUS-2008) Groundwater Conditions Quarterly Report — October 2022 through December 2022 (SynTerra; February 2023) Appendices in excel format: 1) Appendix A Water Level Monitoring Data Files 2) Appendix B Groundwater Model Predicted Trend Files 3) Appendix C Dewatering/Underdrain Pumping Data Files 4) Appendix D Mann -Kendall Results www.duke-energy.com Page 1 of 2 cc (via e-mail): Claire Osborn, NCDEQ Elizabeth Werner, NCDEQ Sherri Stanley, NCDEQ Ed Mussler, NCDEQ Scott Saunders, Duke Energy Dan Zakary, Duke Energy Chris Varner, Duke Energy Tyler Hardin, Duke Energy Ed Sullivan, Duke Energy Thomas Colton, SynTerra Craig Eady, SynTerra www.duke-energy.com Page 2 of 2