May 27, 2022
Ms. Sherri C. Stanley
Permitting Branch Supervisor, Solid Waste Section
Division of Waste Management
North Carolina Department of Environmental Quality
217 West Jones Street
Raleigh, NC 27603
Re: Notice of Transaction for the Asset Purchase of Pinnacle Waste, LLC and Request for Permit
Transfer
Former Pinnacle Waste Goldston Facility
Permit No. 1912-TP-2020 and 1912-TRANSFER-2022
Dear Ms. Stanley:
This letter serves as a follow-up to the April 11, 2022, notice and request for permit transfer to clarify the
ownership structure of the subject facility. In accordance with 15A NCAC 13B.0404(e) and G.S. 130A-
295.2(g) Meridian Waste North Carolina, LLC (Meridian Waste) is providing notification to the North
Carolina Department of Environmental Quality (NCDEQ), Solid Waste Section, that Meridian Waste has
completed an asset purchase of Pinnacle Waste, LLC. Pinnacle Waste, LLC is the former permittee of
Solid Waste Permit to Operate No. 1912-TP-2020 and Solid Waste Permit to Construct No. 1912-
TRANSFER-2022. The transaction closed on March 8, 2022. Please find enclosed a letter from the
former owner confirming the sale and purchase of assets from Pinnacle Waste, LLC.
Please note the entity Pinnacle Waste, LLC, will no longer be in use and the new owner, operator, and
landowner will be Meridian Waste North Carolina, LLC. The corporate officials of Meridian Waste have
not changed.
Meridian Waste hereby agrees to operate the subject facility in accordance with the Solid Waste Permit
to Operate No. 1912-TP-2020 and the associated application document approved by NCDEQ on March
2, 2020. Additionally, Meridian Waste agrees to comply with the permit conditions identified in Solid
Waste Permit to Construct No. 1912-TRANSFER-2022 and the associated application document
approved by NCDEQ on February 1, 2022.
Based on the above, Meridian Waste respectfully requests the subject permits be transferred to reflect the
ownership, operator, and landowner change to Meridian Waste North Carolina, LLC. The facility will be
named the "Triad Transfer Station". To complete the permit transfer, Meridian Waste is in process of
providing an updated bond in the amount of $81,856 to NCDEQ so the existing mechanism in place can
be released to the former owner. This cost is based on the originally permitted financial assurance amount,
enclosed for reference, and inflated to 2022 dollars using the following inflation factors and amounts:
Ms. Sherri C. Stanley
May 27, 2022
Page 2 of 2
2019 (original): $76,400
2020: $77,699 (inflation factor of 1.017)
2021: $78,632 (inflation factor of 1.012)
2022: $81,856 (inflation factor of 1.041)
Should you have any questions or require any additional information regarding this notification and
request for permit transfer, please let us know.
Sincerely,
Walter "Wally" Hall, Jr.
Chief Executive Officer
Meridian Waste North Carolina, LLC
Enclosure
cc: Sarah Moutos, NCDEQ (w/ electronic enclosure)
Jordan Russ, NCDEQ (w/ electronic enclosure)
Josh Daher, Meridian Waste (w/ electronic enclosure)
Murray Long, Meridian Waste (w/ electronic enclosure)
Michael Stubbs, P.E., HHNT (w/o enclosure)
Pinnacle Waste, LLC
2111 S. Main Street
Goldston, NC 27252
919-708-8465
April 11, 2022
Sherri C. Stanley
Permitting Branch Supervisor, Solid Waste Section
Division of Waste Management
North Carolina Department of Environmental Quality
217 West Jones Street
Raleigh, NC 27603
Re. Pinnacle Waste, LLC — Pinnacle Waste Goldston Facility
Ownership Change and Permit Transfer Consent
Permit No.1912-TP-2020 and 1912-TRANSFER-2022
Dear Ms. Stanley:
Pinnacle Waste, LLC, the Permit Holder of Solid Waste Permit to Operate No. 1912-TP-2020 and Solid
Waste Permit to Construct No. 1912-TRANSFER-2022 is hereby notifying NCDEQ that it has consented
and agreed upon the asset sale of Pinnacle Waste, LLC to Meridian Waste North Carolina, LLC. This
transaction was finalized and closed on March 8, 2022.
I hereby request that NCDEQ proceed with review of the permit transfer documents upon receipt in an
expedited manner.
Should you have any questions, please call.
Sincerely,
PINNACLE WASTE, LLC
Bobby Branch
Owner
cc: ,Sarah Moutos, NCDEQ (w/ electronic enclosure)
Jordan Russ, NCDEQ (w/ electronic enclosure)
Josh Daher, Meridian Waste (w/ electronic enclosure)
Murray Long, Meridian Waste (w/ electronic enclosure)
Michael Stubbs, P.E., HHNT (w/o enclosure)
CONSTRUCTION & DEMOLITION
WASTE RECOVERY FACILITY
WITH PROCESSING & STORAGE
OF RECYCLABLE MATERIAL
5.0 Financial Assurance
This section provides financial assurance estimates for closure during the active life of the
facility. Table 1 at the end of this section presents the financial assurance estimates.
The Facility is projected to receive up to 200 tons/day commingled construction and demolition
materials. The financial assurance estimate initially projects the percentage of the total incoming
waste stream that each material to be recovered comprises. The cleanup quantity equal to 5-
days of the daily acceptance rate is then calculated. Please note, the maximum amount of
recyclable materials that could be stored onsite is assumed to be equal to 5-days of the daily
acceptance rate.
The financial assurance estimate is based on all cleanup will be conducted by a third party.
Loading costs include a loader and operator at an estimated $75/hour. Each load is estimated
to require 1 hour to load the transport vehicle. Hauling costs include a driver and transport
vehicle at an estimated $75/hour. Each haul is assumed to be destined to a disposal site within
90 miles of the Facility. Each round trip is estimated to take 3 hours. Tipping fees at the disposal
site are based on market rates for disposal facilities in the area. Tipping fees assume no
recycling value of materials. Tipping fees are estimated to be $50/ton.
The financial assurance estimate concludes a grand total of $76,400 is required for closure
during the active life of the facility and at closure as shown on Table 1.
G MRuTr Z�,P'2 PAGE 13
OO
Engineering for the Pvwer and Waste Industries
Financial Assurance Estimate
Input:
Daily acceptance rate 200 tonslday
Operational daysi 5 days/week
Material
Percent
Weight
Unit
Days Stored
Stored
Tns/Load
Loads
Wood
Metal
Concretelbrick
Shingles
Sheetrock
Cardboard
Unrecoverable
30%
60
tons/day
5
days
300
tons
10
30
20%
40
tons/day
5
days
200
tons
10
20
15%
30
tons/day
5
days
150
tons
12
13
5%
10
tonslday,
5
days
50
tons
12
5
5%
10
tons/day
5
days
50
tons
12
5
5%
10
tonslday
5
days
50
tons
10
5
20%
40
tonsidayl
5
days
200
tons
20
10
Total
100%
200
tonslday
F
I
1 1,000
Iton=
Wood Loadinqj
$ 75.00
/hour
I 1 hour/load
$ 75.00
/load
30 Loads
$ 2,250
Wood Hauling
I $ 75.00
/hour
1 3 hour/load
$ 225.00
/load
30 Loads
$ 6,750
Wood - Tipping Fees
$ 50.00
/ton
300 /Ton
$ 15,000
Subtotal -Wood $ 24,000
Metal Loadingi
$ 75.00
/hour
1 1 hour/load
$ 75.00
/load
20 Loads
$ 1,500
Metal Hauling
$ 75.00
(hour
3 hour/trip
$ 225.00
/trip
20 Trips
$ 4,500
Metal - Tipping Fees
$ 50.00
Iton
200 /Ton
$ 10,000
Subtotal - Metal $ 16,000
ConcretelBrick Loadingl
$ 75.00
/hour
1 hour/load
$ 75.00
(load
13 Loads
$ 975
Haulingi
$ 75.00
Ilhour
1 3 hour/trip
$ 225.00
/trip
13 Trips
$ 2,925
Concrete/Brick - Tipping Fees
$ 50.00
/ton
150 /Ton
$ 7,500
Subtotal - Concrete/Brick $ 11,400
Shingles Loadingl
$ 75.00 /hour
1 hour/load
$ 75.00
Road
5 Loads
$ 375
Shingles Haulingj
$ 75.00 /hour
1 3 hour/trip
$ 225.00
/trip
5 Trips
$ 1,125
Shingles - Tipping Fees
$ 50.00
Iton
50 /Ton
$ 2,500
Subtotal - Shingles $ 4,000
Sheetrock Loading
$ 75.00 /hour
1 1 hour/load
$ 75.00
/load
5 Loads
$ 375
Sheetrock Haulingl
$ 75.00 /hour
1 3 hour/trip
$ 225.00
Itrip
5 Trips
$ 1,125
Sheetrock - Tippin Fees
$ 50.00
Iton
50 [Ton
$ 2,500
Subtotal - Sheetrock $ 4,000
Cardboard Loadingl
$ 75.00
/hour
1 hourlload
$ 75.00
/load
5 Loads
$ 375
Cardboard Haulingj
$ 75.00
/hour
3 hour/trip
$ 225.00
/trip
5 Trips
$ 1,125
Cardboard - Tipping Fees
$ 50.00
/ton
50 /Ton
$ 2,500
Subtotal - Cardboard $ 4,000
Unrecoverable Loading
$ 75.00
/hour
1 hour/load
$ 75.00
/load
10 Loads
$ 750
Unrecoverable Haulingj
$ 75.00
/hour
3 hour/trip
$ 225.00
/trip
10 Trips
$ 2,250
Unrecoverable- Tipping Fees
$ 50.00
/ton
200 Iron
$ 10,000
Subtotal - Unrecoverable
$ 13,000
Grand Total - All Materials $ 76,400