HomeMy WebLinkAbout4901_INSP_20230110NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
Transfer
Compost
SLAS
COUNTY: Iredell
MSWLF
PERMIT NO.: 49-01
Closed
X
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P/
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: 1/10/2023
FACILITY NAME AND ADDRESS:
Iredell County Landfill
Twin Oaks Road
Statesville, NC 28625
Date of Last Inspection: 11/20/2017
GPS COORDINATES (decimal degrees): Lat.: 35.77782 Long.:-80.82049
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Teddy Boller, Iredell County Solid Waste Director
Telephone: (704) 878-5432
Email address: tbollerkco.iredell.nc.us
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Teddy Boller, Iredell County Solid Waste Director
Jeff Webster, Landfill Gas Technician — Iredell County
Kim Sue, NCDEQ — Environmental Senior Specialist — Solid Waste Section
STATUS OF PERMIT:
Facility was issued a letter of closure on September 5, 1995.
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
Page 1 of 2
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
OepaNnent W Environniantal puelily
Solid Waste Section
ADDITIONAL COMMENTS
1. Reviewed semi-annual groundwater (August 2018, February -March 2019, August 2019, August 2020, February
2021, September 2021, February 2022 & August 2022) and quarterly methane monitoring reports (February 2018 to
September 2022).
2. A gate has been provided at the entrance to the facility to prevent unauthorized entry. The gate was shut and locked
at the time of the inspection. Three collapsible metal bollards have been installed at the entrance to the sewer
outfall to prevent unauthorized entry.
3. Edge of waste markers were in place and visible along the perimeter of the landfill.
4. An inspection of monitoring wells was performed to verify proper tags and locks.
Please contact me if you have any questions or concerns regarding this inspection report.
n Digitally signed , o=Kim Sue
DN: cn=Kim Sue, SDivision of Waste
Management, ouSolid Waste Section,
' ...�.`„ email=kim.sue@ncdenr.gov,c=US
Date: 2023.01.1215:56:54 -05'00'
Kim Sue
Environmental Senior Specialist
Regional Representative
Phone: (704) 235-2163
Sent to: Teddy Boller
X
Email
Hand delivery
US Mail
Certified No. j_1
1/12/2023
Copies: Deb Aja, Western District Supervisor - Solid Waste Section
Page 2 of 2