HomeMy WebLinkAbout03001_Terrell Machine_SIR_20221110
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 11/10/2022 1:18 PM
I. Inspection Information
Date & Time: 11/10/2022 10:23 AM Inspection Type: Drive-By
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Alex Moose - Construction superintendent
Location:
Lat: 35.19870984, Long: -80.86906777
Brownfields Inspection Report: Terrell Machine, 03001-99-060
11/10/2022 10:23 AM
Page 2 of 5
II. Project Information
Number: 03001-99-060 Name: Terrell Machine
Address: 3030 South Blvd
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: New Structures Violation: No
Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: Observed on prior site inspections. Other than VIMS exhaust stacks, no
portion of VIMS is currently visible.
Summary: N/A
Summary: Two four story wood framed residential townhomes currently under
construction. One building is on the corner of South Blvd. and Rail Crossing Ln. (Building
#3), and Building #7 is on Rail Crossing Ln, and backs up to the light rail line.
Summary: A soil pile consisting of approximately two truckloads will be hauled to
Republic landfill (Photos 1 & 2).
Brownfields Inspection Report: Terrell Machine, 03001-99-060
11/10/2022 10:23 AM
Page 3 of 5
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition:
Summary: N/A
No risk to the public observed at the time of the Site Visit. The residual soil visible in
Photos 1 & 2 is to be hauled to Republic Landfill later in the day.
Brownfields Inspection Report: Terrell Machine, 03001-99-060
11/10/2022 10:23 AM
Page 4 of 5
IV.Inspector Comments
V.PHOTOGRAPHS
Photo 1: View from northwestern corner of property facing south at townhome building #3.
Soil pile partially visible on left side of photo.
A site inspection was performed at the project managers request to observe the
approximately 2 truckloads of soil located on the northwestern portion of the property
the site superintendent wanted to haul to Republic Landfill before rain that was expected
later in the day. Although there was some broken concrete mixed with the soil, no issues
were identified that would prohibit its removal.
Brownfields Inspection Report: Terrell Machine, 03001-99-060
11/10/2022 10:23 AM
Page 5 of 5
Photo 2: Close-up of a portion of the soil that is to be trucked to Republic Landfill prior to
expected rain later in the day.