DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 04/05/2022 3:32 PM
I. Inspection Information
Date & Time: 04/04/2022 11:10 AM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel: Christie Zawtocki & Alexis
McKenzie - H&H, Steve Lamb and David
Walker - SCS Engineers, and construction
superintendents and VIMS installers.
Location:
Lat: 35.2112151, Long: -80.8698847,
Brownfields Inspection Report: Powers Site (RN), 20045-16-060
04/04/2022 11:10 AM
Page 2 of 7
II. Project Information
Number: 20045-16-060 Name: Powers Site (RN)
Address: 436 W. Tremont
Avenue
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: None Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: Yes
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: When performing the Site Inspection, there were numerous items with the
methane mitigation system that did not match the DEQ approved methane mitigation
design. Liquid Boot was not applied to the exterior of the soil contact walls on the
western portion of the property prior to them being backfilled (Photos 1 and 2), GeoVent
was installed within footer trenches, and no solid PVC piping was used to bridge the
footer trenches in a perpendicular direction, with GeoVent being installed across the
bottom of the trench, and up the other side (Photos 3 and 4). In addition, the VI-20
membrane was installed, and at least one coat of Liquid Boot applied on the northern
portion of the slab prior to the gravel sub-slab piping inspection. The barrier t had been
partially opened prior to my arrival (Photo 5). In addition, some of the locations of the
GeoVent had been moved, including to one riser, a PVC sub-slab monitoring point had
not been located, one sub-slab monitoring point terminated within a footer trench, and
hollow stakes were used (Photos 1, 6 and 7). See Use of Basements and Inspector
Summary: N/A
Summary: New construction high density apartment complex being constructed.
Summary: Consistent with site development activities, and EMP.
Brownfields Inspection Report: Powers Site (RN), 20045-16-060
04/04/2022 11:10 AM
Page 3 of 7
Use of Basements: Observed Basement Violation: Yes
Storage of Chemicals: Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: Upon my arrival, H&H pointed out that there were numerous deviations from
the DEQ approved methane mitigation design. One of these was the backfilling of
occupied space concrete soil contact walls prior to application of Liquid Boot on the soil
contact side of the wall (Photos 1 and 2). Following written approval by the product
manufacturer, H&H will propose to DEQ that Liquid Boot be applied to the interior of
these walls, with an interior wall constructed to cover the interior Liquid Boot application.
According to the Site Superintendent, this wall will be constructed so that it is not
attached to concrete wall, and therefore, no penetrations of the Liquid Boot application
would occur in its construction.
Summary: Numerous 55-gallon drums of 2-part Liquid Boot product staged on different
portions of property.
Condition:
Summary: N/A
No risk of exposure observed at the time of the Site Inspection
Brownfields Inspection Report: Powers Site (RN), 20045-16-060
04/04/2022 11:10 AM
Page 4 of 7
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: Project superintendent team, GeoVent/Liquid Boot contractor, H&H and SCS
personnel in photo on lower-level section of apartment building. Issues with untreated
backfilled concrete walls, and GeoVent installation being discussed. Hollow metal stake visible
in lower left of photo holding up 1” dia. PVC electrical conduit.
The Site Inspection was performed to coincided with an installation inspection
(gravel/sub-slab piping) being performed by H&H and SCS engineers. There were
numerous installation issues as identified in Vapor Mitigation Systems and Basements
Summery above. Based on discussions during the Site Inspection, all of the items
identified (except for the Liquid Boot application to the exterior of the backfilled wall) will
be corrected so the system installation matches the previously approved methane
mitigation design. H&H to contact DEQ for a follow-up gravel/piping inspection once
these repairs are completed, and prior to Liquid Boot application to interior wall.
Brownfields Inspection Report: Powers Site (RN), 20045-16-060
04/04/2022 11:10 AM
Page 5 of 7
Photo 2: Partial view of soil contact interior wall. Waterproofing was applied to exterior of
wall, and it was backfilled with soil prior to applying Liquid Boot as called for in the design.
Photo 3: GeoVent installed perpendicular to several footer trenches without solid PVC bridging
trench depressions as called for in approved design.
Brownfields Inspection Report: Powers Site (RN), 20045-16-060
04/04/2022 11:10 AM
Page 6 of 7
Photo 4: Example of GeoVent installed within footer trench.
Photo 5: Portion of VIMS barrier installed and sprayed with Liquid Boot prior to gravel/sub-slab
piping inspection. VIMS barrier opened prior to my arrival.
Brownfields Inspection Report: Powers Site (RN), 20045-16-060
04/04/2022 11:10 AM
Page 7 of 7
Photo 6: Sub-slab monitoring point terminating within a footer trench.
Photo 7: VIMS Riser installed at the end of a GeoVent “branch” not shown in design (also within
a footer trench). The riser should have been installed along main GeoVent line and not on a
side branch, with GeoVent exiting both sides of PVC “T” at base of riser.