Loading...
HomeMy WebLinkAboutQuality Products - Updated VIMP Drawings - DEQ ApprovalFrom:Schmithorst, William L To:Greg Kanellis Cc:Nikolaus Matthias Lischerong; Brandon Bradford; dhogencamp designbimgroup.com; Ralph McGee; Hardison, Sarah; Slaughter, James K; Johnson, Kelly G Subject:RE: Quality Products - Updated VIMP Drawings - DEQ Comments Date:Tuesday, June 7, 2022 8:53:00 AM Attachments:image003.png Greg, The DEQ has reviewed the proposed modifications and has no comments. Please ensure the work will be completed in accordance with the work procedures presented in the Vapor Intrusion Mitigation Plan. Regards, Bill Schmithorst Project Manager, DWM Brownfields Program North Carolina Department of Environmental Quality 919.441.3606 (Mobile - Primary) 919.707.8159 (Office) Email: william.schmithorst@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Greg Kanellis [mailto:gkanellis@harthickman.com] Sent: Wednesday, May 4, 2022 9:25 AM To: Slaughter, James K <kevin.slaughter@ncdenr.gov>; Schmithorst, William L <William.Schmithorst@ncdenr.gov>; Johnson, Kelly G <kelly.johnson@ncdenr.gov> Cc: Nikolaus Matthias Lischerong <nick@le-h.com>; Brandon Bradford <brandon@hospitalitybuild.com>; dhogencamp designbimgroup.com <dhogencamp@designbimgroup.com>; Ralph McGee <RMcGee@harthickman.com>; Hardison, Sarah <sarah.hardison@ncdenr.gov> Subject: RE: [External] Quality Products - Updated VIMP Drawings CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Ok, thanks Kevin. I know you provided the initial review and the approval of the barrier change, so I thought it would go to you. Bill, please let me know if you have any questions on these minor modifications to the drawings. Thanks, Greg Kanellis, PE, Project Manager Hart & Hickman, PC3921 Sunset Ridge Rd, Ste 301 · Raleigh, NC 27607Direct: 919-723-2512 · Mobile: 919-745-7197www.harthickman.com From: Slaughter, James K <kevin.slaughter@ncdenr.gov> Sent: Wednesday, May 4, 2022 9:04 AM To: Greg Kanellis <gkanellis@harthickman.com>; Schmithorst, William L <William.Schmithorst@ncdenr.gov>; Johnson, Kelly G <kelly.johnson@ncdenr.gov> Cc: Nikolaus Matthias Lischerong <nick@le-h.com>; Brandon Bradford <brandon@hospitalitybuild.com>; dhogencamp designbimgroup.com <dhogencamp@designbimgroup.com>; Ralph McGee <RMcGee@harthickman.com>; Hardison, Sarah <sarah.hardison@ncdenr.gov> Subject: FW: [External] Quality Products - Updated VIMP Drawings Hi Greg, I hope you’re doing well, Generally, the PM is providing at least an initial review of the VIMS designs and modification requests, with Kelly Johnson (and occasionally myself) performing a final review if necessary. Please send any system designs, etc. to the DEQ Project Manager (in this case Bill Schmithorst who I have copied), and they will make sure it is reviewed in a timely manner. Thanks, Kevin J. Kevin SlaughterCompliance CoordinatorBrownfields Property Management UnitNC Department of Environmental Quality704.235.2151 (Office) | 980.435.3657 (Mobile)Kevin.Slaughter@ncdenr.gov From: Greg Kanellis <gkanellis@harthickman.com> Sent: Wednesday, May 4, 2022 8:45 AM To: Slaughter, James K <kevin.slaughter@ncdenr.gov> Cc: Nikolaus Matthias Lischerong <nick@le-h.com>; Brandon Bradford <brandon@hospitalitybuild.com>; dhogencamp designbimgroup.com <dhogencamp@designbimgroup.com>; Ralph McGee <RMcGee@harthickman.com> Subject: [External] Quality Products - Updated VIMP Drawings CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Kevin, Please find the attached updated drawings for the Quality Products site on S. Mint Street in Charlotte. The tenant for the 1513 space is adding an addition to the north side of the building, so we extended the sub-slab piping under that addition. We also made a few other minor edits to the drawings including: Shortened the solid sections of sub-slab piping Changed the vapor pin monitoring points to permanent PVC monitoring points Specified GeoSeal EV20 vapor barrier (barrier change previously approved) As you know, the 1515 space VIMS installation is underway and going well. Since these are two completely separate spaces and the timing of the VIMS installations are staggered, we will likely need to complete two separate installation reports. Please review and provide approval at your earliest convenience. Please do not hesitate to call me with any questions. Thanks, Greg Kanellis, PE, Project ManagerHart & Hickman, PC3921 Sunset Ridge Rd, Ste 301 · Raleigh, NC 27607Direct: 919-723-2512 · Mobile: 919-745-7197www.harthickman.com