Loading...
HomeMy WebLinkAbout24025_ Crayton Printing_SIR_2022.04.22 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 04/22/2022 1:33 PM I. Inspection Information Date & Time: 04/22/2022 12:50 PM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Matt Bramblett, Andrew Besu - Hart & Hickman Location: Lat: 35.206314682358034, Long: -80.86536296591102, Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060 04/22/2022 12:50 PM Page 2 of 7 II. Project Information Number: 24025-20-060 Name: Crayton Printing (RN) Address: 2301, 2321, 2327 Distribution St.; 2300, 2302, 2304, 2306 Dunavant St. City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Observed VIMS barrier inspection performed by H&H. A significant number of issues were identified by H&H, requiring a barrier reinspection the following day. Summary: N/A Summary: High density apartment complex currently under construction. Summary: Consistent with EMP and development activities. Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060 04/22/2022 12:50 PM Page 3 of 7 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Although not observed, did not have a chance to inspect entire property or structure as two overhead cranes were transferring materials overhead across site (Photo 6). As a result, only the large section of VIMS barrier on southeast portion of the property was inspected during the site visit. Summary: N/A Condition: Summary: N/A No public exposure observed at the time of the Site Inspection. Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060 04/22/2022 12:50 PM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: VIMS barrier being inspected facing west. Site inspection made during H&H VIMS barrier inspection on the southeastern portion of the property (Photos 1-5). Although site personnel made repairs as they were pointed out by H&H, they were too numerous to address during the inspection, and a reinspection was required which was to be performed the following day (Photos 4 and 5). As noted in Use of Basements section, did not inspect entire property for soil contact walls due to two different cranes offloading materials from truck overhead, and the amount of time spent on the barrier inspection. Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060 04/22/2022 12:50 PM Page 5 of 7 Photo 2: PVC VIMS riser painted orange in photo. Photo 3: Taped seam up to concrete wall. Vapor barrier adhered to walls and concrete columns using double sided tape. Concrete expansion joint stips attached to walls and columns above barrier. Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060 04/22/2022 12:50 PM Page 6 of 7 Photo 4: 2” PVC monitoring point painted orange. VIMS barrier patch around monitoring point not taped down. Photo 5: Perimeter of VIMS barrier not properly adhered to concrete footer. This section will have to be retaped prior to the reinspection. Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060 04/22/2022 12:50 PM Page 7 of 7 Photo 6: View of property from intersection of Dunavant and Distribution streets facing south. Overhead cranes referenced in previous sections visible in photo.