HomeMy WebLinkAbout21018_E Craighead Storage_SIR_2022.03.03
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 03/07/2022 9:18 AM
I. Inspection Information
Date & Time: 03/03/2022 1:45 PM Inspection Type: Drive-By
Brownfields Staff:
Kevin Slaughter
Other Personnel:
N/A
Location:
Lat: 35.2523067, Long: -80.7990488,
Brownfields Inspection Report: East Craighead Storage, 21018-17-060
03/03/2022 1:45 PM
Page 2 of 6
II. Project Information
Number: 21018-17-060 Name: East Craighead Storage
Address: 204 E Craighead Rd
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: None Structures Violation: No
Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: An approved Vapor Mitigation Plan is in place for the redevelopment, though
installation has not yet begun.
Summary: N/A
Summary: Future high density apartment buildings currently under construction (Photos
1 – 5).
Summary: Site has been rough graded with concrete curbing around future parking areas
partially installed on the southeastern portion of the property (Photos 1-4).
Brownfields Inspection Report: East Craighead Storage, 21018-17-060
03/03/2022 1:45 PM
Page 3 of 6
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: Diesel fuel AST's observed for construction equipment use (Photo 5). Although
there was no sign of staining observed, there were no spill prevention measures observed
at the time of the Site Inspection. The EMP does not specify requirements for AST
storage. However, DEQ recommends that the ASTs be contained within a secondary
storage unit.
Condition:
Summary: N/A
No risk of public exposure observed at the time of the Site Inspection.
Brownfields Inspection Report: East Craighead Storage, 21018-17-060
03/03/2022 1:45 PM
Page 4 of 6
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: View facing north along E. Craighead Rd.
The project manager requested a drive-by inspection to find out if site work had begun at
the property. Site work was in progress upon arrival, with significant amount of grading
having taken place. Concrete curbing installation has been started around future tenant
parking areas, although it did not appear that any work had begun on the future
apartment buildings (Photo 2 and 4).
Brownfields Inspection Report: East Craighead Storage, 21018-17-060
03/03/2022 1:45 PM
Page 5 of 6
Photo 2: View of property facing west along Philemon Ave.
Photo 3: Photograph facing northeast along Philemon Ave.
Brownfields Inspection Report: East Craighead Storage, 21018-17-060
03/03/2022 1:45 PM
Page 6 of 6
Photo 4: View facing north from southeastern portion of property.
Photo 5: Diesel fuel AST's used to refuel site equipment. No barrier or berm installed
under/around tanks.