DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 08/09/2022 3:46 PM
I. Inspection Information
Date & Time: 08/09/2022 8:53 AM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Shannon Switch – Hart & Hickman (H&H), Sam
Roldan -Superintendent Greystar
Location:
Lat: 35.18383492, Long: -80.88413954
Brownfields Inspection Report: AJACC Auto, 24054-20-060
08/09/2022 8:53 AM
Page 2 of 7
II. Project Information
Number: 24054-20-060 Name: AJACC Auto
Address: Verbena St; Macie St;
Yeoman St
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: New Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: Vapor barrier inspection of soil contact walls performed during Site Inspection
(Photos 1-5). No other VIMS components installed at the time of the Inspection.
Summary: N/A
Summary: New high density apartment buildings currently under construction.
Summary: Consistent with construction activities and EMP.
Brownfields Inspection Report: AJACC Auto, 24054-20-060
08/09/2022 8:53 AM
Page 3 of 7
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: Sub-grade soil contact walls were observed at the property (Photos 1-4).
Summary: N/A
Condition:
Summary: N/A
No risk of public exposure observed at the time of the Site Inspection.
Brownfields Inspection Report: AJACC Auto, 24054-20-060
08/09/2022 8:53 AM
Page 4 of 7
IV. Inspector Comments
V. PHOTOGRAPHS
The Site Inspection was performed to observe H&H’s scheduled vapor barrier inspection.
The barrier being inspected was installed on vertical poured concrete soil contact walls. No
issues were observed with the vapor barrier installation. Double sided tape adhering the
vapor barrier to the previously installed waterproofing barrier (Photos 1 - 3). Once the
vapor barrier was adhered to the waterproofing barrier, gray Raven industries tape was
used along the vertical barrier seams to form a water-tight seal (Photos 1 & 4). As shown in
Photos 4 & 5, drainage board was installed on the soil contact side of the vapor barrier to
channel water away from the wall. The drainage board is adhered to the vapor barrier with
a sealant, and additional sealant is placed at the top where two concrete nails are used to
adhere the mat to the concrete wall, thereby sealing the nail penetrations (Photo 5).
Brownfields Inspection Report: AJACC Auto, 24054-20-060
08/09/2022 8:53 AM
Page 5 of 7
Photo 1: From right to left, photo showing concrete retaining wall, waterproofing barrier, and
VIMS barrier installation.
Photo 2: Horizontal strips of double-sided tape installed over waterproofing barrier to adhere
VIMS barrier to waterproofing barrier. Vertical tape also installed at seams.
Brownfields Inspection Report: AJACC Auto, 24054-20-060
08/09/2022 8:53 AM
Page 6 of 7
Photo 3: Vertical edge of VaporBlock 20 VIMS barrier pulled back to show vertical double-sided
tape adhering it to waterproofing barrier.
Photo 4: Section of VIMS barrier applied to vertical soil contact walls. Black drainage board
visible on left of photo.
Brownfields Inspection Report: AJACC Auto, 24054-20-060
08/09/2022 8:53 AM
Page 7 of 7
Photo 5: Drainage board installed over previously inspected section of vapor barrier.