Loading...
HomeMy WebLinkAbout1101_Buncombe_MSWLF_CAERUpdate_FID1755922_20221215BUNNELL LAMMONS ENGINEERING December 15, 2022 Solid Waste Section Division of Waste Management NCDEQ-ARO 2090 U.S. 70 Highway Swannanoa, North Carolina 28778 [via email] Attention: Ms. Jaclynne Drummond, Hydrogeologist Subject: Update to the Phase I Phytoremediation Evaluation Old Buncombe County Landfill Woodfin, North Carolina DWM Permit No. 1101-MSWLF-1979 BLE Project No. J22-14175-07P Dear Ms. Drummond: Bunnell-Lammons Engineering, Inc. (BLE) is pleased to submit this update to the North Carolina Division of Waste Management (NCDWM) Solid Waste Section (SWS) for Phase I of the phytoremediation evaluation for the subject site. BLE recommended an evaluation of phytoremediation as a voluntary supplemental remedy to address VOC compliance issues at the site as part of the DWM approved Corrective Action Evaluation Report dated March 30, 2022 [FID 1661864 (BLE Project No. J20-14175-03)]. The evaluation was recommended to be conducted in three (3) phases as follows: Phase I may include: 1) an assessment of the condition, type, and efficacy of the existing flora; 2) an assessment of soil conditions and groundwater chemistry; and 3) an assessment of water quality at the groundwater -surface water boundary. Phase II may include selection of remedy in accordance with the solid waste rules. Phase III may include submittal of a CAP addendum which may include: 1) preparation of design plans; 2) preparation of bid packages and contractor selection; 3) procurement of selected flora; 4) the installation of flora and irrigation; and 5) ongoing monitoring and maintenance (inspection, testing, and normal horticultural practices). BLE recommended preparation and submittal of an update to the status of Phase I of the voluntary supplemental remedy to the SWS on or before December 30, 2022. Buncombe County retained BLE to perform a limited Phase I evaluation to consist of an assessment of the condition, type, and efficacy of the existing flora. BLE conducted two rounds of assessment on August 2, 2022 and October 24, 2022. The results were inconclusive. Buncombe County and BLE plan to re-evaluate the technical approach to the assessment and potentially conduct a 3rd assessment in the summer of 2023. We note that these types of assessments are typically conducted during maximum flora uptake of subsurface water and transpiration (i.e. summer months). The next update for this project will be submitted to the SWS on or before October 31, 2023. '6004 Ponders Court Greenville, SC 29615 t864.288.1265 HB64,288.4430 info@blecorp.com BLECORP.COM 1s 1m 1i Update to the Phase I Phytoremediation December 15, 2022 Old Buncombe County Landfill, Woodfin, North Carolina BLE Project Number J22-14175-07P We appreciate the continued opportunity to work with the SWS to address regulatory issues. If you have any questions, please do not hesitate to contact us at (864) 288-1265. Sincerely, BUNNELL-LAMMONs ENGINEERING, INC. Riley L. Blais, G.I.T. Staff Hydrogeologist CC: Ms. Kristy Smith — Buncombe County Mr. Dane Pedersen— Buncombe County Mr. Zach J. Downes, PG - BLE At/ Andrew W. Al ander, P.G., RSM Consultant Hydrogeologist Registered, NC #1475 2 of 2