Loading...
HomeMy WebLinkAbout8702T_INSP_20220715NORTH CARnLINAD_E Q�� o.n.mm.m m c.wm..rem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer X Compost SLAS COUNTY: SWAIN MSWLF PERMIT NO.: 8702T-TRANSFER- Closed HHW White X Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P/ X Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: 07/15/2022 FACILITY NAME AND ADDRESS: Swain County Transfer Facility 1492 US Hwy 19 South Bryson City, NC 28713 Date of Last Inspection: 10/21/2021 GPS COORDINATES (decimal degrees): Lat.: 35.41343' Long.:-83.46550' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Jerry Jenkins Telephone: 828-489-4999 Email address: jerry.jenkins@swaincountync.gov FACILITY CONTACT ADDRESS: Swain County Solid Waste Department PO Box 2321 Bryson City, NC 28713 PARTICIPANTS: Jerry Jenkins, Swain County Aaron Smith, Swain County Lee Hill, NCDEQ — Solid Waste Section STATUS OF PERMIT: Life of Site Permit issued December 6, 2019 Permit expires February 24, 2064 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: A. RESOLVED:15A NCAC 13B .0405(e)(4) states: "Signs shall be posted at the site entrances unless otherwise stated in the site permit. The signs shall be constructed of a durable, weather -resistant material. The signs shall be clear and legible to the public. The signs shall state the name of the operator of the site, emergency contact information, the operating hours of the site, the permit number of the current permit authorizing operations at the site, the types of waste that can be accepted under the permit, and that hazardous waste and liquid waste cannot be accepted at the site." Swain County was in Violation of 15A NCAC 13B .0405(e)(4) in that signage for emergency contact information was not posted at the entrance to the facility on July 15, 2022. Page 1 of 5 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA OepaNnent W Environnrenbl puelily Solid Waste Section On July 20, 2022, the facility sent a photograph of the new emergency contact information sign installed at the entrance of the facility. Therefore, the violation is resolved. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1. All photos were taken by Lee Hill on July 15, 2022 unless otherwise noted. 2. The facility is open Monday through Friday, 7:00 am to 4:30 pm. 3. Waste is transported to the R&B Landfill in Homer, Georgia by Kinsland Trucking, Inc. 4. The site was secured by gates, fencing and natural terrain to prevent unauthorized access. 5. The access roads were of all-weather construction and were being maintained at the time of inspection. 6. Emergency contact information signage was missing at the entrance of the facility. On July 20, 2022, the facility sent a photograph of the new emergency contact information sign installed at the entrance of the facility. 7. A response letter to the Transfer Station Assessment Report was sent on May 26, 2022, by Allen Gaither stating that a revised operations plan needs to be submitted. Submit a revised operations plan updated in accordance with the new requirements of 15A NCAC 13B .0404 and .0405 as well as any additional changes necessary to ensure the document accurately reflects current operations. In addition, submit a closure plan prepared in accordance with 15A NCAC 13B .0406 including revised closure cost estimates. The revised operations plan and any questions should be directed to: Allen Gaither, Permit Engineer allen.gaither@ncdenr.gov 828-296-4703 Records Review 8. Waste screening records from January 4, 2022 to July 14, 2022 were available for review. The forms showed the final disposition of any unacceptable materials that were encountered. The facility conducts multiple waste screenings per week to meet the requirements of 15A NCAC 13B .0405(8)(A). 9. Certified Transfer Station Operations Specialists: • Jerry Jenkins (expires June 24, 2023) • Aaron Smith (expires March 12, 2023) • Stan Smith (expires June 24, 2023) • Allen Cutshaw (expires November 2, 2024) • Don Smith (expires November 2, 2024) 10. Tonnage records from the 2021-2022 Facility Annual report showed that the facility disposed of 9,313.41tons of waste from July 1, 2021 to June 30, 2022. Operations Inspection of the Transfer Station (8702T-TRANSFER) 11. The transfer station consists of a covered concrete pad and a metal hopper. Waste is loaded directly into the hopper that is located over the transfer trailer. The transfer station is only used by commercial haulers; residential customers use the convenience site located adjacent to the transfer facility. 12. No unapproved waste was observed in the transfer trailer at the time of inspection. 13. Scrap metal was observed laying on the left side of the concrete pad at the transfer hopper. All material should be removed from the tipping area at the end of each working day. Page 2 of 5 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA °°°—°°0E-!=°""l° W Solid Waste Section 14. Two trailers were parked in the loaded trailer parking area; the trailers appeared to be leak resistant and meet the requirements of 15A NCAC 13B .0105. 15. Litter was observed between the loading bay and the loaded trailer area. 15A NCAC 13B .0405(10) states in part: "Windblown waste: Site staff shall conduct daily inspections for windblown waste on the site property. Windblown litter from site operations discovered during the daily inspections or observed on adjacent properties shall be picked up and containerized for disposal by the end of each operating day..." Facility staff began working on cleaning the area during the inspection. 16. The leachate collection system is connected directly to the Bryson City Sanitary Sewer System. The loading bay and loaded trailer areas have sump pumps installed to pump leachate to the sewer system. The leachate pumps appeared to be functioning as designed at the time of inspection. Operations Inspection of the Scrap Tire, White Goods and Electronics Areas 17. Scrap metal and white goods are collected on a concrete pad next to the electronics area. Facility staff remove refrigerants onsite before the materials are sent for recycling. White goods containing refrigerants were observed to be stored upright and separate from other scrap metal. 18. One trailer is staged to the southeast of the scale house to receive scrap tires. The contracted tire hauler was in the process of swapping trailers at the time of inspection and no scrap tires were stored outside the trailer. 19. Electronics are collected undercover, palletized or placed in Gaylord boxes to the south of the scale house before being sent for recycling. Please contact me if you have any questions or concerns regarding this inspection report. cn=Lee Hill, o=Solid Waste Section, ou=Field Operations Branch, email=lee.hill@ncdenr.gov, c=US 2022.07.25 13:31:34-04'00' 2022.001.20169 Lee Hill Environmental Senior Specialist Regional Representative Phone: 828-296-4700 Sent on: July 25, 2022 to X Email Hand delivery US Mail Certified No. L J Jerry Jenkins Copies: Deb Aja, Western District Supervisor — Solid Waste Section Kevin King, Manager — Swain County Allen Gaither, Permit Engineer — Solid Waste Section Page 3 of 5 Ila* 01 d IAQ \ trd iv� r. wcs`a1,`a Swain County Solid Waste Department Oepartmenl o� Envimnmental0uali� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Windblown Waste Between Loaded Bay and Loaded Trailer Areas Page 5 of 5