HomeMy WebLinkAbout08009_Gateway at Old Salem_SIR_20191206 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 01/16/2020 9:27 AM I. Inspection Information Date & Time: 12/06/2019 12:52 PM Inspection Type: Routine Brownfields Staff: Other Personnel: Joselyn Harriger, Kevin Slaughter Location: Lat: 36.08112, Long: -80.24224, Brownfields Inspection Report: Gateway at Old Salem, 08009-04-034 12/06/2019 12:52 PM Page 2 of 7 II. Project Information Number: 08009-04-034 Name: Gateway at Old Salem Address: 1198 S Broad St City: Winston Salem County: Forsyth III. Environmental Current Use of Property: Mixed Use, Retail, Commercial, and Greenway Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: Unknown Summary: N/A Summary: N/A Summary: New 36-unit apartment complex on S. Marshall Street currently under construction. Numerous other buildings also present on Brownfields property. Mix of older and relatively newer buildings. Summary: Some exposed soils including and uncovered soil stockpile adjacent to parking/drive area west of apartment complex under construction. Based on site discussions with environmental consultant (ECS), stockpiled soil will be utilized onsite within landscape areas and sampled during final grade sampling. Brownfields Inspection Report: Gateway at Old Salem, 08009-04-034 12/06/2019 12:52 PM Page 3 of 7 Use of Basements: Not Observed Basement Violation: Unknown Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A Discussed VI risk of new apartment building with ECS and project developers. Three sub- slab soil-gas samples and final grade sampling to be performed. Currently no risk to public as apartment complex is currently under construction. Walked entire Brownfields property including parcels not included in apartment building development and Greenway. A “Gateway Pollinator Garden” in the process of being completed along western portion of parcel (Photo 5). Ground surface appears to be covered with thick layer of mulch imported from off-site. Does not currently appear to be issues with potential soil contact although if plants need to be replaced in the future, it is unknown if underlying soil had impacts or if clean fill was brought in to “cap” area. Brownfields Inspection Report: Gateway at Old Salem, 08009-04-034 12/06/2019 12:52 PM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: 36-unit apartment building under construction. As part of VI risk discussions, inspected HVAC installation designed to exchange an appropriate volume of air from building exterior to meet LURU requirements, discussed final grade and soil gas sampling requirements. ECS to provide DEQ with a revised EMP in the near future. Walked Brownfield property including parcels not included in the apartment building development looking for potential issues and development. Significant issues were not observed during site walk, although it is unknown if the Gateway Pollinator Garden mentioned above could result in future contact with potentially impacted soil Brownfields Inspection Report: Gateway at Old Salem, 08009-04-034 12/06/2019 12:52 PM Page 5 of 7 Photo 2: Soil pile along drive on west side of new apartment building. Soil to be used onsite in landscaped areas and sampled as part of final grade sampling based on site discussions. Photo 3: HVAC with fresh air inlet piping within typical apartment unit. System designed to meet ASHRAE 62.2 ventilation standards. Brownfields Inspection Report: Gateway at Old Salem, 08009-04-034 12/06/2019 12:52 PM Page 6 of 7 Photo 4: Photo of Greenway on western portion of Brownfields property. Photo 5: “Gateway Pollinator Garden” recently constructed along Greenway trail. Topsoil and mulch used to construct garden brought in from off-site and are stockpiled left of photo. Brownfields Inspection Report: Gateway at Old Salem, 08009-04-034 12/06/2019 12:52 PM Page 7 of 7 Photo 6: View of transformer substation and redeveloped warehouse on southern portion of Brownfields property. Photo 7: Mixed use commercial/residential building on northern portion of property bordering S. Main St./ Salem Avenue W.