Loading...
HomeMy WebLinkAbout3620_DukeAllen_SSLF_PZ Install Request_FID1663936_20220405(' DUKE ENERGY-. April 5, 2022 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 1646 Mail Service Center Raleigh, North Carolina 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Four Additional Piezometer Installations Allen South Starter Landfill (SSLF) Permit No.: 3620-INDUS Allen Steam Station Gaston County, North Carolina Dear Ms. Moutos, 526 South Church Street: Mail Code EC13K Charlotte, North Carolina 28202 704-382-7171 Duke Energy Carolinas (Duke Energy) requests approval from the Division of Waste Management (Division) for the installation of four piezometers within the footprint of the proposed South Starter Landfill (SSLF) (Permit No. 3620-INDUS) located at the Allen Steam Station in Gaston County, North Carolina. These four proposed additional piezometers as shown on the attached Figure 1 are considered to be supplemental and temporary features to better characterize the groundwater levels within the footprint of the SSLF to support a groundwater vertical separation demonstration as requested in North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management (DWM) Solid Waste Section (the Section) letter dated July 26, 2021. The attached Figure 1, prepared by SynTerra on behalf of Duke Energy, depicts proposed piezometer locations. Actual locations will be determined based on field conditions and approved by Duke Energy and a North Carolina Licensed Geologist. Installation of these additional piezometers will be supervised by a North Carolina Licensed Geologist or qualified geological field support that is under the direct supervision of and in contact with a North Carolina Licensed Geologist. Piezometers will be installed by a North Carolina licensed well contractor in accordance with subchapter 02C of the North Carolina Administrative Code. Duke Energy will provide boring logs and well construction records (GW-1 forms) to the Section upon completion of piezometer installation. If you need additional information regarding this request do not hesitate to email or call me at Courtney.Murphy(a)duke-energy.com or (704) 382-7171. Respectfully, dw�w-*Oh� Courtney W. Murphy, P.G. Environmental Services Attachments: Figure 1 — South Starter Landfill (3620-INDUS) Planned Piezometers (SynTerra, March 2022) www.duke-energy.com Page 1 of 2 cc (via e-mail): Jordan Russ, NCDEQ Claire Osborne, NCDEQ Steve Pulley, Duke Energy Tyler Hardin, Duke Energy Ashley Healy, Duke Energy Henry Duperier, Duke Energy Scott Kalau, Duke Energy www.duke-energy.com Page 2 of 2 B-14D/BR �: �• AB-2/D ph GWA-14S/DA I GWA-22S/D L GWA-21 S/DA/BR ■ 5 - IAB-13S/D a' '} AB-4S/D/BR�.�-; c GWA-23S/D �• i CIF WELL ,GWA-9S/D/BR/D/BR GWA-24SA/D/BR AB-21 S/S L/S S/D/ .Ae • AB-5 1 0000, r�•— rr F b AB-29 S/S L/S S/D AB-9S/D AB-30S/D f/ , AB-28S/D AB-27S/D/BR % � CCRCCR-14S/D/D I AB-24S/SL/D/BR • ♦ AB-26S/D GWA-3S/D/BRA AB-25S/SL/SS/BR/BRU , • / 2■ AB-23S/BRU _ � f CCR-16S/D/BR r' ® CCR-17S/D AB-22 S/D/BR/B RL AB-10S/D AB-6A/R b+ CCR-18S/D CCR-21 S/D• . pH ADJ BLDG � PH WELL '; v -22S/DA . t GWA-2S/D "fir ti ■ (' DUKE ENERGY® CAROLINAS — 46 w* ,�;'i • f `�• synTerra ry '4 % F . d y Fr r LEGEND C PLANNED PIEZOMETER EXISTING MONITORING WELL SOUTH STARTER LANDFILL BOUNDARY ACTIVE ASH BASIN WASTE BOUNDARY RETIRED ASH BASIN WASTE BOUNDARY RETIRED ASH BASIN ASH LANDFILL WASTE BOUNDARY DORS FILLS BOUNDARIES - DUKE ENERGY CAROLINAS PROPERTY LINE STREAM (AMEC NRTR 2015) WETLAND (AMEC NRTR 2015) 4T r NOTES: 1. PROPOSED PIEZOMETER LOCATIONS ARE DEEMED APPROXIMATE AND FINAL LOCATIONS WILL BE DETERMINED DURING FIELD IMPLEMENTATION. 2. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR ALLEN STEAM STATION DATED MAY 29, 2015. 3. ALL BOUNDARIES ARE APPROXIMATE. 4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. 5. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON DECEMBER 13, 2018. AERIAL WAS COLLECTED ON MARCH 30, 2018. 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). GRAPHIC SCALE 250 G500 FIGURE 1 (IN FEET) SOUTH STARTER LANDFILL (3620-INDUS) DRAWN BY: B. MCGANN DATE: 09/28/2020 PLANNED PIEZOMETERS REVISED BY: B. MCGANN DATE: 03/24/2022 ALLEN STEAM STATION CHECKED BY: L. DRAGO DATE: 03/24/2022 APPROVED BY: L. DRAGO DATE: 03/24/2022 GASTON COUNTY, NORTH CAROLINA PROJECT MANAGER: C. SUTTELL