HomeMy WebLinkAbout22033_Yorkshire Drive_SIR_2022.02.24
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 03/01/2022 9:40 AM
I. Inspection Information
Date & Time: 02/24/2022 9:12 AM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Shannon Switch - Hart & Hickman (and two
additional H&H personnel)
Location:
Lat: 35.1939921, Long: -80.8783662,
Brownfields Inspection Report: Yorkshire Dr. (RN), 22033-18-060
02/24/2022 9:12 AM
Page 2 of 7
II. Project Information
Number: 22033-18-060 Name: Yorkshire Dr. (RN)
Address: 3605, 3603, 3707 S
Tryon St; 336, 330, 324
Yorkshire Dr.
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: New Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: Active VIMS, onsite for communication testing of building 1011. During Site
Inspection, observed exhaust riser from roof, attic mounted fan, vacuum monitoring
points, and sub-slab communication vacuum measurements (Photos 2-6).
Summary: N/A
Summary: New construction townhomes. Investigating 4-story townhomes situated
along S. Tryon St. during site visit.
Summary: Consistent with EMP and construction activities.
Brownfields Inspection Report: Yorkshire Dr. (RN), 22033-18-060
02/24/2022 9:12 AM
Page 3 of 7
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition:
Summary: N/A
None observed at the time of the Site Inspection.
Brownfields Inspection Report: Yorkshire Dr. (RN), 22033-18-060
02/24/2022 9:12 AM
Page 4 of 7
IV.Inspector Comments
V.PHOTOGRAPHS
Photo 1: View from 4th floor balcony facing south.
Contacted by H&H that communication test was to be performed on Building 1011.
Communication test setup took awhile as there was no power in building, and there were
some initial issues with some of pilot test components. Departed site following
completion of communication test of southern townhome unit, although all townhome
units within building 1011 to be tested during the remainder of the day.
Brownfields Inspection Report: Yorkshire Dr. (RN), 22033-18-060
02/24/2022 9:12 AM
Page 5 of 7
Photo 2: Active fan located within attic space. Permanent power, alarm system and riser
labeling have not been installed yet.
Photo 3: Four inch VIMS exhaust riser exiting roof.
Brownfields Inspection Report: Yorkshire Dr. (RN), 22033-18-060
02/24/2022 9:12 AM
Page 6 of 7
Photo 4: Sub-slab vacuum/sampling test port on southern end of building.
Photo 5: Communication test baseline pressure differential measurement.
Brownfields Inspection Report: Yorkshire Dr. (RN), 22033-18-060
02/24/2022 9:12 AM
Page 7 of 7
Photo 6: Differential pressure measurement after start of communication test.