Loading...
HomeMy WebLinkAbout4205_WeldonTS_AssessmentResponse_20220707Wilson, Donna J From: Wilson, Donna J Sent: Thursday, July 7, 2022 4:56 PM To: Patrick Moseley (patrick.moseley@gflenv.com); Spencer Pernell (spencer.pernell@gflenv.com) Cc: Stanley, Sherri; Thompson, Amanda J; Mike Brinchek; Louis Krasuski; Hammonds, Andrew Subject: Permit No. 4205T-TRANSFER-1997, Weldon Transfer Station - Transfer Station Assessment Report Attachments: 4205T_TownofWelsonTransfer_AssessmentResponse_20220628.pdf Hello Patrick and Spencer —Attached is a letter sent June 8 to the Weldon Transfer Station's previous contact, in response to our review of the submitted transfer station assessment report. I understand that the both of you are now the facility contact persons. If you have any questions, please let me know. Donna Do= J. Wilson Engineering Pro. act t{ anager, .Solid IT'aste .Section Division of Maste Management North Carolma Department ofEn-viromnental Quality 919.707.8255 (Office) Donna_ ikon( Acderv_go Ph,,Fsical Address: 2.17 West Jones Street_ Raleigh N- C 27603 Mail- a address: 1 6 Mail Service Center, Raleigh NC 27699 Emai corresporirierrce lc vrd from ItAs awfai is suLoEcl lo Jl u Ak rrii (:aresna lbL* : L. i _•.- afyJ nW be c*scksed to 0*d pWmaa ROY COOPER Governor ELIZABETH S. BISER Secretary MICHAEL SCOTT Director NORTH CAROLINA Environmental Quality June 81h, 2022 Sent via email: Christopher.williams@aflenv.com Chris Williams Waste Industries, LLC 2211 NC Highway 301 Weldon NC, 27890 SUBJECT: Transfer Station Assessment Report Weldon Transfer Station Permit No. 4205T-TRANSFER-1997 Halifax County Dear Mr. Williams: The State of North Carolina, Division of Waste Management Solid Waste Section (Section) has completed the review of the Transfer Station Assessment Report (report) for Weldon Transfer Station. The Report was submitted by Smith+Gardner Engineers on June 18th, 2021 in accordance with 15A North Carolina Administrative Code 13B .0401(b) and guidance provided to facilities in the February 9, 2021, memo from Ed Mussler, Section Chief. The intent of the report was to self -assess and demonstrate compliance with the rules in 15A NCAC 13B .0400, readopted effective January 1, 2021, with a primary focus of vital infrastructure at the facility as part of transitioning under the new rules and other life of site permit requirements. In summary, the report made the following recommendations: • Continue to monitor asphalt pavement at facility entrance for continued cracking and wear • Update facility signage to include "Acceptable Wastes" • Continue to monitor tipping floor for continued surface wear • Continue to monitor siding panels on rear of transfer station for displacement • Continue to monitor rear pit wall and apron foundation for damage Based upon our review, the Section agrees with the report as submitted. At this time, please proceed with the implementation of the recommendations in the report. Per 15A NCAC 13B .0401(b)(3), the facility has until June 8th, 2025 to fully implement the recommendations Also, per the report recommendations, please submit a revised operations plan as well as a closure plan with closure cost estimatesto include all information now required by 15A NCAC 13B .0404, .0405 and .0406. Please note, the Section has established an electronic form for the submittal of Transfer Station closure cost estimates and requests you submit the cost estimates in this manner using the following link: https://edocs.dea.nc.gov/Forms/TransferStation FA.. The requested response, plans, and cost estimates should be submitted to the Section within 90 days of receipt of this letter D E Q�� North Carolina Department of Environmental Quality I Division of Waste Management 217 West Jones Street 1 1646 Mail Service Center I Raleigh, North Carolina 27699-1646 NORTH CAROLINA oeeDamaem 01 Fmimamemal Quality r 919.707.8200 If you have any questions, please reach out directly to Sherri Stanley at (919) 707-8235 or sherri.stanley@ncdenr.gov. Sincerely, Benjamin Jackson, E.I. Engineering Project Manager Division of Waste Management, Solid Waste Section Copies(email): Ed Mussler, Chief Jason Watkins, Field Operations Sherri Stanley, Permitting Branch Head Sarah Moutos, Solid Waste Section Amanda Thompson, Environmental Sr. Specialist Andrew Hammonds, Field Operations District Supervisor W. Michael Brinchek, Smith+Gardner D E QJ� North Carolina Department of Environmental Quality I Division of Waste Management 217 West Jones Street 1 1646 Mail Service Center I Raleigh, North Carolina 27699-1646 NORTH CAROLINA oeparo emmEnmronmem lQusifty /� 919.707.8200 Wilson, Donna J From: Patrick Moseley <patrick.moseley@gflenv.com> Sent: Tuesday, June 28, 2022 11:39 AM To: Wilson, Donna J Cc: Thompson, Amanda J; Spencer Pernell Subject: [External] Transfer Station Contact Changes Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Donna, We need to update our Operation Manual at both the Vance County Transfer Station and the Weldon Transfer Station. Vance: Primary Contact — Patrick Moseley - GM (919)524-4135 Secondary Contact — Andrew Murray - Ops Manager (252)904-0307 Weldon: Primary Contact — Patrick Moseley - GM (919)524-4135 Secondary Contact — Spencer Pernell - Facility Manager (252)204-9906 Thank you Patrick Moseley I General Manager II GFL Environmental 241 Vanco Mill Road, Henderson, NC 27537 T (800) 207-6618 Ext. 34222 1 C (919) 524-4135 1 patrick.moseley@gflenv.com I www.gflenv.com Confidentiality Notice: This email message (including attachments, if any) is intended for the use of the individual or entity to which it is addressed and may contain information that is privileged, proprietary, confidential and exempt from disclosure. If you are not the intended recipient, you are notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please notify the sender and erase this email message immediately. 1