HomeMy WebLinkAbout7407_INSP_20220525FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer Compost SLAS COUNTY: Pitt
Closed
MSWLF HHW White
goods X Incin T&P FIRM PERMIT NO.: 7407-CDLF-2009
CDLF X Tire T&P /
Collection X Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 25 May 2022 Date of Last Inspection: 1 December 2021
FACILITY NAME AND ADDRESS:
C&D Landfill, Inc
802 Recycling Lane
Greenville, North Carolina 27834
GPS COORDINATES: N: 35.6160944 E: -077.1865917
FACILITY CONTACT NAME AND PHONE NUMBER:
Michael Warren; General Manager
252.752.8274
FACILITY CONTACT ADDRESS:
EJE Recycling and Disposal, Inc
802 Recycling Lane
Greenville, North Carolina 27834
E-mail: mikeejerecycling@gmail.com
Attn: Mike Warren
PARTICIPANTS:
Mike Warren; EJE Recycling and Disposal, Inc
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Expired; Permit to Construct (PTC) Landfill Phase 2B and Operate (PTO) Landfill Phase 1, Phase 2A and 2B (Cells 6
and 7) issued 6 April 2015, expired 21 July 2019. *Please contact SWS Permitting Engineer Diana Felix at
919.707.8257 or via email at: diana.felix@ncdenr.gov for information regarding your Facility permit renewal
requirements.
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection without records review
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
There were no violations observed during this Facility Compliance Inspection. Please see the ADDITIONAL
COMMENTS section below for details concerning this inspection.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20220525
Page 2 of 5
ADDITIONAL COMMENTS:
1) This Facility is a Construction and Demolition Landfill, White Goods Collection, and Scrap Tire Collection
facility.
2) This Facility is permitted to receive Construction and Demolition (C&D) waste as defined in 15 NCAC 13B
.0532(8); Inert Debris as defined in GS 130A-290 (a)(14); Land-clearing waste as defined in GS 130A-290
(a)(15); Asphalt in accordance with GS 130-294 (m); and regulated-asbestos containing material in
accordance with 40 CFR 61 and 15 NCAC 13B .0542 (c).
3) This Facility is permitted to receive the aforementioned wastes generated within a 100-mile radius of the
Facility. Counties included in the permitted area are Beaufort, Bertie, Bladen, Brunswick, Camden, Carteret,
Chatham, Chowan, Craven, Cumberland, Currituck, Dare, Duplin, Durham, Edgecombe, Franklin, Gates,
Granville, Greene, Halifax, Harnett, Hertford, Hyde, Johnston, Jones, Lenoir, Martin, Nash, New Hanover,
Northampton, Onslow, Pamlico, Pasquotank, Pender, Perquimans, Pitt, Sampson, Tyrrell, Vance, Wake,
Warren, Washington, Wayne, and Wilson Counties.
4) Proper signage including the Facility permit number, accepted waste types, banned or excluded items, hours
of operation, and the emergency contact number is posted at the Facility entrance.
5) The hours of operation are Monday through Friday 7:00 AM to 5:00 PM.
6) The Facility is secured by means of a locked gate at the Facility entrance. The gate was open and Facility
personnel were on site during this Facility Compliance Inspection.
7) The entrance to the Facility is well maintained and no windblown debris was noted along the roadway
approaching the site.
8) The Facility access road is of all-weather construction and is being maintained in overall good condition.
9) Permanent Edge of Waste Markers are in place around the footprint of the landfill and are being maintained
as required.
10) Windblown debris is being well managed. Facility personnel were on-site collecting windblown debris upon
my arrival and during this Facility Compliance Inspection. Windblown debris was minimal and no
windblown debris was observed outside of the permitted landfill disposal footprint.
11) Facility groundwater monitoring wells were reviewed during this Facility Compliance Inspection. All
reviewed wells were readily accessible, properly labeled, and secured with functional locks.
12) This Facility is currently operating in Phase 2B.
13) The active working area is being maintained in a compact and manageable size.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20220525
Page 3 of 5
14) This Facility maintains a Trashmaster 375-E Compactor, a Trashmaster TM-8, and a Caterpillar D5M Dozer
on-site for Facility operations and maintenance.
15) Facility personnel were covering and compacting portions of the active working face during this Facility
Compliance Inspection. *Please continue working to ensure the active working area is being covered weekly
or when it reaches ½ acre in size.
16) The waste type was reviewed; only Construction & Demolition waste was observed and no unpermitted waste
streams were noted in the active disposal area during this Facility Compliance Inspection.
17) Portions of the outside slopes of Phase 2B have recently been covered and graded. *Please ensure all newly
covered and graded areas are seeded and mulched in order to establish a groundcover suitable to protect your
landfill cap system in a timely manner.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20220525
Page 4 of 5
18) A cover-crop of native warm season grasses has been established throughout the inactive areas of the landfill.
Much of the cover crop does not appear to have been mowed in some time with some areas supporting small
trees and other woody vegetation. *Please mow the landfill cover crop and the area around the toe of the
landfill. Moving forward, a regular maintenance mowing schedule should be instituted and followed to ensure
the cover crop is mowed throughout the year and properly maintained as required.
19) Areas of sparse cover and erosion were observed on the top lift of the closed western phase of the landfill.
Some of this erosion has exposed disposed waste. *This area should be covered and graded at a slope not
greater than 3:1 and then seeded and mulched to establish a groundcover suitable to prevent erosion of your
landfill cap system.
20) *Corrective measures are required as a result of this Facility Compliance Inspection.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20220525
Page 5 of 5
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 31 May 2022 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
John Demary; Director/Pitt County Solid Waste & Recycling: john.demary@pittcountync.gov
C: \2022\Pitt\Facilities\74-07\Inspections\7407_INSP_20220525
NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx
Go Green! Thank you for helping NCDEQ be environmentally responsible.