Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
9809_WilsonCDLF_3ErosionPlan_20220705
DocuSign Envelope ID: 965902A3-FOC6-4C20-8257-5D3CO3CO373E Attachment Erosion and Sedimentation Control Plan Site Study and Permit to Construct Application Westside CAD Landfill — Area 1 and 2 Wilson, North Carolina DocuSign Envelope ID: 965902A3-FOC6-4C20-8257-5D3CO3CO373E This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Erosion and Sedimentation Control Plan Westside CEO Landfill — Area 2 Wilson, North Carolina Prepared for: Wilson County Solid Waste Services Department Wilson, North Carolina C July 2020 (Revised June 2022) Prepared by: SMITH GARDNER 14 N. Boylan Avenue, Raleigh NC 27603 1 919.828.0577 Pa INTF� ON i00?- RECCL En PAPER RARTLETr ENGFNEENINN a SURVEYING. PC © 2022 Smith C-erdner, Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Coroner, Inc. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Erosion and Sedimentation Control Plan Westside CEO Landfill — Area 2 Wilson, North Carolina Prepared For: Wilson County Solid Waste Services Department Wilson, North Carolina S+G Project No. Wilson-20-1 EA DocuSigned by: t W(A,r;,W At. , 6kt s C4990A659B9B4AD... Matthew M. Jones, E.I. Staff Engineer DocuSigned by: J. k&,OA 358C21 E64007440... W. Michael Brinchek, P.E. Senior Project Manager July2020 (Revised June 2022) 4E-ss o' SEAL 026426 �9ul�l�[rl!I;lil�l�;� 14 N. Boylan Avenue, Raleigh NC 27603 1 919.828.0577 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside CAD Landfill — Area 2 Wilson, North Carolina Erosion and Sedimentation Control Plan Table of Contents Paqe 1.0 NARRATIVE................................................................................................................... 1.1 Project Description.................................................................................................... 1.2 Site Location............................................................................................................... 1.3 Contact Information................................................................................................... 1.3.1 Engineer......................................................................................................... 1.3.2 Ovrner............................................................................................................. 1.4 Existing Site Conditions............................................................................................. 1.5 Adjacent Areas........................................................................................................... 1.6 Site Soils Information................................................................................................ 2.0 DESIGN GUIDELINES AND PROCEDURES................................................................... 3.0 RUNOFF CALCULATIONS............................................................................................. 3.1 Pre -Developed Conditions........................................................................................ 3.2 Post -Developed Conditions....................................................................................... 4.0 EROSION AND SEDIMENTATION CONTROL MEASURES- INITIAL ............................. 4.1 Sediment Basin.......................................................................................................... 4.2 Drainage Channels.................................................................................................... 4.3 Culverts...................................................................................................................... 4.4 Drop Inlets.................................................................................................................. 4.5 Si It Fence.................................................................................................................... 4.6 Vegetative Stabilization............................................................................................. 5.0 EROSION AND SEDIMENTATION CONTROL MEASURES- FINAL ............................... 5.1 Side Slope Swale........................................................................................................ 5.2 Down Pipes................................................................................................................. 6.0 SCHEDULE FOR IMPLEMENTATION............................................................................ 7.0 INSPECTION AND MAINTENANCE............................................................................... FIGURES Figure 1 APPENDICES Appendix A Appendix B USGS Map (Wilson Quadrangle) 1 1 1 1 1 2 2 2 2 2 3 3 3 3 4 4 4 5 5 5 5 5 5 6 6 Erosion and Sedimentation Control Calculations Erosion and Sedimentation Control and Stormwater Permits & Approvals Wilson County Westside C&D Landfill -Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Table of Contents Page i DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. Wilson County Westside CH Landfill —Area 2 July 2020 (Revised June 2022) Erosion and Sedimentation Control Plan Table of Contents Page ii DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 1.0 NARRATIVE 1.1 Project Description Wilson County plans to construct an expansion (Area 2) of their existing construction and demolition (C&D) landfill at their landfill facility located off of Highway42 East in Wilson, North Carolina. The construction and operation of the landfill expansion will require the disturbance of approximately 44.2 acres. This plan discusses both the initial and long term (final) erosion and sedimentation control measures used on this project. 1.2 Site Location The attached USGS map (Wilson Quadrangle) shows the approximate location of the site and the location of stormwater outfalls for this project. Additional information is as fol I ows: 1.3 Address: 2400 NC42 East Wilson, NC27893 Coordinates (Site Entrance): Latitude: 35.732 degrees Longitude:-77.865 degrees River Basin: Neuse Receiving Stream(s) Toisnot Swamp (Other) (Stream Classification): Contact Information 1.3.1 En ineer For questions regarding this erosion and sedimentation control plan, please contact the following: Smith Gardner, Inc. Attn.: W. Michael Brinchek, P.E. 14 N. Boylan Ave. Raleigh, NC 27603 Phone: (919) 828-0577 Fax: (919) 828-3899 Email: mikeamithgardnerinc.com. Wilson County Westside C&D Landfill- Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 1 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 1.3.2 Owner The owner of the site and the person to contact should sediment control issues arise during the land -disturbing activity is as follows: Wilson County Solid Waste Services Attn.: Andy Davis, Director 2400 NC Hwy 42 East Wilson, NC27893 Phone: (252) 399-2823 Fax: (252) 399-0904. 1.4 Existing Site Conditions The proposed site occupies an open field on the existing solid waste property, approximately 2,000 feet northwest of the currently active C&D landfill disposal area. Existing ground surface elevations varyfrom El. 110 (feet) at the northern end of the project area and El. 92 at the southern edge of the project area. 1.5 Adjacent Areas The proposed site lies within County -owned property on all sides. Toisnot swamp, lies just to the south of the proposed site. The site wil I be accessed from Highway 42 East at the north end of the site. 1.6 Site Soils Information The native surficial soils at the site fall under the categories of Wagram loamy sand (WaB) and Tomotley fine sandy loam (Tt) according to the USDA Natural Resources Conservation Service soil survey (see Appendix A soil survey map (USDA NRCS Soils Map)). The Wagram soils can be classified as being in hydrologic soil group (HSG) "A", and the Tomotley soils can be classified as HSG"B". The majority of borrow soils to be used in site construction can be classified as being in HSG"A' or "B". For purposes of runoff calculations soils were conservatively classified as HSG"B". 2.0 DESIGN GUIDELINES AND PROCEDURES The erosion and sediment control design for the landfill was conducted based on guidelines and procedures as set forth in the following references: A. HydroCAD Software Solutions, LLC (2006), HydroCAD Stormwater Modeling System Owner's Manual - Version 8, Chocorua, NH. B. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. Wilson County Westside C&D Landfill- Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 C. North Carolina Division of Land Resources (2013 Update), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. 3.0 RUNOFF CALCULATIONS All stormwater flow volumes were calculated using the HydroCAD computer program (utilizing USDA-NRCS (SCS) methods) based on a 25-year 24-hour design storm event. This storm event, which is a requirement of current North Carolina solid waste regulations, exceeds the 10-year 24-hour design storm event required by current North Carolina Sediment Control regulations. Rainfall quantities and/or intensities used in the analyses were derived from an analysis of design storms for the site. Drainage areas were determined using a planimeter and/or AutoCAD on topographic sheets of the project area. For each drainage area, runoff curve numbers (SCS methods) were selected based on ground cover conditions. Times of concentration were calculated by HydroCAD using SCS methods. The peak discharge from the 25-year 24-hour storm design storm event was evaluated for both pre -developed and post developed conditions as described below. The goal of the post - developed conditions was to limit the peak discharge to no more than pre -developed conditions. 3.1 Pre -Developed Conditions Pre -developed conditions were modeled in HydroCAD. The total site discharge for pre - developed conditions was determined to be approximately 21 cfs. 3.2 Post-Develooed Conditions Post -developed conditions were modeled in HydroCAD. The total site discharge for pre - developed conditions was determined to be 9 cfs and is, thus, below the peak discharge for pre -developed conditions. 4.0 EROSION AND SEDIMENTATION CONTROL MEASURES - INITIAL The following erosion and sedimentation control measures are to be constructed as part of the proposed construction. Appendices Ato this plan include calculations for each of these measures. Plans and details for sedimentation control measures area included in the Engineering Drawings. In most cases, the following erosion and sedimentation control measures were designed using the final drainage areas which were found to represent a worst case for design. Each calculation indicates what condition was used in the analysis. Wilson County Westside Chi) Landfill -Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 3 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 4.1 Sediment Basin There is one permanent (Sediment Basins 1) sediment basin which will serve the site. Sediment Basin 1 is to be located on the southern side of the project area. This basin was designed in accordance with E&SCP&DM Section 6.61. Sediment basins are subject to several design requirements. Each sediment basin must have a basin volume of 1,800 ft3/acre of disturbed area and should have a surface area (measured at crest of principal spillway (riser)) of 0.01 acres/cfs (based on the peak flow from the 10-year storm). Each basin must include a riser/barrel principal spillway and must have an emergency spillway (preferably a weir type spillway). The crest of the emergency spillway is set one foot above the invert of the riser and the spillway must pass the peak runoff from the design storm event with one foot (min.) of freeboard to the crest of berm. Each riser/barrel assembly must be provided with an anchor displacing a buoyant weight of at least 1.1 times the weight of water displaced by the riser. Each riser must also be provided with a method of dewatering the basin. In addition to E&SCP&DM requirements, each sediment basin was designed to have an adequate surface area to achieve an 80% settling efficiency of a 40 micron (silt size) particle at the peak discharge from the design storm. Each sediment basin was modeled with the HydroCAD computer program and a spreadsheet was used to verify the design requirements. 4.2 Drainage Channels Drainage channel calculations were conducted using a reformulation of Manning's Equation in a spreadsheet format. The calculations determine the normal depth of flow based on the peak discharge from the design storm (from HydroCAD) and assumed channel dimensions/slope(s). Both temporary and/or permanent channel linings were chosen, as appropriate, based on the calculated velocity and/or shear stress. Steeper rip rap lined channels (if specified) were analyzed as rock chutes in accordance with NRCS procedures. Temporary channel linings (if specified) were designed based on the peak discharge from a 2-year 24-hour design storm. 4.3 Culverts There are several culverts which will be used at the site to convey flow beneath roadways and embankments. Culverts were designed either using HydroCAD or a spreadsheet based on an analysis of inlet and outlet control under the influence of the design storm to determine the maximum headwater elevation. Where required, culvert outlets were designed for outlet stabilization based on criteria set forth in E&SCP&DM, Section 6.41. Culverts draining disturbed areas, which are not routed to a sediment basin, were designed with a stone filter berm placed around the inlet to trap sediment. Wilson County Westside CH Landfill -Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 4 DocuSign Envelope ID: F45A7F9O-6A55-4F1A-89A4-8O6E1A91C808 4.4 Drop Inlets Weir -type drop inlets will be used in the perimeter drainage channel. These drop inlets were designed either using HydroCAD or a spreadsheet based on an analysis of the flow capacity of the open sides (weirs) of the drop inlet compared to the maximum flow from the design storm. Prior to vegetative stabilization of the perimeter channel, each drop inlet wil I be protected from sedimentation by a placing a wire mesh and coarse aggregate filter around all sides of the drop inlet. 4.5 Silt Fence Silt fencing design was based on criteria set forth in E&SCP&DM, Section 6.62 including the limitation of 100 feet of fencing for each'/4 acre of drainage area. 4.6 Vegetative Stabilization Vegetative stabilization wil I be in accordance with the seeding schedule on the project drawings and/or in the project specifications. 5.0 EROSION AND SEDIMENTATION CONTROL MEASURES - FINAL The following erosion and sedimentation control measures are to be constructed as part of final cover construction. Appendices A, B, and Cto this plan include calculations, technical specifications, and plans and details (project drawings) for each of these measures, respectively. 5.1 Side Slooe Swale A side slope swale wil I be placed near the slope break of the final cover where the 4H:1V side slopes break to a flatter grade. Flow from the side slope swale is directed to the down pipes. The capacity and need for lining the side slope swale was checked using the same procedures as described above for drainage channels. 5.2 Down Pipes Down pipes wil I be used to carry flows from side slope swales to the bottom of final cover slopes. Down pipes were designed based on an analysis of inlet and outlet control under the influence of the design storm to determine the governing headwater condition. Down pipes will be adequately anchored to the landfill side slopes by use of a soil cover and each will be outleted directly to perimeter channels (with rip rap outlet protection). Wilson County Westside CH Landfill -Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 5 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 6.0 SCHEDULE FOR IMPLEMENTATION Erosion and sedimentation control measures will be established prior to, or as soon as practical thereafter, any land disturbance or construction activities may begin in that portion of the site which drains to the erosion control measures. The following general schedule wil I be followed for this project: A. Flag the clearing limits and identify any tree protection areas. B. Install temporary gravel construction entrance/exit. C. Clear the vegetated portion of the site and install silt and stone filter fencing prior to stripping/grubbing. D. Only strip/grub areas required for installation of structures, berms, and drainage channels. Other areas wil I be stripped/grubbed once the sediment basin is completed. E. Install sediment basin outlet structure; outlet protection and/or channel, berm, and emergency spil Iway. F. Perform earthwork as required for construction. G. Perform fine grading and establish permanent vegetation on completed areas. H. After stabilization, remove silt and stone filter fencing and other temporary measures and install permanent vegetation on the disturbed areas. Soil stabilization will be achieved on any area of the site where land disturbing activities have temporarily or permanently ceased according to the following schedule: A. All perimeter dikes, swales, ditches, perimeter slopes, and all slopes steeper than 3 horizontal to 1 vertical (31-1:1\� will be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 7 calendar days from the last land disturbing activity. B. All other disturbed areas will be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 14 calendar days from the last land disturbing activity. C. Basins, traps, channels, and diversions will be lined with anchored rolled erosion control products or rip rap and/or vegetated upon construction. D. Permanent ground cover for all disturbed areas will be established within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. 7.0 INSPECTION AND MAINTENANCE All erosion and sedimentation control measures will be inspected at least once every 7 calendar days and within 24 hours after any storm event of greater than 0.5 inches of rain per 24 hour period and appropriate maintenance conducted. A rain gauge wil I be maintained on the site and a record of the rainfall amounts and dates wil I be kept. During inspections, any stormwater discharges from the site wil I be observed for stormwater discharge characteristics to evaluate the effectiveness of the erosion and sedimentation control Wilson County Westside CH Landfill- Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 6 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 measures incorporating Best Management Practices (BMPs). If visible sedimentation is leaving the disturbed limits of the site, corrective action will be taken immediatelyto control the discharge of sediments. Maintenance activities will include, but not be limited to the following: A. The removal and satisfactory disposal of trapped or deposited sediments from basins, traps, barriers, filters, and/or drainage features/devices; B. Replacement of filter fabrics used for silt fences upon loss of efficiency; and C. Replacement of any other components which are damage or cannot serve the intended use. Wilson County Westside CH Landfill -Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised June 2022) Page 7 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. Wilson County Westside CH Landfill —Area 2 July 2020 (Revised June 2022) Erosion and Sedimentation Control Plan Page 8 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A9lC808 s I _ N 4-6 W ® E r Yf�tS►Y R * s Toisnot art i Cem -Mi- SITS LO ATION ��+R �. ter- 1pp- a1h i �• �' ter- �" � -sw . ��ppfiOViEW Ra E- r u -wil _ e --66 �f- ' �Rpfn➢Y. § SE A �y C SA .a&- �` Y RD Alt -sue -x- -46- - 6 - -6- Alt ->u v yF -r6+- 4 � 0 2000' 4000' REFERENCE: TOPOGRAPHY FROM U.S.G.S. 7.5 MINUTE QUADRANGLE TITLED "WILSON" AND "SARATOGA", DATED 2019. PREPARED BY: NO LIC. N0. F-1370 [ENGINEERING] SC COA NO. C01488 SITE LOCATION MAP SMITH GARDNER 14 N. Boylan Avenue, Raleigh NC 27603 1919.828.0577 1526 Richland St., Columbia SC 29201 DRAWN: APPROVED: SCALE: DATE: PROJECT NO.: FIGURE NO.: FILE NAME: R.V.M. S.W.H. AS SHOWN Jul 2020 WILSON 20-1 1 WILSON-AO016 © 2020 Smith Gardner, Inc. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Appendix A Erosion and Sedimentation Control Calculations Erosion and Sedimentation Control Plan Westside CAD Landfill — Area 2 Wilson, North Carolina DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Erosion and Sedimentation Control Plan Appendix A: Erosion and Sedimentation Control Calculations Table of Contents 1.0 Drainage and E&S Control Calculations - Overview 2.0 Analysis of Design Storms 3.0 Drainage Area Figure 4.0 USDA Soil Survey Map 5.0 Stormwater Routing (HydroCAD output)* • 25-Year 24-Hour Storm • 100-Year 24-Hour Storm 6.0 Drainage Channel Analysis 7.0 Down Pipe Analysis 8.0 Sedimentation Basin Analysis 9.0 Outlet Protection Analysis *The design of culverts is included in the HydroCAD output. Wilson County Westside CH Landfill- Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised October 2021) Appendix A: Table of Contents Page Al DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. Wilson County Westside CH Landfill —Area 2 Erosion and Sedimentation Control Plan July 2020 (Revised October 2021) Appendix A: Table of Contents Page A2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 ADDRESS TEL I WEB 14 N. Bovlan Avenue, Raleigh, NC27603 1 919.828.0577 1 www.smithgardnerinc.com PROJECT Westside C&D Landfill -Area 2 SHEET 1 OF 2 SUBJECT Drainage & E&SC Cal Gs. -Overview JOB # WILSON-20-1 DATE 6/17/2020 COMPUTED BY SWH CHECKED BY WMB OBJECTIVE: To design stormwater conveyance, detention, and erosion and sedimentation control measures to remove and contain stormwater flow from the design storm. The design of these measures will be based on: Design storm information for the site; Peak discharge calculations using the Rational Method and/or USDA-NRCS (SCS) Methods; and Stormwater routing using USDA- NRCS (SCS) or other methods. REFERENCES: Debo, T.N., and Reese, A.J. (1995), Municipal Storm Water Management, Lewis Publishers, Boca Raton, FL. Federal Highway Administration (2001), Urban Drainage Design Manual, Hydraulic Engineering Circular No. 22, FHWA NHI-01-021, Second Ed., U.S. Dept. of Transportation, Washington, D.C. Georgia Soil and Water Conservation Commission (2000), Manual for Erosion and Sediment Control in Georgia, Fifth Edition, Athens, GA. HydroCAD Software Solutions, LLC(2006), HydroCAD Stormwater Modeling System Owner's Manual - Version 8, Chocorua, NH. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. North Carolina Division of Land Resources (2013 Updates), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. North Carolina Division of Water Quality (July2005) Updated Draft Manual of Stormwater Best Management Practices, (Public Comment Version), Raleigh, NC. Pennsylvania DEP Bureau of Watershed Protection (2000), Erosion and Sediment Pollution Control Program Manual. USDA-NRCS (1992), Computer Program for Project Formulation Hydrology(TR-20). USDA-NRCS (1986 & 1999 Update), Urban Hydrologyfor Small Watersheds (TR-55). Virginia Department of Conservation and Recreation (1992), Virginia Erosion & Sediment Control Handbook, Third Edition, Richmond, VA. ANALYSIS: The main design criteria will be to ensure that all stormwater conveyance and detention measures will be able to accommodate the runoff from the design storm. Drainage channels, culverts, etc. were designed based on the peak discharge to each measure. Detention measures were designed based on stormwater routing methods and/or State/local criteria. CALCULATIONS: - Peak Discharge Calculations: USDA-NRCS(SCS) Methods: Use HydroCAD program to determine the peak discharge to each device or structure. HydroCAD is based on the SCS unit hydrograph procedure, which is a principal component of NRCS TR-20. Alternatively spreadsheets can be used to determine flow rates using the procedures detailed in NRCSTR-55. SMITH GARDNER,INC. D&E&SCOVERMEWSG DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SHEET 2 OF 2 DATE 6/17/2020 COMPUTED BY SWH SUBJECT Drainage & E&SC Cal Gs. -Overview JOB # WILSON-20-1 CHECKED BY WMB Rational Method: Q= CIA (Malcom Eq. I -1) where: C = peak discharge (cfs) C = rational runoff coefficient i = applicable rainfall intensity (in/hr) of storm event (based on time of concentration) A = drainage area (acres) Time of Concentration: The time of concentration for use in determining the peak discharge in the NRCS and/or Rational methods can be determined by the methods detailed in NRCSTR-55 or other methods. HydroCAD uses the NRCS methods. - Stormwater Routing: Stormwater routing was accomplished using the HydroCAD program, which is based on USDA-NRCS (SCS) methods. Unless otherwise specified, the unit hydrograph method was used. The storm type (i.e. Type 124-hr., Type II 24-hr., etc.) was selected as appropriate for the project location. �11rIll�t<N1�1�i1I �.11i11111t�L' Ill lJ►i SMITH GARDNER,INC. D&E&SCOVERMEWSG DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 ADDRESS TEL WEB 14 N. Bovlan Avenue, Raleiqh, NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Westside C&D Landfill -Area 2 SHEET 1 OF 2 DATE 6/17/2020 COMPUTED BY SWH SUBJECT Analysis of Design Storms JOB # WILSON-20-1 CHECKED BY WMB OBJECTIVE: To compile the expected design storm depths and intensities over various return periods. These design storm values will be used in various calculations. REFERENCES: Rainfall data was obtained from the followinq references: Frederick, R.H., V.A. Myers, and E.P. Anciel Io (1977), "Five to 60-Minute Precipitation Frequency for the Eastern and Central United States," NOAATechnical Memo. NWSITYDRO-35, National Weather Service, NOAA, U.S. Dept. Of Commerce, Silver Spring, MD. U.S. Weather Bureau (1961), "Rainfall Frequency Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to 100 Years," U.S. Weather Bureau Technical Paper 40. SMITH GARDNER, INC. DESIGN STORMS SG DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SHEET 2/2 JOB # WILSCN-20-1 SUBJECT Analysis of Design Storms DATE 6/17/2020 COMPUTED BY SWH CHECKED BY WMB LOCATION: Wilson, NC RETURN PERIOD 2-YR P 100-YR P SOURCE DURATION (in) (in) 5min 0.48 0.83 NOAAHYDRO-35 15 min 0.97 1.67 NOAAHYDRO-35 60 min 1.69 3.52 NOAAHYDRO-35 2 hr to 24 hr Rainfall Events = USER INPUT USWB TP-40 DEPTH -DURATION -FREQUENCY TABLE: RETURN PERIOD 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR DURATION (in) (in) (in) (in) (in) (in) 5min 0.48 0.56 0.61 0.70 0.76 0.83 10 m i n 0.77 0.89 0.98 1.11 1.22 1.33 15 m i n 0.97 1.12 1.23 1.40 1.54 1.67 30 min 1.32 1.61 1.81 2.11 2.34 2.58 60 min 1.69 2.12 2.42 2.85 3.19 3.52 2 hr 1.97 2.42 2.90 3.49 4.04 4.60 3 hr 2.09 2.58 3.11 3.79 4.43 5.10 6 hr 2.49 3.08 3.72 4.55 5.33 6.16 12 hr 2.92 3.62 4.39 5.41 6.40 7.43 24 hr 3.51 4.54 5.43 6.79 7.99 9.34 1 INTENSITY- DURATION- FREQUENCY TABLE: RETURN PERIOD 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR DURATION (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) 5 min 5.81 6.69 7.36 8.37 9.17 9.97 10 m i n 4.63 5.33 5.87 6.68 7.32 7.96 15 m i n 3.89 4.48 4.93 5.61 6.15 6.68 30 min 2.65 3.22 3.63 4.22 4.69 5.15 60 min 1.69 2.12 2.42 2.85 3.19 3.52 2 hr 0.99 1.21 1.45 1.75 2.02 2.30 3 hr 0.70 0.86 1.04 1.26 1.48 1.70 6 hr 0.42 0.51 0.62 0.76 0.89 1.03 12 hr 0.24 0.30 0.37 0.45 0.53 0.62 24 hr 0.15 0.19 0.23 0.28 0.33 0.39 SMITH GARDNER, INC. DESIGN STORMS SG DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 4 7Rboo0 � \ / C_ ■ '00 l\/50' UNDISTU BM WETLA D i l ii i 1 �& STREAM BUFFER I I JI III IIII I LEGEND EXISTING 10' CONTOUR (SEE REFERENCE 1) EXISTING 2' CONTOUR (SEE REFERENCE 1) 110 PROPOSED 10' CONTOUR PROPOSED 2' CONTOUR APPROXIMATE PROPERTY LINE (SEE REFERENCES 1) APPROXIMA TE STREAM CENTER LINE (SEE REFERENCE 2) 5OFT WETLAND AND STREAM BUFFER 20OFT WETLAND AND STREAM BUFFER TACK ON DIVERSION BERM DOWN PIPE C-1 CULVERT DI-1 ❑ DROP INLET DC-1 DRAINAGE CHANNEL FLOOD HAZARD ZONE (0.2PCT ANNUAL CHANCE) (SEE REFERENCE 3) FLOOD HAZARD ZONE AE (SEE REFERENCE 3) OF P07EN77AL LOGICAL SIGNIFICANCE R\—M (TOEA BE RESERVED) (SEE REFERENCE 6) FLOOD WA Y (SEE REFERENCE 3) WETLANDS (SEE REFERENCE 4) BORROW AREA LIMITS OF GEOMEMBRANE O GV-13 LANDFILL GAS VENT *GP-6 PROPOSED LANDFILL GAS MONITORING PROBE GMW-1 EXISTING C&D LANDFILL AREA 1 GROUNDWA TER MONITORING WELL (SEE REFERENCE 5) EXISTING PIEZOME7ER • P-108 (SEE REFERENCE 5) EXISTING MONITORING WELL 9 MW-1 A (SEE REFERENCE 5) NOTES 1. DRAINAGE CHANNEL INDICATOR REPRESENTS THE START (UPSTREAM) OF THE CHANNEL CROSS—SECTION. REFERENCES 1. PARCEL BOUNDARIES, WETLAND AND STREAM LOCATIONS PROVIDED BY BARTLETT ENGINEERING & SURVEYING, PC. BASED ON FIELD SURVEY DATED AUGUST 5, 2020. 2. EXISTING TOPOGRAPHY IN ACTIVE AREAS PROVIDED BY BARTLETT ENGINEERING & SURVEYING, PC. BASED ON FIELD SURVEY DATED AUGUST 5, 2020. SUPPLEMENTAL TOPOGRAPHY FOR AREAS OUTSIDE OF ACTIVE AREAS PROVIDED BY FLOOD RISK INFORMATION SYSTEM (FRIS) LiDAR. FEMA MAP NUMBERS 3720373100J AND 3720373200J, DATED 04/16/13. 3. FLOOD HAZARD INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM, FEMA FIRM MAP NO. 3720373100J, 3772037200J, AND 3720374100J. 4. WETLAND SURVEY AND STREAM DELINEATION DATED MARCH 2O20 FROM SOIL & ENVIRONMENTAL CONSULTANTS, PA. 5. WELL AND BORING LOCATION PROVIDED BY BARTLETT ENGINEERING & SURVEYING, PC. BASED ON FIELD SURVEY DATED MAY 27, 2020. 6. ARCHAEOLOGICAL STUDY DATED MAY 2020 FROM ARCHAEOLOGICAL CONSULTANTS OF THE CAROLINAS, INC. PERMIT ISSUE PREPARED FOR: OF Kel PREPARED BY: VL _IC. NO. F-1370 [ENGINEERING], SC COA NO. C01488 S M ITH+ GARDNER :NGINEERS 14 N. Boylan Avenue, Raleigh INC 27603 1 919.828.0577 1526 Richland St., Columbia SC 29201 `EAL SEAL REV. DATE DESCRIPTION 10/11/21 RESPONSE TO COMMENTS DATED 5/3/21 Electronic files are instruments of service provided by Srr tl Gardner, Inc. for the convenience of the intended recipient; ,, anc no warranty is ei. ,p- expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard -opies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. PROJECT TITLE: WILSON COUNTY SOLID WASTE WESTSIDE CEO LANDFILL AREA DRAWING TITLE: FINAL COVER GRADING AND DRAINAGE PLAN S.W.H. WILSON 20-1 DRAWN: SCALE: R.V.M. AS SHOWN APPROVED: DATE: JULY 2020 FILENAME: WILSON-DO012 © 2021 Smith Gardner, Inc. NOT FOR CONSTRUCTION 4 I S3 i 4--d `- ro c O 4-d CD 4-a CD M DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Custom Soil Resource Report 3 Soil Map o 240700 240800 240900 241000 241100 241200 35° 4331" N 35° 42' 50" N 240600 240700 240800 240900 241000 241100 241200 3 v N Map Scale: 1:6,160 if printed on A portrait (8.5" x 11") sheet. Meters N 0 50 100 200 300 Feet 0 250 500 1000 1500 Map projection: Web Mercator Comer coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 9 N P, 241300 241400 241500 241300 241400 35° 4331" N I r g M 8 35° 42' 50" N 241500 3 io N DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Existing Conditions OSubca Reach and Lin k DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Prepared by Smith Gardner, Inc. Page 2 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Area Listing (all nodes) Area (acres) CN Description (subcats) 23.610 61 >75% Grass cover, Good, HSG B (1 S) 23.610 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Type 11 24-hr 2 Yr - 24 Hr Rainfall=3.51 " Prepared by Smith Gardner, Inc. Page 3 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Existing Conditions Runoff Area=23.610 ac Runoff Depth>0.47" Flow Length=3,500' Slope=0.0100 7' Tc=99.0 min CN=61 Runoff=3.62 cfs 0.923 of Total Runoff Area = 23.610 ac Runoff Volume = 0.923 of Average Runoff Depth = 0.47" 100.00% Pervious Area = 23.610 ac 0.00% Impervious Area = 0.000 ac DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Type 11 24-hr 2 Yr - 24 Hr Rainfall=3.51 " Prepared by Smith Gardner, Inc. Page 4 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment 1S: Existing Conditions Runoff = 3.62 cfs @ 13.34 hrs, Volume= 0.923 af, Depth> 0.47" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2 Yr - 24 Hr Rainfall=3.51" Area (ac) CN Description 23.610 61 >75% Grass cover, Good, HSG B 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 100 0.0100 0.09 Sheet Flow, Grass: Dense n= 0.240 P2= 3.51" 81.0 3,400 0.0100 0.70 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fos 99.0 3,500 Total Subcatchment 1S: Existing Conditions Hydrograph ❑ Runoff 3.62 cfs Type 11 24-h r 2 Yr": 24 H r Rainfa11=3.51 "' 3 Runoff Area=23.610 ac Runoff Volume=0 923' of Runoff Depth>0.47' 2 Flow Length=3,500' U- Slope : 0.0'100',7 TG=99'.0 min 1 CN=61 viiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiir 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Type 11 24-hr 25 Yr - 24 Hr Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 5 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Existing Conditions Runoff Area=23.610 ac Runoff Depth>2.21" Flow Length=3,500' Slope=0.0100 7' Tc=99.0 min CN=61 Runoff=20.79 cfs 4.356 of Total Runoff Area = 23.610 ac Runoff Volume = 4.356 of Average Runoff Depth = 2.21" 100.00% Pervious Area = 23.610 ac 0.00% Impervious Area = 0.000 ac DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Type 11 24-hr 25 Yr - 24 Hr Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 6 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment 1S: Existing Conditions Runoff = 20.79 cfs @ 13.20 hrs, Volume= 4.356 af, Depth> 2.21" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 11 24-hr 25 Yr - 24 Hr Rainfall=6.79" Area (ac) CN Description 23.610 61 >75% Grass cover, Good, HSG B 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 100 0.0100 0.09 Sheet Flow, Grass: Dense n= 0.240 P2= 3.51" 81.0 3,400 0.0100 0.70 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fos 99.0 3,500 Total Subcatchment 1S: Existing Conditions DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Type 11 24-hr 100 Yr- 24 Hr Rainfall= 9.34 " Prepared by Smith Gardner, Inc. Page 7 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Existing Conditions Runoff Area=23.610 ac Runoff Depth>3.97" Flow Length=3,500' Slope=0.0100 7' Tc=99.0 min CN=61 Runoff=38.13 cfs 7.808 of Total Runoff Area = 23.610 ac Runoff Volume = 7.808 of Average Runoff Depth = 3.97" 100.00% Pervious Area = 23.610 ac 0.00% Impervious Area = 0.000 ac DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF - Existing Type 11 24-hr 100 Yr- 24 Hr Rainfall= 9.34 " Prepared by Smith Gardner, Inc. Page 8 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment 1S: Existing Conditions Runoff = 38.13 cfs @ 13.13 hrs, Volume= 7.808 af, Depth> 3.97" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type 11 24-hr 100 Yr - 24 Hr Rainfall=9.34" Area (ac) CN Description 23.610 61 >75% Grass cover, Good, HSG B 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 18.0 100 0.0100 0.09 Sheet Flow, Grass: Dense n= 0.240 P2= 3.51" 81.0 3,400 0.0100 0.70 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fos 99.0 3,500 Total Subcatchment 1S: Existing Conditions DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 DC-7 'L DC-1 I DA-7 DC-6 A9P DI-1 1S � 10P Pond Area Basin 1 OSubca Reach and Link DA-1 DA-2 v DC-2 DA-3 DA-4 DC-3 DC-4 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Prepared by Smith Gardner, Inc. Page 2 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Area Listing (all nodes) Area (acres) CN Description (subcats) 19.839 69 50-75% Grass cover, Fair, HSG B(DA-1,DA-2,DA-3,DA-4,DA-5,DA-6,DA-7) 1.600 85 Gravel roads, HSG B(DA-1,DA-2,DA-3,DA-4,DA-5,DA-6,DA-7) 2.172 98 Paved parking & roofs (1S) 23.611 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 1124-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 3 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pond Area Runoff Area=94,600 sf Runoff Depth>5.98" Tc=5.0 min CN=98 Runoff=21.26 cfs 1.082 of Subcatchment DA-1: Runoff Area=123,000 sf Runoff Depth>3.17" Tc=5.0 min CN=70 Runoff=17.48 cfs 0.747 of Subcatchment DA-2: Runoff Area=100,200 sf Runoff Depth>3.17" Tc=5.0 min CN=70 Runoff=14.24 cfs 0.608 of Subcatchment DA-3: Runoff Area=41,400 sf Runoff Depth>3.37" Tc=5.0 min CN=72 Runoff=6.21 cfs 0.267 of Subcatchment DA-4: Runoff Area=238,800 sf Runoff Depth>3.17" Tc=5.0 min CN=70 Runoff=33.94 cfs 1.450 of Subcatchment DA-5: Runoff Area=65,800 sf Runoff Depth>3.37" Tc=5.0 min CN=72 Runoff=9.88 cfs 0.425 of Subcatchment DA-6: Runoff Area=215,300 sf Runoff Depth>3.17" Tc=5.0 min CN=70 Runoff=30.60 cfs 1.307 of Subcatchment DA-7: Runoff Area=149,400 sf Runoff Depth>3.17" Tc=5.0 min CN=70 Runoff=21.23 cfs 0.907 of Reach DC-1: Avg. Depth=1.40' Max Vet=2.32 fps Inflow=28.45 cfs 1.352 of n=0.030 L=390.0' S=0.0026 '/' Capacity=139.20 cfs Outflow=26.47 cfs 1.346 of Reach DC-2: Avg. Depth=0.75' Max Vet=2.86 fps Inflow=14.24 cfs 0.608 of n=0.030 L=390.0' S=0.0077 '/' Capacity=241.11 cfs Outflow=12.86 cfs 0.606 of Reach DC-3: Avg. Depth=0.37' Max Vet=3.11 fps Inflow=6.21 cfs 0.267 of n=0.030 L=400.0' S=0.0200 '/' Capacity=388.78 cfs Outflow=5.65 cfs 0.266 of Reach DC-4: Avg. Depth=1.23' Max Vet=3.93 fps Inflow=38.59 cfs 1.716 of n=0.030 L=470.0' S=0.0085 '/' Capacity=253.61 cfs Outflow=35.30 cfs 1.709 of Reach DC-5: Avg. Depth=1.30' Max Vet=4.56 fps Inflow=47.07 cfs 3.940 of n=0.030 L=560.0' S=0.0107 '/' Capacity=284.56 cfs Outflow=46.26 cfs 3.926 of Reach DC-6: Avg. Depth=1.93' Max Vet=2.40 fps Inflow=51.04 cfs 3.545 of n=0.050 L=750.0' S=0.0053 '/' Capacity=120.46 cfs Outflow=45.61 cfs 3.515 of Reach DC-7: Avg. Depth=1.75' Max Vet=2.32 fps Inflow=40.75 cfs 2.253 of n=0.050 L=540.0' S=0.0056 '/' Capacity=122.94 cfs Outflow=36.81 cfs 2.238 of DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 4 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 9P: DI-1 Peak EIev=102.49' Inflow=64.49 cfs 5.635 of Outflow=64.49 cfs 5.635 of Pond 10P: Basin 1 Peak EIev=96.28' Storage=182,351 cf Inflow=76.39 cfs 6.717 of Primary=8.93 cfs 2.792 of Secondary=0.00 cfs 0.000 of Outflow=8.93 cfs 2.792 of Total Runoff Area = 23.611 ac Runoff Volume = 6.793 of Average Runoff Depth = 3.45" 90.80% Pervious Area = 21.439 ac 9.20% Impervious Area = 2.172 ac DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 5 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment 1S: Pond Area [49] Hint: Tc<2dt may require smaller dt Runoff = 21.26 cfs @ 11.95 hrs, Volume= 1.082 af, Depth> 5.98" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN Description 94,600 98 Paved parking & roofs 94,600 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Pond Area Hydrograph 23 ❑Runoff 22 21.26 cfs 21 � e IF 4 h Type 24 HR I' 25 YR 20 19 17 Runoff sf 15 16 Run-off - �F- olurme .082 of w 14 13 I Runoff bepth*5 98- 12 _0 11 Yc 50 min 10 9 GW98 8 7 6 5 4 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 6 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-1: [49] Hint: Tc<2dt may require smaller dt Runoff = 17.48 cfs @ 11.96 hrs, Volume= 0.747 af, Depth> 3.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN DescriDtion 115,000 69 50-75% Grass cover, Fair, HSG B 8,000 85 Gravel roads, HSG B 123,000 70 Weighted Average 123,000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-1: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 7 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-2: [49] Hint: Tc<2dt may require smaller dt Runoff = 14.24 cfs @ 11.96 hrs, Volume= 0.608 af, Depth> 3.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN Description 91,600 69 50-75% Grass cover, Fair, HSG B 8,600 85 Gravel roads, HSG B 100,200 70 Weighted Average 100,200 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-2: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 8 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-3: [49] Hint: Tc<2dt may require smaller dt Runoff = 6.21 cfs @ 11.96 hrs, Volume= 0.267 af, Depth> 3.37" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN DescriDtion 34,000 69 50-75% Grass cover, Fair, HSG B 7,400 85 Gravel roads, HSG B 41,400 72 Weighted Average 41,400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-3: Hydrograph I I ❑Runoff 6.21 cfs 6 Type fl 24 hr 25 YR - 24 HR Rainfall=6.79" 5 Runoff Area=41,400 sf Runoff Volume=0.267 of 4 Runoff Depth>3.37" 3 o Tc=5.0 min LL 3 CN=72 2 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 9 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-4: [49] Hint: Tc<2dt may require smaller dt Runoff = 33.94 cfs @ 11.96 hrs, Volume= 1.450 af, Depth> 3.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN DescriDtion 229,400 69 50-75% Grass cover, Fair, HSG B 9,400 85 Gravel roads, HSG B 238,800 70 Weighted Average 238,800 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-4: Hydrograph 38 ■ Runoff 36 3 3.94 cfs 34 TYp'e 1124-hr 25 ',YR 24 HR 30 Rai nfall=6 79" 28 Runoff Area-238,800 sf 26 24 + Runoff -Volume-=1.450 of w 22 Runoff De th>3 1'' R p 20 3 18 Tc=5.0_min 0 u- 16 EN=70 14 12 10 8 6 .. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 10 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-5: [49] Hint: Tc<2dt may require smaller dt Runoff = 9.88 cfs @ 11.96 hrs, Volume= 0.425 af, Depth> 3.37" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN DescriDtion 54,100 69 50-75% Grass cover, Fair, HSG B 11,700 85 Gravel roads, HSG B 65,800 72 Weighted Average 65,800 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-5: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 11 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-6: [49] Hint: Tc<2dt may require smaller dt Runoff = 30.60 cfs @ 11.96 hrs, Volume= 1.307 af, Depth> 3.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN Description 199,600 69 50-75% Grass cover, Fair, HSG B 15,700 85 Gravel roads, HSG B 215,300 70 Weighted Average 215,300 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-6: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 12 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-7: [49] Hint: Tc<2dt may require smaller dt Runoff = 21.23 cfs @ 11.96 hrs, Volume= 0.907 af, Depth> 3.17" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 YR - 24 HR Rainfall=6.79" Area (sf) CN Description 140,500 69 50-75% Grass cover, Fair, HSG B 8,900 85 Gravel roads, HSG B 149,400 70 Weighted Average 149,400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-7: Hydrograph 23 ■Runoff 22 21.23 cfs - -- ----------- 24-- '------------ 21 ' .- Type--ii-a4-Fir--25--'YR-*- HR---- 20 - pp -------------+------------ 19 ' ,.. Rat 6 79 ------------ nfal, = -. 18------------------------- Runoff-Area-49,400 O---- 17 `, 15 --------- Run-v 90T --- ------ 16 . � �'� - - -- i�LJnCl - - - , � - j -a� - 14 b�ul'1'�e-a. ',-', r � - epth 3---1 13 - U unoff D 12 " 0 11 -.-0- min---- LL CN=70---- 10 9 " 8 " 7 6 '. 5 4 - 3 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 13 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-1: [61] Hint: Submerged 46% of Reach DC-2 bottom Inflow Area = 5.124 ac, Inflow Depth > 3.17" for 25 YR - 24 HR event Inflow = 28.45 cfs @ 11.98 hrs, Volume= 1.352 of Outflow = 26.47 cfs @ 12.06 hrs, Volume= 1.346 af, Atten= 7%, Lag= 4.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.32 fps, Min. Travel Time= 2.8 min Avg. Velocity = 0.78 fps, Avg. Travel Time= 8.3 min Peak Storage= 4,472 cf @ 12.01 hrs, Average Depth at Peak Storage= 1.40' Bank -Full Depth= 3.00', Capacity at Bank -Full= 139.20 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 390.0' Slope= 0.0026 7' Inlet Invert= 115.00', Outlet Invert= 114.00' ❑ Inflow ❑ Outflow 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 14 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-2: Inflow Area = 2.300 ac, Inflow Depth > 3.17" for 25 YR - 24 HR event Inflow = 14.24 cfs @ 11.96 hrs, Volume= 0.608 of Outflow = 12.86 cfs @ 12.02 hrs, Volume= 0.606 af, Atten= 10%, Lag= 4.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.86 fps, Min. Travel Time= 2.3 min Avg. Velocity = 0.86 fps, Avg. Travel Time= 7.5 min Peak Storage= 1,830 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.75' Bank -Full Depth= 3.00', Capacity at Bank -Full= 241.11 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 390.0' Slope= 0.0077 '/' Inlet Invert= 118.00', Outlet Invert= 115.00' Reach DC-2: Hydrograph Inflow 24 cfs ❑ outflow -nf1OW'-Area 2. 0 -0c- 15 " 12.' 14 " 86 cfs -. 13 .9. Depth=Q.7S, - 11 - - --- - ps Max Vel�2. 6f 12 " ----------- ----------------------- - ----- ---- 10 ------- ------------' -----------' ' n— O.OaJQQ-0 L=390.0' 3 8 ".. . — 77 o - --- - ' - - f -- LL7 . -- -o.00 " it24--' 'cs5 apacy----- - 4 " 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 15 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-3: Inflow Area = 0.950 ac, Inflow Depth > 3.37" for 25 YR - 24 HR event Inflow = 6.21 cfs @ 11.96 hrs, Volume= 0.267 of Outflow = 5.65 cfs @ 12.02 hrs, Volume= 0.266 af, Atten= 9%, Lag= 3.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.11 fps, Min. Travel Time= 2.1 min Avg. Velocity = 0.90 fps, Avg. Travel Time= 7.4 min Peak Storage= 757 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.37' Bank -Full Depth= 3.00', Capacity at Bank -Full= 388.78 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 400.0' Slope= 0.0200 7' Inlet Invert= 117.00', Outlet Invert= 109.00' 6- 5- 4- 3 2 , 1 Reach DC-3: Hydrograph 6.21 cfs 5.65 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 16 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-4: Inflow Area = 6.433 ac, Inflow Depth > 3.20" for 25 YR - 24 HR event Inflow = 38.59 cfs @ 11.96 hrs, Volume= 1.716 of Outflow = 35.30 cfs @ 12.02 hrs, Volume= 1.709 af, Atten= 9%, Lag= 3.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.93 fps, Min. Travel Time= 2.0 min Avg. Velocity = 1.24 fps, Avg. Travel Time= 6.3 min Peak Storage= 4,421 cf @ 11.99 hrs, Average Depth at Peak Storage= 1.23' Bank -Full Depth= 3.00', Capacity at Bank -Full= 253.61 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.07' Top Width= 22.00' Length= 470.0' Slope= 0.0085 '/' Inlet Invert= 105.00', Outlet Invert= 101.00' Reach DC-4: Hydrograph - -- -- - -- ■ Inflow 42 " ,'" 3 8.59 cfs -- - - ❑ outflow 40 I of how Ada-6.433c 38 36 %" . 3530 cfs pp Deh=2V. 3349 ' 32 , _ ' , � -- -32 S30 ----------- 28 26 ----------- -------------------_' 42 24 �- 22 -' - ------------------------- - L=470.0' 0 20 - ----------- LL 18 "" .-" -- - S=-.0085--''/' 16 ------------ r------------'r 14 : ' - �� - --- Dacity':=- i, 3 6 �I �i.S 12 - ------- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 17 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-5: [61] Hint: Submerged 32% of Reach DC-6 bottom Inflow Area = 15.007 ac, Inflow Depth > 3.15" for 25 YR - 24 HR event Inflow = 47.07 cfs @ 12.17 hrs, Volume= 3.940 of Outflow = 46.26 cfs @ 12.23 hrs, Volume= 3.926 af, Atten= 2%, Lag= 3.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.56 fps, Min. Travel Time= 2.0 min Avg. Velocity = 1.73 fps, Avg. Travel Time= 5.4 min Peak Storage= 5,723 cf @ 12.20 hrs, Average Depth at Peak Storage= 1.30' Bank -Full Depth= 3.00', Capacity at Bank -Full= 284.56 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 560.0' Slope= 0.0107 '/' Inlet Invert= 107.00', Outlet Invert= 101.00' ❑ Inflow ❑ Outflow DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 18 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-6: [61] Hint: Submerged 64% of Reach DC-7 bottom Inflow Area = 13.496 ac, Inflow Depth > 3.15" for 25 YR - 24 HR event Inflow = 51.04 cfs @ 12.00 hrs, Volume= 3.545 of Outflow = 45.61 cfs @ 12.17 hrs, Volume= 3.515 af, Atten= 11%, Lag= 10.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.40 fps, Min. Travel Time= 5.2 min Avg. Velocity = 0.95 fps, Avg. Travel Time= 13.1 min Peak Storage= 14,205 cf @ 12.08 hrs, Average Depth at Peak Storage= 1.93' Bank -Full Depth= 3.00', Capacity at Bank -Full= 120.46 cfs 4.00' x 3.00' deep channel, n= 0.050 Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 750.0' Slope= 0.0053 '/' Inlet Invert= 111.00', Outlet Invert= 107.00' ❑ Inflow ❑ Outflow DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 19 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-7: [62] Warning: Submerged 25% of Reach DC-1 inlet Inflow Area = 8.554 ac, Inflow Depth > 3.16" for 25 YR - 24 HR event Inflow = 40.75 cfs @ 12.00 hrs, Volume= 2.253 of Outflow = 36.81 cfs @ 12.11 hrs, Volume= 2.238 af, Atten= 10%, Lag= 6.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.32 fps, Min. Travel Time= 3.9 min Avg. Velocity = 0.84 fps, Avg. Travel Time= 10.7 min Peak Storage= 8,709 cf @ 12.05 hrs, Average Depth at Peak Storage= 1.75' Bank -Full Depth= 3.00', Capacity at Bank -Full= 122.94 cfs 4.00' x 3.00' deep channel, n= 0.050 Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 540.0' Slope= 0.0056 7' Inlet Invert= 114.00', Outlet Invert= 111.00' 1 ❑ Inflow ❑ Outflow DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 20 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 9P: DI-1 [57] Hint: Peaked at 102.49' (Flood elevation advised) [61] Hint: Submerged 37% of Reach DC-4 bottom [61] Hint: Submerged 25% of Reach DC-5 bottom Inflow Area = 21.439 ac, Inflow Depth > 3.15" for 25 YR - 24 HR event Inflow = 64.49 cfs @ 12.06 hrs, Volume= 5.635 of Outflow = 64.49 cfs @ 12.06 hrs, Volume= 5.635 af, Atten= 0%, Lag= 0.0 min Primary = 64.49 cfs @ 12.06 hrs, Volume= 5.635 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 102.49' @ 12.06 hrs Device Routing Invert Outlet Devices #1 Primary 93.00' 36.0" x 70.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 92.00' S= 0.01437' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 101.00' 3.0' long Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) Primary OutFlow Max=63.77 cfs @ 12.06 hrs HW=102.48' (Free Discharge) L1=Culvert (Passes 63.77 cfs of 96.15 cfs potential flow) L2=Sharp-Crested Rectangular Weir (Weir Controls 63.77 cfs @ 3.98 fps) N V 3 0 LL Pond 9P: DI-1 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ❑ Primary DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 1124-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 21 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 10P: Basin 1 [82] Warning: Early inflow requires earlier time span [79] Warning: Submerged Pond 9P Primary device # 1 INLET by 3.28' Inflow Area = 23.611 ac, Inflow Depth > 3.41" for 25 YR - 24 HR event Inflow = 76.39 cfs @ 12.02 hrs, Volume= 6.717 of Outflow = 8.93 cfs @ 13.20 hrs, Volume= 2.792 af, Atten= 88%, Lag= 71.0 min Primary = 8.93 cfs @ 13.20 hrs, Volume= 2.792 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 96.28' @ 13.20 hrs Surf.Area= 52,653 sf Storage= 182,351 cf Plug -Flow detention time= 211.3 min calculated for 2.792 of (42% of inflow) Center -of -Mass det. time= 120.9 min ( 911.0 - 790.1 ) Volume Invert Avail.Storage Storage Description #1 92.00' 279,900 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 92.00 32,400 0 0 94.00 42,000 74,400 74,400 96.00 51,300 93,300 167,700 98.00 60,900 112,200 279,900 Device Routing Invert Outlet Devices #1 Primary 92.00' 18.0" x 60.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 90.00' S= 0.03337' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 92.10' Special & User -Defined Head (feet) 0.00 0.10 1.00 10.00 Disch. (cfs) 0.000 1.130 1.130 1.130 #3 Device 1 96.00' 4.0' long Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) #4 Secondary 97.00' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.85 cfs @ 13.20 hrs HW=96.28' (Free Discharge) L1=Culvert (Passes 8.85 cfs of 15.99 cfs potential flow) t2=Special & User -Defined (Custom Controls 1.13 cfs) 3=Sharp-Crested Rectangular Weir (Weir Controls 7.72 cfs @ 1.74 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=92.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 25 YR - 24 HR Rainfall=6.79" Prepared by Smith Gardner, Inc. Page 22 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 10P: Basin 1 Hydrograph 8.93 cfs 15 10 11 0.00 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 1124-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 23 HydroCADO 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pond Area Runoff Area=94,600 sf Runoff Depth>8.26" Tc=5.0 min CN=98 Runoff=29.29 cfs 1.495 of Subcatchment DA-1: Runoff Area=123,000 sf Runoff Depth>5.23" Tc=5.0 min CN=70 Runoff=28.20 cfs 1.232 of Subcatchment DA-2: Runoff Area=100,200 sf Runoff Depth>5.23" Tc=5.0 min CN=70 Runoff=22.97 cfs 1.003 of Subcatchment DA-3: Runoff Area=41,400 sf Runoff Depth>5.48" Tc=5.0 min CN=72 Runoff=9.86 cfs 0.434 of Subcatchment DA-4: Runoff Area=238,800 sf Runoff Depth>5.23" Tc=5.0 min CN=70 Runoff=54.74 cfs 2.391 of Subcatchment DA-5: Runoff Area=65,800 sf Runoff Depth>5.48" Tc=5.0 min CN=72 Runoff=15.67 cfs 0.690 of Subcatchment DA-6: Runoff Area=215,300 sf Runoff Depth>5.23" Tc=5.0 min CN=70 Runoff=49.36 cfs 2.156 of Subcatchment DA-7: Runoff Area=149,400 sf Runoff Depth>5.23" Tc=5.0 min CN=70 Runoff=34.25 cfs 1.496 of Reach DC-1: Avg. Depth=1.78' Max Vet=2.66 fps Inflow=46.69 cfs 2.231 of n=0.030 L=390.0' S=0.0026 '/' Capacity=139.20 cfs Outflow=43.52 cfs 2.222 of Reach DC-2: Avg. Depth=0.97' Max Vet=3.27 fps Inflow=22.97 cfs 1.003 of n=0.030 L=390.0' S=0.0077 '/' Capacity=241.11 cfs Outflow=20.93 cfs 1.000 of Reach DC-3: Avg. Depth=0.48' Max Vet=3.59 fps Inflow=9.86 cfs 0.434 of n=0.030 L=400.0' S=0.0200 '/' Capacity=388.78 cfs Outflow=9.05 cfs 0.432 of Reach DC-4: Avg. Depth=1.56' Max Vet=4.47 fps Inflow=62.56 cfs 2.824 of n=0.030 L=470.0' S=0.0085 '/' Capacity=253.61 cfs Outflow=57.74 cfs 2.815 of Reach DC-5: Avg. Depth=1.72' Max Vet=5.32 fps Inflow=83.95 cfs 6.505 of n=0.030 L=560.0' S=0.0107 '/' Capacity=284.56 cfs Outflow=82.57 cfs 6.488 of Reach DC-6: Avg. Depth=2.54' Max Vet=2.80 fps Inflow=90.06 cfs 5.854 of n=0.050 L=750.0' S=0.0053 '/' Capacity=120.46 cfs Outflow=81.32 cfs 5.816 of Reach DC-7: Avg. Depth=2.24' Max Vet=2.66 fps Inflow=68.95 cfs 3.718 of n=0.050 L=540.0' S=0.0056 '/' Capacity=122.94 cfs Outflow=63.48 cfs 3.699 of DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 24 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 9P: DI-1 Peak EIev=106.02' Inflow=115.54 cfs 9.303 of Outflow=115.54 cfs 9.303 of Pond 10P: Basin 1 Peak EIev=97.47' Storage=248,321 cf Inflow=132.27 cfs 10.798 of Primary=18.49 cfs 6.057 of Secondary=16.90 cfs 0.766 of Outflow=35.38 cfs 6.823 of Total Runoff Area = 23.611 ac Runoff Volume = 10.896 of Average Runoff Depth = 5.54" 90.80% Pervious Area = 21.439 ac 9.20% Impervious Area = 2.172 ac DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 25 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment 1S: Pond Area [49] Hint: Tc<2dt may require smaller dt Runoff = 29.29 cfs @ 11.95 hrs, Volume= 1.495 af, Depth> 8.26" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN Description 94,600 98 Paved parking & roofs 94,600 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1S: Pond Area Hydrograph 32 ❑Runoff 29.29 cfs 30 e tt 24 28 ::Type = 24 HR -hr,100, YR nfal 2s Ra'j 1=9.34" 24 Runoff -Area=94,600 sf - 22 Runoff Volume=1.495 of 20 w 18 Runoff Depth>8 26" 3 16 Tc=5.0 min LL 14 CN i98 12 10 8 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 26 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-1: [49] Hint: Tc<2dt may require smaller dt Runoff = 28.20 cfs @ 11.96 hrs, Volume= 1.232 af, Depth> 5.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN DescriDtion 115,000 69 50-75% Grass cover, Fair, HSG B 8,000 85 Gravel roads, HSG B 123,000 70 Weighted Average 123,000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-1: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 27 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-2: [49] Hint: Tc<2dt may require smaller dt Runoff = 22.97 cfs @ 11.96 hrs, Volume= 1.003 af, Depth> 5.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN Description 91,600 69 50-75% Grass cover, Fair, HSG B 8,600 85 Gravel roads, HSG B 100,200 70 Weighted Average 100,200 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-2: Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 28 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-3: [49] Hint: Tc<2dt may require smaller dt Runoff = 9.86 cfs @ 11.95 hrs, Volume= 0.434 af, Depth> 5.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN DescriDtion 34,000 69 50-75% Grass cover, Fair, HSG B 7,400 85 Gravel roads, HSG B 41,400 72 Weighted Average 41,400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-3: Hydrograph w 3 0 U- 0 5 6 7 8 9 10 9.86 cf ______ ❑Runoff s Type II 24-hr,100'YR ' : 24 HR Rainfall=9.34" Runoff Area=41,400 sf RunoffYolume=0.43A of Runoff Depth>5.48" Tc=5.0 min CN=72 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 29 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-4: [49] Hint: Tc<2dt may require smaller dt Runoff = 54.74 cfs @ 11.96 hrs, Volume= 2.391 af, Depth> 5.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN DescriDtion 229,400 69 50-75% Grass cover, Fair, HSG B 9,400 85 Gravel roads, HSG B 238,800 70 Weighted Average 238,800 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-4: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 30 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-5: [49] Hint: Tc<2dt may require smaller dt Runoff = 15.67 cfs @ 11.95 hrs, Volume= 0.690 af, Depth> 5.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN DescriDtion 54,100 69 50-75% Grass cover, Fair, HSG B 11,700 85 Gravel roads, HSG B 65,800 72 Weighted Average 65,800 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-5: Hydrograph 17------------- - 16 ------------ 15 ------------------------------ 14 ------------ 13 ------------- 12 ------------- 11 ------------ w 10 - - - -'- - -� --- o I I I r 9 ------------ o g 7 - - - -'----------'-------------' - 6 - - - -'----------'-------------' - 5 ------------- 4 - - - -'---------'----------- 3 -------- '-------------------------- ' 2 ------------- 1 . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 31 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-6: [49] Hint: Tc<2dt may require smaller dt Runoff = 49.36 cfs @ 11.96 hrs, Volume= 2.156 af, Depth> 5.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN Description 199,600 69 50-75% Grass cover, Fair, HSG B 15,700 85 Gravel roads, HSG B 215,300 70 Weighted Average 215,300 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-6: Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 32 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Subcatchment DA-7: [49] Hint: Tc<2dt may require smaller dt Runoff = 34.25 cfs @ 11.96 hrs, Volume= 1.496 af, Depth> 5.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100 YR - 24 HR Rainfall=9.34" Area (sf) CN DescriDtion 140,500 69 50-75% Grass cover, Fair, HSG B 8,900 85 Gravel roads, HSG B 149,400 70 Weighted Average 149,400 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA-7: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 33 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-1: [61] Hint: Submerged 59% of Reach DC-2 bottom Inflow Area = 5.124 ac, Inflow Depth > 5.23" for 100 YR - 24 HR event Inflow = 46.69 cfs @ 11.98 hrs, Volume= 2.231 of Outflow = 43.52 cfs @ 12.05 hrs, Volume= 2.222 af, Atten= 7%, Lag= 4.2 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.66 fps, Min. Travel Time= 2.4 min Avg. Velocity = 0.86 fps, Avg. Travel Time= 7.6 min Peak Storage= 6,512 cf @ 12.00 hrs, Average Depth at Peak Storage= 1.78' Bank -Full Depth= 3.00', Capacity at Bank -Full= 139.20 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.07' Top Width= 22.00' Length= 390.0' Slope= 0.0026 'i' Inlet Invert= 115.00', Outlet Invert= 114.00' ❑ Inflow ❑ Outflow 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 34 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-2: Inflow Area = 2.300 ac, Inflow Depth > 5.23" for 100 YR - 24 HR event Inflow = 22.97 cfs @ 11.96 hrs, Volume= 1.003 of Outflow = 20.93 cfs @ 12.01 hrs, Volume= 1.000 af, Atten= 9%, Lag= 3.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.27 fps, Min. Travel Time= 2.0 min Avg. Velocity = 0.96 fps, Avg. Travel Time= 6.8 min Peak Storage= 2,597 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.97' Bank -Full Depth= 3.00', Capacity at Bank -Full= 241.11 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 390.0' Slope= 0.0077 '/' Inlet Invert= 118.00', Outlet Invert= 115.00' Reach DC-2: Hydrograph ----- - ■ Inflow 22.97 cf s ❑ outflow 24 1nf1oW: Area=�2.3p0 ac - 22 , 20.93 cfs --- ' =0.97'Avg Depth 20 718 'axv@�=32;fps --- 16 n=0.03042 - L=390.0' n 14 c 12 - S= LL ©.007-7--'T 8" --- Capaaity'�=24 1.'1;1 cfs 6 ------------------------------------ -- ------ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 35 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-3: Inflow Area = 0.950 ac, Inflow Depth > 5.48" for 100 YR - 24 HR event Inflow = 9.86 cfs @ 11.95 hrs, Volume= 0.434 of Outflow = 9.05 cfs @ 12.01 hrs, Volume= 0.432 af, Atten= 8%, Lag= 3.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.59 fps, Min. Travel Time= 1.9 min Avg. Velocity = 1.00 fps, Avg. Travel Time= 6.7 min Peak Storage= 1,045 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.48' Bank -Full Depth= 3.00', Capacity at Bank -Full= 388.78 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 '/' Top Width= 22.00' Length= 400.0' Slope= 0.0200 '/' Inlet Invert= 117.00', Outlet Invert= 109.00' 0 Reach DC-3: Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 36 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-4: Inflow Area = 6.433 ac, Inflow Depth > 5.27" for 100 YR - 24 HR event Inflow = 62.56 cfs @ 11.96 hrs, Volume= 2.824 of Outflow = 57.74 cfs @ 12.01 hrs, Volume= 2.815 af, Atten= 8%, Lag= 3.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.47 fps, Min. Travel Time= 1.8 min Avg. Velocity = 1.38 fps, Avg. Travel Time= 5.7 min Peak Storage= 6,329 cf @ 11.98 hrs, Average Depth at Peak Storage= 1.56' Bank -Full Depth= 3.00', Capacity at Bank -Full= 253.61 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 470.0' Slope= 0.0085 '/' Inlet Invert= 105.00', Outlet Invert= 101.00' Reach DC-4: Hydrograph 70 ------ � ■ Inflow 62.56 c fs ❑ outflow 65 ----33 - Inflow: ac 60 -'Depth=l.6' 57.74 cfs ----- ----- - - -Avg. 55 50 Max ite f-4 7 Jps 45 - — • ' � -' 30 F 40 35 , ' ------------', ----------- 4 — IO 'O o - u. 30 .- " _ S=0.0085''/' 25 -' - - - - - --------- {--- Capacity,=253.61 --- cfs 20 15 - 10 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 37 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-5: [61] Hint: Submerged 43% of Reach DC-6 bottom Inflow Area = 15.007 ac, Inflow Depth > 5.20" for 100 YR - 24 HR event Inflow = 83.95 cfs @ 12.13 hrs, Volume= 6.505 of Outflow = 82.57 cfs @ 12.19 hrs, Volume= 6.488 af, Atten= 2%, Lag= 3.2 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.32 fps, Min. Travel Time= 1.8 min Avg. Velocity = 1.92 fps, Avg. Travel Time= 4.9 min Peak Storage= 8,785 cf @ 12.16 hrs, Average Depth at Peak Storage= 1.72' Bank -Full Depth= 3.00', Capacity at Bank -Full= 284.56 cfs 4.00' x 3.00' deep channel, n= 0.030 Earth, grassed & winding Side Slope Z-value= 3.07' Top Width= 22.00' Length= 560.0' Slope= 0.0107 'i' Inlet Invert= 107.00', Outlet Invert= 101.00' ❑ Inflow ❑ Outflow I 1 1 . 1, Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 38 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-6: [61] Hint: Submerged 84% of Reach DC-7 bottom Inflow Area = 13.496 ac, Inflow Depth > 5.21" for 100 YR - 24 HR event Inflow = 90.06 cfs @ 12.00 hrs, Volume= 5.854 of Outflow = 81.32 cfs @ 12.14 hrs, Volume= 5.816 af, Atten= 10%, Lag= 8.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.80 fps, Min. Travel Time= 4.5 min Avg. Velocity = 1.05 fps, Avg. Travel Time= 11.9 min Peak Storage= 22,097 cf @ 12.06 hrs, Average Depth at Peak Storage= 2.54' Bank -Full Depth= 3.00', Capacity at Bank -Full= 120.46 cfs 4.00' x 3.00' deep channel, n= 0.050 Side Slope Z-value= 3.07' Top Width= 22.00' Length= 750.0' Slope= 0.0053 'i' Inlet Invert= 111.00', Outlet Invert= 107.00' 1 3 0 LL 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 39 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Reach DC-7: [62] Warning: Submerged 41 % of Reach DC-1 inlet Inflow Area = 8.554 ac, Inflow Depth > 5.22" for 100 YR - 24 HR event Inflow = 68.95 cfs @ 11.99 hrs, Volume= 3.718 of Outflow = 63.48 cfs @ 12.09 hrs, Volume= 3.699 af, Atten= 8%, Lag= 5.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.66 fps, Min. Travel Time= 3.4 min Avg. Velocity = 0.93 fps, Avg. Travel Time= 9.7 min Peak Storage= 12,966 cf @ 12.03 hrs, Average Depth at Peak Storage= 2.24' Bank -Full Depth= 3.00', Capacity at Bank -Full= 122.94 cfs 4.00' x 3.00' deep channel, n= 0.050 Side Slope Z-value= 3.07' Top Width= 22.00' Length= 540.0' Slope= 0.0056 'i' Inlet Invert= 114.00', Outlet Invert= 111.00' �Mi ❑ Inflow ❑ Outflow DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 40 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 9P: DI-1 [57] Hint: Peaked at 106.02' (Flood elevation advised) [62] Warning: Submerged 33% of Reach DC-4 inlet [61] Hint: Submerged 83% of Reach DC-5 bottom Inflow Area = 21.439 ac, Inflow Depth > 5.21" for 100 YR - 24 HR event Inflow = 115.54 cfs @ 12.06 hrs, Volume= 9.303 of Outflow = 115.54 cfs @ 12.06 hrs, Volume= 9.303 af, Atten= 0%, Lag= 0.0 min Primary = 115.54 cfs @ 12.06 hrs, Volume= 9.303 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 106.02' @ 12.06 hrs Device Routing Invert Outlet Devices #1 Primary 93.00' 36.0" x 70.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 92.00' S= 0.01437' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 101.00' 3.0' long Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) Primary OutFlow Max=114.75 cfs @ 12.06 hrs HW=105.87' (Free Discharge) L1=Culvert (Inlet Controls 114.75 cfs @ 16.23 fps) L2=Sharp-Crested Rectangular Weir (Passes 114.75 cfs of 284.64 cfs potential flow) N V 3 0 LL Pond 9P: DI-1 Hydrograph 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) ■ Inflow ❑ Primary DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 11 24-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 41 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 10P: Basin 1 [82] Warning: Early inflow requires earlier time span [79] Warning: Submerged Pond 9P Primary device # 1 INLET by 4.47' Inflow Area = 23.611 ac, Inflow Depth > 5.49" for 100 YR - 24 HR event Inflow = 132.27 cfs @ 12.02 hrs, Volume= 10.798 of Outflow = 35.38 cfs @ 12.55 hrs, Volume= 6.823 af, Atten= 73%, Lag= 31.9 min Primary = 18.49 cfs @ 12.55 hrs, Volume= 6.057 of Secondary = 16.90 cfs @ 12.55 hrs, Volume= 0.766 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 97.47' @ 12.55 hrs Surf.Area= 58,358 sf Storage= 248,321 cf Plug -Flow detention time= 150.8 min calculated for 6.823 of (63% of inflow) Center -of -Mass det. time= 78.5 min ( 859.3 - 780.8 ) Volume Invert Avail.Storage Storage Description #1 92.00' 279,900 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 92.00 32,400 0 0 94.00 42,000 74,400 74,400 96.00 51,300 93,300 167,700 98.00 60,900 112,200 279,900 Device Routing Invert Outlet Devices #1 Primary 92.00' 18.0" x 60.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 90.00' S= 0.03337' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 92.10' Special & User -Defined Head (feet) 0.00 0.10 1.00 10.00 Disch. (cfs) 0.000 1.130 1.130 1.130 #3 Device 1 96.00' 4.0' long Sharp -Crested Rectangular Weir X 4.00 2 End Contraction(s) #4 Secondary 97.00' 20.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=18.49 cfs @ 12.55 hrs HW=97.47' (Free Discharge) L1=Culvert (Inlet Controls 18.49 cfs @ 10.46 fps) �__3=Sharp-Crested 2=Special & User -Defined (Passes < 1.13 cfs potential flow) Rectangular Weir (Passes < 86.42 cfs potential flow) Secondary OutFlow Max=16.83 cfs @ 12.55 hrs HW=97.47' (Free Discharge) L4=Broad-Crested Rectangular Weir (Weir Controls 16.83 cfs @ 1.79 fps) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Westside C&D LF PTC Type 1124-hr 100 YR - 24 HR Rainfall=9.34" Prepared by Smith Gardner, Inc. Page 42 HydroCAD® 8.00 s/n 004004 © 2006 HydroCAD Software Solutions LLC 10/12/2021 Pond 10P: Basin 1 Hydrograph 132.27 cfs - - - --, - --- �'�-----+------ --- - �'� -- ---� -- --- �'� - --- - utflow ow' Area=23.61-1_-ac- -��f� IMInflow rimary econdary 140 - eak Efev=97- 47 130 - Storage-248,321 cf- 120 __ 110---- --------------- 100 ,' :" - - --- - -'-- --'---------- �'�-----'-----'----- �'�-----'---- --- --- --- --- 90 ----- -- --- ----- ----- ----- ----- ----- ----- 42 -� 80 0 70 --- -�---------------------------- ----- -� ----- - 60 35.38 cfs 50 ; " - - - - - -'--------------------'----------- ------------------------------- '----------- 40 30 18.49 cfs 16.90 cfs 20zz 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 TEL I WEB 14 N. Boylan Avenue, Raleigh, NC27603 919.828.0577 1 www.smithgardnerinc.com PROJECT Westside C&D Landfill -Area 2 SHEET 1 OF 11 SUBJECT Drainage Channel Analysis JOB # WILSON-20-1 DATE 7/17/2020 COMPUTED BY SWH CHECKED BY WMB OBJECTIVE: To design drainage channels, ditches, etc. to handle stormwater flow from the design storm(s). The main design criteria will be to ensure that all drainage channels, ditches, etc. will be able to accommodate the peak discharge from the design storm without overtopping and without exceeding the allowable shear stress and/or velocity of the selected channel lining. REFERENCES: Federal Highway Administration (2001), Urban Drainage Design Manual, Hydraulic Engineering Circular No. 22, FHWA NHI-01-021, Second Ed., U.S. Dept. of Transportation, Washington, D.C. North Carolina Division of Land Resources (2013 Updates), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. Pennsylvania DEP Bureau of Watershed Protection (2000), Erosion and Sediment Pollution Control Program Manual. ANALYSIS: The following approach is used in the design of drainage channels: 1 Determine the peak discharge from the design storm(s) (from HydroCAD or spreadsheet methods). For permanent linings (Grass, TRM, rip rap, gabions, etc.) use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. For grass lined channels, a smaller design storm (2-Yr 24-Hr -unless otherwise specified) is used to evaluate temporary linings. 2- Input other design parameters (bottom width side slopes minimum freeboard, min./max. slopes and channel lining). 3. Based on the design parameters calculate normal depth of flow, velocity, Froude number, and maximum shear stress for both max./min. slopes. Also determine the critical slope and corresponding normal depth. 4. Compare the velocity and/or shear stress to allowable values (the maximum slope val ues will control). If val ues are exceeded, revise design parameters as required. 5. Based on normal depth values and required freeboard (generally use the greater of 6 inches or 25 of the flow depth), determine the minimum channel depth and top width for both max./min. slopes (the minimum slope values will control). 6. If the channel has a significant curved reach, evaluate the shear stress and superelevation of the water surface in the bend. CALCULATIONS: - Manning s Equation: 1.49AR213S112 AV (HEC-22 Eq. 5-5) Q= n where: Q = discharge (cfs) n = Manning s roughness coefficient (See Below) A = cross sectional area of flow (ft2) R = hydraulic radius (ft) = A/P P = wetted perimeter S = slope of channel (ft/ft) V = average channel velocity (ft/sec) SMITH GARNER, INC. DRAINAGE CHANNEL-Westside C&DArea 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SHEET SUBJECT Drainage Channel Analysis JOB# 2 OF 11 WI LSON-20-1 - Maximum Shear Stress (Tractive Force Method zd = )dS (HEC-22 Eq. 5-13) where: r, = maximum shear stress on channel lining (psf) y = unit weight of water (62.4 pcf) d = maximum depth of flow (ft) S = channel slope (ft/ft) - Froude Number: DATE 7/17/2020 COMPUTED BY SWH CHECKED BY WMB where: F, = Froude number (dimensionless) v = flow velocity (ft/sec) g = acceleration of gravity (32.2 ft/sec`) A = cross -sectional area of flow (W) T = top width of flow (ft) Note that A/T=the hydraulic depth (D). For Fr 1.0, flow is supercritical Fr 1.0, flow is subcritical Fr = 1.0, flow is critical. Critical Slope: The critical slope (Sj is the slope at which Fr = 1.0. When the slope is between 0.7S. and 1.3S. , unstable flow may occur as small flow disturbances can initiate a change in the flow state. If slopes are within this range, consider additional freeboard. - Manning s Roughness Coefficient (n): Grass: Rip Ram R v6 (HEC-22 Eq. 5-6 - 5-10) n = [K+ 19.971og(R14SO4)] where: R = hydraulic radius (ft) K = vegetative coefficient (depending on retardance class) =15.8 (Class A) = 23.0 (CI ass B) = 30.2 (a ass C) = 34.6 (CI ass D) = 37.7 (Class E) S = slope of channel (ft/ft) y v6 n= 21.61og( Y + 14 d50 where: y = 050 _ depth of flow (ft) median si e of rip rap (ft) (PA DEP Manual Fig. 3) SMITH GARDNER, INC. DRAINAGE CHAN N EL-Westside C&DArea 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A9lC808 PROJECT Westside C&D Landfill -Area 2 SHEET SUBJECT Drainage Channel Analysis JOB # - Curved Channels (WhereApplicable. Shear Stress in Bend: Zb = Kb Zd where: r a = Kb = ra = B= Superelevation at Outside of Bend: TVZT A d = 0.5 gR, 3 OF 11 WI LSON-20-1 (HEC-22 Eq. 5-15) bend shear stress (psf) function of Rc/B (use HEC-22 Chart 21) maximum shear stress on channel lining (psf) radius to the centerline of the channel (ft) bottom width of channel (ft) (HEC-22 Eq. 5-11 modified) DATE 7/17/2020 COMPUTED BY SWH CHECKED BY WMB where: A o = superelevation of water surface between the outer channel bank and the centerline of the channel (avg. water surface before bend) (ft) V = average channel velocity (ft/sec) T = top width of flow (ft) g = acceleration of gravity (32.2 ft/sec2) A, = radius to the centerline of the channel (ft) - Allowable Shear Stress/Velocity: Grass -Lined Channels: For grass -lined channels, an allowable velocity approach is applicable for slopes flatter than 10 . For slopes of 10 and steeper appropriate permanent linings should be used. For use in the evaluation of curved channels, the following allowable shear stress values (lb/ft2) can be assumed based on retardance cl ass: Class A: 3.7 Gass B: 2.1 Class C: 1 Gass D: 0.6 CI ass E: 0.35 Rip Rap -Lined Channels: For rip rap -lined channels, an allowable velocity approach is applicable for slopes flatter than 10% (see table below). For slopes of 10% or steeper, use the following equation: Z7,1/,_ = 4 x dso (HEC-22 Eq. 5-17) where: rallow = allowable shear stress (psf) aM = median si a of rip rap (ft) SMITH GARDNER, INC. DRAINAGE CHANNEL-Westside C&DArea 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside CBDLandfil l -Area 2 SHEET 4/15 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-1 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, Q?= 7.5 ft'/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 28.5 ftl/s Source: HydroCAD25-Yr24-Hr Bottom Width, B = 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft' rare= 1.55 Ib/ft, Maximum Channel Slope, S_ = 0.020 ft/ft Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.001 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=ArP T D=A7T V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft' Used z-,I'd 02 Maximum Slope: 0.46 0.035 2.47 6.91 0.36 6.76 0.37 3.04 7.5 0.88 0.6 S 2.7 0.K. Minimum Slope: 1.02 0.035 7.15 10.42 0.69 10.09 0.71 1.05 7.5 0.22 0.1 S 24.5 O.K. 025 Maximum Slope: 1.17 0.054 8.73 11.37 0.77 10.99 0.79 3.29 28.7 0.65 1.5 V 1.4 0.K. Minimum Slope: 2.63 0.068 31.37 20.67 1.52 19.81 1.58 0.91 28.6 0.13 0.2 V 4.9 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Crit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft, ft ft ft ft ft25 ft'/s ft/s # ft/ft 02 0.43 0.035 2.24 6.69 0.34 6.55 0.34 1.31 7.4 3.32 1.00 0.026 Slopes Near Sc- Check Freeboard. C25 0.92 0.051 6.17 9.79 0.63 9.49 0.65 4.98 28.2 4.58 1.00 0.045 FI ow Is Stable. Determination of Minimum Channel Depth & Top Width (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.67 13.99 3.13 22.81 SMITH GARDNER, INC DC- 1 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside CBDLandfil l -Area 2 SHEET 5/15 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-2 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, Q?= 4.1 ft'/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 14.2 ftl/s Source: HydroCAD25-Yr24-Hr Bottom Wdth, B= 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft' rare= 1.55 Ib/ft, Maximum Channel Slope, S_ = 0.020 Wit Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.005 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Wdth Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=ArP T D=AiT V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft' Used z-,I'd 02 Maximum Slope: 0.33 0.035 1.65 6.09 0.27 5.98 0.28 2.52 4.1 0.85 0.4 S 3.8 0.K. Minimum Slope: 0.48 0.035 2.61 7.04 0.37 6.88 0.38 1.55 4.1 0.44 0.1 S 10.3 O.K. C25 Maximum Slope: 0.87 0.061 5.75 9.50 0.61 9.22 0.62 2.45 14.1 0.55 1.1 V 1.8 0.K. Minimum Slope: 1.31 0.069 10.39 12.29 0.85 11.86 0.88 1.37 14.2 0.26 0.4 V 3.3 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Crit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft, ft ft ft ft ft2s ft'/S ft/s # ft/ft O2 0.30 0.035 1.47 5.90 0.25 5.80 0.25 0.74 4.2 2.86 1.00 0.029 Flow Is Stable. 025 0.62 0.056 3.63 7.92 0.46 7.72 1 0.47 2.49 14.1 3.89 1.00 0.061 Flow is Stable. Determination of Minimum Channel Depth 8 Top W dth (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.37 12.22 1.81 14.86 SMITH GARDNER, INC DC-2 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside CBDLandfil l -Area 2 SHEET 6/10 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-3 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, L72= 1.9 ft'/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 6.2 ftl/s Source: HydroCAD25-Yr24-Hr Bottom Wdth, B= 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft' rare= 1.55 Ib/ft, Maximum Channel Slope, S_ = 0.020 Wit Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.005 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Wdth Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=A7P T D=AiT V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft' Used z-,I'd C2 Maximum Slope: 0.22 0.035 1.00 5.36 0.19 5.29 0.19 1.96 2.0 0.80 0.3 S 5.8 0.K. Minimum Slope: 0.32 0.035 1.56 5.99 0.26 5.89 0.26 1.23 1.9 0.42 0.1 S 15.8 O.K. C25 Maximum Slope: 0.63 0.075 3.67 7.95 0.46 7.75 0.47 1.68 6.2 0.43 0.8 V 2.7 0.K. Minimum Slope: 0.96 0.084 6.56 10.04 0.65 9.73 0.67 0.94 6.2 0.20 0.3 V 4.8 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Crit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft, ft ft ft ft ft25 ft'/S ft/s # ft/ft 02 0.19 0.035 0.84 5.17 0.16 5.11 0.16 0.34 1.9 2.30 1.00 0.033 Flow Is Stable. 025 0.39 0.068 1.98 6.43 0.31 6.31 1 0.31 1.11 6.3 3.18 1.00 0.101 Flow is Stable. Determination of Minimum Channel Depth & Top W dth (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.13 10.75 1.46 12.73 SMITH GARDNER, INC DC-3 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&DLandfil l -Area 2 SHEET 7/15 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-4 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, Q?= 10.9 ft'/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 38.6 ftl/s Source: HydroCAD25-Yr24-Hr Bottom Width, B = 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft' rare= 1.55 Ib/ft, Maximum Channel Slope, S_ = 0.020 Wilt Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.005 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=ArP T D=A7T V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft' Used z-,I'd 02 Maximum Slope: 0.57 0.035 3.22 7.57 0.42 7.39 0.44 3.40 10.9 0.91 0.7 S 2.2 O.K. Minimum Slope: 0.82 0.035 5.25 9.15 0.57 8.89 0.59 2.08 10.9 0.48 0.3 S 6.1 O.K. 025 Maximum Slope: 1.31 0.051 10.45 12.32 0.85 11.89 0.88 3.69 38.5 0.69 1.6 V 1.2 0.K. Minimum Slope: 1.92 0.057 18.82 16.17 1.16 15.55 1.21 2.05 38.6 0.33 0.6 V 2.2 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Grit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft, ft ft ft ft ft2s ft'/S ft/s # ft/ft 02 0.54 0.035 3.00 7.38 0.41 7.21 0.42 1.93 11.0 3.66 1.00 0.025 Slopes Near Sc- Check Freeboard. C25 1.09 0.049 7.87 10.86 0.72 10.51 1 0.75 6.81 38.7 4.91 1.00 0.040 FI ow Is Stable. Determination of Minimum Channel Depth & Top Width (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Wdth Depth T Depth T ft ft ft ft 1.81 14.89 2.42 18.55 SMITH GARDNER, INC D04 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside CBDLandfil l -Area 2 SHEET 8/15 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-5 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, L72= 9.4 ft'/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 47.1 ftl/s Source: HydroCAD25-Yr24-Hr Bottom Width, B = 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft' rare= 1.55 Ib/ft, Maximum Channel Slope, S_ = 0.020 ft/ft Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.005 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=A7P T D=AiT V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft' Used z-,I'd 02 Maximum Slope: 0.52 0.035 2.89 7.29 0.40 7.12 0.41 3.25 9.4 0.90 0.6 S 2.4 0.K. Minimum Slope: 0.75 0.035 4.69 8.74 0.54 8.50 0.55 1.99 9.3 0.47 0.2 S 6.6 O.K. 025 Maximum Slope: 1.43 0.050 11.85 13.04 0.91 12.58 0.94 3.99 47.3 0.72 1.8 V 1.1 0.K. Minimum Slope: 2.08 0.055 21.30 17.16 1.24 16.48 1.29 2.21 47.2 0.34 0.6 V 2.0 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Crit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft, ft ft ft ft ft2s ft'/S ft/s # ft/ft 02 0.49 0.035 2.68 7.10 0.38 6.94 0.39 1.67 9.5 3.53 1.00 0.025 Slopes Near Sc- Check Freeboard. C25 1.21 0.047 9.23 11.65 0.79 11.26 0.82 8.36 47.4 5.14 1.00 0.037 Flow Is Stable. Determination of Minimum Channel Depth & Top Width (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Wdth Depth T Depth T ft ft ft ft 1.93 15.58 2.68 19.48 SMITH GARDNER, INC DC-5 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside CBDLandfil l -Area 2 SHEET 11/15 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-6 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, Q?= 10.5 ft'/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 51.0 ftl/s Source: HydroCAD25-Yr24-Hr Bottom Width, B = 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft' rare= 1.55 Ib/ft, Maximum Channel Slope, S_ = 0.020 ft/ft Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.005 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=ArP T D=AiT V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft' Used z-,I'd 02 Maximum Slope: 0.56 0.035 3.14 7.51 0.42 7.33 0.43 3.37 10.6 0.91 0.7 S 2.2 0.K. Minimum Slope: 0.80 0.035 5.08 9.03 0.56 8.77 0.58 2.05 10.4 0.47 0.2 S 6.2 O.K. C25 Maximum Slope: 1.47 0.049 12.43 13.33 0.93 12.85 0.97 4.10 51.0 0.73 1.8 V 1.1 0.K. Minimum Slope: 2.14 0.054 22.38 17.57 1.27 16.87 1.33 2.28 51.0 0.35 0.7 V 2.0 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Crit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft, ft ft ft ft ft25 TO ft/s # ft/ft 02 0.53 0.035 2.93 7.32 0.40 7.15 0.41 1.87 10.6 3.63 1.00 0.025 Slopes Near Sc- Check Freeboard. 025 1.26 0.047 9.75 11.94 0.82 11.53 0.85 8.96 50.8 5.22 1.00 0.035 FI ow Is Stable. Determination of Minimum Channel Depth & Top Width (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Wdth Depth T Depth T ft ft ft ft 1.97 15.85 2.64 19.87 SMITH GARDNER, INC DC-6 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside CBDLandfil l -Area 2 SHEET 12/15 JOB# WILSON-20-1 SUBJECT Drainage Channel Analysis (Grass Lined) DATE 10/11/2021 COMPUTED BY SWH Channel No. DC-7 CHECKEDBY WMB Design Parameters: PEAK DISCHARGE, L72= 9.3 ft3/s Source: HydroCAD 2-Yr 24-Hr PEAK DISCHARGE, r225= 40.8 ft3/s Source: HydroCAD25-Yr24-Hr Bottom Width, B = 4.0 ft Permanent Grass Linina: Temporary Lining Left Side Slope, r = 3.0 hori ontal :1 vertical Grass Retardance= D Temporary Lining Used (Y/N)= Y Right Side Slope, a = 3.0 hori ontal :1 vertical K= 34.6 RECP Product Name = NA Green - Curlex I, or equal V_ = 4.5 ft/sec Manning s Coefficient, n = 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft3 rare= 1.55 Ib/ft3 Maximum Channel Slope, S_ = 0.020 ft/ft Bare Ground (If Temporary Liner Not Used Minimum Channel Slope, S do = 0.005 Wit Manning s Coefficient, n = 0.020 V_ = 2.0 ft/sec Normal Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm. Depth) Roughness of Fl ow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Vel ocity(V)or of Safety Comment Y„ Coefficient A P R=ArP T D=A7T V O F, (Normal) rd Sh. Stress (S) vll,,,,/v„ or ft n ft, ft ft ft ft ft/s ft3/s # Ib/ft3 Used z-,I'd 02 Maximum Slope: 0.52 0.035 2.86 7.26 0.39 7.09 0.40 3.23 9.2 0.90 0.6 S 2.4 0.K. Minimum Slope: 0.75 0.035 4.65 8.71 0.53 8.47 0.55 1.98 9.2 0.47 0.2 S 6.7 O.K. 025 Maximum Slope: 1.34 0.051 10.81 12.51 0.86 12.07 0.90 3.77 40.7 0.70 1.7 V 1.2 0.K. Minimum Slope: 1.96 0.056 19.44 16.43 1.18 15.79 1.23 2.10 40.8 0.33 0.6 V 2.1 0.K. Critical Depth Depth of Flow Manning Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform -Flow (Grit. Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T O-AiT O V, F, (Qifical) S, ft n ft2 ft ft ft ft ft25 ft3/S ft/s # ft/ft 02 0.49 0.035 2.65 7.07 0.37 6.91 0.38 1.64 9.3 3.51 1.00 0.025 Slopes Near Sc- Check Freeboard. 025 1.12 0.048 8.19 11.05 0.74 10.69 0.77 7.17 40.7 4.97 1.00 0.039 FI ow Is Stable. Determination of Minimum Channel Depth 8 Top Width (Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Wdth Depth T Depth T ft ft ft ft 1.84 15.07 2.46 18.79 SMITH GARDNER, INC DC-7 DRAINAGE CHANNEL-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfil I - Area 2 SHEET 15115 JOB# WiLSCN-20-1 SUBJECT Drainage Channel Analysis (TRM Lined) DATE 7/17/2020 COMPUTED BY SWH Channel No. Final Cover Side Slope Swale CHECKED BY WMB Design Parameters: PEAK DISCHARGE, Q25= 21.2 ft'/s Source: HydroCAD 25-Yr 24-Hr Bottom Width, B = 0.0 ft Turf Reinforcement Matti ng(TRM) Li ni no: Left Side Slope, f = 1.5 hori ontal :1 vertical Grass Retardance = D Rght Side Slope, z = 4.0 hori ontal :1 vertical K = 34.6 TRM Product Name = Propex - Landlok TRM 435, or equal Minimum Freeboard = 0.5 ft z�iow = 5.0 lb/ft2 Maximum Channel Slope, S... = 0.040 ft/ft Minimum Channel Slope, Sm = 0.020 ft/ft Normal Depth Depth of Flow (Norm. Depth) Y ft Manning s Roughness Coefficient n Area of Flow A ft2 Wetted Perimeter P ft Hydraulic Radius R-,WP ft Top Width T ft Hydraulic Depth D-WT ft Average Velocity 1/1Q ft/s Flow Rate ft'/s Froude Number F, (Norma/) # Maximum Shear Stress zo Ib/ft2 Factor of Safety 1a /To Comment Maximum Slope: 1.36 0.052 5.09 8.06 0.63 7.48 0.68 4.22 21.4 0.90 3.4 1.5 O.K. Minimum Slope: 1.58 0.055 6.87 9.36 0.73 8.69 0.79 3.11 21.3 0.62 2.0 2.5 O.K. _.._.. ....._...__ __...._.... ..... ......._.._...._.............._._............._._.................. .......... ... ................... .............. .__. ._._.............. _................ _................._........... ...._._._.... ......_._... ...._... Critical Depth Depth of Flow (CYit. Depth) Y ft Manning s Roughness Coefficient n Area of Flow A ft2 Wetted Perimeter P ft Hydraulic Radius R-,WP ft Top Width T ft Hydraulic Depth D-WT ft Section Factor ADO2 ft- Flow Rate Q ft'/s Average Velocity V ft/s Froude Number F, (0YiN-1) # Uniform -Flow Critical Slope S, ft/ft Comment 1.29 0.051 4.61 7.67 0.60 7.12 0.65 3.71 21.1 4.57 1.00 0.048 Slopes Near Sc- Check Freeboard. ......................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................_. Determination of Minimum Channel Depth & Top Width Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.86 10.23 2.08 11.44 0 (D 0_ 0 c w c 2) in 0 U O DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 IL �14N. Boylan Avenue, Raleigh, NC PROJECT Westside C&D Landfill -Area 2 SHEET SUBJECT Down Pipe Analysis JOB# TEL I WEB 919.828.0577 1 www.smithgardnerinc.com 1 OF 3 WI LSON-20-1 DATE 7/ 20/ 2020 COMPUTED BY SWH CHECKED BY WMB OBJECTIVE: To design down pipes to handle the peak discharge from the design storm. REFERENCES: Debo, T.N., and Reese, A.J. (1995), Municipal Storm Water Management, Lewis Publishers, Boca Raton, FL. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. ANALYSIS: The following approach is used in the design of rain gutters and down pipes: 1. Determine the peak discharge from the design storm(s). Use the Rational Method. 2. For each pipe si e, determine the maximum area (A), to handle the predicted peak discharge (Q) with an added factor of safety. Analy e rain gutters and down pipes based on partial flow to determine flow depth and velocity then compare the full flow capacity of each pipe si e with the calculated peak flow rate to verify the desired factor of safety. Analy e down pipe inlets as a culvert under inlet control. CALCULATIONS: Down Pipe Inlets (Inlet Control Determine C, , For SG: Qmax = 0.372CdD(Z)3/2 (Malcolm Equation III-13) For S: i/z Qmax = 0.0437CdD2 Z — � (Malcolm Equation III-13) where: Gmax = flow capacity of inlet (cfs) height of water above pipe invert (ft) allowable headwater depth (HW) G d = coefficient of discharge G = inside diameter of pipe (in) Determine Factor of Safety_(FSY FS = Qmax Q Iterate the drainage area (A) to each drainage structure that Cmax/Q: the desired factor of safety. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PRQIECT Westside C&D Landfill -Area 2 SHEET SUBJECT Down Pipe Analysis JOB # Down Pipes: 2 OF WI LSON-20-1 3 DATE 7/20/2020 COMPUTED BY SWH CHECKED BY WMB Determine Flow Capacity of Pipe: O.463D8/3Sliz Amax = (D&R Equation 8.24) n where: Gmax = flow capacity of pipe (cfs) G = inside diameter of pipe (ft) 5 = pipe slope (ft/ft) n = Manning s roughness coefficient Determine Factor of Safety (FS)� FS _ Q. �7 Q) Iterate the drainage area (A) to each drainage structure that G ,a,/Q>. the desired factor of safety. Determine Flow Depth: h \\ = Z I 1 — cos( 0)) D (D&R Equation 8.29) where: h= flow depth (inches) 0 = central angle (degrees) 39L vz 11/2 (D&R Equation 8.28) R = constant K = 0.673QnD-813S-1i2 (D&R Equation 8.27) Determine Flow Velocity: v= = Q AD&R Equation 8.30 for A A Dz (B— sing) ( q ) 8 where: t/ = flow velocity (ft/sec) A = cross -sectional area of flow (ft) DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SUBJECT Down Pipe Analysis (CPE Pipe) Input Parameters: Manning s Rougness Coefficient = 0.012 -- CPE Pipe (Type S- Use 0.012 Type C- Use 0.02) Runoff Coefficient = 0.60 Rainfall Intensity= 9.23 IN/HR--- 50 YR-5MIN STORM Allowable Headwater Depth (Above Pipe Invert) (Down Pipe Inlets) = 3.0 FEET Orifice Coef. Of Discharge (Down Pipe lnl ets)= 0.6 TYPICAL SHEET 3/3 JOB # WILSCN-20-1 DATE 7/20/2020 COMPUTED BY SWH CHECKED BY WMB Down Pipe Inlets ID Drainage Area (AC) (Q) (CFS) Pipe I.D. (IN) Area (SF) A.) (CFS) Factor of Safety ( /=1.10) Max. Area - 12 0.95 5.26 12.0 0.79 5.97 1.13 Max. Area - 15 1.45 8.03 15.0 1.23 9.09 1.13 Max. Area - 18 2.05 11.35 18.0 1.77 12.74 1.12 Max. Area - 24 3.40 18.83 24.0 3.14 21.36 1.13 Down Pipes ID Drainage Area (A(-;) RunoffVolume (Q) ((;FS) Pipe I.D. (IN) Pipe Slope ( ) Flow Capacity A.) (CF5) Factor of Safety ( /=mu) K (CONSTANT) q ( 265`) Flow Depth (IN) Flow Area (SF) Flow Velocity (FPS) Max. Area - 12 3.10 17.17 12.0 25 19.29 1.12 0.277 233 8.66 0.61 28.30 Max. Area - 15 5.65 31.29 15.0 25 34.98 1.12 0.279 233 10.86 0.95 32.87 Max. Area - 18 9.30 51.50 18.0 25 56.88 1.10 0.282 235 13.16 1.38 37.20 Max. Area - 24 20.10 111.31 24.0 25 122.49 1.10 0.283 236 17.60 2.47 45.09 SMITH GARGNER, INC. CPE Pipe DOWN PIPE SG 0 (D 0_ 0 c w c 2) in 0 U O DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 TEL I WEB 14 N. Boylan Avenue, Raleigh, NC27603 919.828.0577 1 www.smithciardnerinc.com PROJECT Westside C&D Landfill -Area 2 SHEET 1 OF 8 DATE 7/20/2020 COMPUTED BY SWH SUBJECT Sediment Basin Analysis JOB # WILSON-20-1 CHECKED BY WMB OBJECTIVE_ To design a sediment basin(s) to satisfyerosion and sediment control requirements and to handle the flow from the design storm. REFERENCES: American Concrete Pipe Association (1996), "Design Data 41 - Manhole Floatation", ACPA, Irving, T . Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. North Carolina Division of Land Resources (2013 Updates), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. Virginia Department of Conservation and Recreation (1992), Virginia Erosion & Sediment Control Handbook, Third Edition, Richmond, VA. ANALYSIS: The following approach is used to properly si a and evaluate each sediment basin: 1. Design for Wet (If Applicable) and Dry Storage. 2. Route Design Storm. 3. Design Outlet Structures (Design Riser/Barrel Structures and Perform Riser Base Calculations, Anti -Seepage Collar Calculations, & Emergency Spillway Calculations). CALCULATIONS: - Design for Wet (If Applicable) and Dry Storage: Determine required wet (if applicable) and dry storage volumes based on applicable erosion and sedimentation control requirements. If applicable, calculate the desired surface area at the principal spillway. For some locations: A = 0.01Q, where: A = desired surface area (acres) 6, = peak discharge from design storm (cfs) (Use 25-yr 24-hr storm) Set up a stage -storage relationship for the proposed basin as shown below. Based on this relationship and the required volume(s) and/or desired surface area, determine the required wet storage (if applicable) and dry storage elevations. Alternatively the elevation(s) can be determined from a graphical stage -storage relationship. S = KZ' (Malcom Eq. III-7) where: 5 = storage volume (ft) R,, b = linear regression constants describing the stage -storage relationship = stage referenced tothe bottom elevation included in the analysis (ft) Set sediment basin cleanout elevation. SMITH GARDNER, INC. SED BASIN- GEN ERAL-Westside C&D LF Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SHEET 2 OF 8 SUBJECT Sediment Basin Analvsis JOB# WILSON-20-1 DATE 7/20/2020 COMPUTED BY SWH CHECKED BY WMB Si a the outlet device to release the dry storage volume (WW over the desired drawdown period (typically this is a minimum of 24 hours). Use the following equation: A 2h (from Original Edition of NCE&SCP&DM) A = s ° TCd(20,428) where: A , = surface area of dewaterinq hole(s) (ft2) A a = surface area of basin (at principal spillway) (ft) h = average head of water above hole (_ (elev. of principal spillway- elev. of wet storage or (if not applicable) bottom of basin)/2) (ft) C o = coefficient of contraction (=0.60) 7 = detention time (hrs.) (vary over recommended limits) Select a standard pipe si a and number of holes. Verifythat the pro ected drawdown period is within the recommended limits. Where desired, si e a drain for the basin for maintenance. The drain should dewater the basin (to principal spillway) within 24 hours. Use the above equation to determine A. of the basin drain. The inlet of the drain should be protected from the sediment storage one. Evaluate basin shape. Compare with the recommended length to width ratio. If this ratio is not achieved, the basin should be modified or baffles should be added as required. - Route Design Storm: Route the design storm through the basin and determine the maximum pool elevation and the peak discharge (via HydroCAD, spreadsheet methods, or other). Depending on local requirements, multiple design storms may need to be considered and the peak discharge may need to be compared with the pre -development value. Based on the peak stage of the design storm, check settling efficiency of the design particle. The design particle is typically40 microns (0.04 mm) (within silt si a criteria). Settling Velocity of resign Particle V = g �(S S _ 11�1d2 (Malcom Eq. IV-3) ° 18 \ v J where: 1/' = settling velocity (ft/s) - convert from (m/s) 9 = gravitational acceleration (m/s2) 55 = specific gravity of design particle v = kinematic viscosity ofthefluid(m2/s) (= 1.14 x 10-6 m2/s 16C- Ref. Streeter, 1975) a = diameter of design particle (m) Surface Area AS = bKSZ(b-1) (Malcom Eq. IV-7) where: A, = surface area at given stage ( ) (ft) K,,b = linear regression constants describing the stage -storage relationship SMITH GARDNER, INC. SED BASIN- GEN ERAL-Westside C&D LF Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A9lC808 PROJECT Westside C&D Landfill -Area 2 SUBJECT Sediment Basin Analvsis Settling Efficiency E=1-IVoAs I]-N 1+ NQJ SHEET 3 OF 8 JOB# WILSON-20-1 (Malcom Eq. IV-1) DATE 7/20/2020 COMPUTED BY SWH CHECKED BY WMB where: E = settling efficiency (decimal fraction - convert to ) A a = surface area at given stage ( ) (ft) N = number of effective cel Is (N = 2 with forebay) G = discharge at given stage ( ) (cfs) - Design of Outlet Structures: Design riser/barrel structures based on information used in routing the design storm. Design base for riser structure to resist design uplift force. Base must have a buoyant weight of at least the design uplift force. If a concrete riser structure is used, the buoyant weight of the riser can be accounted for in the calculations. Design Uplift Force (IF) T F = (FS)Vxtse,-Yxzo — Wnrse,- —WTop — Wsotr — Rsojt (from VAE&SCH Spec. 3.14) where: TF = design uplift force (Ibs) FS = factor of safety (use 1.25) URiser = interior volume of the riser (ft2) (base elevation to principal spil lwav elevation) VH2C = density of water (62.4 pcf) WRiser buoyant weight of riser (not including base or top) (Ibs) WTop = buoyant weight of riser top (Ibs) WSW = buoyant weight of soil backfill around riser (above base pro ection) (Ibs) Rso;i = sliding resistance of soil backfill around riser (Ibs) See American Concrete Pipe Association Design Data 41 for more information. Volume of Concrete for Base vcoa = (from VAE&SCH Spec. 3.14) W,_,a (150 — 62.4) where: I/C." = volume of concrete (ft) 1+C""6 = buoyant weight of concrete (150 - 62.4 = 87.6 Ibs) Anti -Seepage Collar(s) Determine anti -seepage collar requirements based on the following equation. Alternatively, a filter diaphragm maybe designed. LS = y(z + 4)1 1 + 0.25 — s) 'I (VA E&SC Handbook p. III-102) where: L 5 = length of pipe in the saturated one (ft) y = distance from barrel invert to riser crest (ft) = slope of upstream embankment( HAV) s = pipe slope (ft/ft) SMITH GARDNER, INC. SED BASIN-GENERAL-Westside C&D LF Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SUBJECT Sediment Basin Analvsis SHEET 4 OF 8 JOB # WILSON-20-1 DATE 7/20/2020 COMPUTED BY SWH CHECKED BY WMB Determine Ls and use design chart to determine anti -seepage collar requirements. If more than one col lar is used, the spacing between collars should be 14 times the pro ection (P) of the collar above the barrel. The first collar should beset at 2P from the riser or a minimum length to bury collar in slope. Emergency Spillway Design crest length of emergency spillway to handle flow from the design storm using the following equation. Determine peak flow from stormwater routing program. If applicable, design outlet channel as a drainage channel or rock chute. QP = C"LH3'2 (Malcom Eq. 1-6) where: C F = peak discharge from design storm (cfs) C W = weir coefficient (=3.0 for free overfal I ) L = length of weir (ft) h = driving head (ft) (=allowable headwater above crest of weir or calculated value from stormwater routing program) SMITH GARNER, INC. SED BASIN-GENERAL-Westside C&D LF Area 2 DocuSign Envelope ID: F45A7F9O-6A55-4F1A-89A4-8O6E1A91C8O8 PROJECT SUBJECT Westside C&D Landfill -Area 2 Sediment Basin Analysis SHEET JOB# DATE COMPUTED BY CHECKED BY 518 WILSCN-20-1 10/12/2021 SWH WMB Basin No.: Basin 1 DESIGN FOR WET Areas Draining Into (IF APPLICABLE) Basin• AND DRY STORAGE• Area Drainage Area (acres) Drainage Area 25.0 Total = 25.0 Acres Basin Requirements: Wet Storage, Required Storage Capacity (fta/Ac.)= 0Enter "C" if Not Applicable. Required Storage Capacity (ft3)= 0 Required Depth of Wet Storage (ft)= 0.0 Enter "0" if Not Applicable. Dry Storaoe: Required Storage Capacity (ft0/Ac.)= 1,800 To Crest of Principal Spillway Required Storage Capacity (ft') = 45,000 Multipier ( )for Desired Surface Area (Gpx )= 0.01 At Crest of Principal Spillway Peak Discharge into Basin (Op) (cfs)=� 91.1 From HydroCAD- 25-Yr, 24-Hr. Storm Desired Surface Area(Ac)= 0.91 Desired Surface Area (ft2)= 39,683 Determine Stage -Storage Function: Contour Area Area Incremental Cumulative Stage ITS In eat (ft') (acres) Volume (ft') Volume(ft')(ft) 92 32,400 0.74 0 0.0 94 42,000 0.96 74,400 74,400 2.0 11.22 0.69 2.01 96 51,300 1.18 93,300 167,700 4.0 12.03 1.39 3.95 98 60,900 1.40 112,200 279,900 6.0 12.54 1.79 6.05 Linear Regression Constants: Ks= 32,150 Storage=32150 1.2 b= 1.20 *CAUTION: CHECK INPUT FOR REGRESSION ANALYSIS? Stage -Surface Area Relationship Stage -Storage Relationship 99 99 98 98 97 97 96 96 95 = 95 9 9 y 94 ra 94 93 93 92 92 91 91 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 0 50.000 100,000 150,000 200,000 250,000 300,000 Surface Area (sf) Storage (cf) SMITH 6ARONE INC Besln 1 SED BASIN-GENERAL-Wsstside C&D LF Nee 2 DocuSign Envelope ID: F45A7F9O-6A55-4F1A-89A4-8O6E1A91C8O8 PROJECT Westside C&D Landfill -Area 2 SUBJECT Sediment Basin Analysis Basin Design Elevations: Elev. of Bottom of Basin (ft) = 92.0 Wet Storage, Required Storage Capacity (fta)= 0 Min. Elev. of Wet Storage (Permanent Pool) = 92.0 Selected Elev. of Wet Storage (Permanent Pool)= 92.0 O.K. Actual Wet Storage Volume (fta)= 0 O.K. Dry Storage Required Storage Capacity (ft') _ Min. El ev. of Pr l ncipal Spil lway(ft)= Selected El ev. of Principal Spil lway(ft)= Actual Total Storage Volume (ft') _ Desired Surface Area (ft') _ Actual Surface Area at Principal Spillway (ft') _ geanout Cleanout Requirement( of Wet Storage)= Cleanout Requirement( of Total Storage)= Basin Cleanout Volume (ft')_ Basin Cleanout Elevation (ft)= Dewatering of Dry Storage: Option: Fairdoth Skimmer Actual Total Storage Volume to Dewater (ft') _ Required Skimmer Si a (in)= Required Orifice Diameter (in)= Dewatering Rate (cis) _ 45,000 = Required Dry Storage + Actual Wet Storage 93.3 96.0 O.K. 170,260 O.K. 39,683 51.182 O.K. 0 Enter "0" if Not Applicable 50 85,130 Based on 50%of Total Storage Volume 94.2 170,260 =Volume at Principal Spillway 8.0 From www.fairclothskimmer.com Based on 3 Day Drawdown 6.0 From www.fairclothskimmer.com Based on 3 Day Drawdown 1.13 Fromwww.fairclothskimmer.com Length of Basin (ft)= 500 Measured at Principal Spillway Elevation Width of Basin (ft)= 120 Measured at Principal Spillway Elevation Desired Length to Width Ratio( :1)= 3 Actual Length to Width Ratio (:1)= 4.2 O.K. SHEET 6/8 JOB# WILSCN-20-1 DATE 10/12/2021 COMPUTED By SWH CHECKED By WMB SMITNGARONERINC Basin 1 SEDBASIN-GENERAL-westside C&DLFNre 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SHEET 7/8 JOB# WILSCN-20-1 SUBJECT Sediment Basin Analysis DATE 10/12/2021 COMPUTED BY SWH CHECKED BY WMB ROUTE DESIGN STORM, Use HydroCAD or Other Method. Design Parameters, Design Storm: 25-Yr, 24-Hr Design Storm Rainfall (in)= 6.79 Rainfall Distribution: Type II Runoff Method: SCSTR-20 Results: Maximum Pod Elevation = 96.3 Surface Area at Maximum Pool(ff')= 51,936 Peak Discharge (ofs)= 8.9 Check Bottling Efficiency: Particle Data Diam.(microns)= 40 Specific Gravity= 2.65 Settling Value. (ft/s)= 0.004140 Reynolds No.( 0.5) = 0.044284 O.K. Efficiency Data, Desired Efficiency( )= 80 No. of Effective Calls = 1 Settling Efficiency( )= 96.0 O.K. Type of Riser: Concrete -Rectangular Top of Riser Base Elevation (ft) = 92.0 El ev. of Pr inci pal Spi l lway(ft)= 96.0 Riser Top Elevation (ft)= 97.0 Riser Height (ft) = 5.0 Outlets: Outlet No. 1 (for Dewatering Dry Storage): Si e: 6.0 Diam. For Skimmer From Above - Dewatering of Dry Storage Invert Elevation: 92.1 May Vary For Multiple Holes Outlet No. 2 (Principal Spillway): Si e: 4.0 Wide x 1.0 H Weir (x4) Invert Elevation: 96.0 Concrete Riser Wall Thickness (in)= 6.0 Riser Inside Length (ft)= 5.0 Poser Inside Wdth (ft)= 5.0 Approx.Fact. Concrete Riser Interior Volume (cf)= 100(Top of Baseto Principal Spillway) Approx. Fact. Concrete Riser Vol. of Concrete (cf) = 44 Barrel Design: Type of Barrel: Concrete Diameter(in)= 18 Inv. In Elevation (ft)= 92.0 Inv. Out Elevation (ft)- 90.0 Length (ft)= 130.0 Slope (ft/ft)= 0.015 SMITH 6ARONE INC Besin 1 SED BASIN-GENERAL-Mdestside C&D LF Area 2 DocuSign Envelope ID: F45A7F9O-6A55-4F1A-89A4-8O6E1A91C8O8 PROJECT Westside C&D Landfill -Area 2 SHEET 8/8 JOB# WILSON-20-1 SUBJECT Sediment Basin Analysis DATE 10/12/2021 COMPUTED By SWH CHECKED BV WMB !4-77:=!'=ll l = Factor of Safely = 1.25 F(unad usted)(I bs)= 7,800 0 Approx. Rect. Concrete Riser Buoyant W. (I bs) = 3,084 Factors in 80%of the Buoyant Weight of the Concrete Riser to Account for Out els. 0 0 Buoyant W. of Riser Top (I bs) = 1,-7 6' x 6' x 0.5' x Buoyant Wt. of Concrete (87.6 pcf) Buoyant W. of Surrounding Soil Acting on Ext. Base (Ibs)= 1,440 3' Min. Depth x Outside Perimeter (24') x Base Protrusion (05) x Buoyant Wt. of Soil (40 pcf) Slidi ng Resistance of Sur rounding Soil(I bs)= Im 0 F(ad usted)(I bs)= 1,700 Concrete Base* Required Volume of Concrete (ft') 19.4 Length(ft)- 7.0 Wdth(ft )= 7.0 Thickness (ft)= 1.0 (includes Concrete Infill Inside of Box) Actual Volume of Concrete Wt= 49.0 O.K. Anti -Seepage Collar Calculations: (Alternatively- Design Filter Diaphragm) Slope of Upstream Embankment( HAV)= 3 Slope of Outlet Pipe (ft/ft)= 0.015 L,(ft)= 37 Number of Collars: 2 Length of Each Collar (ft) = 4.0 From Design Chart Based on L, and No. of Col lars Width of Each Collar (ft)= 4.0 From Design Chart Based on L, and No. of Collars Collar Pro action, P(ft)= 1.25 Spacing of Subsequent Anti -Seep Collars (ft) = 18 =14P Emergency Spillway Calculations: Crest Elev. (ft)- 97.0 Required Freeboard (ft)= 1.0 Top of Berm Bev. (ft) = 98.0 Required Capacity (cfs) = 44.9 From HydroCAD Driving Head (ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest (ft)= 42.3 Determine by Weir Equation* Design Crest Length (ft)= 44 - Length=2Oft minimum. Basin No.: Basin 1 Elev. of Bottom of Basin (ft) = 92.0 6leanout Bev. (ft)= 94.2 Bev. of Wet Storage (Permanent Pool) (ft)= NA El— of Principal Spillway (ft) = 96.0 See Above for Poser and Other Design information. Emergency Spillway Bev. (ft)= 97.0 Top of Berm Bev. (ft) = 98.0 Top of Berm Width (ft)= 10 Barrel Diameter (in)= 18 Barrel Slope( )= 1.5 SMITH GARON ER INC Basin 1 SED BASIN-GENERAL-westside C&D LF Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 TEL I WEB 14 N. Boylan Avenue, Raleigh, NC27603 919.828.0577 1 www.smithciardnerinc.com PROJECT Westside C&D Landfill -Area 2 SHEET 1 OF 2 SUBJECT Outlet Protection Analysis JOB # WILSON-20-1 DATE 7/20/2020 COMPUTED BY SWH CHECKED BY WMB OBJECTIVE_ To design outlet protection for culverts and/or drainage channels based on the maximum flow from the design storm. Rip rap aprons are applicable when the Froude Number (F,) is less than or equal to 2.5 (Debo and Reese). For higher Froude Numbers, rip rap outlet basins, baffled outlets, and/or other methods are more appropriate. REFERENCES: Debo, T.N., and Reese, A.J. (1995), Municipal Storm Water Management, Lewis Publishers, Boca Raton, FL, Section 8.11 - pp. 289-290 Section 12.6 - pp. 523-526. Federal Highway Administration (2000), Hydraulic Design of Energy Dissipators for Culverts and Channels, Hydraulic Engineering Circular No. 14, FHWA EPD-86-110, Metric Ed., U.S. Dept. of Transportation, Washington, D.C. North Carolina Division of Land Resources (2013 Updates), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. ANALYSIS: For each outlet, determine the Froude Number (Fr) based on the pipe Manning s number, diameter, slope, and design discharge. Use the methods described in Section 8.11 of Debo and Reese. Select the method of outlet protection, as appropriate, and perform design calculations. Fain Rap Aprons: If Fr 2.5, a rip rap apron may be used. The following design approach is based on Section 12.6 of Debo and Reese and Section 8.06 of the NC Erosion & Sediment Control Planning and Design Manual: 1. Determine the tailwater condition and select the appropriate design chart. 2- Using the appropriate design chart, determine the d5o rip -rap si a and minimum apron length (La) based on the maximum design flow (Q), flow depth (d), and/or velocity (v) (depending on whether the pipe is flowing full or partiallyfull). 3. Using the same chart, determine apron dimensions. 4. Determine the maximum stone diameter: d.. =1.5 x d50 5. Determine the apron thickness: Thickness = 1.5 x dma (No Filter Geotextile) Thickness = 1.5 x d5o (With Filter Geotextile) Other Methods: If Fr 2.5, consider the use of a rip rap basin, baffled outlet, or other device. Design method according to FHAguidelines using HY8-Energy program (or other documented source). SMITH GARDNER, INC. OUTLET PROTECTION-Westside C&DArea 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 PROJECT Westside C&D Landfill -Area 2 SHEET 2/2 JOB# WILSCN-20-1 SUBJECT Outlet Protection Analysis - Rip Rap Aprons (Circular Pipe) DATE 10/11/2021 COMPUTED BY SWH CHECKED BY WMB Rio Rap pA rom Outlet Basin SB-1 DI-1 Pipe Type: Concrete Concrete Manning s Coefficient: 0.012 0.012 Diameter (Do) (in) = 18 36 Slope( )= 1.5 2.9 Design Discharge (cfs)= 15.8 65.0 Source of Discharge Data: HydroCAD 25-Yr 24-Hr HydroCAD 25-Yr 24-Hr K = 0.353 0.165 0(degrees)= 265 185 Flow Depth (d) (in)= 15.1 18.8 Flow Area (ft2) = 1.6 3.7 Flow Velocity (v) (ft/sec) = 10.0 17.4 Froude Number = 1.57 2.45 Rip Rap Aprons Applicable Yes Yes Tailwater Condition (Low or High) : Low Low dso (ft) = 0.50 0.75 dmax(ft)= 0.75 1.13 Apron Thickness( ) (ft): ----- ----- No Geotexti I e: 1.13 1.69 With Geotexti I e: 0.75 1.13 Apron Dimensions (ft): ----- ----- Length (La) = 10 24 Width(W)= 11.5 27.0 Tailwater Conditions: Low: Tw 0.5Dc High: Tw 0.5Dc Value from Chart. SMITH GARGNER, INC. Rip Rap Aprons (Circular Pipe) OUTLET PROTECTION-Westside C&D Area 2 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Appendices 3 0 Outlet IW = D0 + La pipe i diameter (Do) La —W iIwater < 0.5Do ion `�,all�l, rO'`Pp I M11, e`591 L. 1::_ llii:""I."' I I I I I 1 1 1 I LA I I I � I- II 'I'll•I I' 1.-ICI �I I I I �'I 1'1.!0 3 5 10 20 50 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Rev. 12/93 8.06.3 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Appendix Erosion and Sedimentation Control and Stormwater Permits and Approvals Erosion and Sedimentation Control Plan Westside CAD Landfill — Area 2 Wilson, North Carolina DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 IZOY CFtR EUZA-DETH S. OFS�R .Serrevarp o&Y%C of Fn "fur. mrn'r: f Qpriiii I - June 27, 2022 LETTER OF APPROVAL City of Wilson ATTN: Denise Stinagle, County Manager PO Box 1728 Wilson, NC 27894 RE: Project Name: Westside C&D Landfill -Area 2 Phase 1 Acres Approved: 19.97 Acres Project ID: WILSO-2022-012 County: Wilson City: Wilson Address: NC 42 East River Basin: Neuse Stream Classification: Other Submitted By: W. Michael Brinchek, PE, Smith+Gardner Date Received by LQS: June 8, 2022 Plan Type: Revised Dear Mr. Stingale, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the IWOi Cemko ffr mMmrV of bw147mrmnrA l I br.134m re Erb. kTrrw'rA" Land iCrwruxe, OAIwo Clr UN-11"SRiuf I In2Z MPdit*Wfi 07"M 14#km.0r. t"h�,xrymm 2 •5412 414.M rr" DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Letter of Approval City of Wilson June 27, 2022 Page 2 of 3 Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Letter of Approval City of Wilson June 27, 2022 Page 3 of 3 Your cooperation is appreciated. Sincerely, Ivana Barham, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: W. Michael Brinchek, PE, Smith+Gardner Regional Office file DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). Westside C &D Landfill Area 2 Phase 1: WILSO-2022-012 Project Name and Location June 22, 2022 Date of Plan Approval D_E�, Certificate of Coverage Number 04taa, IV Regional Engineer 0 (D 0_ 0 c w c 2) in 0 U O DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Nam. i NORTH i.A.?WLINA Envffon—tn! Qvailly A. Project Information NOTE: If you save a draft of this application, do not save it with uploaded attachments. This may cause problems when you resume editing the draft and try to submit it. Remove all uploaded attachments before saving a draft. Upload necessary documents only when you are ready to submit the eNO1. Part A. Proiect Location and Waterbodv Information Are you submitting • No an NOI that was Yes rejected before? la. Project Name* Westside C&D Landfill - Area 2 Phase 1 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 1 c. Parcel ID List all PINS associated with this project Number(s) (PIN)* 3732-52-9078 2. County* Wilson 3. Highway or Street 2400 NC Hwy 42 East Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Wilson 5. State* NC 6. Zip Code* 27893 7. Latitude* Enter the latitude in decimal degrees 35.7210 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -77.8620 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/29/2022 Estimated Construction Project Start Date 10. Date to End* 06/30/2023 Estimated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial Classification for Development DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 12. Acres to be IMPORTANT: Must match E&SC Plan Approval Letter or Grading Permit disturbed* 19.97 (including off -site borrow and waste areas) 13. Total site area 700.00 (acres)* 14. Post -construction 2.10 impervious area (Estimated) (acres) * Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Buck Branch Waterbody* Name of waterbody into which stormwater runoff will discharge 15b. Waterbody Index 27-86-11-6 No. * NC Waterbody Index Number Stormwater ✓ No discharges will flow Yes to additional waters* 16a. Is this project • Yes subject to the NC No, not subject to NC SPCA Sediment Pollution Control Act?* Note: Stormwater discharges from construction activities associated with oil and gas exploration, production, processing, treatment, or transmission facilities are eligible for the exemption from NPDES permit coverage except in very limited instances. Do not proceed with this application before consulting this EPA fact sheet and verifying a permit applies. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A9lC808 B. Permittee Information Part B. ^ Permittee Information - Legally Responsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee* Legally Responsible Entity Wilson County If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership (FRO) Form. 2. First Name* Denise 3. Last Name* Stinagle 3b. Title* County Manager 4. Permitee E-mail dstinagle@wilsoncountync.gov Address* 5. Permittee 252-399-2804 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box 1728 Address Line 2 City State / Province / Region Wilson NC Postal / Zip Code Country 27894 Wilson Check box if the Yes street address the same as mailing address 7. Permittee Street Street Address Address* 2201 Miller Road South Address Line 2 City State / Province / Region Wilson NC Postal / Zip Code Country 27893-6860 us 8. Type of Ownership is only individual if an individual is named in 13.1. above. Ownership* Government - County DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 C. Site Contact information 2. Primary Site Davis Contact - Last Name* 3. Title Director of Solid Waste Services 4. Site Contact E-mail adavis@wilsoncountync.gov Address* This person will be copied on all correspondence. 5. Site Contact 252-399-2823 Telephone No.* 6. Organization Name 7. Site Contact Street Address Mailing Address* PO Box 1728 Address Line 2 City State / Province / Region Wilson NC Postal / Zip Code Country 27894 Wilson 8. Consultant Name (optional) Mike Brinchek First and Last name 9. Consultant E-mail mike@smithgardnerinc.com This person will be copied on all correspondence. 10. Consultant 919-815-0813 Telephone No. Verify billing contact information and revise if necessary. 11. Billing E-mail* (For Annual Fee correspondence) dstinagle@wilsoncountync.gov Default is legally responsible person e-mail 12. Billing (For Annual Fee correspondence) Telephone* 252-399-2804 Default is legally responsible person telephone DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Plan Approval Information 1. Date E&SC Plan 06/27/2022 Approved * 2. E&SC Plan Project WILSO-2022-012 Number/ID * Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. State DEQ Office* Raleigh Regional Office (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan Approval documentation only! DO NOT upload entire set(s) of E&SC Plans Approval letter or Letter of Approval.pdf 135.04KB Grading Permit* Must be PDF format 6. Signed FRO* Financial Responsibility/Ownership Form Signed FRO Form.pdf 1.17MB Must be PDF format 7. Site Location Map* Must be PDF format (limit 20 MB) Site Location Map.pdf 625.88KB Please do not upload entire set of E&SC plans. 8. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application. Include additional waterbodies if necessary. 9. NOI Certification NCG01.pdf 672.95KB Form * Must be PDF format YOU MUST MAIL THE ORIGINAL SIGNED NOI CERTIFICATION FORM (click on this link) to The Stormwater Program at the address on the form for the application to fulfill federal application requirements. The Certification Form must be signed by the person listed in Section B (Permittee Information) or by an authorized responsible person within the same organization. NOTE: The person who signs the paper form must be the same person to electronically certify and sign the eNOI. This is an Express • No Review Project* Yes DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 E. Certification North Carolina General Statute 143-215.6113 (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: * ✓ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * ✓ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * ✓ I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * + I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* • The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person' (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature* Type Name* Denise Stinagle Title* County Manager Organization * Legally Responsible Entity Wilson County Date * 06/29/2022 DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A9lC808 NCGO1 Notice of Intent (NOI) Certification Form Directions: Print this form, complete, scan and upload to the electronic NOI. Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 6th Floor (Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN ACCEPTED AS COMPLETE. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.22] Per NC General Statute 143-215.6B (i), any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that (check all boxes to indicate your agreement): 0 1 am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. 0 The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. 0 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. 0 If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCGO10000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. 0 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. ct Name (must match Ala): Westside C&D Landfill -Area 2 Phase 1 c Lot Numbers (must match Alb); Permittee (must match B1): Wilson County Legally Responsible Person (must match B2 & B3): Denise Stinagle Title of Legally Responsible Person (must match B3b): County Manager Name & Title of Signed if Authorized individual Differs from Legally Responsible Person: Phone Number: 252.399.2804 6/29/22 Signature o g 11y R onsible Person or Authorized Individual Date * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 permit. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 This page intentionally left blank. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 Mike Brinchek From: laserfiche@ncdenr.gov Sent: Wednesday, June 29, 2022 9:57 AM To: dstinagle@wilsoncountync.gov Cc: Brooklyn.Broussard@ncdenr.gov; Kieu.Tran@ncdenr.gov; adavis@wilsoncountync.gov; mike@smithgardnerinc.com; dstinagle@wilsoncountync.gov Subject: Construction Stormwater eNO1 Status - Payment Instructions Dear Construction Stormwater Permit Applicant: We have reviewed the eNO1 that you submitted for Westside C&D Landfill - Area 2 Phase 1 submitted on 6/29/2022 and found it to be complete. Your Certificate of Coverage (COC) number: NCC222395 Project Name: Westside C&D Landfill - Area 2 Phase 1 Permittee Name: Wilson County Legally Responsible Person: Denise Stinagle This e-mail serves as the invoice for the initial annual permit fee. Application Invoice No. NCC222395-2022 Annual Permit Fee: $100 Invoice Date: 6/29/2022 Due Date: 7/29/2022 After we receive payment of the $100 annual permit fee, we will e-mail you the COC for this project. Failure to pay the annual fee in 30 days will result in your application being rejected, and you will need to re -apply for a new COC. You have two options for paying the $100 fee: 1. Electronic payment by debit/credit card is preferred. To access the ePayment website, go to https://deq.nc.gov/sw- epayments You will need to enter the COC number above (NCC222395). If you select eCheck, there is no convenience fee. The convenience fee for a credit card is 2.65%, and the convenience fee for debit card is $3.95. 2. Mail a $100 check made payable to "DEMLR Stormwater Program." After we receive the check in the Raleigh Central Office, it will take 1-2 business days for us to e-mail your COC. A $25.00 processing fee will be charged for a returned check in accordance with NC General Statute 25-3-512. No matter which method of payment you choose, you must mail the original signed NOI Certification Form to: DEMLR Stormwater Program 512 N. Salisbury Street, 640K 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, contact the Stormwater Program at (919) 707-3640 or by email at kieu.tran@ncdenr.gov. DocuSign Envelope ID: F45A7F90-6A55-4F1A-89A4-806E1A91C808 The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor (640K), 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.